Loading...
HomeMy WebLinkAboutbocc.con.amended.112.20 A2019-12-17 CDD Contract Information Contract Number Project Name Contractor Budget Line Item 40451150.572000 Procurement Method: Type: Contract Start Date Contract End Date Contract Type Retainage If this is a new contractor, please enter the New Vendor information into Munis for workflow approval. Contact Information: Department County Representative Matt Whitelock County Representative Phone (970) 429-1880 Provide a brief description of the contract: Contract Value Summary: $ 428,712.90 $ - $231,812.96 $ 660,525.86 112.20 A Pitkin County Procurement Cover Sheet Please complete the Contract Cover Sheet when the contract/task order is complete and fully executed. Return all Contract Cover Sheets and Contracts/Change Orders/Amendments/Task Orders to Procurement Yes - 5% Installation of Runway 15 REILs Phoenix Industries LLC $231,812.96 Additional Budget Line Item(s) (Please fully allocate New Contract Total) $- $- $- $- Formal Construction 9/21/2020 5/27/2021 New Contract Airport Change Order to install new conduit and cable along the westside of Runway 15/33 from the Airport Operations Center to the Runway 15 REILs due to unsuccessful attempts at the original construction areas. Original Contract Amount Previous Change Order/Amendment Amount This Change order/Amendment amount New Contract Total Contract #: 112.20 A Rev. 2018.06.13 btf Budget Line Item #: 40451150.572000 *Increases over $25,000 and/or 10% (single increase or accumulative) of original contract must have County Manager signature. 1 CHANGE ORDER / CONTRACT AMENDMENT Change Order Number: 112.20 A OWNER: Pitkin County, Colorado 530 E. Main St., Suite #302 Aspen, CO 81611 CONTRACTOR: Phoenix Industries LLC Roy Thompson, Managing Member 1338 Grand Ave. #294 Glenwood Springs, CO 81601 The Provision of Installation of Runway 15 REILs (the “Contract”) dated September 30, 2020 between the Board of County Commissioners of Pitkin County, Colorado (the “County”) and Phoenix Industries LLC (the “Contractor”), is hereby amended as follows: Description of Change: Install new conduit and cable along the westside of Runway 15/33 from the Airport Operations Center to the Runway 15 REILs with an extension of time to complete the project through 5/27/2021. See attachment A, B, and C for further details of this change order. Reason for Change: The existing conduits from the Airport Operations Center parking lot to the runway and under the runway were found to be damaged and blocked with soil and thus not usable. Because of this, new conduit was required. Directional boring was attempted under the runway, ARFF road, and Vehicle Service Road but was unsuccessful due to large rocks. Consideration was given to utilizing a more powerful boring machine but this was dismissed due to concerns that it could lead to vertical displacement of the runway pavement creating a bump on the surface. Since the runway could not be crossed, installation of a new conduit route along the westside of the runway was required. Winter weather was starting to set in by the time the damaged conduits were discovered, so snow and cold temperature construction practices were required for a majority of the westside work. . Original Contract Amount $ 428,712.90 Previous Change Order/Amendment Amount $ This Change Order/Amendment Amount $ 231,812.96 New Contract Total $ 660,525.86 Contract #: 112.20 A Rev. 2018.06.13 btf Budget Line Item #: 40451150.572000 *Increases over $25,000 and/or 10% (single increase or accumulative) of original contract must have County Manager signature. 3 In all other respects, the Contract is in full force and effect and remains unchanged by this Amendment. PHOENIX INDUSTRIES LLC ________________________________________________ !#VENDOR SIGNATURE#! Date PITKIN COUNTY, COLORADO RECOMMENDED FOR APPROVAL: _________________________________________________ !#DEPARTMENT REPRESENTATIVE#! Date _________________________________________________ Date MANAGER APPROVAL: ________________________________________________ !