HomeMy WebLinkAboutbocc.res.005.2021RESOLUTION OF THE BOARD OF COUNTY
COMMISSIONERS ("BOCC") OF PITKIN COUNTY,
COLORADO, ENDORSING THE EMMA STORE BUILDINGS
FUTURE USE RECOMMENDATION.
RESOLUTION NO. 005-2021
RECITALS
WHEREAS, Pursuant to Section 2.8.4 (Actions) of the Pitkin County Home Rule Charter
("HRC"), all matters not required to be acted upon by ordinance or formal resolution may
be acted upon by informal resolution, and;
WHEREAS, The Voters of Pitkin County and the Pitkin County Commissioners established
an Open Space and Trails Fund for the purposes of preserving and providing open space
and trails resources, and established an Open Space and Trails Board of Trustees to guide
the expenditure of those funds.
WHEREAS, The Open Space and Trails Program is charged with protecting open space,
habitat, scenic view planes, water rights and recreational resources.
WHEREAS, The Emma Store Buildings and Town Site represent an important part of
Pitkin County's history, built in 1898 (approximately) and which the County acquired as an
open space property in 2008 (ORD 019- 2008).
WHEREAS, The Emma Store Buildings are the only Victorian -era commercial buildings
within the County, and have retained a high degree of integrity and level of architectural
detail leading to their designation to the Pitkin County Historic Register in 2009.
WHEREAS, The preservation and stabilization of the three town site buildings (the
store/east building, warehouse/west building and accessory building) has been further
advanced using both County Open Space and Trails funding as well as State Historical
Fund Grants to stabilize the building's exteriors, while the interior of the buildings
unfinished for a future use.
WHEREAS, The Emma Open Space Master Plan was approved by the Open Space and
Trails Board in 2017, which included direction to assemble a Steering Committee of
interested community members to formulate a recommendation for the future use of the
town site buildings.
WHEREAS, The Steering Committee, consisting of nine members of the public, has drafted
a recommendation for the future use of the buildings, which has been recommended for
endorsement by the Open Space and Trails Board at their January 4, 2020 meeting. The
BOCC finds that it is in the best interests of the citizens of Pitkin County to approve this
Resolution.
NOW, THEREFORE, BE IT RESOLVED bx the Board of County Commissioners of
Pitkin County, Colorado that it hereby adopts a Resolution Endorsing the Emma Store
Buildings Future Use Recommendation and authorizes the Chair to sign the Resolution and
upon the satisfaction of the County Attorney as to form, execute any other associated
documents necessary to complete this matter.
INTRODUCED AND ADOPTED ON THE 27TH DAY OF JANUARY, 2021.
ADOPTED AFTER FIRST READING AND PUBLIC HEARING ON THE 27TH DAY
OF JANUARY 2021.
PUBLISHED BY TITLE AND SHORT SUMMARY, AFTER ADOPTION, IN THE
ASPEN TIMES WEEKLY ON THE 11TH DAY OF FEBRUARY, 2021.
POSTED BY TITLE AND SHORT SUMMARY ON THE OFFICIAL PITKIN COUNTY
WEBSITE (www.pitkincounty.com) ON THE 4TH DAY OF FEBRUARY 2021.
ATTEST: BOARD OF COUNTY COMMISSIONERS
By ,jt4 tt,& jbvut-S
Jeanette Jones
Deputy County Clerk
APPROVED AS TO FORM:
John Ely, County Attorney
Revised 01-01-2021
By: 2z27.,/„6 71111 -
Kelly McNicholas Kury, Chair
Date:
Jan -31-2021
MANAGER APPROVAL
Phylis Mattice for Jon Peacock, County
Manager
2
EMMA STOR
BUILDINGS
Attachment 2
Future Use Recommendation
January 2021
Recommended for BOCC adoption by the Open Space and Trails Board - January 7, 2021
TABLE OF CONTENTS
1. INTRODUCTION
1.1 EXTENT AND PURPOSE
1.2 HISTORY
1.3 PLANNING PROCESS / STEERING COMMITTEE
1.4 EXISTING CONDITIONS
2. SUMMARY OF STRENGTHS, CHALLENGES & OPPORTUNITIES
2.1 SITE STRENGTHS
2.2 SITE CHALLENGES AND POTENTIAL SOLUTIONS
3. STEERING COMMITTEE RECOMMENDATIONS
3.1 PARAMETERS FOR FUTURE USE(S)
3.2 PARTNERSHIPS
3.3 A PATH FORWARD
4
5
10
12
20
22
26
29
30
APPENDIX
A. OST MISSION AND HISTORIC STRUCTURES POLICY
B. EMMA OPEN SPACE MANAGEMENT PLAN
C. EMMA CAUCUS MASTER PLAN
D. 2013 TRAFFIC STUDY
E. HISTORIC BUILDING INFORMATION
F. EMMA STORE SNOW DEBRIS PROTECTION BARRIER TECHNICAL MEMORANDUM (SGM)
G. BUILDING MOVE ISSUES
H. CDOT LETTER / INFORMATION
I. UCD ARCHITECTURAL STUDIO PROJECT SUMMARY
J. PUBLIC INPUT ON DRAFT RECOMMENDATIONS
Emma Townsite 1 Table of Contents iii
1. INTRODUCTION
1.1 EXTENT AND PURPOSE
During the 2017 Emma Open Space Management Planning process, there was much discussion about
the Emma Store buildings and the variety of future management options. At that time, it was decided
that this was too large a conversation to be accomplished during the management planning time frame
and that it deserved its own discussion and process. Therefore, the 2017 Management Plan included
an Action Item that specifically called for the formation of a committee to focus on developing a
recommendation for a future management strategy and programming of the store buildings.
