HomeMy WebLinkAboutbocc.ord.003.2019 AN ORDINANCE OF THE BOARD OF COUNTY COMMISSIONERS OF PITKIN
COUNTY, COLORADO, REPEALING AND REENACTING TITLE 11 (BUILDING
REGULATIONS), SECTION 11.32 (IN PART) AND REPEALING IN ITS ENTIRETY,
SECTION 11.40 (THE EFFICIENT BUILDING CODE) OF THE PITKIN COUNTY
CODE
ORDINANCE NO. G6 3 2011
RECITALS:
I. Pursuant to 30-35-301 C.R.S., the Board of County Commissioners ("BOCC") of Pitkin
County, Colorado, a home rule county, is authorized to make and publish ordinances for
carrying into effect or discharging the powers and duties conferred upon such counties by
law and as it deems necessary.
2. Pursuant to Section 2.8.1 of the Home Rule Charter ("HRC"), the BOCC is authorized to
take official action by Ordinance certain matters where action is prescribed pursuant to
the Colorado Revised Statutes as amended.
3. Pursuant to Ordinance No. 014-2016, the Board of County Commissioners ("BOCC:)
adopted the 2015 version of the International Energy Conservation Code; and
4. Pitkin County strives to stay current with new building construction technology that
allows new buildings to benefit from current standards and technological advancement;
and
5. Pitkin County strives to provide for and promote the health, safety and welfare of Pitkin
County citizens and visitors with the benefits of the most current building standards; and
6. The BOCC has the authority to adopt and implement regulations for new and existing
construction in Pitkin County; and
7. The BOCC finds that adoption of this ordinance with the attached Exhibit A is in the best
interest of the citizens of Pitkin County.
NOW, THEREFORE, BE IT ORDAINED by the Board of County Commissioners of Pitkin
County, Colorado that it hereby adopts an Ordinance Repealing and Reenacting Title 11
(Building Regulations), Section 11.32 (In Part) and Repealing in its Entirety, Section 11.40 (The
Efficient Building Code) of the Pitkin County Code and authorizes the Chair or the Chair's
designee to sign the Ordinance and upon the satisfaction of the County Attorney as to form,
execute any other associated documents necessary to complete this matter.
INTRODUCED AND FIRST READ ON THE 5 CIL DAY OF4 ' , 2A1-9 AND
SET FOR SECOND READING AND PUBLIC HEARING ON THE DAY DAY OF
%/14t/1-r X2019.
s
NOTICE OF PUBLIC HEARING AND TITLE AND SHORT SUMMARY OF THE
O'DINANCE PUBLISHED IN THE ASPEN TIMES WEEKLY ON THE iPA` DAY OF
, 2019.
0
NOTICE OF PUBLIC HEARING AND THE FULL TEXT OF THE ORDINANCE POSTED
ON THE OFFICIA PITKIN COUNTY WEBSITE (www.pitkincounty.com) ON THE
/L2 DAY OF > tic„(--r 2019.
ADOP ED AFTER FINAL READING AND PUBLIC HEARING ON THE 0'3 " DAY
OF ` __ rc 2019.
PUBLISHED BY TITLE AND SHORT SUMM RY, AFTER ADOPTION, IN THE ASPEN
TIMES WEEKLY ON THE (,4'.4 DAY OF 1 c/ 2019.
POSTED BY TITLE AND SHORT SUMMARY ON THE OFFIC AL PITKIN COUNTY
WEBSITE (www.pitkincounty.com ) ON THE -'i - DAY OF v., t cc<r , 2019.
ATTEST: BOARD OF COUNTY COMMISSIONERS
By\\)l l 61;. 'A" \\-_)/
Jea -tte Jones reg Poschman, Chair
Dep ty County Clerk
Date: 3' )
APPROVED AS TO FORM: MANAGER APPROVAL
-14 )161' k J7-
John Ely, Coun Corney JonTsAcock, Count anager
11.32: INTERNATIONAL ENERGY CONSERVATION CODE
Amendments to the 2015 International Energy Conservation Code
Section 101.1 Jurisdiction, Pitkin County
Section 107.1 Fees is hereby amended and shall read as follows: "A permit shall not be valid until
all fees as prescribed in the Pitkin County Community Development Fee Ordinance that is in effect
at the time of permit submittal are paid in full, nor shall an amendment to the permit be released
until the additional fees, if any, have been paid."