#COUNTY MANAGER#! Date Jan-11-2021 Managing Member Roy Thomson Matt Whitelock Jan-11-2021 Director of Security and Construction Rich Englehart Jan-11-2021 Deputy County Manager Jan-15-2021 County Manager Jon Peacock 1 or - AIRPORT:DATE: LOCATION: CONTRACTOR:Project: Install Runway 15 REIL Item No.Unit Unit Price Quantity Change P-152-4.1 CY $ 101.50 -704.00 P-152-4.2 CY $ 76.25 -810.00 T-901-5.1 Acre $ 11,300.00 1.45 L-108-5.1 LF $ 5.37 12,000.00 L-108-5.2 LF $ 3.26 4,547.00 L-110-5.1 LF $ 9.67 4,547.00 L-110-5.2 LF $ 22.00 -150.00 L-125-5.2 EA $ 1,312.00 11.00 C-105-CO1.1 LS $ 6,730.00 1.00 C-105-CO1.2 LS $ 8,750.00 1.00 C-105-CO1.3 LS $ 18,625.00 1.00 C-103-CO1.4 LS $ 5,248.00 1.00 T-901-CO1.5 Acre $ 4,600.00 1.00 L-108-CO1.6 LF $ 1.91 12,000.00 L-108-CO1.7 LF $ 0.75 4,547.00 L-110-CO1.8 LF $ 20.00 902.00 L-110-CO1.9 LF $ 5.50 4,547.00 L-125-CO1.10 LS $ 13,400.00 1.00 L-125-CO1.11 EA $ 1,800.00 11.00 CO1.12 LS $ 29,250.00 1.00 CO1.13 LS $ 38,500.00 1.00 This Change Order Total Previous Change Order(s) Total Original Contract Total (Schedule 1) No. 8 AWG, 5kV L-824, Type C Cable, Installed in Trench, Duct Bank or Conduit - Cold Weather Supplement $ 22,920.00 U.S. DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION AIRPORT IMPROVEMENT PROGRAM CONTRACT CHANGE ORDER NO.: SUPPLEMENTAL AGREEMENT NO.: $ 231,812.96 $ - $ 428,712.90 Revised Contract Total $ 660,525.86 The items described in this change order are a compilation of changes that were necessary due to conditions found in the field. In addition, the time provided for completeion of the contract will increase by 30 working days. You are requested to perform the following described work upon receipt of an approved copy of this document or as directed by the Engineer: Description Amount Total Aspen-Pitkin County Airport January 7, 2021 Aspen, CO AIP PROJECT NO.:3-08-0003-055 Phoenix Industries, LLC Non-Encased 2-Way 3" Conduit $ (3,300.00) ARFF Road Conduit Crossing with Detour $ 29,250.00 Mobilization - Directional Boring for Attempt under the Runway $ 6,730.00 Rock Excavation $ (71,456.00) No. 6 AWG, Solid, Base Copper Counterpoise Wire, Installed Above the duct Bank or Conduit, Including Connections/Terminations $ 64,440.00 Survey, Layout and Staking - Westside Improvements Borrow Excavation $ (61,762.50) $ 14,823.22 No. 8 AWG, 5kV L-824, Type C Cable, Installed in Trench, Duct Bank or Conduit L-867 Base Can, Size D $ 14,432.00 Seeding $ 16,385.00 Non-Encased 1-Way 2" Conduit $ 43,969.49 Mobilization - Trenching along the West side $ 8,750.00 VSR Conduit Crossing with Detour $ 38,500.00 Non-Encased 1-Way 2" Conduit - Cold Weather Supplement $ 25,008.50 Bonding & General Conditions $ 18,625.00 Modify West REIL Foundation $ 13,400.00 L-867 Base Can, Size D - Cold Weather Supplement $ 19,800.00 $ 5,248.00 No. 6 AWG, Solid, Base Copper Counterpoise Wire, Installed Above the duct Bank or Conduit, Including Connections/Terminations - Cold Weather Supplement $ 3,410.25 Non-Encased 1-Way 2" Conduit - Steep Slope Supplement $ 18,040.00 Seeding - Additional Grading and Jute Mat on Westside $ 4,600.00 AIP PROJECT NO.: 3-08-0003-055 CHANGE ORDER NO.: 1 AIRPORT: Aspen-Pitkin County Airport LOCATION: Aspen, CO JUSTIFICATION FOR CHANGE 1.Brief description of the proposed contract change(s) and location(s). P-152-4.1, P-152-4.2, T-901-5.1, L-108-5.1, L-108-5.2, L-110-5.1, L-110-5.2, and L- 125-5.2: Adjust estimated contract quantities to as-constructed quantities. L-105-CO1.1: Add a Mobilization item for remobilizing the boring subcontractor for directional bores under Runway 15/33, Vehicle Service Road, and ARFF Road. L-105-CO1.2: Add a Mobilization item for remobilizing the trenching equipment for the added trenches along the west side. L-105-CO1.3: Add bonding & general conditions for the extra work L-103-CO1.4: Add a Survey, Layout and Staking item the new westside T-901-CO1.5: Add a suplement to the contract unit price for seeding on the westside due to irregular and steep terrain. This supplement covers removal of existing landscape netting, the extra manpower and