HomeMy WebLinkAboutbocc.ord.032.2002 AN ORDINANCE OF THE BOARD OF
COUNTY COMMISSIONERS OF PITKIN COUNTY, COLORADO,
ESTABLISHING FEES FOR THE
COMMUNITY DEVELOPMENT DEPARTMENT AND REPEALING ORDINANCE
058-2001 AND SECTION 2-11 OF ARTICLE 2, SERIES OF 1999, ORDINANCE NO. 61
Ordinance No.03)L-2002
RECITALS
1. Pitkin County wishes to set fees which are consistent and fair to the public and
which reflect the expense incurred in providing such services to the public.
2. Certain fees currently charged for development review no longer reflect the cost
of providing the necessary levels of such services. The policy of the Pitkin County
Board of County Commissioners is that development shall pay, in full, the cost of
development review in Pitkin County. Long Range planning shall be funded
through the general fund.
3 . Payments due to the County for obligations due to sales and tax are not regarded
as fees and therefore not included in the Ordinance. The Ordinance does not
reflect an encompassing fee schedule.
COMMUNITY DEVELOPMENT FEES
1. Planning, Zoning Review and Referral Fees: These Fees shall be based on the
attached fee schedule (exhibit A).
2. Building permit fees shall be based on the attached fee schedule (Exhibit B).
3. Electrical permit fees shall be based on the attached fee schedule (Exhibit Q.
4. Mechanical permit fees shall be based on the attached fee schedule (Exhibit D).
5. Plumbing permit fees shall be based on the attached fee schedule (Exhibit E).
INTRODUCED, FIRST READ, AND SET FOR PUBLIC HEARING AT THE
REGULAR MEETING ON THE 4'DAY OF DECEMBER, 2002.
APPROVED AND ADOPTED AFTER CONTINUED SECOND READING
AND PUBLIC HEARING ON THE 18TH DAY OF DECEMBER, 2002
ATTEST: BOARD OF COUNTY COMMISSIONERS
OF PITKIN COUNTY, COLORADO
By: i.. T k/ -(f
Patti Kay-Clap er,
Jerk to Lthe B, and Chair
Date: C/
032
APPROVED AS TO FORM: MANAGER APPROVAL:
John Ely Hilary Smith i ' /-,J
County Attorney County Manager
V
EXHIBIT A
Land Use Application Fees:
A. The base fees for the processing of Land Use application shall be as follows:
Case Type Fee
1041 at building ernit $420.00
1041 Hazard Review $2,100.00
1041 activity of state/local $4,200.00
Annual Administrative Reviews $630.00
Annual BOCC Review $840.00
Appeal of Administrative Decisions $630.00
CDU $630.00
Code Amendment $1,050.00
Conceptual Subdivision $4,620.00
Deed Restriction $630.00
Detailed Subdivision $3,360.00
Development Agreement $1,050.00
District Service Plan $1,260.00
Extension of Deadlines $420.00
Extension of Vested Rights $840.00
Final Plat $1,260.00
GMQS Competition $3 780.00
GMQS Exemption $630.00
Historic Referral $420.00
Lot Line Adjustment $840.00
Major Plat Amendment $1,470.00
Master Plan Amendment $840.00
Minor Amendment to Development Permit $630.00
Minor Plat Amendment $630.00
Non-Conforming Use $1,050.00
Redstone HPC Application $150.00
Reinstatement of Vested Rights $840.00
Rezoning $1,260.00
Road Impact Fee Appeal $420.00
Road Vacations $840.00
Scenic/Rid eline Review $840.00
Site visit not associated with application (min. 1 hour $210.00
charge/hourly basis
Special Review-- one step $1,000.00
Special Review-- two step $2,500.00
Subdivision Exemption $1,260.00
Temporary Use Permits $1,260.00
Board of Adjustment $525.00
Consultation on zoning and planning (over 1/2 hour) $210.00
Public Notice/Publication fee $25.00
B. The following guidelines shall be used for the administration of the fee structure set forth above:
1. Fees charged for the processing of applications,which fall into more than one type of
application shall be cumulative. In the event that the fees, which result from
accumulation, are found by the Community Development Director to be excessive in
relation to the number of hours it is anticipated to require to process the application, the
Community Development Department may waive or adjust the accumulation
requirement.