The purpose of the Emma Town Site Future Use Recommendation is to capture the discussion and
recommendations from the Emma Store Building Steering Committee for the future management of
the store buildings. These recommended parameters will serve as a guide for staff and the Open Space
and Trails Board, and ultimately, the Board of County Commissioners, when making decisions regarding
future management of the buildings.
The recommendations contained in the following document are meant to focus on the Emma Store
buildings and the immediately adjacent environment. Any management questions regarding other
structures on the Emma Open Space or land management should refer to the most recent Emma Open
Space Management Plan.
QUICK FACTS:
Property Acquisition: Emma Townsite (12.5 acres), July 2008 for $2.65 million (Ord. No. 019, Series of
2008). OST reserved the option to convey interest not essential for the preservation of the open space,
including the existing structures and immediately surrounding lands
Funding Partners: Town of Basalt
Grants Received: State Historic Fund grants for exterior stabilization of the Emma Store buildings and
accessory building
Original Construction of Emma Store buildings: Approx. 1898
Historical Significance: Only existing Victorian -era commercial examples in the County; the buildings retain
a high degree of integrity and represent a high level of architectural detail
Easements, Covenants & Encumbrances:
• Designated to the Pitkin County Historic Register in 2009 (Resolution No. 018A-2009) — any alterations
to the structures are governed by the Pitkin County Historic Preservation Guidelines. The buildings
were granted benefits under the land -use code, including: Alternative Building Code compliance (may
be exempted from Energy Code and Efficient Building Program), variances, priority for participation in
County programs and expedited review.
• State Historical Fund Grant, Colorado Historical Society 20 -year Covenant (Resolution No. 102-2009) —
this covenant ensures the preservation of the property and requires written permission from History
Colorado for any activity that would alter the architectural appearance of the property or encroach on
the property's open land. The covenant requires compliance with Secretary of the Interior's Standards
for the Treatment of Historic Properties and the Guidelines for Preserving, Rehabilitating, Restoring,
and Reconstructing Historic Buildings.
Emma Townsite 1 Introduction
4
1.2 HISTORY
Two distinctive brick buildings, constructed side by side
more than a century ago, stand today as an historic marker
for one of the first settlements to gain prominence in the
Roaring Fork Valley.
Basalt and Carbondale were not yet names on a map
when Emma was established, serving first as a stagecoach
stop and then as a station on the Denver and Rio Grande
Railroad. The settlement was already a burgeoning
epicenter of commerce and social activity when East Coast
native Charles H. Mather arrived in Emma in the late 1880s
and constructed the brick mercantile buildings that have
defined the unincorporated outpost west of Basalt ever
since.
Mather came west in 1888 to seek his fortune, but quickly
abandoned ranching to pursue what he knew best —
merchandising. He took over as Emma's post master and
storekeeper, replacing the original log buildings at the
junction of Emma Road and the railroad line with a set of
landmark structures that endure to this day.
"I pre-empted a small plot of land consisting of eight
acres, which had a log cabin and log store building upon
it," Mather offered in a 1937 recounting of his Colorado
venture. "I opened the store with a cash capital of $150 and
borrowed at that. Having a large territory to draw from,
some of my customers came 21 miles to get their goods. I
naturally had an opportunity to expand and by practicing
rigid economy, gradually was able to get ahead."
Top: A log store building predated the brick buildings (bottom)
built by Charles Mather. Among the signs on the original
storefront is "D&RG Ticket Office." Isabel Harvey Collection
Emma's elevation, however, proved a hardship to his wife, and they returned to the East in 1901. By that time,
Mather had constructed a two-story brick house, a brick barn, a main store and a two-story warehouse "filled
with a stock of merchandise valued at not far from $20,000 and every dollar of it paid," he recounted.
His legacy includes the side-by-side store and warehouse, a small brick building, and the brick Victorian home just
to the west. The structures, along with an old, one -room schoolhouse located across Hwy. 82 from the former
Mather property, stand as reminders of Emma's former conspicuity.
Before returning to Connecticut, Mather sold his holdings to Harry A. Pinger, who ran both the Emma Store and
one in Basalt under the name Pinger Mercantile Co. A continuing succession of proprietors ran the store business,
though none, apparently, with Mather's flair.
In 1943, Basalt resident Ernest Gray wrote a letter to George Mather, grandson of Charles H. Mather. Gray's
father, Elbert, had long been a clerk at Mather's store. The business that flourished under Mather's ownership
floundered under his successors, according to Ernest Gray. He wrote: "For you see since Charley Mather left
Emma that business has never prospered....As far as I know the brick buildings Charley erected have stood
empty, except for an occasional dance or farmers meeting, for some twenty years."
In his heyday at Emma, Mather did as much as $80,000 a year in receipts, drawing business from many miles
around, Gray claimed.
Emma Townsite 1 Introduction 5
WOW
•
•
a
■i■ ,
• t
4111140.