Section 107.5 Refunds is hereby amended and shall read as follows:
The building official shall authorize the refund for the full amount of any fee paid which was
erroneously paid or collected. Not more than 80% of a permit fee paid may be refunded when no
work has been done under a permit issued in accordance with this code. The building official shall
not authorize refunding any fee paid except on written application filed by the original permittee
not later than six months after the date of payment.
Refunds may be approved for up to 100% of a fee paid for REMP. No refund will be approved
when requested more than 180 days after the Certificate of Occupancy or Letter of Completion is
issued.
Section 109 Board of Appeals
Section 109.1 General is deleted in its entirety and shall read as follows: Appeals shall be in
accordance with Pitkin County Code Title 11, Chapter 11.04, Section 112.1.
Section 110 Liability to read as follows:
The Building Official or his authorized representative charged with the enforcement of this
code, acting in good faith and without malice in the discharge of his duties, shall not thereby
render himself personally liable for any damage that may accrue to persons or property as a
result of any act or omission in the discharge of his duties.
This code shall not be construed to relieve or lessen the responsibility of any person owning,
operating or controlling any building or structure for any damage to persons or property
caused by defects on or in such premises, nor shall the code enforcement agency, any
employee thereof, or Pitkin County be held as assuming any such responsibility or liability by
reason of the adoption of this code or by the exercise of inspections authorized and carried
out thereunder, or by the issuance of any permits or certificates issued pursuant to this code.
Section 301 Climate Zones shall be deleted in its entirety and shall read as follows:
Pitkin County, Colorado shall use Climate Zone 7 in determining the applicable requirements
from Chapters 4 and 5".
Section 402.4 Air sealing and insulation is hereby amended and shall read as follows:
"Building envelope air tightness and insulation installation shall be demonstrated to comply
with the testing option section 402.4.2.1.
Section 402.4.2 Fireplaces is hereby amended and shall read as follows:
New wood-burning fireplaces and gas log fireplaces shall have gasketed doors and outdoor
combustion air.
Exception: Listed and Labeled automatic damper interlocked with a gas log set.
Energy Addendum(aka: the Matrix)
Section 100 General Requirements
The purpose of this Energy Addendum(Matrix) is to establish certain code requirements that
address issues specific to this jurisdiction that are not already addressed in the currently adopted
2015 International Energy Conservation Code (IECC). These requirements include increased
energy conservation measures to offset additional energy use and consumption in houses above a
certain size or that contain large amounts of glazing. The Matrix also addresses energy upgrades
in existing houses when feasible and removes certain exemptions found in the 2015 IECC. The
Matrix also establishes certain minimum equipment efficiencies and renewable energy
preparation requirements per Appendix RB of the 2015 IECC.
Section 101 Scope and Administration
Section 101.1 Scope All Residential and Commercial Residential (multi-family dwellings or the
Residential portions of mixed use occupancy)buildings in Pitkin County shall be required to
comply with the requirements of the Matrix as applicable.
Section 200 Definitions
Air Sealing (Leakage) The buildings thermal envelope shall be constructed to limit air leakage
in accordance with the requirements of Section 402.4 (f) 2015 IECC
AFUE Annual Fuel Utilization Efficiency A measure of how efficiently your furnace can
utilize its fuel. The more efficient your furnace, the more heat you will get per unit of fuel.
Commissioning Project commissioning is the process of assuring that all systems and
components of a building or industrial plant are designed, installed, tested, operated, and
maintained according to the operational requirements of the owner or final client.
