Loading...
HomeMy WebLinkAboutbocc.con.172.20192017-11-13 btf Contract Information Contract Number Project Name Contractor Budget Line Item 416.68.92660.86878 Procurement Method: Type: Contract Start Date Contract End Date Contract Type Retainage If this is a new contractor, please request they complete and submit to Finance a New Vendor Request Form. Contact Information: Department County Representative Cathy Hall County Representative Phone (970) 429-2882 Provide a brief description of the contract: Contract Value Summary: $ 44,582.00 $ - $ - $ 44,582.00 NOTE: Clerks Office will keep original documents in compliance with Colorado State Archives retainage Landfill Installation of new well and abandonment of existing well-heads at the Solid Waste Center Original Contract Amount Previous Change Order/Amendment Amount This Change order/Amendment amount New Contract Total No 2019 Well Installation and Abandonment Services Golder Associates, Inc. $ - Additional Budget Line Item(s) (Please fully allocate New Contract Total) $ - $ - $ - $ - Sole Source Services/Maintenance 4/18/2019 12/31/2019 New Contract 172.2019 Pitkin County Procurement Cover Sheet Please complete the Contract Cover Sheet when the contract/task order is complete and fully executed. Return all Contract Cover Sheets and Contracts/Change Orders/Amendments/Task Orders to Procurement Rev 2018-10-10 btf Note: Every effort should be made to obtain a written contract when otherwise required under County procedures. When a contract is obtained, complete the Clerk’s check list and send the original signed contract with coversheet to clerk’s office for archiving. 1 PITKIN COUNTY SOLE SOURCE PROCUREMENT JUSTIFICATION REQUEST TO: Jon Peacock, County Manager DATE: May 1, 2019 FROM: Cathy Hall, Solid Waste Manager Proposed Contractor: Golder Associates, Inc. Product/Service: Well Installation and Existing Well Abandonment Services Estimate expenditure for the above Product/Service: $ 45,000.00 This form is required, and is to aid you, in documenting your Sole Source request. Complete all portions of this form. This purchase is clearly and legitimately limited to a Single or Sole Source. (Examples: original manufacturer, no regional distributor, standardization etc): Explain: Golder Associates have been performing our ground water monitoring for many years, and they developed recommendations for the well site and work to be performed. With their knowledge and documentation of the site, they are the only contractor that would be able to complete the well installation in the timeframe required to avoid any delays to the construction of the new maintenance facility at the solid waste center. Rev 2018-10-10 btf Note: Every effort should be made to obtain a written contract when otherwise required under County procedures. When a contract is obtained, complete the Clerk’s check list and send the original signed contract with coversheet to clerk’s office for archiving. 2 The undersigned requests that Pitkin County waive other procurement requirements and recognize this transaction as a sole source exception to the Pitkin County Procurement Code. Department Head Section Head !#COUNTY REPRESENTATIVE#! Date !#SECTION LEADER#! Date County Manager Reason for Denial: ______________________________________________ !#COUNTY MANAGER SOLE#! Date Solid Waste Manager Cathy Hall May-06-2019 Public Works Director Brian Pettet May-06-2019 County Manager May-08-2019 Jon Peacock Contract # 172.2019 Budget Line Item #: 416.68.92660.86878 Revision: 2017-12-07 btf 1 PITKIN COUNTY CONTRACT FOR PROVISION OF SERVICES 2019 WELL INSTALLATION AND ABANDONMENT SERVICES THIS CONTRACT, made February 28, 2018 by and between the Board of County Commissioners of Pitkin County, Colorado, 123 Emma Rd., Suite #106, Basalt, CO 81621, (hereinafter called the “County”) and Golder Associates, Inc., 44 Union Boulevard, Suite 300, Lakewood, CO 80228 (hereinafter called the “Contractor”) to perform the following work: 2019 Well Installation and Abandonment Services (“Project”). I. Term of Contract: The term of this contract is from April 18, 2019 to December 31, 2019. At the expiration of the initial term, the contract may be extended for an additional term of one (1) year by the express written consent of both parties. II. Contractor’s Obligations. Contractor shall provide well installation and abandonment services to the County Solid Waste Center. The services include the following scope(s) of work (further detail in Exhibit A): 1.The installation of a water supply well and abandonment of two existing wells at the Pitkin County Solid Waste Center. III. Compensation and Expenses, Invoicing, Payment and Offset. The County shall compensate Contractor for its services in accordance with the Project Budget and Schedule set out in Paragraph II. It is expressly understood and agreed that in no event will the total compensation and reimbursement to be paid hereunder exceed the sum of Forty-Four Thousand Five-Hundred Eighty-Two dollars and Zero cents ($44,582.00) for all services rendered. By contract or amendment, the County and Contractor may reallocate the budget among project tasks if the total budget amount remains unchanged. Contractor shall invoice for the project monthly based on hours worked, with payment expected within thirty (30) days of invoice. Any payment by the County may be offset by any amount the Contractor owes the County for any reason. IV. County’s Exclusive Ownership of Work Product. Drawings, specifications, guidelines and other documents prepared by Contractor in connection with this contract Contract # 172.2019 Budget Line Item #: 416.68.92660.86878 Revision: 2017-12-07 btf 2 shall be the property of the County. However, Contractor shall have the right to utilize such documents in the course of its marketing, professional presentations, and for other business purposes. Contractor assigns to County the copyrights to all work prepared, developed, or created pursuant to this contract, including the right to: 1) reproduce the work; 2) prepare derivative works; 3) distribute copies to the public; 4) perform the works publicly; and 5) to display the work publicly. Contractor shall have right to use materials produced in the course of this contract for marketing purposes and professional presentations, articles, speeches and other business purposes. V. Pitkin County’s Obligations. Pitkin County shall administer this contract through a County Representative. Cathy Hall, Solid Waste Manager will manage the project as the County’s Representative. In the event that Cathy Hall is not available, Jed Miller, Assistant Solid Waste Manager shall assume the County Representative’s duties. The services provided and products delivered by the Contractor under this contract will be subject to review by the County’s Representatives, or a designee, for compliance with Contractor’s obligations prior to final payment. VI. Termination Prior to Expiration of Contract Term. The County has the right to terminate this contract, with or without cause, by giving written notice to the Contractor of such termination and specifying the effective date thereof. Such notice shall be given at least ten (10) days before the effective date of such termination. In such event all finished or unfinished documents, data, studies and reports prepared by the Contractor pursuant to this contract shall become the County’s property. Contractor shall be entitled to receive compensation in accordance with the contract for any satisfactory work completed pursuant to the terms of this contract prior to the date of termination. Notwithstanding the above, Contractor shall not be relieved