,.I
• r
r
Kr a
EMMA TOWNSITE VISION:
The Emma Store Buildings will honor their historic agricultural
roots, the natural environment and character of Emma, and
provide a space that is accessible to the community and celebrates
the innovative spirit of this location.
alriK
•
tr. 41+414164.1116
amormoivalmoy so
rinP. Mew
YAWNS el VIA
1.6
i
,odi
d
wr
isioa
1-
4
Emma Townsite 1 Introduction
6
The Emma crossing, marked by the store business,
schoolhouse and railroad depot, was a community focal
point and the goings-on at Emma in Mather's day often
made the pages of Aspen's newspapers. By the 1920s, the
store building was no longer being used for a commercial
enterprise but it was the site of well -attended community
dances and meetings, while the back of the building was
used as a residence.
While the mercantile store had long been shuttered, a small
general store/gas station and post office operated to the
west of the vacated brick store and warehouse. It burned
down in early 1949 and postal services were run out of the
Victorian house for a time before the postal operation was
permanently transferred to Basalt.
By the mid -20th century, Emma was a quiet spot along a
country road. The store building stood vacant but for an
occasional social event or meeting, while the ranching
family living on the property used the warehouse for
potato storage and sorting. The demise of railroad service,
meanwhile, was a long, drawn-out affair that began with
the end of passenger service to Aspen in 1949. The railroad
sold off the Emma depot, which was dissembled for lumber.
The railroad water tower, which had been retired in 1942,
collapsed. Freight service ceased in 1969, though the Rio
Grande Railroad continued to serve a coal loadout at Woody
Creek into the 1980s.
Emma Store and railroad tracks 1952: By the mid -20th century,
the Emma store buildings saw little use. The Denver and Rio
Grande Railroad tracks are visible in the foreground. Isabel
Harvey Collection
The Basalt Bypass — a new, four -lane reroute of Hwy. 82
— cut a wide swath through the heart of old Emma and sliced Emma Road into two disconnected pieces. The
bypass, completed in 1988, brought the historic buildings of Emma into prominent view for motorists but the
asphalt, regrettably, came within spitting distance of Charles Mather's once -handsome brick edifices. The busy
highway compromised the old buildings, rattling bricks loose, exposing their facades to the ravages of plowed
snow and highway deicer, and making access to the property challenging.
The store and warehouse, along with the Mather House, counted various owners over the decades, some
of whom floated plans to repurpose the old buildings. None tried harder than the late Owen Minney, who
purchased the Emma townsite buildings in 1998. He resided in the Mather House and dreamed of revitalizing the
store and warehouse, though proposals to repurpose the structures were ultimately rejected by Pitkin County
as too intensive for the site. Frustrated, Minney obtained a permit to demolish the historic buildings in 2008. In
2000, the Emma Store buildings were nominated and listed on Colorado's Most Endangered Places by Colorado
Preservation Inc. (CPI) to bring awareness to the threats to the integrity and condition of the buildings.
Ultimately, the Pitkin County Open Space and Trails program purchased the 12.5 -acre Emma Townsite from
Minney, with a contribution of funds from the Town of Basalt. The county quickly initiated work to stabilize the
deteriorating mercantile buildings and stave off their collapse. Two more restoration projects followed with help
from the State Historic Fund. All of the buildings have been placed on the Pitkin County Historic Register. These
actions led CPI to declare the buildings "saved" and removed from "alert" status on the Endangered Places list.
Emma Townsite 1 Introduction 7
Historic Designation and Building Stabilization Timeline
e
1988 - Highway 82 bypass constructed.
Federally mandated Section 106
Evaluation found the buildings to be
historically significant and they were
saved from demolition
2000 Townsite was listed on Colorado
Preservation Inc's Most Endangered
Places List. Originally listed on the "alert"
status, the buildings have since been re-
classified as "saved."
The collapsed roof on the east building was removed in
the first phase of stabilization.
The accessory building in 2008 before stabilization.
•
The collapsed west building roof in 2008 before stabilization.
2008 Emma Townsite purchased by Pitkin
County Open Space & Trails / Phase 1
Stabilization.
Immediate structural needs were
addressed for all three buildings to
prevent their imminent collapse.
2009 Store, Accessory Building, and
Mather House added to Pitkin County
Historic Inventory.
The remaining east building shared wall with removea
roof framing, phase 1.
The east building east wall with plywood protection in
place, phase 1.
The interior of west building, roof removed, upper
floor partially remains, phase 1.
Emma Townsite 1 Introduction 8
2010 - Phase 2 - Work completed on roof and
masonry repairs to east and west store
buildings
New structural walls and a new roof
installed on both buildings. The State
Historic Fund awarded a grant to fund
the Phase 2 permanent protection of the
buildings. The total construction cost was
$477,819.
The east building east wall repaired, phase 2.
The west wall with rebuilt masonry, phase 2.
The interior of the east building with new roof
structure and stabilized floor, phase 2.
The north wall of both buildings with repaired masonry
and new roof edge. Repaired main facades, with
restored metal fascia.
2012 - Phase 3 - Work completed on
accessory building roof and masonry
repairs.
This work included substantial masonry
repair, a new interior structural frame,
new roof framing and new roofing.
A successful application to the
State Historic Fund helped fund the
permanent protection of the building.
The total construction cost was $141,353.
The west and north sides of the accessory building,
phase 3.
The south and east walls with rebuilt masonry, phase 3.