Continuous Insulation (as defined by Section R202 2015 IECC)
ERI Energy Rating Index (as defined by Section 406.3 2015 IECC)
Glazing Windows, doors and skylights or other similar glass components
Home Energy Assessment (Home Energy Audit) A home energy audit is a service where
the energy efficiency of a house is evaluated by a person using professional equipment (such as
blower doors and infrared cameras), with the aim to suggest the best ways to
improve energy efficiency in heating and cooling the house.
R-Value A measure of thermal resistance, or how well a material or series of materials resist the
flow of heat. The R-value is the reciprocal of the U-factor.
Sustainable Construction Methods Using processes that are environmentally responsible and
resource-efficient throughout a buildings construction.
Thermal Bridging A component, or assembly of components, in a building envelope through
which heat is transferred at a substantially higher rate than through the surrounding envelop area.
U-Factor A measure of how well a material or series of materials conducts heat. U-factors for
window and door assemblies are the reciprocal of the assembly R-value. The smaller the
number, the less the heat flow.
Section 300 Application and Enforcement
Section 301 Submittal Requirements and Inspections
Section 301.2 Plan Submittal. Compliance with the Matrix shall be demonstrated by appropriate
notations or details represented on the set of documents submitted to the Building Department
for review, approval and issuance.
Section 301.2 Inspection Process. Compliance with the Matrix shall be demonstrated by review
of the approved permit documents and field inspection of the indicated requirements.
The Matrix (attached to the ordinance)
(Ord. 99-61 (part);prior code Title VII§9-4); Chapter 11.32 repealed/replaced Ord. 01-10;
Chapter 11.32 amended(part) Ord. 030-10) Chapter 11.32 amended(part) Ord. 016-13
The Matrix
A B C D
1 Building Tier 1 Building Tier 2
Insulation R-Values <5750 >5751 Compliance Explanation
2
•
Required>5751 ft2.Continuous Insulation(CI)shall be
installed to improve the cumulative R value at exterior walls
for larger homes and/or homes containing >15%glazing.
Equivalent=full depth foam with incorporation of
sustainable construction methods indicated below.Basic
Prescriptive or UA trade off paths are not allowed.
3 Walls Current code C.I.or equivalent
Windows <5750 >5751 Compliance Explanation(glazing percentages must be
4 provided per wall section)
Adjusted U-factors below and Continuous Insulation
requirements apply for all house sizes with>15%total
5 Maximum Glazing >15%*requires offset >15%**requires offset glazing.
ONLY apply for>15%glazing,this becomes the new
prescriptive value.Energy Rating Index(ERI)is also an
6 Required U-Factor 0.28 0.28 alternative pathway.
ONLY apply for>15%glazing,this becomes the new
7 Skylights U-Factor 0.40 0.40 prescriptive value.ERI is also an alternative pathway.
8 *prescriptive method not allowed.Must use UA trade off or ERI modeling for energy compliance.
9 **prescriptive method not allowed.Must model using Energy Rating Index path with a maximum score of50
Sustainable Construction Method <5750 >5751 Compliance Explanation
10
Minimum 50%engineered materials required for projects
under 5750 ft2 with>15%glazing.
