HomeMy WebLinkAboutbocc.con.022.2003 CHECK LIST CONTI~CTS SUBbIITTED TO CLERKS OFFICE FOR SCA~NINGL4.RCHIVi~f:
Originating Depmmen ivision:
Contact Pe~on: ~ ~ ~ } ~O0 ~
Phone~: q~0-q~0-~3 ~4
Check Con. ct TTpe: (C~ ~L T~T ~ ~PROP~ATE)
~.Se~ces
Ma~ten~ce
Liceme~se
Le~e -
Co~cfion
~.P~ch~e
Empio~ent
Intergove~em~ Agreement (Requ~es BOCC Ac~on)
Non-Profit
~Q~i-Public
Si$na~es Req~red:
Under 25K- Dep~ent Head
25-50K-Dep~ent Head (if appropriate), Section Leader
Over 50 K - Dep~nem Head (if appropriate), Section Leader, Co~W M~ager
Con~actor~ess (Complete Nme): ~)~aCD~ ~
Contact S~ Date: h/~/~:~ Con~act End Date: Automatic Renew~ (Y~: ~
~i Con~acB shoed be proofed for ~e folloMng:
No Pages ~ss~g
If a Page is Le~ Intentio~y BI~ - Note on Page
Comecufive Page No's
· ~1 Silages ~xed
~1 Dates Ffll~ In
~10~er Bl~s Filled In
~1 E~bi~ A~ched
M1 Legfl Descfiptio~ A~ached (if appropriate).
· Notice ofA~roceed A~ched (ff appropriate)
Sent to Clerk and Recorder for Scannh~Archiving
Authored St~ Pemon
Note: Signature of au~orized staff person indicates ~at document h~ been proofed ~d ready for sc~ing.
(Clerk's Office will keep orSg~nal documents ~n compliance with Sta~e Archives retnSnnge schedule)
AMENDMENT NO. SIX CO NTRACT # d 22- 2
DATED JANUARY 9, 2003
TO CONTRACT
BETWEEN
WASHINGTON INFRASTRUCTURE SERVICES, INC.
(Successor in Interest to)
ISBILL DIVISION,
Raytheon Infrastructure, Inc.
AND
PITK1N COUNTY, COLORADO
The Sponsor and the Engineer agree to amend their "Engineering Consultation Contract"
contract dated December 20, 1999 for improvements to Aspen-Pitkin County Airport, Aspen,
Colorado. The items covered by this amendment are described as follows and amend the "Scope
of Work" paragraph #1 as follows:
CURRENT LANGUAGE:
1. The Engineer shall perform all Basic Services as defined below, and such Special Services as
are specifically requested in writing by Pitkin as necessary or appropriate to the completion
of all Capital Improvement Projects at the Aspen-Pitkin County Airport designated for
construction by the Airport Manager from the date of the contract through the conclusion of
all projects for the year 2004. The project is currently expected by the parties to include the
following individual project elements.
The scope of work contemplated under this agreement with regard to the Project is for
engineering service services for improvements at the Aspen-Pitkin County Airport. Said
improvements will include, but are not limited to, the following items:
I. Relocate North GA Aimrafi Parking out of ROFA
2. Rehabilitate GA Apron Phase I
3. Acquire Land for Runway Protection Zone
4. Rehabilitate GA Apron Phase 1I
5. Construct Perimeter Road
6. Relocate GA Parking Between ARFF Building and Air Carrier Apron
7. Overlay Runway and Upgrade Medium Intensity Runway Lighting
8. Various projects to Meet Runway Safety Area and Object Free Area Standards
9. Construct North GA Apron/Relocate Aircraft parking out of ROFA
Page 1 of 4
Aspcn-Pitkin Amend 6
AMENDMENT NO. 6
Pitkin County, CO Contract
Aspen/Pitkin County Airport
10. Relocate North Portion Taxiway "A"
11. Widen Runway 15/33 Runway Safety Area
12. Relocate South Portion of Taxiway "A"
13. Install Medium Intensity Taxiway Lights
14. Relocate ARFF Building to West Side of Airport
15. Rehabilitate GA Apron Phase III
AMEND TO READ:
1. The Engineer shall perform all Basic Services as defined, and such Special Services as are
specifically requested in writing by Pitkin as necessary or appropriate to the completion of all
Capital Improvement Projects at the Aspen-Pitkin County Airport for construction as
identified by previously signed Amendments.