equipment time required for preperation and grading, and installation of a jute stabilization matting. L-108-CO1.6: Add a suplement to the contract unit price for No. 8 AWG, 5kV L-824 Cable to cover additional manpower, equipent and heating needed to pull wire during cold weather conditions in order to maintain wire integrity per NEC code. L-108-CO1.7: Add a suplement to the contract unit price for No. 6 AWG, Solid, Base Copper Counterpoise Wire to cover additional manpower, equipent and heating needed to pull wire during cold weather conditions in order to maintain wire integrity per NEC code. It also includes snow removal and ground thawing at cadwelded splice locations L-110-CO1.8: Add a suplement to the contract unit price for Non-Encased 1-Way 2" Conduit to cover installation and removal of a temporary construction road for trenching and equipment access along the steep hillside on the northwest side of the runway (Station 10+18 to 19+20). L-110-CO1.9: Add a suplement to the contract unit price for Non-Encased 1-Way 2" Conduit to cover trench excavation and backfill in frozen soil (12" - 14" frost depth). This amount of frozen soil required extra processing for use as backfill or was hauled and disposed of off-site (Westside Station 10+18 to 51+58). L-125-CO1.10: Add an Item to cover modification of the west REIL foundation to accept the new westside conduit. This work includes thawing frozen ground, foundation modification labor and materials, and covering and heat curing new concrete to protect from freezing. L-125-CO1.11: Add a supplement to the contract unit price for L-867 Base Can, Size D to cover the additional effort to thaw frozen ground, and covering and heat curing new concrete to protect from freezing. CO1.12: Add an Item to cover installation of conduit under the ARFF Road including concrete backfill and construction of a detour to maintain access for ARFF vehicles. This construction included thawing several feet of frozen soil, demolition of the existing asphalt pavement, conduit installation, placement of concrete backfill, finishing the concrete surface as new road pavement, and covering and heat curing the concrete. The gravel surfaced detour road was constructed to maintain access for ARFF vehicles during construction of the crossing CO1.13: Add an Item to cover installation of conduit under the Vehicle Service Road including concrete backfill and construction of a detour to maintain access for Operations and ARFF vehicles. This construction included thawing several feet of frozen soil, demolition of the existing asphalt pavement, conduit installation, placement of concrete backfill, finishing the concrete surface as new road pavement, and covering and heat curing the concrete. The gravel surfaced detour road was constructed to maintain access during construction of the crossing. 2.Reason(s) for the change(s). (Continue on reverse if necessary.) During construction it was discovered that existing conduits from the Airport Operations Center parking lot to the runway and under the runway were damaged and blocked with soil and thus not usable. Because of this new conduit was required. Directional boring was attempted under the runway, ARFF road, and Vehicle Service Road but was unsuccessful due to large rocks. Consideration was given to utilizing a more powerful boring machine but this was dismissed due to concerns that it could lead to verticle displacement of the runway pavement creating a bump on the surface. Since the ruway could not be crossed installation of a new conduit route along the westside of the runway was required. Winter weather was starting to set in by the time the damaged conduits were discovered, so snow and cold temperature construction practices were required for a majority of the westside work. . 3.Justifications for unit cost or price. Prices for new items have been reviewed and negotiated with the Contractor. Based on documentation provided by the Contractor and observation of the work performed, they were determined to be fair and reasonable. 