Loading...
HomeMy WebLinkAboutbocc.ord.032.2002 AN ORDINANCE OF THE BOARD OF COUNTY COMMISSIONERS OF PITKIN COUNTY, COLORADO, ESTABLISHING FEES FOR THE COMMUNITY DEVELOPMENT DEPARTMENT AND REPEALING ORDINANCE 058-2001 AND SECTION 2-11 OF ARTICLE 2, SERIES OF 1999, ORDINANCE NO. 61 Ordinance No.03)L-2002 RECITALS 1. Pitkin County wishes to set fees which are consistent and fair to the public and which reflect the expense incurred in providing such services to the public. 2. Certain fees currently charged for development review no longer reflect the cost of providing the necessary levels of such services. The policy of the Pitkin County Board of County Commissioners is that development shall pay, in full, the cost of development review in Pitkin County. Long Range planning shall be funded through the general fund. 3 . Payments due to the County for obligations due to sales and tax are not regarded as fees and therefore not included in the Ordinance. The Ordinance does not reflect an encompassing fee schedule. COMMUNITY DEVELOPMENT FEES 1. Planning, Zoning Review and Referral Fees: These Fees shall be based on the attached fee schedule (exhibit A). 2. Building permit fees shall be based on the attached fee schedule (Exhibit B). 3. Electrical permit fees shall be based on the attached fee schedule (Exhibit Q. 4. Mechanical permit fees shall be based on the attached fee schedule (Exhibit D). 5. Plumbing permit fees shall be based on the attached fee schedule (Exhibit E). INTRODUCED, FIRST READ, AND SET FOR PUBLIC HEARING AT THE REGULAR MEETING ON THE 4'DAY OF DECEMBER, 2002. APPROVED AND ADOPTED AFTER CONTINUED SECOND READING AND PUBLIC HEARING ON THE 18TH DAY OF DECEMBER, 2002 ATTEST: BOARD OF COUNTY COMMISSIONERS OF PITKIN COUNTY, COLORADO By: i.. T k/ -(f Patti Kay-Clap er, Jerk to Lthe B, and Chair Date: C/ 032 APPROVED AS TO FORM: MANAGER APPROVAL: John Ely Hilary Smith i ' /-,J County Attorney County Manager V EXHIBIT A Land Use Application Fees: A. The base fees for the processing of Land Use application shall be as follows: Case Type Fee 1041 at building ernit $420.00 1041 Hazard Review $2,100.00 1041 activity of state/local $4,200.00 Annual Administrative Reviews $630.00 Annual BOCC Review $840.00 Appeal of Administrative Decisions $630.00 CDU $630.00 Code Amendment $1,050.00 Conceptual Subdivision $4,620.00 Deed Restriction $630.00 Detailed Subdivision $3,360.00 Development Agreement $1,050.00 District Service Plan $1,260.00 Extension of Deadlines $420.00 Extension of Vested Rights $840.00 Final Plat $1,260.00 GMQS Competition $3 780.00 GMQS Exemption $630.00 Historic Referral $420.00 Lot Line Adjustment $840.00 Major Plat Amendment $1,470.00 Master Plan Amendment $840.00 Minor Amendment to Development Permit $630.00 Minor Plat Amendment $630.00 Non-Conforming Use $1,050.00 Redstone HPC Application $150.00 Reinstatement of Vested Rights $840.00 Rezoning $1,260.00 Road Impact Fee Appeal $420.00 Road Vacations $840.00 Scenic/Rid eline Review $840.00 Site visit not associated with application (min. 1 hour $210.00 charge/hourly basis Special Review-- one step $1,000.00 Special Review-- two step $2,500.00 Subdivision Exemption $1,260.00 Temporary Use Permits $1,260.00 Board of Adjustment $525.00 Consultation on zoning and planning (over 1/2 hour) $210.00 Public Notice/Publication fee $25.00 B. The following guidelines shall be used for the administration of the fee structure set forth above: 1. Fees charged for the processing of applications,which fall into more than one type of application shall be cumulative. In the event that the fees, which result from accumulation, are found by the Community Development Director to be excessive in relation to the number of hours it is anticipated to require to process the application, the Community Development Department may waive or adjust the accumulation requirement. 2. Additional charges shall be billed on an hourly basis only if the time exceeds the average by more than 20% in the processing of an application. 