2. Additional charges shall be billed on an hourly basis only if the time exceeds the average
by more than 20% in the processing of an application.
3. Additional charges shall be computed at the rate of two hundred and ten dollars ($210.00)
per hour of additional Community Development Department staff time required
4. The Community Development Department shall identify, prior to or at the time of
submission of a land use application, whether an application is to be referred to the
Engineering, Housing, or Environmental Health Departments. Additional charges will
apply based on referral fees.
5. An applicant may request the BOCC waive fees for projects serving a public purpose,
proposed by a non-profit organization, or in order to dispute the fee charged.
Zoning Review Fees:
Zoning shall be charged the following fees for the services listed:
I. Building plan checks by zoning(a$105.00 deposit shall be collected at building permit application
submittal):
A. RESIDENTIAL, AGRICULTURAL, AND, PUBLIC USES WITHIN THE PUBLIC
ZONE DISTRICT
1. Manufactured Housing $105.00
2.New Work and Major Repair/Remodeling Change Orders
Up To 500 Square Feet $105.00 Flat Fee
510-3,500 Square Feet $105 plus $0 13 per s f over 500 s f
3 501-10,000 Square Feet $495 plus $0 31 per s f 3,501 s f over 3,500 s f
10,000+ Square Feet $2 510 plus $0 36 per s f over 10,000 s f
3. Minor Repair/Remodel and Change Orders $105.00
(Note: Minor applications request no changes to floor area, use,height and/or footprint. Those
applications which are not Minor are considered Major.)
B. NON-RESIDENTIAL
1. New Work, Major Repair/Remodeling and Change Orders
Up to 500 Square Feet $105.00 Flat Fee
501-5,000 Square Feet $105 plus $0 31 per s f over 500 s f
5,001-10,000 Square Feet $1 500 plus $0 62 per s f over 5,000 s f
10,000+ Square Feet $4 600 plus $0 72 per s f over 10,000 s f
2. Minor Remodel/Repair/Change Orders $105.00
(Note: Minor applications request no changes to floor area, use, height and/or footprint. Those
applications which are not Minor are considered Major)
C. ZONING ENFORCEMENT FEES
1. Projects constructed without permits, planning fees and building permit fees are
doubled as a penalty.
2. PENALTY PROVISION
A penalty fee for enforcement actions requiring a land use approval $670.00
3. Sign permits: $125.00
Processing and code compliance for all sign permits
4. Board of Adjustment fees: $525.00
Processing and application fee for all Board of Adjustment appeals
Referral Fees
Land Use Application Flat Fees Env. Health Engineer Wildlife
1041 Hazard Review
Single Family Residence-Administrative Review $378.00 $480.00 $420.00
Single Family Residence-Hearing Officer Appeal of AR $283.50 $300.00 $315.00
Single Family Residence-Hearing Officer Review $450.00 S525.00 $500.00
Single Family Residence-BOCC Appeal of HO Review $378.00 $435.00 $420.00
Subdivision-Conceptual,Detailed,or Final Submission
Minor $540.00 $660.00 $600.00
Major $756.00 $900.00 $840.00
Minor Amendment to a Development Permit $189.00 $300.00 S210.00
Minor Plat Amendment $189.00 $300.00 S210.00
Major Plat Amendment $360.00 $350.00 $400.00
Temporary Use/Special Event Permit
Minor $250.00 $260.00 $210.00
Major $500.00 $425.00 $315.00
GMQS Review for Additional Floor Area or New Unit n/a $575.00 $420.00
Hourly Fee for Miscellaneous Reviews n/a $210.00 $210.00
Airport Clerk
Insignificant n/a $115.00
Minor $106.00 $310.00
Major $318.00 $625.00
613
Building Permit Fees
Exhibit B
TOTAL VALUATION FEE
$1.00 to $500.00 $25.00
$501.00 to $25.00 for the first $500.00 plus $3.05 for each additional $100.00, or
$2,000.00 fraction thereof, to and including $2,000.00
$2,000.00 to $70.75 for the first $2,000.00 plus $14.70 for each additional
$25,000.00 $1,000.00, or fraction thereof, to and including $25,000.00
$25,001.00 to $408.85 for the first $25,000.00 plus $10.65 for each additional
$50,000.00 $1,000.00, or fraction thereof, to and including $50,000.00
$50,001.00 to $675.10 for the first $50,000.00 plus $7.35 for each additional
$100,000.00 $1,000.00, or fraction thereof, to and including $100,000.00
$100,001.00 to $1042.60 for the first $100,000.00 plus $5.90 for each additional
$500,000.00 $1,000.00, or fraction thereof, to and including $500,000.00
$500,001.00 to $3402.60 for the first $500,000.00 plus $5.00 for each additional
$1,000,000.00 $1,000.00 or fraction thereof, to and including $1,000,000.00
$1,000,000 and up $5902.60 for the first $1,000,000.00 plus $3.85 for each additional
$1,000.00 or fraction thereof
