Loading...
HomeMy WebLinkAboutpitkin.eh.264929101001 (1975)$r PITKIN COUNTY HEALTH DEPARTMENT PERMIT iv NUMBER RECEIPT NUMBER Owner Paul Cush p Phone # 961-1589 Owner's Mailing Address Box 1017, Carbondale Contractor DBD Comrary Phone # 623-1880 Address Systems Contractor's Name DBD Address Legal Description (-Ir gtal River EstgtPs, '"raet 'F Lot Size ;,^^ aeras Type of Building by Use r^,�gidence Number of Bedrooms Type of Waters Supply Type of Individual Sewage Disposal SystemC► /�ll/�'� Type of Soil or Soil Classification r4^ C e `f' /aCt byrJ Proximal Location of Bedrock Proximal Location of Gr d atera lve, jr % /Heli J� L 2. %G Owner's Signature Date PLOT PLAN: Percolation Test Data 6100 — Minutes Minimum Recommended Absorption r inr"h Minimum R dolma nddedTank Size /p(/rJ _ /a Zpfc!t 77alid one ear from Date. Application to become permit and final only Permi� ppy after lower portion is completed and signed by the Sanit RETAIN TH FORM tAT THE CONSTRUC TON ITE. Date t-� 7s Sanitarian (Drawing of system on back) SIGi! �'i'UItL DATE PITKIN COUNTY ENVIRONMENTAL HEALTH (p Field Test Data Sheet on Percolation `Pest CN- ' PROPERTY OWNER PHONE ADDRESS 1 3 7 MAILING LEGAL DESCRIPTION OF PROPERTY 77- < LOCATION OF TEST HOLES Three (3) test holes required per system r Z Test Hole Depths (24" minimum) '� Diameter of Test Holes Water Remaining after 24 hour soaky TEST HOLE #1 TEST HOLE #2 TEST HOLE #3 Drqp Time Drop Time _ Drop Ti e 8. 1/l5, &a 1l .v 8 It Z S G 61+/19 It 3 s 4,/ :3 (0 1137 11 4-s 114-6 1. V // S_ yis 11s4 G IV.9 / s7 g 12 s - s 2 ca S' Ae 1207 —?,26 2 20 2! 22z 230 [�31 S �� Percolation Rate Each Hole O Average Rate ! Comments on soil or site: U SIGi! �'i'UItL DATE Section FILE REFERENCE: INDIVIDUAL OR ESTABLISHMENT: ADDRESS: NARRATIVE: COLORADO DEPARTMENT OF HEALTH DIVISION OF ENGINEERING AND SANITATION ACT I V I T Y RE PORT Code 12 County 57 Private Sewage Disposal Bob O' Hefferman &ystal River Estates I went to look at a leach field. He had assured me on Friday 44momp for certain it would be done on Tuesday morning. It wasn't done. The tank was set in, the field was dug, and the gravel was put into the excavation, but the lines were not done yet --the effluent line, the grouting of the tank. Several things remain to be done. The one thing that concerns me is that they came out awfully high on the low end of that hillside in a northerly direction and it looks like they may be in the fill there although I really can't tell for sure because I don't know how deep they excavated or how much gravel they've got. I left a message that I would like to talk to the contractor to see if I can get this problem rectified. LETTER TO FOLLOW: ( ) OTHER RECOMMENDATIONS: DATE: Sept. 2 19= . REPRESENTATIVE: R ert Nelson ES: 7 (Rev. 6-70-].00)