3. Additional charges shall be computed at the rate of two hundred and ten dollars ($210.00) per hour of additional Community Development Department staff time required 4. The Community Development Department shall identify, prior to or at the time of submission of a land use application, whether an application is to be referred to the Engineering, Housing, or Environmental Health Departments. Additional charges will apply based on referral fees. 5. An applicant may request the BOCC waive fees for projects serving a public purpose, proposed by a non-profit organization, or in order to dispute the fee charged. Zoning Review Fees: Zoning shall be charged the following fees for the services listed: I. Building plan checks by zoning(a$105.00 deposit shall be collected at building permit application submittal): A. RESIDENTIAL, AGRICULTURAL, AND, PUBLIC USES WITHIN THE PUBLIC ZONE DISTRICT 1. Manufactured Housing $105.00 2.New Work and Major Repair/Remodeling Change Orders Up To 500 Square Feet $105.00 Flat Fee 510-3,500 Square Feet $105 plus $0 13 per s f over 500 s f 3 501-10,000 Square Feet $495 plus $0 31 per s f 3,501 s f over 3,500 s f 10,000+ Square Feet $2 510 plus $0 36 per s f over 10,000 s f 3. Minor Repair/Remodel and Change Orders $105.00 (Note: Minor applications request no changes to floor area, use,height and/or footprint. Those applications which are not Minor are considered Major.) B. NON-RESIDENTIAL 1. New Work, Major Repair/Remodeling and Change Orders Up to 500 Square Feet $105.00 Flat Fee 501-5,000 Square Feet $105 plus $0 31 per s f over 500 s f 5,001-10,000 Square Feet $1 500 plus $0 62 per s f over 5,000 s f 10,000+ Square Feet $4 600 plus $0 72 per s f over 10,000 s f 2. Minor Remodel/Repair/Change Orders $105.00 (Note: Minor applications request no changes to floor area, use, height and/or footprint. Those applications which are not Minor are considered Major) C. ZONING ENFORCEMENT FEES 1. Projects constructed without permits, planning fees and building permit fees are doubled as a penalty. 2. PENALTY PROVISION A penalty fee for enforcement actions requiring a land use approval $670.00 3. Sign permits: $125.00 Processing and code compliance for all sign permits 4. Board of Adjustment fees: $525.00 Processing and application fee for all Board of Adjustment appeals Referral Fees Land Use Application Flat Fees Env. Health Engineer Wildlife 1041 Hazard Review Single Family Residence-Administrative Review $378.00 $480.00 $420.00 Single Family Residence-Hearing Officer Appeal of AR $283.50 $300.00 $315.00 Single Family Residence-Hearing Officer Review $450.00 S525.00 $500.00 Single Family Residence-BOCC Appeal of HO Review $378.00 $435.00 $420.00 Subdivision-Conceptual,Detailed,or Final Submission Minor $540.00 $660.00 $600.00 Major $756.00 $900.00 $840.00 Minor Amendment to a Development Permit $189.00 $300.00 S210.00 Minor Plat Amendment $189.00 $300.00 S210.00 Major Plat Amendment $360.00 $350.00 $400.00 Temporary Use/Special Event Permit Minor $250.00 $260.00 $210.00 Major $500.00 $425.00 $315.00 GMQS Review for Additional Floor Area or New Unit n/a $575.00 $420.00 Hourly Fee for Miscellaneous Reviews n/a $210.00 $210.00 Airport Clerk Insignificant n/a $115.00 Minor $106.00 $310.00 Major $318.00 $625.00 613 Building Permit Fees Exhibit B TOTAL VALUATION FEE $1.00 to $500.00 $25.00 $501.00 to $25.00 for the first $500.00 plus $3.05 for each additional $100.00, or $2,000.00 fraction thereof, to and including $2,000.00 $2,000.00 to $70.75 for the first $2,000.00 plus $14.70 for each additional $25,000.00 $1,000.00, or fraction thereof, to and including $25,000.00 $25,001.00 to $408.85 for the first $25,000.00 plus $10.65 for each additional $50,000.00 $1,000.00, or fraction thereof, to and including $50,000.00 $50,001.00 to $675.10 for the first $50,000.00 plus $7.35 for each additional $100,000.00 $1,000.00, or fraction thereof, to and including $100,000.00 $100,001.00 to $1042.60 for the first $100,000.00 plus $5.90 for each additional $500,000.00 $1,000.00, or fraction thereof, to and including $500,000.00 $500,001.00 to $3402.60 for the first $500,000.00 plus $5.00 for each additional $1,000,000.00 $1,000.00 or fraction thereof, to and including $1,000,000.00 $1,000,000 and up $5902.60 for the first $1,000,000.00 plus $3.85 for each additional $1,000.00 or fraction thereof Other Inspections and Fees: 1. Inspections outside of normal hours $55.00 per hour (minimum charge—two hours) 2. Reinspection fees assessed under provisions of Section 305.8 $55.00 3. Inspections for which no fee is specifically indicated $55.00 4. Additional plan review required by changes, additions or revisions $60.00 per hour to plans (minimum charge—one-half hour) ELECTRICAL PERMIT FEES Exhibit C Inspection Fees A. Residential: This fee (based on the enclosed living area only), includes construction of, or remodeling or addition to a: single family home, duplex, condominium, town house. If you are ONLY changing or providing a service and not wiring and portion on the above, see section B below for correct permit fee. Not more than 1,000 square feet $46.00 1,001 square feet and not more than 1,500 square feet $51.75 1,501 square feet and not more than 2,000 square feet $63.25 Per 100 square feet in excess f 2,000 square feet $3.45 B. All Other Fees, including service hookups to modular homes and temporary construction meters, shall be computer on the dollar value of the electrical installation, including time and materials, whether they are provided by the contractor or the property owner. Such fees shall be computed as follows: (See Section C for the fees for inspections in mobile home and travel parks) Not more than$300.00 $46.00 $301.00 but not more than $2,000.00 $51.75 $2,001.00 but not more than $50,000.00 $19.55 per thousand or fraction thereof $50,001.00 but not more than $500,000.00 $18.40 per thousand or fraction thereof plus $57.50 base fee More than$500,000.00 $17.25 per thousand or fraction thereof plus $632.50 base fee C. Mobile homes and travel trailer parks $46.00 per space D. Reinspections $51.75 43�j - �)-0a v MECHANICAL PERMIT FEES Exhibit D Permit Issuance and Heaters 1. For the issuance of each mechanical permit $24.75 2. For issuing each supplemental permit for which the original has not $7.65 expired,been canceled or finaled Unit Fee Schedule (Note: the following does not include permit-issuing fee) 1. Furnaces For the installation or relocation of each forced-air or gravity-type $15.55 furnace or burner, including ducts and vents attached to such appliance up to and including 100,000 Btu/h (29.3 kW) For the installation or relocation of each forced-air or gravity-type $19.15 furnace or burner, including ducts and vents attached to such appliance over 100,000 Btu/h (29.3 kW) For the installation or relocation of each floor furnace, including vent $15.55 For the installation or relocation of each suspended heater, recessed $15.55 wall heater or floor-mounted unit heater 2. Appliance Vents For the installation, relocation or replacement of each appliance vent $7.65 installed and not included in an appliance permit 3. Repairs and Additions For the repair of, alteration of, or addition to each heating appliance, $14.40 refrigeration unit, cooling unit, absorption unit, or each heating, cooling, absorption or evaporative cooling system, including installation of controls regulated by the Mechanical Code 4. Boilers, Compressors and Absorption Systems For the installation or relocation of each boiler or compressor to and $15.45 including 3 horsepower(10.6 kW), or each absorption system to and including 100,000 Btu/h(29.3 kW) For the installation or relocation of each boiler or compressor over $28.50 3 horsepower(10.6 kW) to and including 15 horsepower(52.7 kW), or each absorption system over 100,000 Btu/h (29.3 kW) to and including 500,000 Btu/h(293.1 kW) For the installation or relocation of each boiler or compressor over $39.15 15 horsepower(52.7 kW) to and including 30 horsepower(105.5 kW), or each absorption system over 500,000 Btu/h (146.6 kW) to and including 1,000,000 Btu/h (293.1 kW) For the installation or relocation of each boiler or compressor over $58.25 30 horsepower(105.5 kW) to and including 50 horsepower(176 kW), or each absorption system over 1,00,000 Btu/h (293.1 kW) to and including 1,750,000 Btu/h (512.9 kW) For the installation or relocation of each boiler or compressor over $97.30 50 horsepower(176 