of liability to the County for damages sustained by the County by virtue of any breach of the contract by the Contractor. VII. Independent Contractor Status. A. The parties to this contract intend that the relationship between them contemplated by the contract is that of independent contractor. Contractor, and any agent, employee, or servant of Contractor shall not be deemed to be an employee, agent, or servant of Pitkin County. B. Contractor is not required to offer his services exclusively to Pitkin County under this contract. Contractor may choose to work for other individuals or entities during the term of this contract, provided that the basic services and deliverable products required under this contract are submitted in the manner and on the schedule defined under this contract. C. Contractor warrants that all work produced will conform to all applicable industry standard of care, skill and diligence in the performance of Contractor’s obligations under this contract. Contract # 172.2019 Budget Line Item #: 416.68.92660.86878 Revision: 2017-12-07 btf 3 D. Contractor shall not attempt to oversee or supervise the work or actions of any Pitkin County employee, servant or agent in the course of completing work under this contract. E. Contractor is not entitled to any Workers’ Compensation benefits through Pitkin County and is responsible for payment of any federal, state, FICA and other income taxes. VIII. Assignability. This contract is not assignable by either party. Any use of subcontractors by the Contractor for performance of this contract must be accepted in writing by the County. IX. Severability. In the event that any provision of this contract shall be held to be invalid or unenforceable, the remaining provisions of this contract shall remain valid and binding upon the parties hereto. X. Integration and Modification. A. This contract represents the entire and integrated contract between the County and the Contractor and supersedes all prior negotiations, representations, or contract, either written or oral. This contract may be amended only by written contract signed by both the County and the Contractor. B. The County may, from time to time, request changes in the scope of services of the Contractor to be performed hereunder. Such changes, including the increase or decrease in the amount of the Contractor’s compensation, which are mutually agreed upon between the County and the Contractor, shall be in writing and upon execution shall become part of this contract. XI. Indemnity. A. The Contractor agrees to indemnify, hold harmless and, not excluding the County's right to participate, defend the County, its subsidiary, parent, associated and/or affiliated entities, successors, or assigns, its elected officials, trustees, employees, agents, volunteers, and any jurisdiction or agency issuing permits for any work included in the project, hereinafter referred to as indemnitee, from all suits and claims, including attorney's fees and cost of litigation, actions, loss, damage, expense, cost or claims of any character or any nature to the extent arising out of the negligent acts, errors or omissions or willful misconduct in the performance of the work done in fulfillment of the terms of this Contract or on account of any act, claim or amount arising or recovered under workers' compensation law or arising out of the failure of the Contractor to conform to any statutes, ordinances, regulation, law or court decree. It is agreed that the Contractor will be responsible for primary loss investigation, defense and judgment costs where this contract of indemnity applies. In consideration of the award of this contract, the Contractor agrees to waive all rights of subrogation against the County its subsidiary, parent, associated and/or affiliated entities, successors, or assigns, its elected officials, trustees, employees, Contract # 172.2019 Budget Line Item #: 416.68.92660.86878 Revision: 2017-12-07 btf 4 agents, and volunteers for losses arising from the work performed by the Contractor for the County. B. The Contractor further shall investigate, process, respond to, adjust, provide defense for and defend, pay or settle all claims, demands, or lawsuits related hereto at its sole expense and shall bear all other costs and expenses related thereto, even if the claim, demand or lawsuit is groundless, false or fraudulent. XII. Insurance. Contractor and subcontractors shall procure and maintain until all of their obligations have been discharged, including any warranty periods under this Contract are satisfied, insurance against claims for injury to persons or damage to property which may arise from or in connection with the performance of the work hereunder by the Contractor, its agents, representatives, employees or subcontractors. The insurance requirements herein are minimum requirements for this Contract and in no way limit the indemnity covenants contained in this Contract. The policies shall include, or be endorsed to include, the following provision: On insurance policies where the County is named as an additional insured, the County shall be an additional insured to the full limits of liability purchased by the Contractor even if those limits of liability are in excess of those required by this Contract. The County in no way warrants that the minimum limits contained herein are sufficient to protect the Contractor from liabilities that might arise out of the performance of the work under this Contract by the Contractor, its agents, representatives, employees, or subcontractors. The Contractor shall assess its own risks and if it deems appropriate and/or prudent, maintain higher limits and/or broader coverages. The Contractor is not relieved of any liability or other obligations assumed or pursuant to the Contract by reason of its failure to obtain or maintain insurance in sufficient amounts, duration, or types. Commercial General Liability Completed Operations coverage must be kept in effect for up to three (3) years after completion of the project. A. Coverage and Limits of Insurance. Contractor shall provide coverage with limits of liability requirements provided that the coverage is written on a “following form” basis. 1) Statutory Workers’ Compensation: Colorado statutory minimums a. Policy shall contain a waiver of subrogation against the County. b. This requirement shall not apply when a contractor or subcontractor is exempt under Colorado Workers’ Compensation Act AND when such contractor or subcontractor executes the appropriate sole proprietor waiver form. Minimum Limits: Coverage A (Workers’ Compensation) Statutory Contract # 172.2019 Budget Line Item #: 416.68.92660.86878 Revision: 2017-12-07 btf 5 Coverage B (Employers Liability) $ 500,000 $ 500,000 $ 500,000 2) Commercial General Liability – ISO 1CG 0001 form or equivalent. (With County named as an additional insured) Minimum Limits: General Aggregate $ 2,000,000 Products/Completed Operations Aggregate $ 2,000,000 Each Occurrence Limit $ 1,000,000 Personal/Advertising Injury $ 1,000,000 Fire Damage (Any One Fire) $ 50,000 Medical Payments (Any One Person) $ 5,000 Coverage to include:  Premises and Operations  Explosions, Collapse and Underground Hazards  Personal / Advertising Injury  Products / Completed Operations  Liability assumed under an Insured Contract (including defense costs assumed under contract)  Independent Contractors  Additional Insured—Owners, Lessees or Contractors Endorsement, ISO Form 2010 (2004 Edition or equivalent)  Additional Insured—Owners, Lessees or Contractors Endorsement, ISO CG 2037 (2004 Edition or equivalent)  The policy shall be endorsed to include the following additional insured language on the Additional Insured Endorsements specified above: “County, its subsidiary, parent, associated and/or affiliated entities, successors, or assigns, its elected officials, trustees, employees, agents, and volunteers named as an additional insured with respect to liability and defense of suits arising out of the activities performed by, or on behalf of the Contractor, including completed operations”. 