Loading...
HomeMy WebLinkAboutbocc.con.amended.106.2018 A2017-11-13 btf Contract Information Contract Number Project Name Contractor Budget Line Item 404.23.00000.82000 Procurement Method: Type: Contract Start Date Contract End Date Contract Type Retainage If this is a new contractor, please request they complete and submit to Finance a New Vendor Request Form. Contact Information: Department County Representative Aaron Buob County Representative Phone (970) 429-3337 Provide a brief description of the contract: Contract Value Summary: $ 351,576.78 $- $ 21,812.00 $ 373,388.78 NOTE: Clerks Office will keep original documents in compliance with Colorado State Archives retainage Airport Landside Painting in the parking lots Original Contract Amount Previous Change Order/Amendment Amount This Change order/Amendment amount New Contract Total No Airfield and Ladnside Parking and Roadway Pavement Marking Services Proline West $21,812.00 Additional Budget Line Item(s) (Please fully allocate New Contract Total) $- $21,812.00 Formal Services/Maintenance 5/29/2018 5/31/2019 Change Order/Contract Amendment 106.2018 A Pitkin County Procurement Cover Sheet Please complete the Contract Cover Sheet when the contract/task order is complete and fully executed. Return all Contract Cover Sheets and Contracts/Change Orders/Amendments/Task Orders to Procurement Contract #: 106.2018 Rev. 2018.06.13 btf Budget Line Item #: 404.23.00000.82000 *Increases over $25,000 and/or 10% (single increase or accumulative) of original contract must have County Manager signature. 1 CHANGE ORDER / CONTRACT AMENDMENT Change Order Number: 106.2018 A OWNER: Pitkin County, Colorado 530 E. Main St., Suite #302 Aspen, CO 81611 CONTRACTOR: Proline West 604 SE 8th Street, Suite C Loveland, CO 80537 The Provision of AIRFIELD AND LANDSIDE PARKING AND ROADWAY PAVEMENT MARKING SERVICES (the “Contract”) dated May 29, 2018 between the Board of County Commissioners of Pitkin County, Colorado (the “County”) and Proline West (the “Contractor”), is hereby amended as follows: Description of Change: Landside Painting, along with an additional budget line. Reason for Change: Yearly repainting before June 1st, 2019, with scope of work to be completed from May 21, 2019 – May 31, 2019. Original Contract Amount $ 351,576.78 Previous Change Order/Amendment Amount $ This Change Order/Amendment Amount $ 21,812.00 New Contract Total $ 373,388.78 Contract #: 106.2018 Rev. 2018.06.13 btf Budget Line Item #: 404.23.00000.82000 *Increases over $25,000 and/or 10% (single increase or accumulative) of original contract must have County Manager signature. 2 In all other respects, the Contract is in full force and effect and remains unchanged by this Amendment. PROLINE WEST ________________________________________________ !#VENDOR SIGNATURE#! Date PITKIN COUNTY, COLORADO _________________________________________________ !#DEPARTMENT REPRESENTATIVE#! Date _________________________________________________ Date May-17-2019 Thomas McLeod Owner May-17-2019 Airport Controller Chris Padilla Aaron Buob Assistant Aviation Director May-17-2019 Proline West Inc. 604 SE 8th Street Loveland, CO 80537 US (970) 593-6789 info@prolinewest.com prolinewest.com Estimate ADDRESS Aspen-Pitkin County Airport 0233 Airport Rd Aspen, CO 81611 SHIP TO Aspen-Pitkin County Airport 0233 Airport Rd Aspen, CO 81611 ESTIMATE #DATE 1504 05/16/2019 ACTIVITY QTY RATE AMOUNT Airport:P-Mob Airport Mobilization 1 5,600.00 5,600.00 Parking Lots:2Stall All Stalls in specified parking lots yellow and white approximately 500 8,634 0.75 6,475.50 Parking Lots:1Stall White and yellow striping in front of terminal and Terminal Road 2,690 0.75 2,017.50 Parking Lots:1Arrows:Large Large Left, Right Turn or Straight 43 25.00 1,075.00 Parking Lots:2Hatched Mark Large Hatched Area Large 8 20.00 160.00 Parking Lots:2Hatched Mark Small Hatched Area Mark Small 6 15.00 90.00 Parking Lots:2LF 4" Hatching and lines throughout the parking lots 1,696 0.75 1,272.00 Parking Lots:2Handy-Cap:Multi Color Blue/White Handicap Signs 16 25.00 400.00 Parking Lots:2Letters and Numbers 12" Letters 12" (No Parking) (Thru Traffic) 170 1.00 170.00 Parking Lots:1Stop Stop Bars per Sq Ft 316 0.75 237.00 Parking Lots:2Crosswalk Bars Crosswalk Bars (per Sq Ft) 420 0.75 315.00 Airport:P-101a Existing marking Removal in front of terminal building by grinding method to facilitate least amount of damage to surface 1 3,500.00 3,500.00 Airport:P-100ab Traffic Control 1 500.00 500.00 Parking Lots:1LF Running man signs are included and all other misc signs to be determined while on job site 1 0.00 0.00 Airport operations will facilitate clearing and blocking off of parking lots in advanced. All terminal road markings will receive glass beads for nighttime safety. We will do light prep cleaning where the paint goes, we ask that the airport help with the heavy winter debris removal. Surface needs to be dry and any snow pack in the parking lots needs to be removed. Assistance with towing and coordination of closures. TOTAL $21,812.00 Accepted By Accepted Date