Projects 5751 ft2 and over and/or>15%glazing require a
11 Materials Engineered lumber Engineered Lumber minimum of 75%engineered materials.
Required when>5751 ft2 or>15%glazing and continuous
exterior insulation is substituted by an equivalency. (when
12 Framing Practices Insulated Header Insulated Header structurally feasible)
Required when>5751 ft2 or>15%glazing and continuous
13 Framing Practices 24"o.c.Framing 24"o.c.Framing exterior insulation is substituted by an equivalency.
Required when>5751 ft2 or>15%glazing and continuous
exterior insulation is substituted by an intended
14 Framing Practices Three Stud Corners Three Stud Corners equivalency.
15 Framing Practices Other: SIPs,Strawbale,etc. Other: SIPs,Strawbale,etc. Alternatives to Continuous Insulation
Equipment <5750 >5751 Compliance Explanation
16
17 Appliance Efficiency eStar eStar All major appliances.
18 Boiler AFUE Min 92% Min 92% All projects and equipment replacements when feasible.
19 Boiler Operation Sequential Sequential All projects and equipment replacements when feasible.
20 Outdoor Reset Outdoor Reset All projects and equipment replacements when feasible.
21 Furnace AFUE Min 92% Min 92% All projects and equipment replacements when feasible.
22 Water Heater Min Efactor 91 Min Efactor 91 All projects and equipment replacements when feasible.
Multiple Systems,or over 5 Multiple Systems,or over 5 If more than 5 zones(heating or cooling)OR if multiple
23 Commissioning thermal zones thermal zones boilers OR heating and cooling
24 Mechanical Rooms Sealed and Vented to Exterior Sealed and Vented to Exterior Vent to be continuous low,and thermally activated to high.
25 Sealed Ductwork Mandatory Mandatory Stud and joist bays must be lined or panned.
Controlled by an occupancy sensor with timer.Fan and
timer combo to be sized to provided 1 ACH for each
operation.(For example:600 ft2 garage,10 ft tall,would
26 Exhaust fan in Garage 1 ACH/Day 1 ACH/Day require a 100 cfm fan to run for 1 hr).
The Matrix
A B C D
27 Upgrades to Existing Homes <5750 >5751 Compliance Explanation
Remodels affecting Building Prescriptive Minimum Prescriptive Minimum Must meet current adopted energy code with all
28 Envelope Insulation and U-factor Insulation and U-factor requirements for house size and maximum glazing.
lighting,heating and lighting,heating and Must meet current adopted code with all requirements for
29 Remodels interior only ventilation systems ventilation systems house size and maximum glazing.
30 Additions greater than 1000 sf or 20%of existing floor area(whichever is less)require the following to existing portion of the house:
Full ERI compliance method Must meet current adopted code and obtain a HERS score of
31 Home Energy Assessment Required required 58.
The Addition and any altered existing elements must meet
Building Envelope of existing Prescriptive Minimum Prescriptive Minimum current code including all requirements for house size and
32 portions affected by project Insulation and U-factor Insulation and U-factor maximum glazing.
Existing house to be air sealed Existing house to be air sealed
with a minimum 15%air with a minimum 15%air
leakage reduction.Test-in of leakage reduction.Test-in of
existing and test-out with existing and test-out with
33 Air Sealing addition required. addition required. Blower door test before and after addition work. _
Existing passively vented Existing passively vented 2015 International Residential Code section R408.3 for
crawlspaces to be converted crawlspaces to be converted Unvented Crawlspaces requires mechanical exhaust
to meet 2015 prescriptive to meet 2015 prescriptive ventilation or conditioned air supply with a return to the
34 Crawlspace ventilation crawlspace requirements crawlspace requirements common interior area.
Accessible existing vented Accessible existing vented
attics must comply with an attics must comply with an
approvable method of approvable method of The Home Energy Assessment will be used to determine
ventilation and insulation ventilation and insulation appropriate path for correction of any attic insulation or
consistent with current code if consistent with current code ventilation deficienies that will need to be addressed to
35 Attic ventilation and insulation possible. if possible. bring to IECC 2015.
The Exception in Section 404.1(2015 IECC)for Low
75%of lighting must be high- 75%of lighting must be high- Voltage Lighting that does not equate to high
36 Lighting efficacy luminairs or LEDs efficacy luminaires or LEDs efficacy shall be deleted.
Renewable Preparation <5750 >5751 Compliance Explanation
37
38 Solar Hot Water Prepiping Prepiping Provide a Solar Ready Zone per 2015 IECC Appendix RB
Provide a Solar Ready Zone and Electrical provisions per
39 Photovoltaic Conduit pre run Conduit pre run 2015 IECC Appendix RB.
provide vehicle charging outlet provide vehicle charging Provide appropriate circuitry and outlet location for a
40 Garage Electric Vehicle Station for one vehicle space outlet for each vehicle space standard EV station.