3) Auto Liability: Bodily injury and property damage for any owned, hired and non-owned vehicles used in the performance of this Contract. Minimum Limits: Statutory Coverage Bodily/Property Damage (Each Accident) $ 1,000,000 4) Special Coverages (check as appropriate and insert amount): Contract # 172.2019 Budget Line Item #: 416.68.92660.86878 Revision: 2017-12-07 btf 6 a. ☐ Performance Bond $ b. ☐ Professional Errors and Omissions c. ☐ Aircraft Liability d. ☐ Owner’s Protective e. ☐ Builder’s Risk f. ☐ Boiler and Machinery g. ☐ Loss of Use Insurance h. ☐ Pollution Liability i. ☐ Crime, including Employee Dishonesty Coverage, or Fidelity Bond B. Proof of Insurance: 1) Each insurance policy required by the insurance provisions of this Contract shall provide the required coverage and shall not be suspended, voided or canceled except after thirty (30) days prior written notice has been given to the County, except when cancellation is for non-payment of premium, then ten (10) days prior notice may be given. Such notice shall be emailed directly to Procurement@pitkincounty.com. If the insurance carrier will not provide the required notice, the Consultant/Contractor and or its insurance broker shall notify the County of any cancellation, or reduction in coverage or limits of any insurance within seven (7) days of receipt of insurers’ notification to that effect. 2) In addition, these Certificates of Insurance shall contain the following clauses: a. The contractor’s insurance shall be primary and non-contributory as to the interests of the additional insured with any insurance or self- insurance purchased by the County. b. The insurance companies issuing the policy or policies hereunder shall have no recourse against the County of Pitkin for payment of any premiums or for assessments under any form of policy. c. Any and all deductibles or self-insured retentions in the above- described insurance policies shall be assumed by and be for the amount of, and at the sole expense of the Contractor. d. Location of operations shall be: “all operations and locations at which work for the referenced Project is being done.” 3) Certificates of Insurance for all renewal policies shall be delivered to the County’s Representative at least fifteen (15) days prior to a policy’s expiration date except for any policy expiring on the expiration date of this contract or thereafter. Contract # 172.2019 Budget Line Item #: 416.68.92660.86878 Revision: 2017-12-07 btf 7 4) The County reserves the right to request and receive a copy of any policy and any policy endorsement at any time during the term of this contract. XIII. Exemptions and Preferences. All purchases of construction or building or any other materials for this contract shall not include Federal Excise Taxes or Colorado State or local sales or use taxes. Pitkin County is exempt from such taxes under registration numbers 98-02624 and 84-78000-5k. XIV. Records. The Contractor shall maintain comprehensive, complete and accurate books, records, and documents concerning its performance relating to this contract for a period of three (3) years after final payment under the contract and the County shall have the right within the three (3) year period to inspect and audit these books, records and documents, upon demand, in a reasonable manner and at reasonable times, for the purpose of determining, by accepted accounting and auditing standards, compliance with all provisions of the contract and applicable law. XV. Contract Made in Colorado. The parties agree that this contract was made in accordance with the laws of the State of Colorado and shall be so construed. Venue is agreed to be exclusively in the courts of Pitkin County, Colorado. XVI. Attorney’s Fees. In the event that legal action is necessary to enforce any of the provisions of this contract, the substantially prevailing party shall be entitled to its costs and reasonable attorney’s fees. XVII. Governmental Immunity. Contractor agrees and understands that Pitkin County is relying on and does not waive, by any provision of this contract, the monetary limitations or terms (presently $150,000 per person and $600,000 per occurrence) or any other rights, immunities, and protections provided by the Colorado Governmental Immunity Act, 24-10-101, et seq., C.R.S., as from time to time amended, or otherwise available to Pitkin County or any of its officers, agents or employees. Further, nothing in this contract shall be construed or interpreted to require or provide for indemnification of the Contractor by the County for any injury to any person or any property damage whatsoever which is caused by the negligence or other misconduct of the County or its agent or employees. XVIII. Current Year Obligations. The parties acknowledge and agree that any payments provided for hereunder or requirements for future appropriations shall constitute only currently budgeted expenditures of Pitkin County. Pitkin County’s obligations under this contract are subject to Pitkin County’s annual right to budget and appropriate the sums necessary to provide the services set forth herein. No provisions of the contract shall constitute a mandatory charge or requirement in any ensuing fiscal year beyond the then current fiscal year of Pitkin County. No provision of the contract shall be construed or interpreted as creating a multiple-fiscal year direct or indirect debt or other Contract # 172.2019 Budget Line Item #: 416.68.92660.86878 Revision: 2017-12-07 btf 8 financial obligation of Pitkin County within the meaning of any constitutional or statutory debt limitation. This contract shall not directly or indirectly obligate Pitkin County to make any payments beyond those appropriated for Pitkin County’s then current fiscal year. No provisions of this contract shall be construed to pledge or create a lien on any class or source of Pitkin County’s moneys, nor shall any provision of this contract restrict the future issuance of Pitkin County’s bonds or any obligations payable from any class or source of Pitkin County’s money. XIX. Notice. Any notice required or permitted under this Agreement shall be in writing and shall be provided by electronic delivery to the e-mail addresses set forth below and by one of the following methods 1) hand-delivery or 2) registered or certified mail, postage pre-paid to the mailing addresses set forth below. Each party by notice sent under this paragraph may change the address to which future notices should be sent. Electronic delivery of notices shall be considered delivered upon receipt of confirmation of delivery on the part of the sender. Nothing contained herein shall be construed to preclude personal service of any notice in the manner prescribed for personal service of a summons or other legal process. To Pitkin County: Cathy Hall 32046 Highway 82 Snowmass Village, CO 81615 Email: Cathy.Hall@pitkincounty.com with copies to: Pitkin County Attorney’s Office 123 Emma Rd., Suite #204 Basalt, Colorado 81621 Email: Attorney@pitkincounty.com To Contractor: Golder Associates, Inc. 44 Union Boulevard, Suite 300 Lakewood, CO 80228 Phone: (303) 980-0540 Email: Mark_McClain@golder.com XX. Public Contracts for Services and Public Contracts