Loading...
HomeMy WebLinkAboutpitkin.bldg.272917401011 (2010)DOCUMENT LAYOUT Certificate of Occupancy or Letter of Completion Permits Final Inspections Any Supporting Documents Site Plans (NOTE: All structural plans will be grayed out. If you require the ability to see structural plans, you must have a letter from the owner stating you are allowed to have plans. This letter must be submitted to Pitkin County Community Development Department) PERMITS trWDCList.rpt Inspection Check List Page: 4 5/13/2013 8:26:02AM PITKIN COUNTY Inspection Line:920 -5532 Inspection Schedule for rayg Scheduled for May 13, 2013 Permit No: 0080.2010. PMEC Type: 428 FINAL MECHANICAL Notes: Inspection Resu 1 -Accepted _e11 2 - Accepted as Noted Reinspection Fee $ Comments: Time: 08:00 3 - Rejected 4 - Partial /Not Complete This inspection report comes with the understanding that the inspection does not, in any way, constitute a guarantee, warranty of merchantability or fitness for a particular purpose, express or implied warranty of habitability, or assurance in any way of the safety of the system(s) inspected, nor shall this inspection be construed to relieve or lessen the responsibility of the person performing the work. Additionally, neither this inspection,dor this inspection report is a substitute for a complete inspection by the owner or subsequent buyer or occupant Date Signature of Applicant o^� G Print Name 611L 47- Dat -1 3_Signature of Inspector (L Print Name Address Contact N- ni edie Cont t # (970) 963 -9620 675 REDSTONE BLVD Contractor: THE FIREPLACE COMPANY Owner: KNAPP Page 4