kW) or each absorption system over 1,750,000 Btu/h (512.9 kW) 5. Air Handlers $11.20 For each air-handling unit to and including 10,000 cubic feet per minute (cfm) (4719 L/s), including ducts attached thereto Note: This fee does not apply to an air-handling unit which is a portion of a factory-assembled appliance, cooling unit, evaporative cooler or absorption unit for which a permit is required elsewhere in the Mechanical Code. For each air-handling unit over 10,000 cfin (4719 L/s) $19.00 6. Evaporative Coolers For each evaporative cooler other than portable type $11.20 7. Ventilation and Exhaust For each ventilation fan connected to a single duct $7.65 For each ventilation system which is not a portion of any heating $11.20 or air-conditioning system authorized by a permit For the installation of each hood which is served by the mechanical $11.20 exhaust, including the ducts for such hood S. Incinerators For the installation or relocation of each domestic-type incinerator $19.15 For the installation or relocation of each commercial or industrial- $15.25 type incinerator 9. Miscellaneous For each appliance or piece of equipment regulated by the Mechanical $11.20 Code but not classed in other appliance categories, or for which ** Other Inspections and Fees: 1. Inspections outside of normal business hours, per hour(minimum $55.00 charge—two hours) 2. Reinspection fees assessed under provisions of Section 305.8, per $55.00 Inspection 3. Inspections for which no fee is specifically indicated, per hour $55.00 (minimum charge one hour) 4. Additional plan review required by charges, additions or revisions to $60.00 plans or plans for which an initial review has been completed (minimum charge-one-half hour) I PLUMBING PERMIT FEES Exhibit E Permit Issuance 1. For the issuance of each plumbing permit $25.00 2. For issuing each supplemental permit for which the original has$7.65 not expires, been canceled or finaled Unit Fee Schedule (Note: The following do not include permit-issuing fee) 1. Fixtures and Vents For each plumbing fixture or trap or set of fixtures on one trap $10.30 (including water, drainage piping and backflow protection thereof) For repair or alteration of drainage or vent piping, each fixture $5.00 2. Sewers, Disposal Systems and Interceptors For each building sewer and each trailer park sewer $25.90 For each cesspool $39.15 For each private sewage disposal system $78.25 For each industrial waste pretreatment interceptor, including $20.90 its trap and vent, excepting kitchen-type grease interceptors functioning as traps Rainwater systems-per drain(inside buildings) $10.30 3. Water Piping and Water Heaters For installation, alteration, or repair of water piping or water- $5.00 treating equipment, or both, each For each water heater including vent $12.95 For vents only, see Table 3-C 4. Gas Piping Systems For each gas piping system of one to five outlets $6.45 For each additional outlet over five, each $1.15 5. Law Sprinklers, Vacuum Breakers and Backflow Protection Devices For each lawn sprinkler system on any one meter, including $15.55 backflow protection devices thereof For atmospheric-type vacuum breakers or backflow protection devices not included in Item 1: 1 to 5 devices $12.95 Over 5 devices, each $2.40 For each backflow-protection device other than atmospheric-type vacuum breakers: 2 inches (50.88 mm) and smaller $12.95 Over 2 inches (50.8 mm) $25.90 6. Swimming Pools For each swimming pool or spa: Public pool $95.85 Public spa $63.80 Private pool $63.80 Private spa $31.80 7. Miscellaneous For each appliance or piece of equipment regulated by the $10.30 Plumbing Code but not classed in other appliance categories, or for which no other fee is listed in this code Other Inspections and Fees: 1. Inspections outside of normal business hours, per hour $55.00 2. Reinspection fees assessed under provisions of Section 305.8 $55.00 per inspection 3. Inspections for which no fee is specifically indicated,per hour $55.00 4. Additional plan review required by changes, additions or revisions to $60.00 plans or to plans for which an initial review has been completed— (minimum charge-one half hour)