with Natural Persons. In conformance with the provisions of C.R.S. §§ 8-17.5-101, et seq., as amended and C.R.S. §§ 24-76.5-101, et seq., as amended: A. PUBLIC CONTRACTS FOR SERVICES. §§8-17.5-101, et seq. C.R.S. [Not applicable to agreements relating to the offer, issuance, or sale of securities, investment advisory services or fund management services, sponsored projects, intergovernmental agreements, or information technology services or products and services] Contractor certifies, warrants, and agrees that it does not knowingly employ or contract with an illegal alien who will perform work under this Contract and will confirm the employment eligibility of all employees who are newly hired for employment in the United States to perform work under this Contract, through participation in the E-Verify Program established under Pub. L. 104-208 or the State Contract # 172.2019 Budget Line Item #: 416.68.92660.86878 Revision: 2017-12-07 btf 9 verification program established pursuant to §8-17.5-102(5)(c), C.R.S., Contractor shall not knowingly employ or contract with an illegal alien to perform work under this Contract or enter into a contract with a Subcontractor that fails to certify to Contractor that the Subcontractor shall not knowingly employ or contract with an illegal alien to perform work under this Contract. Contractor (i) shall not use E-Verify Program or State program procedures to undertake pre-employment screening of job applicants while this Contract is being performed, (ii) shall notify the Subcontractor and the contracting State agency within 3 days if Contractor has actual knowledge that a Subcontractor is employing or contracting with an illegal alien for work under this Contract, (iii) shall terminate the subcontract if a Subcontractor does not stop employing or contracting with the illegal alien within 3 days of receiving the notice, and (iv) shall comply with reasonable requests made in the course of an investigation, undertaken pursuant to §8-17.5-102(5), C.R.S., by the Colorado Department of Labor and Employment. If Contractor participates in the State program, Contractor shall deliver to the contracting State agency, Institution of Higher Education or political subdivision, a written, notarized affirmation, affirming that Contractor has examined the legal work status of such employee, and shall comply with all of the other requirements of the State program. If Contractor fails to comply with any requirement of this provision or §§8-17.5-101 et seq., C.R.S., the contracting State agency, institution of higher education or political subdivision may terminate this Contract for breach and, if so terminated, Contractor shall be liable for damages. B. PUBLIC CONTRACTS WITH NATURAL PERSONS. §§24-76.5-101, et seq., C.R.S. Contractor, if a natural person 18 years of age or older, hereby swears and affirms under penalty of perjury that he or she (i) is a citizen or otherwise lawfully present in the United States pursuant to federal law, (ii) shall comply with the provisions of §§24- 76.5-101 et seq., C.R.S., and (iii) has produced one form of identification required by §24-76.5-103, C.R.S. prior to the Effective Date of this Contract. Contract # 172.2019 Budget Line Item #: 416.68.92660.86878 Revision: 2017-12-07 btf 10 GOLDER ASSOCIATES, Inc. __________________________________________________ Date PITKIN COUNTY, COLORADO __________________________________________________ Date ATTORNEY APPROVAL __________________________________________________ Date Cathy Hall May-06-2019 Solid Waste Manager Asst. County Attorney May-15-2019 Richard Neiley Mark McClain May-15-2019 Principal                                             EXHIBIT A SCOPE OF WORK April 18, 2019 Our Reference: 18114945 Ms. Cathy Hall Pitkin County Solid Waste Center 76 Service Center Road Aspen, Colorado 81611 RE: PROPOSED SCOPE OF WORK AND COST ESTIMATE FOR THE INSTALLATION OF A WATER SUPPLY WELL AND ABANDONMENT OF TWO EXISTING WELLS AT THE PITKIN COUNTY SOLID WASTE CENTER Dear Cathy, Golder Associates Inc. (Golder) is pleased to provide the Pitkin County Solid Waste Center (Waste Center) with this scope of work (SOW) and cost estimate for the installation of a water supply well, the abandonment of an existing water supply well that is no longer in service, and the abandonment of monitoring well MW- 9. This proposal is organized into the following sections: 1) background, 2) scope of work, 3) health and safety, and 4) schedule and cost estimate 1.0 BACKGROUND The Waste Center plans to construct an operation and maintenance building in the northwest portion of the site in 2019. Pitkin County is requiring a water supply well to support sanitary facilities in the new building and to provide water for fire suppression and other facility needs. Pitkin County has also requested the abandonment of two existing wells, referenced as “dump well” and monitoring well MW-9. The dump well is located near existing monitoring well MW-10 and was historically used as a water supply well. The dump well has not been operational since 2012 and is no longer used as part of site operations. Well MW-9 is located near the northwest extent of the site and is being abandoned due to the construction of the proposed operation and maintenance building. 2.0 SCOPE OF WORK 2.1 Well Augmentation Permitting Golder will contract Quantum Water and Environment (Quantum) to prepare the Augmentation Plan for the commercial well permit. The Augmentation Plan will consist of:  Analysis of stream depletions in terms of timing and volume.  Location of a source of augmentation water. In conversations with the Pitkin Solid Waste Center, excess water rights are held by Pitkin County. This SOW assumes that the excess water rights held by Pitkin County will be used as the source of augmentation water.  An expert report prepared by a qualified water resources expert, detailing the depletions, modeling, and augmentation replacement to be filed with the Water Court Application. This SOW assumes that Pitkin County will provide an attorney to file the Augmentation Plan application with Water Court Division 5 (Colorado River). To meet the late spring/summer deadline for well installation, a Substitute Water Supply Plan (SWSP) will be filed at the same time as the Water Court application. Once the SWSP is filed, the State Engineer https://golderassociates.sharepoint.com/sites/102208/proposal project management/2019 pitkin drilling sow.docx Golder Associates Inc. 44 Union Boulevard, Suite 300 Lakewood, CO 80228 USA Tel: (303) 980-0540 Fax: (303) 985-2080 www.golder.com Golder Associates: Operations in Africa, Asia, Australasia, Europe, North America and South America Golder, Golder Associates and the GA globe design are trademarks of Golder Associates Corporation Ms. Cathy Hall Pitkin County April 18, 2019 18114945 2 will issue the permit within 30 days. Without a SWSP, the permitting process can take at least 6 months. Please see Table 1 for the well augmentation permitting fees. 2.2 Well Installation and Abandonment Golder will contract with Shelton Drilling Corp. of Basalt, CO (Shelton) for the water supply well installation and for the abandonment of the dump well. Golder will provide a qualified professional for oversight of the drilling operations and will have utilities located by the public service Utility Notification Center of Colorado (Colorado 811) prior to site activities. Geologic logs of subsurface materials will be prepared by Golder and shall be based on observations made of drill cuttings. No geotechnical or environmental samples of subsurface materials will be collected during drilling. Mancos Shale is expected