The interior of the main level of the accessory building,
phase 3.
Emma Townsite 1 Introduction 9
1.3 PLANNING PROCESS / STEERING
COMMITTEE
The Emma Townsite Steering Committee was appointed
by the Open Space and Trails Board to develop a
recommendation for the future of the Emma Store
buildings. Six members of the committee were
appointed from interested members of the public: Raul
Gawrys, Carolyn Shipp, Harry Teague, Mitzi Rapkin,
Martha Ferguson and Jason Smith. The Emma Caucus
selected Liz Newman as its representative with Margaret
Simmons as the alternate. The Town of Basalt had
Watkins Fulk-Gray, Sara Nadolny and James Lindt take
turns participating. Matt Annabell was the Historical
Society liaison. Michael Kinsley participated as the Open
Space and Trails Board representative and Suzannah
Reid participated as the County Historic Preservation
Officer.
The committee began by meeting for a site tour in April
2019. In subsequent meetings, members discussed
the existing conditions of the site, developed a vision
statement, and discussed the site's strengths and
challenges, potential future solutions, and future uses
they thought would be appropriate. This information
was ultimately used to develop the parameters for
recommended future uses and next steps.
The recommendation for future use was presented
to the OSTB at their September, 2020 board meeting
before being released for public comment through
November 6th. The committee met on December 1st
to review final revisions prior to plan adoption by the
BOCC.
VISION STATEMENT:
The Emma Store buildings will honor their
historic agricultural roots, the natural
environment and character of Emma, and
provide a space that is accessible to the
community and celebrates the innovative
spirit of this location.
STEERING COMMITTEE MEMBERS
• Raul Gawrys
• Carolyn Shipp
• Harry Teague
• Mitzi Rapkin
• Martha Ferguson
• Jason Smith
• Liz Newman, Emma Caucus
• Margaret Simmons, Emma Caucus alternate
• Watkins Fulk-Gray, Sara Nadolny and James
Lindt, Town of Basalt
• Matt Annabell, Historical Society liaison
• Michael Kinsley, Open Space and Trails
Board representative
• Suzannah Reid, County Historic Preservation
Officer.
Emma Townsite 1 Steering Committee 10
STEERING COMMITTEE AND PUBLIC COMMENT PROCESS*
IDSteering Committee Draft Recommendation Development
1-- - -0 April 23 and May 3 2019 - Steering Committee Site Tours
r - - ♦ May 28, 2019 - Steering Committee Meeting
i Committee discussed the strengths and challenges of the buildings, outlined
additional questions, and developed a vision statement for the buildings.
r - - ♦ August 14, 2019 - Steering Committee Meeting
i Committee began brainstorming exercise for long-term future uses, uses that do
not meet the vision, champions and funding.
p
r - - ♦ September 26, 2019 - Steering Committee Meeting
1 Committee continued discussion around long-term future uses, uses that do not
meet the vision, champions and Topics to include the in
1 p funding.
1 recommendation were also outlined.
I
�
--♦ January 21, 2020 - Steering Committee Meeting
Committee reviewed, edited and commented on Draft Recommendation.
1
---♦ July 21, 2020 - Steering Committee Meeting
Committee reviews updates to the Draft Recommendation and discusses proposed
0 public process.
0Draft Recommendation Public Comment
__
•
September 3, 2020 - Open Space and Trails Reviews the Draft Recommendations
OSTB reviews and comments on the Draft Recommendations, depending on the
comments, recommendation is released for public comment.
September 2020 - Community Outreach / Public Comment
OST will launch an outreach process that complies with Public Health requirements to
collect input on the draft recommendation.
September 15, 2020 - Board of County Commissioners Work Session Update
November 6, 2020 - Public Comment Closes
0 Final Recommendation Development and Adoption
--• December 1, 2020 - Steering Committee Meeting
Committee reviews Board and public comments, updates the recommendations.
- - ♦ January 7, 2021 - Open Space and Trails Board Recommendation for BOCC Adoption
"- ♦TBD - Board of County Commissioners Adoption
* Subject to change
Emma Townsite 1 Steering Committee 11
1.4 EXISTING CONDITIONS
1.4.1 TOWNSITE STRUCTURES
The Emma Townsite parcel has four existing historic structures constructed around 1898 by
Charles H. Mather. The Emma Store and Warehouse, and the accessory building have been
stabilized and restored over three phases following the County's purchase of the property
in 2008. Using both county funds and grants from the State Historic Fund, the exterior
restoration was completed in 2012, returning the three buildings to stable, weatherproof
shells with new, permanent roof structures and reconstructed portions of their exterior
brick walls.
Emma Store and Warehouse — The side-by-side store and warehouse (east and west)
buildings are the only existing Victorian -era commercial building examples in the County,
and retain an exceptionally high degree of integrity and architectural detail. The west
building or warehouse is a two-story structure with an elegant brick facade and brick side
and end walls with a flat roof. The west building has a 2,000 -square -foot footprint potential
for a maximum of 4,000 square feet with a second floor. The east building, or store
building, is a one-story structure. It abuts the west building and measures 2,250 square
feet. It has a framed facade with an elaborate tin frieze and brick side walls. Both buildings
have stone foundations and shallow crawl spaces for the majority of their footprint. A
small, full -height basement of about 500 square feet is located in the rear of the east
building. The two buildings are prominent fixtures along Hwy. 82, but have suffered from
their proximity to the highway and the effects of snow and deicer. A protective facade has
been used during winter months on the western building to prevent further deterioration.