4.The sponsor's share of this cost is available from: Airport Capital Funds 5.If this is a supplemental agreement involving more than $2,000, is the cost estimate based on the latest wage rate decision: Yes □ No □ Not Applicable X. 6.Has consent of surety been obtained? Yes □ Not Necessary X. 7.Will this change affect the insurance coverage? Yes □ No X. 8.If yes, will the policies be extended? Yes □ No □. 9.Has this Change Order been discussed with FAA Officials? Yes X□ No □ When: November 17, 2020 With Whom: Kristin Brownson Comments ______________________________________________________________________ ID Task Mode Task Name Duration Start Finish Predecessors 1 Aspen Runway 15 REIL 179 days Mon 9/21/20 Thu 5/27/21 2 Admin & Submittals 90 days Mon 9/21/20 Fri 1/22/21 3 Contract & Notice Of Award 0 days Mon 9/21/20 Mon 9/21/20 4 Pre‐Construction Meeting & Notice to Proceed 0 days Mon 9/21/20 Mon 9/21/20 3 5 General Submittals 5 days Mon 9/21/20 Fri 9/25/20 4 6 REIL Submittal 5 days Mon 9/21/20 Fri 9/25/20 4 7 General Submittal Review 10 days Mon 9/28/20 Fri 10/9/20 5 8 REIL Submittal Review 10 days Mon 9/28/20 Fri 10/9/20 6 9 REIL Lead Time 9 to 10 Weeks 75 days Mon 10/12/20 Fri 1/22/21 8 10 TSA Security Review & Orientation 5 days Mon 10/12/20 Fri 10/16/20 7 11 Eastside Conduit 16 days Mon 10/19/20 Mon 11/9/20 12 Mobilization 1 day Mon 10/19/20 Mon 10/19/20 10 13 Directional Boring 1 day Tue 10/20/20 Tue 10/20/20 12 14 Trench Excavation, Conduit & Backfill 5 days Tue 10/20/20 Mon 10/26/20 12 15 Weather Delay 6 days Tue 10/27/20 Tue 11/3/20 14 16 Trench Excavation, Conduit & Backfill 4 days Wed 11/4/20 Mon 11/9/20 15 17 Form & Pour Cans 5 days Wed 10/28/20 Tue 11/3/20 13FS+5 days 18 Set Cans 2 days Wed 11/4/20 Thu 11/5/20 17 19 Electrical Wire Pull 2 days Fri 11/6/20 Mon 11/9/20 18 20 Westside Conduit 55 days Mon 11/9/20 Mon 1/25/21 21 Work Directive 002 West Side Conduit & Bore 0 days Mon 11/9/20 Mon 11/9/20 19,16 22 Trench Excavation, Conduit & Backfill 12 days Tue 11/10/20 Wed 11/25/20 21 23 Directional Boring 3 days Thu 11/12/20 Mon 11/16/20 21FS+2 days 24 Work Directive 003 West Side Conduit w/Out Bore 0 days Wed 11/25/20 Wed 11/25/20 22,23 25 Trench Excavation, Conduit & Backfill 15 days Thu 11/26/20 Wed 12/16/20 24 26 Peremiter Road 8 days Thu 12/17/20 Mon 12/28/20 25 27 ARFF Road 7 days Tue 12/29/20 Wed 1/6/21 26 28 Form & Pour Cans & West Side REIL 14 days Mon 12/21/20 Thu 1/7/21 24FS+17 days 29 REIL's Integration VPN Programing 15 days Mon 12/28/20 Fri 1/15/21 25FS+7 days 30 Set Cans & REIL's Foundations 10 days Fri 1/8/21 Thu 1/21/21 27,28 31 Electrical Wire Pull 10 days Fri 1/8/21 Thu 1/21/21 28 32 REIL Delivery 0 days Fri 1/22/21 Fri 1/22/21 9,29,30,31 33 REIL Install 1 day Mon 1/25/21 Mon 1/25/21 32 34 Spring of 2021 73 days Tue 1/26/21 Thu 5/6/21 35 Winter Shut Down (Weather Providing) 68 days Tue 1/26/21 Thu 4/29/21 33 36 Final Grading & Seeding 5 days Fri 4/30/21 Thu 5/6/21 35 37 Substantial Completion 0 days Thu 5/6/21 Thu 5/6/21 36 38 Project Closeout 15 days Fri 5/7/21 Thu 5/27/21 39 Project Closeout 15 days Fri 5/7/21 Thu 5/27/21 37 40 Project Completion 0 days Thu 5/27/21 Thu 5/27/21 39 9/21 9/21 11/9 11/25 1/22 5/6 5/27 26 2 9 16 23 30 6 13 20 27 4 11 18 25 1 8 15 22 29 6 13 20 27 3 10 17 24 31 7 14 21 28 7 14 21 28 4 11 18 25 2 9 16 23 30 6 13 2 Aug '20 Sep '20 Oct '20 Nov '20 Dec '20 Jan '21 Feb '21 Mar '21 Apr '21 May '21 Jun '21 Task Split Milestone Summary Project Summary Inactive Task Inactive Milestone Inactive Summary Manual Task Duration-only Manual Summary Rollup Manual Summary Start-only Finish-only External Tasks External Milestone Deadline Critical Critical Split Progress Manual Progress Aspen REIL 15 Page 1 Phoenix Industries LLC LEGEND GENERAL NOTES CJM JPT DJC C3.1 ELECTRICAL LAYOUT PLAN STA. 7+50 TO STA. 16+50 EL-096557013 3-08-0003-055 07/15/2020 RE V AS P E N / P I T K I N C O U N T Y A I R P O R T AS P E N , C O L O R A D O IN S T A L L R U N W A Y 1 5 R E I L SHEET NO. SHEET TITLE AIP NO. PROJECT NO. FILE NO. CHECKED BY DRAWN BY DESIGNED BY DATE 096557013 R Know what's below. Call before you dig. ISSUED FOR BID 07/15/2020 C 2020 KIMLEY-HORN AND ASSOCIATES, INC. 16 KEARNS ROAD SUITE 310C/D SNOWMASS VILLAGE, CO 81615 PHONE: (970) 429-8855 BY DE S C R I P T I O N DA T E CK D 54946 MA T C H L I N E 16 + 5 0 S E E S H E E T C3 . 