The. scope of work defined by this amendment removes the following Projects for
engineering services at the Aspen-Pitkin County Airport:
4. Rehabilitate GA Apron Phase II
5. Construct Perimeter Road
7. Overlay Runway and Upgrade Medium Intensity Runway Lighting, except as
identified in Amendment #5 to the Contract
8. Various projects to Meet Runway Safety Area and Object Free Area Standards
9. Construct North GA Apron/Relocate Aircraft parking out of ROFA
10. Relocate North Portion Taxiway "A"
11. Widen Runway 15/33 Runway Safety Area
12. Relocate South Portion ofTaxiway "A"
13. Install Medium Intensity Taxiway Lights
14. Relocate ARFF Building to West Side of Airport
15. Rehabilitate GA Apron Phase III
Page 2 of 4
Aspen-Pitldn Amend 6 ~.~
AMENDMENT NO. 6
Pitldn County, CO Contract
Aspen/Pitkin County Airport
CADD / ELECTRONIC FILE TRANSFER
Engineer's electronic files are compatible with AutoCAD Release 14. Engineer makes no
representation as to the compatibility of these files with other hardware or software beyond said
Release.
Data contained on these electronic files are a part of Engineer's instruments of service and shall
not be used by Sponsor or anyone else receiving these data through or from Sponsor for any
purpose other than as a convenience in the preparation of design or construction documents.
Any other use or reuse by Sponsor or by others will be at Sponsor's sole risk and without
liability or legal exposure to Engineer. Sponsor agrees to make no claim and hereby waives, to
the fullest extent permitted by law, any claim or cause of action of any nature against Engineer,
Engineer's officers, directors, employees, agents or subconsultants that may arise out of or in
connection with Sponsor's use of the electronic files.
Furthermore, Sponsor shall, to the fullest extent permitted by law, indemnify and hold Engineer
harmless against all damages, liabilities or costs, including reasonable attorney's fees and
defense costs, arising out of or resulting from Sponsor's use of these electronic files.
These electronic files are not construction documents. Differences may exist between these
electronic files and the corresponding hard copy construction documents. Engineer makes no
representation regarding the accuracy or completeness of the electronic files Sponsor receives.
In the event that a conflict arises between the hard copy documents and the electronic files
prepared by Engineer, the signed and sealed hard copy ESID design or construction documents
shall govern.
Because information presented on the electronic files can be modified, unintentionally or
otherwise, Engineer reserves the right to remove all indicia of ownership and/or involvement
from each electronic display.
Under no circumstances shall delivery of the electronic files for use by Sponsor be deemed a sale
by Engineer, and Engineer makes no warranties, either express or implied, of merchantability
and fitness for any particular purpose. In no event shall Engineer be liable for any loss of profit
or any consequential damages as a result of Sponsor's use or reuse of these electronic files.
Except as otherwise provided herein all other terms and conditions of the original contract shall
remain in full force and effect.
THE REMAINDER OF THIS PAGE IS INTENTIONALLY LEFT BLANK
Aspen-Pitkin Amend 6 Page 3 of 4 ~
IN WITNESS WHEREOF, the parties hereto have made and executed this Amendment No. 6
that is effective as of the date first above written.
SPONSOR: ENGINEER:
PITKIN COUNTY, COLORADO, INC. WASHINGTON INFRASTRUCTURE
f SERVICES, INC.
Hilary Fletcl~ S~_~ounty Manager Neff E Ro6~
Vice President, Airport Services
J;f~s~. Elwood, A."-~E~.
Director of~ _
Deputy ~gufityU'J~(e[~
By
County Attorney
Page 4 of 4 ~
Aspen-Pitldn Amend 6