MAP 1: Townsite Focus Area
Emma Store buildings (store and warehouse)
Accessory Building
Emma Townsite 1 Existing Conditions
12
In 2009, following OST's acquisition of the Townsite
Parcel, the Emma Store and Warehouse and the
accessory building were granted Pitkin County historic
designation (Resolution No. 018A-2009). The interiors
of both buildings remain unfinished. Any alterations
to the structure in future phases will need to address
the restoration of the windows, doors and rear
walls, construction of new interior floors, and other
requirements determined by their anticipated use.
Accessory Building - There are a few theories as to the
past use of the small square structure located to the
north of the Store and Warehouse. One theory is that
it was used to house explosives separately from the
store building. Another theory of the building's prior
use is a hop house for drying hops, or a brick barn,
which Mather said he built on the property. Following
the restoration of the two commercial buildings, a
separate grant was awarded to focus on the accessory
building's restoration. The small, two-story building
has a hipped roof and a small cupola centered along
the short ridge. The building has a 294 square foot
footprint with a single door opening on the west side
and minimal window openings.
Mather House — The Mather House is also a part of
the Emma Townsite, however it is not a part of this
recommendation. Renovations in 2019 and 2020
restored the home so that it can continue to serve as
affordable housing within the County.
MAP 2: Emma Townsite Existing Site Configuration
• ,N
I I
����\\
1 size
size and location `\
approximate leach field
• ..f ^-Ix Mather House \
• / \ ��
out building
two store buildings
East Building — one story 2,250 sq. ft., has partial basement of
additional 500 sq. ft
West Building—two stories 2,000 sq. ft. per level
Accessory Building — two stories 294 sq. ft. per level
Emma Townsite 1 Existing Conditions 13
1.4.2 BACKGROUND INFORMATION AND
EXISTING PLANS/POLICIES
OST MISSION AND ARTICLE 13
The Open Space and Trails Mission and Article XIII
of the Pitkin County Home Rule Charter define the
purposes of the program and how the Open Space
fund can be used. The overarching mission of the
Pitkin County Open Space and Trails Board of Trustees
(OSTB) is to acquire, preserve, maintain and manage
open space properties for multiple purposes including,
but not limited to, recreational, wildlife, agricultural,
scenic and access purposes; and to acquire, preserve,
develop, maintain and manage trails for similar
purposes.
Article XIII further details the roles and responsibilities
of the Open Space and Trails program. In regard to
historic properties such as the Emma Store buildings,
Article XIII supports preserving cultural, historic and
archeological resources located within properties
that are otherwise acquired for their customary open
space characteristics. There are parameters for how
much OST funds can be used on historic preservation
and what the fund can be spent on to support the
reuse of historic buildings. These parameters are
outlined in the 2018 Historic Structures Policy. Uses or
improvements to the buildings that do not meet the
purposes stated in the charter and that are outside the
OST mission are allowed, however they will need to
have additional funding sources.
OPEN SPACE AND TRAILS HISTORIC
PRESERVATION POLICY
The Open Space Historic Preservation Policy was
adopted by the Open Space and Trails Board on
November 1st, 2018 to guide expenditure of funds
on historic assets (included as Appendix A). The
policy outlines four management options for historic
structures on OST properties. The Emma Store
buildings, due to their historic significance and
architectural quality, have been actively stabilized
to exterior restoration historic standards, fulfilling
management Option 3 in the policy. However, the
preferred management outcome, when financially
feasible and appropriate, is Option 4 - to preserve
structures for continued use. This management option
states, it is "appropriate for historic structures that can
Open Space Definition:
"Open Space" shall be defined as primarily
undeveloped lands and waters which meet one
or more of the following criteria: Within public
scenic view planes; bounding or within urbanized
areas; incorporating or protecting significant
wildlife habitat; preserving historic agricultural
and ranching activities; protecting riparian or
wetlands areas; protecting other public lands
from the impacts of development, and preserving
cultural, historic and archeological resources lying
within properties which are otherwise acquired
for their customary Open Space characteristics.
be preserved and maintained in active use including,
but not limited to, reservation to sell consistent with
the County Charter and leasing consistent with County
regulations."
The Historic Preservation Policy limits the amount of
money the OST fund can spend on historic structures,
on all open space properties, over the life of the fund
to 2% of the annual revenue between 2017 and 2040.
Spending in an individual year may exceed the 2%
target as long as the 20 -year average complies with
the policy. Grants, gifts and other outside funding
sources can complement outlays from the Open Space
fund.