2 7 OF 15 C RUNWAY 15-33L LEGEND GENERAL NOTES CJM JPT DJC C3.2 ELECTRICAL LAYOUT PLAN STA. 16+50 TO STA. 25+50 EL-096557013 3-08-0003-055 07/15/2020 RE V AS P E N / P I T K I N C O U N T Y A I R P O R T AS P E N , C O L O R A D O IN S T A L L R U N W A Y 1 5 R E I L SHEET NO. SHEET TITLE AIP NO. PROJECT NO. FILE NO. CHECKED BY DRAWN BY DESIGNED BY DATE 096557013 R Know what's below. Call before you dig. ISSUED FOR BID 07/15/2020 C 2020 KIMLEY-HORN AND ASSOCIATES, INC. 16 KEARNS ROAD SUITE 310C/D SNOWMASS VILLAGE, CO 81615 PHONE: (970) 429-8855 BY DE S C R I P T I O N DA T E CK D 54946 MA T C H L I N E 25 + 5 0 S E E S H E E T C3 . 3 MA T C H L I N E 16 + 5 0 S E E S H E E T C3 . 1 8 OF 15 TW A 1 C RUNWAY 15-33L TAXIWAY A LEGEND GENERAL NOTES CJM JPT DJC C3.3 ELECTRICAL LAYOUT PLAN STA. 25+50 TO STA. 34+50 EL-096557013 3-08-0003-055 07/15/2020 RE V AS P E N / P I T K I N C O U N T Y A I R P O R T AS P E N , C O L O R A D O IN S T A L L R U N W A Y 1 5 R E I L SHEET NO. SHEET TITLE AIP NO. PROJECT NO. FILE NO. CHECKED BY DRAWN BY DESIGNED BY DATE 096557013 R Know what's below. Call before you dig. ISSUED FOR BID 07/15/2020 C 2020 KIMLEY-HORN AND ASSOCIATES, INC. 16 KEARNS ROAD SUITE 310C/D SNOWMASS VILLAGE, CO 81615 PHONE: (970) 429-8855 BY DE S C R I P T I O N DA T E CK D 54946 MA T C H L I N E 34 + 5 0 S E E S H E E T C3 . 4 MA T C H L I N E 25 + 5 0 S E E S H E E T C3 . 2 9 OF 15 C RUNWAY 15-33L TAXIWAY ATAXIWAY A LEGEND GENERAL NOTES CJM JPT DJC C3.4 ELECTRICAL LAYOUT PLAN STA. 34+50 TO STA. 43+50 EL-096557013 3-08-0003-055 07/15/2020 RE V AS P E N / P I T K I N C O U N T Y A I R P O R T AS P E N , C O L O R A D O IN S T A L L R U N W A Y 1 5 R E I L SHEET NO. SHEET TITLE AIP NO. PROJECT NO. FILE NO. CHECKED BY DRAWN BY DESIGNED BY DATE 096557013 R Know what's below. Call before you dig. ISSUED FOR BID 07/15/2020 C 2020 KIMLEY-HORN AND ASSOCIATES, INC. 16 KEARNS ROAD SUITE 310C/D SNOWMASS VILLAGE, CO 81615 PHONE: (970) 429-8855 BY DE S C R I P T I O N DA T E CK D 54946 MA T C H L I N E 43 + 5 0 S E E S H E E T C3 . 5 MA T C H L I N E 34 + 5 0 S E E S H E E T C3 . 3 10 OF 15 C RUNWAY 15-33L TAXIWAY ATAXIWAY A TW A 2 LEGEND GENERAL NOTES CJM JPT DJC C3.5 ELECTRICAL LAYOUT PLAN STA. 43+50 TO STA. 52+50 EL-096557013 3-08-0003-055 07/15/2020 RE V AS P E N / P I T K I N C O U N T Y A I R P O R T AS P E N , C O L O R A D O IN S T A L L R U N W A Y 1 5 R E I L SHEET NO. SHEET TITLE AIP NO. PROJECT NO. FILE NO. CHECKED BY DRAWN BY DESIGNED BY DATE 096557013 R Know what's below. Call before you dig. ISSUED FOR BID 07/15/2020 C 2020 KIMLEY-HORN AND ASSOCIATES, INC. 16 KEARNS ROAD SUITE 310C/D SNOWMASS VILLAGE, CO 81615 PHONE: (970) 429-8855 BY DE S C R I P T I O N DA T E CK D 54946 MA T C H L I N E 43 + 5 0 S E E S H E E T C3 . 4 MATCH LINE SEE SHEET C3.6 11 OF 15 C RUNWAY 15-33L TAXIWAY ATAXIWAY A TA X I W A Y A 3 LEGEND GENERAL NOTES CJM JPT DJC C3.6 ELECTRICAL LAYOUT PLAN STA. 43+50 TO STA. 52+50 EL-096557013 3-08-0003-055 07/15/2020 RE V AS P E N / P I T K I N C O U N T Y A I R P O R T AS P E N , C O L O R A D O IN S T A L L R U N W A Y 1 5 R E I L SHEET NO. SHEET TITLE AIP NO. PROJECT NO. FILE NO. CHECKED BY DRAWN BY DESIGNED BY DATE 096557013 R Know what's below. Call before you dig. ISSUED FOR BID 07/15/2020 C 2020 KIMLEY-HORN AND ASSOCIATES, INC. 16 KEARNS ROAD SUITE 310C/D SNOWMASS VILLAGE, CO 81615 PHONE: (970) 429-8855 BY DE S C R I P T I O N DA T E CK D 54946 MATCH LINE SEE SHEET C3.5 12 OF 15 AIRPORT OPERATIONS CENTER EZ-096557013 3-08-0003-055 07/15/2020 RE V AS P E N / P I T K I N C O U N T Y A I R P O R T AS P E N , C O L O R A D O IN S T A L L R U N W A Y 1 5 R E I L SHEET NO. SHEET TITLE AIP NO. PROJECT NO. FILE NO. CHECKED BY DRAWN BY DESIGNED BY DATE 096557013 R Know what's below. Call before you dig. ISSUED FOR BID 07/15/2020 C 2020 KIMLEY-HORN AND