Other Inspections and Fees:
1. Inspections outside of normal hours $55.00 per hour
(minimum charge—two hours)
2. Reinspection fees assessed under provisions of Section 305.8 $55.00
3. Inspections for which no fee is specifically indicated $55.00
4. Additional plan review required by changes, additions or revisions $60.00 per hour
to plans (minimum charge—one-half hour)
ELECTRICAL PERMIT FEES
Exhibit C
Inspection Fees
A. Residential: This fee (based on the enclosed living area only), includes construction of,
or remodeling or addition to a: single family home, duplex, condominium, town house. If
you are ONLY changing or providing a service and not wiring and portion on the above,
see section B below for correct permit fee.
Not more than 1,000 square feet $46.00
1,001 square feet and not more than 1,500 square feet $51.75
1,501 square feet and not more than 2,000 square feet $63.25
Per 100 square feet in excess f 2,000 square feet $3.45
B. All Other Fees, including service hookups to modular homes and temporary construction
meters, shall be computer on the dollar value of the electrical installation, including time
and materials, whether they are provided by the contractor or the property owner. Such
fees shall be computed as follows:
(See Section C for the fees for inspections in mobile home and travel parks)
Not more than$300.00 $46.00
$301.00 but not more than $2,000.00 $51.75
$2,001.00 but not more than $50,000.00 $19.55 per thousand
or fraction thereof
$50,001.00 but not more than $500,000.00 $18.40 per thousand
or fraction thereof
plus $57.50 base fee
More than$500,000.00 $17.25 per thousand
or fraction thereof
plus $632.50 base fee
C. Mobile homes and travel trailer parks $46.00 per space
D. Reinspections $51.75
43�j - �)-0a v
MECHANICAL PERMIT FEES
Exhibit D
Permit Issuance and Heaters
1. For the issuance of each mechanical permit $24.75
2. For issuing each supplemental permit for which the original has not $7.65
expired,been canceled or finaled
Unit Fee Schedule (Note: the following does not include permit-issuing fee)
1. Furnaces
For the installation or relocation of each forced-air or gravity-type $15.55
furnace or burner, including ducts and vents attached to such appliance
up to and including 100,000 Btu/h (29.3 kW)
For the installation or relocation of each forced-air or gravity-type $19.15
furnace or burner, including ducts and vents attached to such appliance
over 100,000 Btu/h (29.3 kW)
For the installation or relocation of each floor furnace, including vent $15.55
For the installation or relocation of each suspended heater, recessed $15.55
wall heater or floor-mounted unit heater
2. Appliance Vents
For the installation, relocation or replacement of each appliance vent $7.65
installed and not included in an appliance permit
3. Repairs and Additions
For the repair of, alteration of, or addition to each heating appliance, $14.40
refrigeration unit, cooling unit, absorption unit, or each heating, cooling,
absorption or evaporative cooling system, including installation of controls
regulated by the Mechanical Code
4. Boilers, Compressors and Absorption Systems
For the installation or relocation of each boiler or compressor to and $15.45
including 3 horsepower(10.6 kW), or each absorption system to and
including 100,000 Btu/h(29.3 kW)
For the installation or relocation of each boiler or compressor over $28.50
3 horsepower(10.6 kW) to and including 15 horsepower(52.7 kW),
or each absorption system over 100,000 Btu/h (29.3 kW) to and
including 500,000 Btu/h(293.1 kW)
For the installation or relocation of each boiler or compressor over $39.15
15 horsepower(52.7 kW) to and including 30 horsepower(105.5 kW),
or each absorption system over 500,000 Btu/h (146.6 kW) to and
including 1,000,000 Btu/h (293.1 kW)
For the installation or relocation of each boiler or compressor over $58.25
30 horsepower(105.5 kW) to and including 50 horsepower(176 kW),
or each absorption system over 1,00,000 Btu/h (293.1 kW) to and
including 1,750,000 Btu/h (512.9 kW)
For the installation or relocation of each boiler or compressor over $97.30
50 horsepower(176 kW) or each absorption system over 1,750,000
Btu/h (512.9 kW)
5. Air Handlers $11.20
For each air-handling unit to and including 10,000 cubic feet per minute
(cfm) (4719 L/s), including ducts attached thereto
Note: This fee does not apply to an air-handling unit which is a portion of a
factory-assembled appliance, cooling unit, evaporative cooler or absorption
unit for which a permit is required elsewhere in the Mechanical Code.