Emma Townsite 1 Existing Conditions 14
MAP 3: Project Location Map - Open Space Context
t
STATE WILDLIFE
AREA
(CPW)
TOWN OF BASALT
EMMA OVERLOOK
EMMA TOWNSITE OPEN SPACE
Heritage
Orchard
CDOT ROW
East Access
GRACE OPEN SPACE
LIGHT HILL
(BLM)
Emma Store Building "Planning Area"
Open Space (fee simple)
Agricultural Lease Areas
Paved Trails
Soft Surface Trail (foot / horse only)
Irrigation Ditch
1-1
O'
0 160 320 640
1Feet
Emma Townsite 1 Existing Conditions
15
2017 EMMA OPEN SPACE MANAGEMENT
PLAN*
The Emma Open Space Management Plan was
developed through a public process and adopted by
the Open Space and Trails Board in 2017. The plan
covers both the Emma Open Space parcel (to the
south and east of the Emma Schoolhouse) and the
Emma Townsite Parcel, which includes the Emma
Store buildings, the Mather House, the historic
orchard and the Osprey nest, as well as frontage along
the Roaring Fork River. The plan provides an extensive
history of the Emma area and its role as an agricultural
and commercial hub in the valley, and details about
the existing conditions and the preserved structures
on the site. Management action 4.3.1, "Emma Store
Buildings," set the framework for a planning process
specific to the Emma Store buildings. The plan seeks
to identify a management strategy and programming
to facilitate the future use of the buildings, guided by
the recommendations of a Steering Committee. The
complete plan is included as Appendix B.
2016 EMMA CAUCUS MASTER PLAN*
Pitkin County caucus master plans are used as
guidance to elected and appointed officials when
reviewing planning and development proposals
within caucus boundaries. The 2016 Emma Caucus
Master Plan was developed by residents of the Emma
Caucus area and outlines the vision and goals for the
neighborhood. The goal for any proposed future of
the Emma Store buildings is to align with the Emma
Caucus Master Plan whenever possible. The complete
caucus Master Plan is included as Appendix C.
The principal goal of the Master Plan is that "the
dominant agricultural, open space and rural residential
character of the Emma Caucus Area be preserved and
enhanced." Section 8 of the Master Plan specifically
addresses historic preservation, with the goal to
"Preserve the unique rural/agricultural heritage of
the Emma Caucus area as expressed by the existing
historic structures that embody the historic ranching
and farming community." Section 8.1.3 states, "The
County should work with property owners to find
solutions and incentives for the preservation and
possible adaptive re -use of existing historic structures."
Section 8.1.5 specifically addresses the historic Emma
Emma Caucus Vision Statement:
"The Emma area will continue to be a low-density
residential area with on-going farming and
ranching operations prevalent. Agricultural lands
will continue to be used as such, or preserved
by the use of conservation easements or other
preservation options, and will not be further
subdivided; and water rights will be protected.
Fields and pastures will be the predominant
views, wildlife will continue to be a strong
presence due to the preservation of riparian
corridors and other habitats, and the night sky
will continue to be visible without light or air
pollution. Residents and guests will enjoy public
trails and lands; a neighborhood feeling of
common goals will exist, and residents will have a
sense of community."
Townsite as the area's main historic structures and
the Caucus' support for preserving the structures. The
plan recommends that, as funds become available,
the County continue efforts to preserve the historical
integrity of the buildings and that any future use of
the property be compatible with preservation and the
goals and objectives of the Caucus Master Plan.
A few sections of the Master Plan are particularly
relevant to the future use of the Emma Townsite
structures, including: 1.3 Commercial/Institutional
Goal: "New commercial, institutional and other
intense, high -traffic -generating uses are considered
incompatible with the rural residential character and
the basic infrastructure of the Caucus Area and should
not be allowed." Appropriate uses, which include
minor activities that do not create inappropriate
community impacts on traffic, energy, light and noise,
are supported.
The "Roads" section of the plan includes a
recommendation for the west access point to
the Emma Townsite buildings. Item 5.1.11 states,
"Methods other than signalization should be
identified, with input from CDOT and OST, to improve
the safety and functionality of the Emma Road/
Hwy. 82/Rio Grande Trail intersection. The Caucus
*Note that plans are updated periodically and the most recently
adopted plan or policy will apply to the Emma Townsite.
Emma Townsite 1 Existing Conditions 16
MAP 4: Emma Caucus Area
El Jebel
Willits
Pe
Glassier
- Red Ridge
Eagle County
Pitkin County
Basalt
Townsite
Emma Caucus
Lazy
Glen
Bionaz
Gulch
b _ j Pitkin County Boundary
L —j Emma Caucus Area
- Open Space (fee simple)
Conservation Easement
Town Limits
0 0.25 0.5 1
Miles
Schoellkopf
Open Space
Oxamer
C i we Aing„cr Offio
Emma Townsite 1 Existing Conditions
17
MAP 5: Project Location and Highway Access
Emma Townsite 1 Existing Conditions
Emma Store Building
"Planning Area"
Open Space (fee simple)
Agricultural Lease Areas
Paved Trails
0 1 I_ I Feet
0 45 90 180
recommends roadside intersection reflectors be
installed at the intersection to improve the safety of
nighttime turning movements. The Caucus opposes
the installation of overhead streetlights." It also
supports improvements to the pedestrian underpass
connecting Emma Road to Emma Trail and the park-
and-ride facility via the bike and pedestrian bridge.
PITKIN COUNTY ZONING*
The Emma Townsite parcel is 12.5 acres and is
zoned AR -10, agricultural/residential with a 10 -acre
minimum lot size. Both single-family dwellings and
agricultural uses are allowed by right. There are a
number of additional uses that are permitted as
"special review uses." These uses require a one-step
review by the Board of County Commissioners and are
subject to compliance with the applicable standards
in Chapter 4 of the land -use code. Special Review uses
must be implemented within three years following the
date of approval of a development permit and may
be required to submit annual reports attesting to the
continued conformance of the use to the conditions of
approval.