ASSOCIATES, INC. 16 KEARNS ROAD SUITE 310C/D SNOWMASS VILLAGE, CO 81615 PHONE: (970) 429-8855 BY DE S C R I P T I O N DA T E CK D 54946 CJM JPT DJC C3.7 13 OF 15 ELECTRICAL DETAILS TYPICAL TRENCH SECTION - DIRECT BURY (DB)1 TYPICAL DUCT SECTION - DIRECTIONAL BORE2 COUNTERPOISE SYSTEM GROUND ROD DETAIL3 SYSTEM GROUNDING DETAIL5 L-867 SIZE D BASE CAN4 PCC BACKFILL EDGE SEAL6 Certificate Of Completion Envelope Id: 802754A1797C48E8B9047E796703BF8A Status: Completed Subject: 112.20 A Runway 15 REILs Change Order Source Envelope: Document Pages: 14 Signatures: 4 Envelope Originator: Certificate Pages: 5 Initials: 0 Jennifer Mitchley AutoNav: Enabled EnvelopeId Stamping: Disabled Time Zone: (UTC-07:00) Mountain Time (US & Canada) 530 East Main Street Suite 203 Aspen, CO 81611 jennifer.mitchley@aspenairport.com IP Address: 216.237.67.99 Record Tracking Status: Original 1/11/2021 11:14:19 AM Holder: Jennifer Mitchley jennifer.mitchley@aspenairport.com Location: DocuSign Signer Events Signature Timestamp Roy Thomson roy@pillc.co Managing Member Security Level: Email, Account Authentication (None)Signature Adoption: Pre-selected Style Using IP Address: 208.72.68.168 Sent: 1/11/2021 11:23:29 AM Viewed: 1/11/2021 11:24:44 AM Signed: 1/11/2021 11:28:38 AM Electronic Record and Signature Disclosure: Accepted: 1/11/2021 11:24:44 AM ID: 323f2773-5db7-485c-80b4-45c70d1bc617 Company Name: Pitkin County, Colorado Matt Whitelock matt.whitelock@aspenairport.com Director of Security and Construction Security Level: Email, Account Authentication (None)Signature Adoption: Pre-selected Style Using IP Address: 65.38.144.66 Sent: 1/11/2021 11:28:43 AM Viewed: 1/11/2021 1:14:30 PM Signed: 1/11/2021 1:14:44 PM Electronic Record and Signature Disclosure: Accepted: 1/11/2021 1:14:30 PM ID: 6d92e273-ba45-420c-b447-f500d199f7bb Company Name: Pitkin County, Colorado Rich Englehart rich.englehart@pitkincounty.com Deputy County Manager Pitkin County Security Level: Email, Account Authentication (None) Signature Adoption: Pre-selected Style Using IP Address: 73.34.180.169 Sent: 1/11/2021 1:14:49 PM Viewed: 1/11/2021 1:16:36 PM Signed: 1/11/2021 1:17:19 PM Electronic Record and Signature Disclosure: Not Offered via DocuSign Jon Peacock Jon.peacock@pitkincounty.com County Manager Pitkin County Security Level: Email, Account Authentication (None) Signature Adoption: Drawn on Device Using IP Address: 75.71.107.170 Sent: 1/11/2021 1:17:23 PM Viewed: 1/15/2021 2:47:19 PM Signed: 1/15/2021 2:47:26 PM Electronic Record and Signature Disclosure: Signer Events Signature Timestamp Not Offered via DocuSign In Person Signer Events Signature Timestamp Editor Delivery Events Status Timestamp Agent Delivery Events Status Timestamp Intermediary Delivery Events Status Timestamp Certified Delivery Events Status Timestamp Carbon Copy Events Status Timestamp Accounts Payable AP@pitkincounty.com Accounts Payable Pitkin County Security Level: Email, Account Authentication (None) Sent: 1/15/2021 2:47:29 PM Electronic Record and Signature Disclosure: Not Offered via DocuSign Evelyn Cruz evelyn.cruz@aspenairport.com Aspen/Pitkin County Airport Security Level: Email, Account Authentication (None) Sent: 1/15/2021 2:47:29 PM Electronic Record and Signature Disclosure: Not Offered via DocuSign Pitkin County Procurement procurement@pitkincounty.com Procurement Pitkin County Security Level: Email, Account Authentication (None) Sent: 1/15/2021 2:47:29 PM Viewed: 1/26/2021 12:54:52 PM Electronic Record and Signature Disclosure: Not Offered via DocuSign Witness Events Signature Timestamp Notary Events Signature Timestamp Envelope Summary Events Status Timestamps Envelope Sent Hashed/Encrypted 1/11/2021 11:23:29 AM Certified Delivered Security Checked 1/15/2021 2:47:19 PM Signing Complete Security Checked 1/15/2021 2:47:26 PM Completed Security Checked 1/15/2021 2:47:29 PM Payment Events Status Timestamps Electronic Record and Signature Disclosure ELECTRONIC RECORD AND SIGNATURE DISCLOSURE From time to time, Pitkin County (we, us or Pitkin County) may be required by law to provide you