to be encountered during drilling, with water bearing zones within the shale being targeted for the well screen interval. Based on our understanding of groundwater elevations at the site, it is assumed that groundwater will be encountered 40 to 50 feet below ground surface. Golder proposes to drill up to 50 feet past the first occurrence of groundwater to investigate if additional significant water producing zones are encountered. The borehole may not be advanced the full 50 feet past the first occurrence of groundwater if significant water production is observed. Golder will work with the drillers to monitor well production using air lifting techniques. After drilling the borehole, a nominal 5-inch diameter PVC well will be installed according to a well construction plan agreed upon by Golder and the drilling subcontractor. A draft well construction plan from Shelton is provided for reference as Attachment A. It is noteworthy that drilling costs are increased due to the use of sand filter pack around the screened interval and the use of flush joint PVC as the well casing. The filter pack increases well quality and will help prevent sedimentation of the well casing and borehole collapse around the screened interval. Flush joint PVC well casing is recommended to avoid the potential introduction of solvents into the groundwater that could be detected in the site monitoring wells. Well development will follow installation in accordance with a well development plan agreed upon by Golder and Shelton. The anticipated development method is surging the screened interval followed by airlifting. Golder cannot guarantee that the well will produce sufficient water to meet site needs. Golder recommends the collection of a groundwater sample for chemical analysis after the completion of well development. Golder can order bottles and collect samples at no additional cost upon request from the County. However, this SOW does not provide for sample shipment or analytical laboratory fees. The existing dump well and monitoring well MW-9 will be abandoned in accordance with State regulations for the abandonment of wells. The dump well has a pump and water level meter probe stuck in the well casing which will not be retrieved. For abandonment, it is anticipated that the steel surface casing will be cut off at the surface, and the existing PVC well casing will remain. Well abandonment reports (form GWS- 9) will be submitted to the CO Division of Water Resources within 60 days of well abandonment. For further details on the drilling, well installation, well development, and well abandonment please refer to the Request for Drilling Quote provided as Attachment B and the Driller Estimate provided as Attachment C. A well installation letter will be submitted upon completion of field activities. The letter will summarize drilling and well installation activities and will include geologic logs, well completion diagrams, and well development records, the dump well abandonment report and a copy of the well permit. For costing purposes, we have assumed that the report will be submitted electronically. 3.0 HEALTH AND SAFETY Services provided under this scope of work will be performed under a project-specific work method statement that will be prepared prior to the start of field activities. Golder will review the drilling subcontractor’s health and safety plan, as well as conduct daily safety tailgates with all involved personnel. https://golderassociates.sharepoint.com/sites/102208/proposal project management/2019 pitkin drilling sow.docx Ms. Cathy Hall Pitkin County April 18, 2019 18114945 3 4.0 SCHEDULE AND COST ESTIMATE Well installation and abandonment are expected to be performed in the Summer of 2019 (May through August), but we will be flexible to accommodate the County’s schedule. Golder proposes to conduct this work on a time-and-materials basis. Pitkin County reserves the right to stop work on the project if the project is cancelled. In the event of termination, Golder shall be paid for services performed up to the termination notice date plus any demobilization costs if fieldwork is on-going at the time of termination. Additional costs due to unexpected delays (e.g. weather, unexpected drilling conditions, etc.) cannot be estimated, but Pitkin County will be advised of any of these conditions, especially unexpected drilling conditions, so that contract change orders can be approved in a timely manner if necessary. In the event of unexpected delays, Pitkin County will be notified and a request for additional budget will be submitted. Golder’s estimated cost to perform the scope of work outlined above is $44,582. A detailed breakdown of these estimated costs is provided in Table 1. A drilling cost breakdown is provided as Table 2 and is supported by the Driller Estimate (Attachment C). The total approved cost estimate for the project will not be exceeded without prior approval from Pitkin County. If you have any questions, please do not hesitate to call the undersigned. SINCERELY, GOLDER ASSOCIATES INC. Van Smith, PE Project Environmental Engineer Attachments: Table 1 – Total Cost Estimate Table 2 – Drilling Cost Estimate Attachment A – Draft Well Construction Plan Attachment B – Drilling and Well Installation Request for Quote Attachment C – Driller Estimate https://golderassociates.sharepoint.com/sites/102208/proposal project management/2019 pitkin drilling sow.docx Mark McClain, PE Principal TABLE 1 TOTAL COST ESTIMATE April 2019 18114945 Table 1: Total Cost Estimate Total Estimated Hours Total Estimated Costs Phase 1 Phase 2 Drilling, Well Installation, Well Development, and Well Abandonment Well Installation Report (est. hrs) ($) (est. hrs.) (est. hrs.) ESTIMATED PERSONNEL JOB COSTS Hourly Rate Project Director/Practice Leader $200 4 $800 2 2 Senior Project Engineer/Scientist $135 18 $2,430 10 8 Project Engineer/Scientist $115 66 $7,590 50 16 Clerical/Word Processing $70 4 $280 4 Est. Total Personnel Costs ESTIMATED DIRECT JOB COSTS Rate Vehicle Expense/Fuel $100 Lodging $150 Food (Daily per Diem) $50 Field Supplies (bailers, rope, gloves, etc) $200 Well Augmentation Expert Subcontractor $7,920 (including 10% markup) Drilling Subcontractor (including 10% markup) $23,397 Well Permit (including 10% markup) $110 Office Expenses (5% of Task Labor) 5 92 $11,100 $7,500 $3,600 Unit day $500 $500 day $600 $600 day $200 $200 Lump $200 $200 Lump $7,920 $7,920 Lump $23,397 $23,397 Lump $110 $110 % $555 $375 $180 Est. Total Direct Costs $33,482 $33,302 $180 Estimated Total $44,582 $40,802 $3,780 Notes. 1. Three full days on site are expected for the completion of the work. Two additional days are budgeted for the drive to and from site. 2. See Table 2 for breakdown of drilling cost. C:\Users\DVSmith\Golder Associates\P18114945,Pikin County Drilling Oversight - Proposal – Project Management\Table 1-Pitkin Drill CostEst.xlsx TABLE 2 DRILLING COST ESTIMATE April 2019 18114945    Table 2. Drilling Cost Worksheet  Task Unit Cost Units Type Cost  Mobilization and Demobilization  Lump Sum  1  ‐  $4,000  Drill 11" surface casing  $55  40 ft  $2,200  Furnish and install 8‐5/8" steel surface casing  $45  40 ft  $1,800  Furnish and install cement grout  $15  30 ft  $450  Drill 7‐7/8" borehole  $40  60 ft  $2,400  Install 5" SCH 40 flush joint PVC blank casing  $30  50 ft  $1,500  Install 5" SCH 40 flush joint PVC screen casing  $34  50 ft  $1,700  Furnish and install filter pack  $30  54 ft  $1,620  Rig Hours (for Well development)  $475  6 hours  $2,850  Well abandonment (dump well)  Lump Sum  1  ‐  $2,000  Well abandonment (MW‐9)  Lump Sum  1  ‐  $750  Subtotal  $21,270  Subcontractor markup (10%)  $2,127  Total  $23,397                                                ATTACHMENT A DRAFT WELL CONSTRUCTION PLAN I _, L 1.ob I I 8 5/8" OD Steel Surface Casing / / '<I V '<I V / '<I 17 '<I 17 Permit# 43773-F-R I / / / / '<I 17 slJ '- 17 '<I 17 / '<I 17 '- '<I Grout 10' to4 - I / r- / / 1'-1 17 '<I I 171 '<I 17( '<I ? .,_pirt!Cl y I / - I 'II V '<I V 'l 17 I 'l i '<I _L Static Level 39' 11" Bore Hole 7 7/8" Bore Hole ' '"°.