This parcel is not within the urban growth boundary
of Basalt and it is not anticipated to be included in
the urban growth boundary during the 2019 Master
Plan update, which began in 2019. There is currently
no commercial or institutional zoning in the Emma
Caucus Area.
2013 TRAFFIC IMPACT STUDY
Vehicular access to the Townsite parcel is currently
one of largest impediments to public use. In 2013, OST
commissioned a Traffic Impact Study (completed by
McDowell Engineering) to help evaluate the potential
future uses for the Emma Store buildings, given
the limitations based on the State Highway Access
Code. Appendix D includes the full Traffic Impact
Memorandum. Traffic and trip generation will need
to be re-evaluated before final programming for the
buildings is implemented.
Vehicular Access: The 2013 study looked at the west
access at the intersection of Emma Road and Emma
Spur and the east access at Emma West Road (which
provides access to the Mather House). Existing
conditions at both access points do not meet CDOT's
Access Code Standards. The preferred access point to
the store buildings is the west access, which has better
sight distances and turning lanes to accommodate
potential land uses.
Traffic Generation and Use: The study evaluated
the potential land uses with the existing highway
constraints and traffic capacity with the assumption
that no additional turning lanes would be added.
Potential land uses are therefore restricted to
approximately 10 vehicles per hour. Based upon the
trip generation calculations, the following land use
alternatives are examples of what is possible:
• 6 -acre open space park
• 7,000 -square -foot administrative building
• 5,700 -square -feet of commercial retail
• 7,500 -square -foot community center
(recreation center)
• 22,000 -square -foot museum
Parking: Parking considerations will need to be
addressed in the future for the selected alternative.
CDOT owns a small, triangular parcel directly west of
the buildings for the purpose of preserving access to
the buildings (see Appendix H), which was truncated
during the expansion of Hwy 82. This parcel might also
be used for a small parking area if approved by CDOT.
*Note that the County Land Use Code and other plans are
updated periodically and the most recently adopted plan or policy
will apply to the Emma Townsite.
Emma Townsite 1 Existing Conditions 19
2. SUMMARY OF STRENGTHS,
CHALLENGES AND OPPORTUNITIES
2.1 SITE STRENGTHS
The Steering Committee discussed the strengths of
the Emma Store buildings and immediate site during
committee meetings. The following is the identified list
of strengths that can be built upon in the reuse of the
buildings.
THE HISTORIC BUILDINGS
• The buildings themselves are amazing historic
assets, which deserve to be celebrated and
preserved within the community. They have
maintained historic integrity and are a truly
unique community asset that does not exist
elsewhere in the County.
• There is room for multiple uses within the
existing structures, which could be built out to
have over 7,000 square feet of leasable space.
There could be scenarios where the two store
buildings, which are currently separated by an
internal wall, are connected.
• Architectural flexibility — The restoration of
the exteriors have left a blank canvas for
the interiors and back wall of the buildings.
There are a number of potential strategies
to repurpose the buildings - for example, the
stabilization efforts left open the option to
have the future entry from the back of the site
rather than the front of the buildings, where
the site is more constrained. There is potential
to add more light from the back (river -facing)
side of the buildings, or add skylights.
LOCATION, LOCATION, LOCATION
• The visibility of the site and the buildings
from the highway. The view of the buildings
from the highway should be preserved in any
future -use scenario.
• The location between Old Town Basalt and
Willits along the Emma Trail — One of the
goals of the Basalt Master Plan is to have
better connectivity/cohesiveness between
Old Town and Willits (1.5 miles to Old Town
Basalt, 2.3 miles to Willits Town Center on
the bike path).
• Connections to recreation and established
commuter trails. Located on the Emma Trail
The east building is framed with an elaborate tin frieze facade that
remains in good condition.
multi -use path and across the highway from
the regional Rio Grande Trail (linked by the
Emma underpass). Approximately 0.5 miles
from the CDOT park-and-ride on Two Rivers
Road.
• Located along the Roaring Fork River, though
there is a vertical separation of approximately
50 feet from the bench where the buildings
are located down the steep hillside to the
river.
HISTORY OF THE SITE
• The story of Emma. The push and pull
between the Old West and the New West
exhibited in the transition from horse and
wagon to rail to highway transportation
through the Roaring Fork Valley, and the
symbolism of the changes and the stories of
loss and gain and grit.
• The agricultural/ranching history of Emma
and present-day land conservation. The Emma
area has preserved its agricultural history and
there is forward momentum in preserving the
agricultural roots of the community.
OPPORTUNITY TO FILL A COMMUNITY NEED
• This site could fulfill a community need or
niche that is not currently fulfilled elsewhere
in the community.
Emma Townsite 1 Strengths, Challenges and Opportunities 20
EI J hnl Rd
Willits Town
Center
0
x
parkq
W
'. 2.3 Miles to Willits
\ Town Center
1I
rr
Emma West Rd
Grate Church
of the Raffling
Fork Valley
Emma Townsite
1.S Miles to
Old Town
Basalt
Ter* Rleers Rd Basait
Sol4h31d0 Pork
Smolt High
School
Basan.
Elementary
Scheel
Ba:al
Cemetery
/Roaring Fork
Club
MAP 6: Emma Townsite
is 1.5 miles from Old
Town Basalt and 2.3
miles from Willits Town
Center on the Emma
Trail.