with certain written notices or disclosures. Described below are the terms and conditions for providing to you such notices and disclosures electronically when we send you documents for electronic signature. Acknowledging your Access, Intent, and Consent to Receive and Sign Materials Electronically To confirm that you can access this information electronically, which will be similar to other electronic notices and disclosures that we will provide to you, please verify that you were able to read this electronic disclosure and that you also were able to print on paper or electronically save this page for your future reference and access or that you were able to e-mail this disclosure and consent to an address where you will be able to print on paper or save it for your future reference and access. Further, if you consent to receive notices and disclosures exclusively in electronic format on the terms and conditions described above, please let us know by clicking the 'I agree' button below. By checking the 'I Agree' box, I confirm that:  I am establishing my intent to be bound to the transaction, and indicating that I am fully aware of the purpose for which the signature is being provided.  I can access and read this Electronic CONSENT TO ELECTRONIC RECEIPT OF ELECTRONIC RECORD AND SIGNATURE DISCLOSURES document; and  I can print on paper the disclosure or save or send the disclosure to a place where I can print it, for future reference and access; and  Until or unless I notify Pitkin County as described above, I consent to receive from exclusively through electronic means all notices, disclosures, authorizations, acknowledgments, and other documents that are required to be provided or made available to me by Pitkin County during the course of my relationship with you. Signing Documents without a Pitkin County DocuSign Account: Pitkin County may not require all document signers to be authorized users of the Pitkin County DocuSign Account. Please read the information below carefully and thoroughly, and if you can access this information electronically to your satisfaction and agree to these terms and conditions, please confirm your agreement by clicking the 'I agree' button at the bottom of this document. When you don't have a DocuSign account, you will be provided the opportunity to agree to the Legal Disclosure each time you open an "envelope" for signing, at this time, you can download and retain this disclosure. Pitkin County will forward completed documents that you've reviewed, processed or signed via email. Should you require copies of these signed documents (e.g., if they get deleted from your email account) you should request those documents from Pitkin County under the Colorado Open Records Act by contacting the Pitkin County custodian who sent you the document for signature. Signing Documents with a Pitkin County DocuSign Account: Electronic Record and Signature Disclosure created on: 3/20/2020 3:28:13 PM Parties agreed to: Roy Thomson, Matt Whitelock Please read the information below carefully and thoroughly, and if you can access this information electronically to your satisfaction and agree to these terms and conditions, please confirm your agreement by clicking the 'I agree' button at the bottom of this document. Getting paper or electronic copies At any time, you may request from us a paper or electronic copy of any record provided or made available electronically to you by us. For such copies, as long as you are an authorized user of the DocuSign system you will have the ability to download and print any documents we send to you through your DocuSign user account for a limited period of time (usually 30 days) after such documents are first sent to you. After such time, if you wish for us to send you paper or electronic copies of any such documents from our office to you, you may be charged a per-page fee. You may request delivery of such paper or electronic copies from us by following the procedure described below. Withdrawing your consent If you are an authorized DocuSign Account holder, you can