- 1-- - ---t-- - - - - - - - - - - - - ----; 5.5" PVC -------- Cfl .1 8-12 Silica Sand _ - r ATTACHMENT B DRILLING AND WELL INSTALLATION REQUEST FOR QUOTE February 6, 2019 Project Number 18114945 REQUEST FOR BID – DRILLING AND WELL INSTALLATION, PITKIN COUNTY SOLID WASTE CENTER, SNOWMASS VILLAGE, COLORADO Dear Bidder: This document is a request by Golder Associates Inc. (Golder) on behalf of Pitkin County for a proposal to drill and install one water supply well at the Pitkin County Solid Waste Center (the Site), approximately 9 miles north of Aspen, Colorado. The purpose of this drilling and well installation program is to log geology, identify the first occurrence of groundwater, and install a water supply well in the borehole. Additionally, one existing water supply well will be abandoned. 1.0 SPECIFICATIONS 1.1 Drilling The drilling locations can be safely accessed with a two-wheel drive drilling rig. The specifics of the drilling are summarized as follows. • Based on water level data from existing monitoring wells at the Site, we anticipate the first occurrence of groundwater to be between 40 and 50 ft below the ground surface (bgs). The well boring shall be advanced 50 feet past the first occurrence of groundwater for an estimated total depth of 100 feet. • The borehole diameter and well casing diameter shall be recommended by the drilling contractor and appropriate for a water supply well. • The drilling method selected should accommodate continuous sampling of drill cuttings throughout borehole drilling. Previous boreholes on site have been drilled using air-rotary methods. • The drill rig should be equipped to perform air lifting of drilling fluid (if used) and encountered groundwater. Air lifting the borehole dry and then monitoring well recovery will be directed during drilling to test potential well yield. • The rig and downhole equipment (augers and/or rods) shall be clean (i.e. free of potential contaminants) upon arrival at the site and prior to the start of drilling. • Lubricants for the drilling pipe and fittings must be hydrocarbon free (no hydrocarbon-based grease or oils). A Golder representative will observe the drilling and well installation and will prepare a geologic log of the borehole. A geologic log for a nearby boring has been provided as Attachment A for reference. Work shall be Golder Associates Inc. 44 Union Boulevard, Suite 300 Lakewood, Colorado, USA 80228 T: +1 303 980-0540 | F: +1 303 985-2080 Golder and the G logo are trademarks of Golder Associates Corporation golder.com 18114945 February 6, 2019 completed in a detailed manner and in cooperation with the Golder representative so that the data can be properly recorded. Because subsurface conditions may differ from expectations, the drill rig shall be equipped with sufficient tooling to drill beyond 100 ft bgs. It is recommended to be equipped with a minimum of 150 ft of tooling. 1.2 WELL INSTALLATION After drilling the borehole, a water supply well will be installed as detailed below and in accordance with State Regulations. Any variations to the materials specified below must be approved by a Golder representative prior to mobilization to the site. The specifics of the installation are summarized as follows: • Well casing and screen shall be Schedule 40 polyvinyl chloride (PVC) and each joint shall be flush- threaded with sealing o-rings. Solvent glued casing joints will not be permitted. Well casing diameter shall be recommended by the drilling contractor and appropriate for a water supply well. • Well shall have 2.5 to 3.0 ft of stick up above ground surface. • Well screens shall be machine slotted with a slot size appropriate for a water supply well. The driller shall specify the screen slot size in their bid. • Because subsurface conditions may differ from expectations, the driller shall be equipped with sufficient well construction materials to complete a well beyond 100 ft bgs. It is recommended to be equipped with a minimum of 150 ft of well construction materials. • The screen length shall be appropriate for a water supply well given the encountered geology. The driller shall be prepared to install at least 50 feet of screen. • Flush-threaded end caps with sealing o-rings shall be placed on the bottom of each newly installed well. • Sand pack appropriate for the screen slot size shall be used. The driller shall specify the sand pack gradation in their bid. • The sand pack shall extend 2 to 4 ft above the top of the well screen. • A minimum of 2 ft of bentonite chips shall be placed above the sand pack and, if above the water table, hydrated for a minimum of 30 minutes before well installation progresses. If the bentonite seal is installed below the water table, time release bentonite pellets shall be used and the pellets shall be allowed to hydrate for a period of time equivalent to the time required for the pellets to begin hydration (e.g. if 30 minute time release pellets are used, 30 minute hydration time will be required). As such, both bentonite chips and pellets shall be available for each monitoring well installation. • The annular space above the bentonite pellets or chips shall be filled with appropriate impermeable material in accordance with State regulations. The bid shall specify the proposed method of bentonite/grout placement. • Sand pack and bentonite chips/pellets shall be placed using tremie pipe. 2 18114945 February 6, 2019 • The well shall be completed to allow future pump installation and accompanying plumbing. Surface completions shall be constructed at the driller’s discretion and in accordance with State Regulations. Please describe the surface completion plan in the bid. Water for drilling, equipment decontamination, and well installation will not be available on site. The drilling subcontractor will need to provide a water truck or supply tanks as necessary to transport water from an approved potable source to the site. The drilling subcontractor shall provide all the required equipment and supplies to complete the scope of work outlined above. Other assumptions to consider for your bid are as follows. • Disposable latex or nitrile gloves shall be used to handle all downhole equipment and materials including but not limited to well casing and other construction materials (e.g. filter sand, bentonite chips/pellets, and bentonite grout). • Drilling subcontractor shall provide a weighted tape measure to determine total depth of boreholes and depth to well materials during construction. • Drilling subcontractor is responsible for clean-up of the drill area; drill cuttings can be spread finely on the ground surface. No waste will be permitted to be left on site, including but not limited to construction material bags, sleeves, boxes, etc. • Drilling subcontractor is responsible for providing and transporting water from an approved potable source for drilling. • Decontamination water does not need to be collected and containerized. It can be allowed to run onto and infiltrate the ground surface • Personal Protective Equipment, at a minimum, shall consist of level D protection (e.g., steel toe boots, hard hat, safety glasses, work gloves, and hearing protection). • Drillers shall perform utility locates prior to commencing drilling activities. Copies of utility locates shall be provided to Golder prior to mobilization. 