For each air-handling unit over 10,000 cfin (4719 L/s) $19.00
6. Evaporative Coolers
For each evaporative cooler other than portable type $11.20
7. Ventilation and Exhaust
For each ventilation fan connected to a single duct $7.65
For each ventilation system which is not a portion of any heating $11.20
or air-conditioning system authorized by a permit
For the installation of each hood which is served by the mechanical $11.20
exhaust, including the ducts for such hood
S. Incinerators
For the installation or relocation of each domestic-type incinerator $19.15
For the installation or relocation of each commercial or industrial- $15.25
type incinerator
9. Miscellaneous
For each appliance or piece of equipment regulated by the Mechanical $11.20
Code but not classed in other appliance categories, or for which **
Other Inspections and Fees:
1. Inspections outside of normal business hours, per hour(minimum $55.00
charge—two hours)
2. Reinspection fees assessed under provisions of Section 305.8, per $55.00
Inspection
3. Inspections for which no fee is specifically indicated, per hour $55.00
(minimum charge one hour)
4. Additional plan review required by charges, additions or revisions to $60.00
plans or plans for which an initial review has been completed
(minimum charge-one-half hour)
I
PLUMBING PERMIT FEES
Exhibit E
Permit Issuance
1. For the issuance of each plumbing permit $25.00
2. For issuing each supplemental permit for which the original has$7.65
not expires, been canceled or finaled
Unit Fee Schedule
(Note: The following do not include permit-issuing fee)
1. Fixtures and Vents
For each plumbing fixture or trap or set of fixtures on one trap $10.30
(including water, drainage piping and backflow protection thereof)
For repair or alteration of drainage or vent piping, each fixture $5.00
2. Sewers, Disposal Systems and Interceptors
For each building sewer and each trailer park sewer $25.90
For each cesspool $39.15
For each private sewage disposal system $78.25
For each industrial waste pretreatment interceptor, including $20.90
its trap and vent, excepting kitchen-type grease interceptors
functioning as traps
Rainwater systems-per drain(inside buildings) $10.30
3. Water Piping and Water Heaters
For installation, alteration, or repair of water piping or water- $5.00
treating equipment, or both, each
For each water heater including vent $12.95
For vents only, see Table 3-C
4. Gas Piping Systems
For each gas piping system of one to five outlets $6.45
For each additional outlet over five, each $1.15
5. Law Sprinklers, Vacuum Breakers and Backflow Protection Devices
For each lawn sprinkler system on any one meter, including $15.55
backflow protection devices thereof
For atmospheric-type vacuum breakers or backflow protection
devices not included in Item 1:
1 to 5 devices $12.95
Over 5 devices, each $2.40
For each backflow-protection device other than atmospheric-type
vacuum breakers:
2 inches (50.88 mm) and smaller $12.95
Over 2 inches (50.8 mm) $25.90
6. Swimming Pools
For each swimming pool or spa:
Public pool $95.85
Public spa $63.80
Private pool $63.80
Private spa $31.80
7. Miscellaneous
For each appliance or piece of equipment regulated by the $10.30
Plumbing Code but not classed in other appliance categories,
or for which no other fee is listed in this code
Other Inspections and Fees:
1. Inspections outside of normal business hours, per hour $55.00
2. Reinspection fees assessed under provisions of Section 305.8 $55.00
per inspection
3. Inspections for which no fee is specifically indicated,per hour $55.00
4. Additional plan review required by changes, additions or revisions to $60.00
plans or to plans for which an initial review has been completed—
(minimum charge-one half hour)