decide to receive notices and disclosures from us electronically, you may at any time change your mind and tell us that thereafter you want to receive required notices and disclosures only in paper format. Described below is the process for informing us of your decision to receive future notices and disclosure in paper format and also how to withdraw your consent to receive notices and disclosures electronically. Consequences of changing your mind If you elect to receive required notices and disclosures only in paper format, it will slow the speed at which we can complete certain steps in transactions with you and delivering services to you because we will need first to send the required notices or disclosures to you in paper format, and then wait until we receive back from you your acknowledgment of your receipt of such paper notices or disclosures. To indicate to us that you are changing your mind, you must withdraw your consent using the DocuSign 'Withdraw Consent' form on the signing page of your DocuSign account. This will indicate to us that you have withdrawn your consent to receive required notices and disclosures electronically from us and you will no longer be able to use your DocuSign user account to receive required notices and consents electronically from us or to sign electronically documents from us. All notices and disclosures will be sent to you electronically Unless you tell us otherwise in accordance with the procedures described herein, we will provide electronically to you through your DocuSign user account all required notices, disclosures, authorizations, acknowledgments, and other documents that are required to be provided or made available to you during the course of our relationship with you. To reduce the chance of you inadvertently not receiving any notice or disclosure, we prefer to provide all of the required notices and disclosures to you by the same method and to the same address that you have given us. Thus, you can receive all the disclosures and notices electronically or in paper format through the paper mail delivery system. If you do not agree with this process, please let us know as described below. Please also see the paragraph immediately above that describes the consequences of your electing not to receive delivery of the notices and disclosures electronically from us. How to contact Pitkin County: You may contact us to let us know of your changes as to how we may contact you electronically, to request paper copies of certain information from us, and to withdraw your prior consent to receive notices and disclosures electronically as follows: To contact us by email send messages to Helpdesk@provelocity.com To advise Pitkin County of your new e-mail address To let us know of a change in your e-mail address where we should send notices and disclosures electronically to you, you must send an email message to us at Helpdesk@provelocity.com and in the body of such request you must state: your previous e-mail address, your new e-mail address . In addition, you must notify DocuSign, Inc to arrange for your new email address to be reflected in your DocuSign account by following the process for changing e-mail in DocuSign. To request paper or electronic copies from Pitkin County To request delivery from us of paper or electronic copies of the notices and disclosures previously provided by us to you electronically, you should request those documents from Pitkin County under the Colorado Open Records Act by contacting the Pitkin County custodian who sent you the document for signature. To withdraw your consent with Pitkin County To inform us that you no longer want to receive future notices and disclosures in electronic format you may: i. decline to sign a document from within your DocuSign account, and on the subsequent page, select the check-box indicating you wish to withdraw your consent, or you may; ii. send us an e-mail to Helpdesk@provelocity.com and in the body of such a request, you must state your e-mail, full name, Postal Address, telephone number, and account number.