1.3 WELL ABANDONMENT One existing well on site will be abandoned in accordance with State regulations. The well to be abandoned is installed to a depth of approximately 200 ft bgs, the well construction report has been provided in Attachment B. The well to be abandoned has a pump and water level meter probe stuck in the well casing that will not be retrieved. For abandonment, it is anticipated that the steel surface casing will be removed, and the existing PVC well casing will remain. The well shall be filled with clean sand or clean gravel to the static water level which is estimated at 70 feet below ground surface, then grouted to within five feet of the ground surface. The top five feet of the hole shall be filled with materials less permeable than the surrounding soils that are adequately compacted and/or mounded to prevent settling. Golder will submit the well abandonment report (form No. GWS-09). 3 18114945 February 6, 2019 1.4 WELL DEVELOPMENT Following well construction, the well will be developed by the driller. Development methods will be adapted to field conditions. The following specifications are provided for planning purposes:  Well development will be performed a minimum of 24 hours after well construction is complete to allow the bentonite to further hydrate and concrete pad to cure.  All equipment used for well development will be cleaned prior to use.  Preliminary development will be completed by surging with a surge block, bailer, or stainless-steel swab. Preliminary development will be considered complete at Golder’s discretion, and will be limited to one hour.  Final development will be completed by overpumping.  The driller shall be prepared for a variety of methods for development.  The driller shall provide the required equipment and supplies to complete the scope of work outlined herein. Samples of the purged water will be tested for pH, temperature, and specific conductivity. Purging will continue until parameters stabilize and a minimum of three well volumes are removed. A well volume is defined as the submerged casing volume plus the porous annular volume. Parameters are considered stabilized when three consecutive readings of specific conductivity and temperature are within a ±10% change and pH readings are within a ±0.2 pH units. A Golder representative will monitor and record these parameters. Groundwater removed during well development can be discharged directly on the ground surface. Details of well development will be recorded by Golder. 2.0 BID The bid estimate for this work shall include the following: 1. A single mobilization and demobilization cost to and from the site; 2. Costs for drilling, monitoring well construction materials and abandonment shall be provided on a per-foot basis. 3. The type of drill method to be used; 4. The size of borehole, well casing, well screen slot size, sand pack gradation, and surface completion to be used; 5. The proposed well development method; 6. Availability in Spring 2019 (April through June); 7. An estimated time-frame to complete the work; and 8. The “notice to proceed” lead time needed to secure a start date. 4 18114945 February 6, 2019 This work is currently planned to occur in Spring 2019. Thank you for your consideration in responding to this request. If you should have any questions or require additional information regarding this request for bid, please contact Van Smith at (303) 980-0540 or dvsmith@golder.com. Golder Associates Inc. Van Smith, PE Project Environmental Engineer Attachments: Attachment A – Example Site Boring Log Attachment B - Well Construction Report for Well to be Abandoned 5 18114945 February 6, 2019 Attachment A – Example Site Boring Log 6 z.on /n ,l DEPTH z u a: l8 -::, ufil <w SURFACE .., e: a: a: I Prrl?tt\J / Lf= t c o RECORD OF DRILLHOL.E P - \ Sheet / of 3 PROJECT: . 0 I PROJECT No: qb3 - l). BORING METHOD: _H DRIWNG DATE: !>/'f C0£.£- Are..../wNr,;,t I\ . ,J _ DATUM: COORDINATES N: COLLAR ELEV: E: LOCATION: .P\"r\li--i. C<,.\ ul,-U't:o AOCKTYPE-1 DRILL RIG: c..,'(Ji£..:...._ l"\.Y- '1 f AZIMUTH: Cz!I ii:x .:.r. C < ,; INCLINATION: I :WrWe z t'J 0.., .s i .w.. C ... I NOTES w WATER LEVELS DESCRIPTION ►a: w ... DISCONTlNUrTY DATA 3: en 5 C I El.EV ci WW .a..:.0.. u 0.. INSTRUMENTATION -- z a:> ROD ::, 0 TYPE ANO .. (Fi) a: a: 0000 fa.. 0 OESCRIPTION 0 ;::;::;::, in • r"I N 1 C")- c,- :rN"7 ... \11Cl ClllQ .. N N.-om- Ul :E: I: a: cc a: a: a: cc a: a: - 0 I \ ,;..,,_.,, bb-1h""'I (!! Ii j I ' 1 I 1 / - 1 fa.it, R.v1'! I 1 '2 '-/ S- \ I J l wfl£ Lo5s 1 j ...,o --· >10 -· -,-=:: 10§. ·· >10 -- .>It) - >10 - - -- -- - --::::: /55' --= - r- I I >IO - oO c:: ?; z ?; C, C, 0 I I X 0000 0\1100\n i1 J.Joi,t F-Fut PI.-Plana" C-Cuved P-Poishod K-slkansidod F.. FeOlode CL-Clay $-Shea' U-UncUatiig SM-Smoolh 8-Badcfng F-Foia1ion ST-S,lj)!)Od 1-1 C/l R-Rcug, VA-V.Rcug, AAAf h ,,,,.,. DEPTH SCALE: : 2- · DRIWNG CONTRACTOF): 1,0 -::f"11.., DRn..LER: Q / fi.,_,r A<.:.,.,i:,,; LOGGED: I-'\, CHECKED: DATE: Golder Associates PROJECT: . ('J I k - _HG o.- 1n ... - - MvJ - - -- --·· · □DEPTH SCALE· / =- 2- I ....z, ....., z_ ..::ffL sM 9/ ILL 1 1 -- Prr .11\l / LF t c...o PROJECT No: qb3 - n l>. LOCATION: .p\ 1'1- Ge,., c.,l6U°t:o AOCKTYPE-' RECORD OF DRILLHOL.E BORING METHoo: Cl?!e£.. A.U.../wi\7 ORIWNG DATE: , ;/ /c;? DRIU. RIG: A.c..'(R._ I/ f-AouNT J.Joi-11 PL-l'lanar P-Pobhed F•FoOlode DATUM: COORDINATES N: AZIMLJTH: P -1 Sheet C:! 3 COLLAR ELEV: E: INCLINATION: w --l F-FaA C-cu-v.d K-$1kansidod CL-clay i :c: C CJ $-Shear U-Undualr>g SM-Smoolh a:x t; X c§ ';' O B-Beda,g ST-Stepped R-RDlq'I WC Wz CW -' ,!: - 0..J F-Foia1ion 1-1---•.-.- VR-V.0.,.~.......,._.,,......·.,....,.......,,_....., -t i>'-.li ;: f-z X NOTES ..-..wu. w C DESCRIPTION ci wffi b DISCONTINUfTYDATA g :': rn _ELEV_ i § ACD f2 TYPE ANO 6:8 a: ., _ g WATER LEVELS INSTRUMENTATION CJ DEPTH ::, U h1 < ffi SURFACE ..i 1.1.. 0 cc: cc o 0 0o 0o "" {FT) CC: CC 0000 ff Q. o DESCRIPTION O ;:., 11'1 .. l"llN c<'JN-1"2-r'J.IOll'l-fO mc.-N N•c.a- rn:I:: a:a:cca: cc:cc:a:a: cc: ot;. - 2..Z. ) l,A-®F..RA.-r ly :;:: wF.J..-rlv:JVcbI --,(A,,,_,\/ .-- u,_t.,\ <NA-.ru:>, o\1vt..YAi -- - l 5 Y 1././,) W/Ll.\L t.,\L 1 S\\A\.E..I Fe..Ot- S<TA\M/\J5 - >lo rr,...,.i!.-'T s 1'.'.vJ t:. "' 1• 1:) ll \vl)vCE.P, 1 A,St'..=-D 't:,(2. Ll.r...e..... -r<' fuE.-0\1(.£.... P-._'t;JAN ,.r, "!'£.. , l. e,,Jc...,i-e \[l'_u=vs ftlAt.f.S' - j bLy ,:::: -- = 1.---_ z_ ..:f K S.k 50" 1 "• fJ\W ' -7,.0 -- 1 fe.0-,(, J y (L-Z..... j --·.. -· zo?- I :::S- Pl,SM 1 Fe.C¼ '-'\c.n£. :500 -...... - @ 1so--0l X IX V 1......... ...... , I j ....zz. ._,.... -- >10 I --- o, •I-- .... . 'I, I/ 1 1.-- 1 ....- ( { -- .:::r, PL I.,.k 50" 1 1-? [!-7- \<. - 35" ) 9,f:,._ ...-.. - I .:::::f 1 Pl ,SM :S°"0 V J C.,01<\, '911\,_,\ y -- ' WM -r I MIE:o 1\JM, - :3;\J.. l)Auc 'cf'--Ay (N'-I) --- I .::S-, -l , 'Sk £"0"' V t--- 15 ---- -- -· -- I ' .::r, ,s"' 75° 1 ► --7\1' --- -;t:. 3°/ ' z_ .:::r,PL,-SM 1£" - J I- V - .T, fl.Si"\ 6 b0 / j ' ,.....'<- -- -Tl PL I<:;;/-\ "2--""' z._ ....j I PL I.SI'\. --i€'" -I--- ' --·-- -3o --- , -· :,0- -- z.. - --3" fL ,'5/-\ C-e";. -,i;o d .._- 3 -:::f [)L SM '-150 1/ -- 1 I >-- 35° - --- 2.... 50" V I- - 0 :JI Pl, /-\ ...5, 0 - 1 , - I I RIW NG coNTRACro : MAf 1-ro hR-, 1.,- -:r"'t.. DRn.LER: .D I .. A.,. A e-.-- LOGGED: t--\, CHECKED: DATE: Golder Associates t/ q63 -2-01""1 • 'f? .Pt-r\l.<1'1 k - Pd?-1r.J / Lf; c o Pif:- -· . l 1 i l w I RECORD OF DRILLHO Sheet '5013 PROJECT: - i I BORINGMETHOD: - C0 /\lP.... W,\7 DATUM: COLLAFI ELEV: PAOJECTNO: DRILLING DATE: !> COOAOINATES N: E: LOCATION: Cc,\ e,,l,utio DRILL RIG: ,-c}(Ja?._ t,AovNT A21MUTH: INCLINATION: ROCKTYP!=-1 J.Jonl PL-Plalar P- Fo-F C!l w F-Fut CClzved K-sac.nsidod Cl-Clay z :,:c C ..j C!l $-ShNr U-Unci.uting SM-Smoo1h ii:x < C!l 0 8-Bedci,g ST-stopped R-Rougt WW z 1';j 0 .E, ..J .u c., w F-Foia1ion l•lrregua- VR.V.Rcug, Ill :Cc w C ,..J ,C : z X NOTES WATER LEVELS ,..."- DESCRIPTION :i: >a: w ... DISCONTINUITY DATA 3: en 5 C aw.- a. ELEV 0 ww .a.:..0.. u a. INSTRUMENTATION 0 C<: -- z a:> RQD ::, 0 TYPE AND 8 C!l DEPTH :z:, ouOU ., 0 (FT) a: wa: ff: ffi SURFACE ..... fl: a: ii: "o'in"oow,_, e0o0..-N0 a.. 0 DESCRIPTION 0 3:3:3:1 in..-'°'N Neo,..-in 11D I- ""32 . Q -359 slrf-tjy I., ,.,. <-b -J,.."" y !<'. N•cic...- u:i2: a::a::a:a: a::a::a::a: a: w"'' e:R.....@ "3 'Z- 1._.AJ,Ju.tvA,""tF.::2:>i' \1/M._ 1)11,>-1 \::f/Ay LN'-l)I W,E-A\'-.. kKI ""- /0 0 V _)\I.; .:st-\A.\£ i,..--, zi 3 ..::-.f, s.._l IL .,o" --3 t3.[- s ) i::,F_ru.T \') IAJ-'cA., • --· ·∙-∙· ,.. 10 1/ {! :.,..--c, >10 7;" · -- R-_Z-- [v\W --- 1 ,_.-· z. .::T, C.. , Sh c.5° 1 ..-_ 55£ .::i"1 PL 1 10" 5w f'N'.l) !wN 7 @_ 1 /$5::5" j -3C 1 C'..-o .o l!z_ \ce)v\)./\ A,T .z::, --32 (1 3 . 1 1 J 1 . 1 1 I- j,; . j j 1 1 l 'j i . ; ; ..J ! i '' i - - I ... - : 0000 0000 I l - .. I - DEPTI-t SCALE· I II == Z- I I LOGGED: 1--\., DRILLING CONTRACTOFj: t1Af \"TO hk..1 1,,. -:rNC., CHECKED: Golder Associates DRILLER: f2 I &.;:-M.._ (!-J:> DATE: 18114945 February 6, 2019 Attachment B – Well Construction Report for Well to be Abandoned 7 _,W,,J_9 6,--.77 •• THIS FORM MUST BE SUBMITTED WITHIN 60 OAYS OF COMP\.ETION OF THE WORK DESCRIBED HERE- ON. TYPE OR PAINT IN BLACK INK. {}_6) COLORADO DIVISION OF WATER RESOURCES 1313 Shennan Street • Room 818 Denver, Colorado 80203 WELL COMPLETION AND PUMP INSTALLATION REPORT PERMIT NUMBER ·•·{66-28 :∙l . "· ,._, J',J WELLOWNER Frank Bishop/ Bishop Cont. -----¼of the NE ¼ of Sec._? _ ADDRESS P.O.Box 467 Basalt, Co. 81621 T. --, R. BSW 6 P.M. DATE COMPLETED 8/9/ .19 90 HOLE DIAMETER WELL LOG 9- in. from Q to 24 ft. -.6..-5- in. from 24 to 20 0 ft. in.from 10 ft. DRILLING METHOD·..-A.1LJiL..1r1.-.1-R ou.t.LC&a.1.r y:... CASING RECORD: Plain Casing Size _L_ & kind steel from O to _l.! _ ft. Size & kind from 24 to 200 ft. Size & kind from Perforet1d Casilltl to ft. Size -----2..a..S& kind from 1 20 to 200 ft. Size Size & kind from & kind from to to ft. ft. GROUTING RECORD Material cement 6gal/sk intervals 6 to 24 Placement Method g-r..a...v.'-"'.i.. -.;Y1---------- GRAVEL PACK: Size------------- Interval TEST DATA Date Tested 8/9 , 199..0_ Static Water Level Prior to Test 90 ft. Type of Test Pump Ab· compr1nsor Length of Test -'2=--h....,..o.::uc:r s"------------ Sustained Yield (Metered) .1'-'0,.. _ Final Pumping Water Level _l'_o.._t......,_a..,,.l _ From To Type and Color of Material Water Loe. 000 000 003 200 .. ,. - - - . .. Topsoil Mancos Shale ,, -- .. TOTAL DEPTH 200 110 140 180 Use additional pages oecHsarv to complete log. ATTACHMENT C DRILLER ESTIMATE Smith, Van From: Wayne Shelton <wsdi@rof.net> Sent: Monday, February 18, 2019 12:58 PM To: Smith, Van Subject: PitCo Landfill Well Attachments: PitCo well design.pdf; PitCo-Golder Bid 1.docx EXTERNAL EMAIL    Van,  Attached is our bid for your Pitkin County landfill water well. Attached also is a drawing of a proposed well design.    Our drilling sequence are as follows : Arrive at site and set up the drill rig and support equipment  Drill a 11” nominal hole to 40’ using air compressor and if needed air mist and foam  Install 40’ of 8 5/8” steel surface casing  Install 30’ of neat cement grout by installing from the surface  Drill 7 7/8” hole to hole TD using air compressor and if needed air mist and foam  Install engineer determined amount of 5” nominal id pvc plain and slotted casing  Install engineer determined amount of silica sand pack by pouring from the surface  Develop well by air lift and surging    I have listed several items for your consideration.  1. Well will be constructed at or above State minimum standards.  2. At this time we do not have the equipment available to tremie the sand ( a 1.25” annulus between borehole and  pvc casing should facilitate surface installation of sand)  3. PVC blank casing will be a flush joint 5” nominal id schedule 40 casing (120’ will be available)  4. PVC slotted casing will be a flush joint 5” nominal id schedule 40 casing with .040 machine slots (60’ will be  available)  5. Silica sand will be 8‐12 sized (40 x 50lb bags will be available)  6. The flush joint pvc and the silica sand are special order for us and as such may be subject to availability  7. These methods and materials are subject to your consideration and approval        It should be noted that this well design represents nearly a doubling of our normal cost to drill a well in this type of rock  formation as our normal well consists of a 7” surface casing, 5” solvent weld pvc casing and no sand pack.    If you have any questions please feel free to give me a call.  Wayne Shelton                    1 Shelton Drilling Corp. P.O. Box 1059 Basalt, Co. 81621 February 14, 2019 Golder Associates Inc Attn: Van Smith 44 Union Boulevard, Suite 300 Lakewood, CO 80228 Re : Pitkin County landfill water well Mr. Smith, The following is our proposal for the drilling a water well to be located at the Pitkin County Landfill. Mobilization & Demobilization (Lump Sum). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $4000.00 Drill 11” surface casing hole . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $55.00 per foot Furnish and install 8 5/8” surface casing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$45.00 per foot Furnish and install neat cement grout . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$15.00 per foot Drill 7 7/8” hole . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $40.00 per foot Install 5” ID nominal flush joint schedule 40 pvc plain casing. . . . . . . . . . . . . . . . . .$30.00 per foot Install 5” ID nominal flush joint schedule 40 pvc slotted casing. . . . . . . . . . . . . . . . $34.00 per foot Furnish and install 8-12 Silica Sand pack . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$30.00 per foot Rig Hours (including development time ) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$ 475.00 per hour Standby Hours (if necessary) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$ 325.00 per hour Well abandonment (Lump sum) see note below. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2000 Abandonment of existing well as follows: fill well with 3/8” clean gravel to water table, pour 2’ of bentonite chips, native clays or soil to within 5’ of the surface, neat grout to surface. (See State regs). 7’ steel casing was grouted in place with cement so it will not be removed however it can be cut off at ground level. If you have any questions please give me a call Wayne Shelton (970) 927-4182. Shelton Drilling Corp. P.O. Box 1059 Basalt, Co. 81621 April 12, 2019 Golder Associates Inc Attn: Van Smith 44 Union Boulevard, Suite 300 Lakewood, CO 80228 Re : Pitkin County landfill water well abandonment Mr. Smith, The following is our proposal for the abandonment of MW-9 at the Pitkin County Landfill Well abandonment (Lump sum) see note below. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$750.00 Abandonment of existing well MW-9 as follows: fill inside of 2” pvc with silica sand to water table, pour 2’ of bentonite chips, native clays or soil to within 5’ of the surface, neat grout to surface. (See State regs). We will attempt to cut off 4” round protective casing at ground level, depending on access and construction . If you have any questions please give me a call Wayne Shelton (970) 927-4182.