MAP 7: Emma Townsite
is located on the Emma
Trail multi -use path and
across the highway from
the regional Rio Grande
Trail.
Emma Townsite 1 Strengths, Challenges and Opportunities 21
2.2 SITE CHALLENGES AND POTENTIAL SOLUTIONS
While the historic buildings and surrounding open space have a number of strengths
and the potential for adaptive reuse, there are a number of challenges that will need to
be addressed to facilitate most uses. The level of mitigation required is likely to depend
heavily on the type of use/uses proposed for the buildings and therefore the following is
only a preliminary list of challenges and potential solutions that the Steering Committee
discussed.
Underlying each of the potential solutions or mitigation strategies is the cost of
implementation and how the improvements will be funded. Open Space and Trails
funds are limited both in the amount of funding available, as determined by the Historic
Preservation Policy, and to improvements that are within the program's mission. Any
appropriations from the OST fund would be part of the annual budgeting process subject
to OSTB and BOCC approval.
2.2.1 PROXIMITY TO HIGHWAY 82
As mentioned in the history section, the buildings were saved from demolition during the
1988 Hwy. 82 reroute to bypass Basalt, when a federal decision declared the buildings to
be historically significant. While the buildings were saved, they weren't spared by very
much, and the highway now has perhaps the greatest impact on the character of the
original Townsite. A constant stream of vehicles speeds by the buildings at 65 miles per
hour, passing only 20 feet from the entrance to the western building. Currently, the Emma
Trail passes between the storefronts and the highway, protected by a Jersey barrier. The
specific impacts of the highway include:
• Vehicular Noise — The noise generated from being adjacent to the highway is
significant and detracts from the experience of the buildings.
• Snow and Debris from the Highway/Plowing Operations — In the winter, the
spoils from snowplowing have impacted the western building and present a
challenge going forward in finding a way to protect both the buildings and
visitors to the site. Currently, a temporary facade is placed on the western
building to protect it from further deterioration; this is not a long-term solution
and regardless of the future use of the buildings, an improved barrier is needed.
Mitigation Strategies/Solutions:
The strategies discussed to address the impacts of being in such close proximity to the
highway range from moving the buildings to improved barriers and architectural features.
• Highway Barrier — A highway barrier may be able to address the snow/debris
issue, as well as help mitigate the impact of vehicular noise for pedestrians
outside and inside the buildings. Initial ideas have ranged from a mesh panel
design to a transparent shield. Pitkin County OST commissioned a preliminary
study to look into barrier options that are detailed in Appendix F, including a
chain-link fence, transparent acrylic panels, and a glare -screen barrier with costs
ranging from $16,000 to $140,000. Another option that may be viable is using a
removable Blast -Safe Barrier Fence System that would be installed behind jersey
barriers to block snowplow debris; it could be removed during the summer
months.
If a barrier is implemented in the future, consideration should be given
to maintaining views of the buildings from the highway, drainage needs,
Emma Townsite 1 Strengths, Challenges and Opportunities 22
maintenance costs and aesthetic upkeep (e.g. a clear or transparent barrier
may require frequent cleaning to maintain its appearance).
• Architectural Strategies — These may include soundproof windows and
insulating features to dampen the noise from the highway. The main
entrance could be located on the back (north side) of the buildings.
• Trail Realignment — It may be desirable to reroute the Emma Trail behind
the buildings to improve the trail user experience as well as allow more
space for a barrier. The Town of Basalt, which manages the trail, is open to
looking at realigning the trail should this be necessary.
• Building Relocation — Relocating the buildings farther back on the site
would address both the noise and debris issues, and could bring a number
of additional benefits. On the other hand, there are a number of compelling
reasons to leave the buildings in their historic location, which would need to
be weighed against the benefits and cost of moving the structures. Reasons
to leave the buildings in place include preserving their historic location and
maintaining the integrity of the subgrade space, as well as the expense of
moving the structures. A preliminary summary of what would be required to
move the buildings is included as Appendix G.
• Lowering Highway 82 - The highway expansion through Emma dramatically
changed the character of the community and the continuing increase of
highway traffic makes access increasingly challenging, creates a real barrier
for both residents and wildlife, and impacts both the structures themselves
and the experience of being in or around the buildings. Grade separating
the highway could help reduce some of these impacts, though the feasibility
of this type of a project has not been evaluated and is likely to be cost
prohibitive.
The buildings' proximity
to the highway and
access constraints
present significant
challenges to the
buildings' future use.
Emma Townsite 1 Strengths, Challenges and Opportunities 23
2.2.2 SITE ACCESS FROM HIGHWAY 82 AND TRIP GENERATION LIMITS
As described above in the Traffic Impact Study summary, one of the most limiting factors
influencing the future use of the Townsite buildings is the CDOT access regulations/
requirements from Hwy. 82 and the safety of vehicular access to the site. Improving
the configuration of the intersection is not within CDOTs existing capacity and no
improvements are planned at this time. In past discussions, CDOT has ruled out the
addition of a traffic light - a determination that has been supported by the Emma Caucus.
Limited Vehicular Trip Generation - The conclusion from the 2013 Traffic Study was that
future use of the buildings, via the west access at Emma Spur Road, cannot exceed 10
vehicles per hour per the State Highway Access Code. The Emma Caucus is also wary of
adding more congestion at the intersection due to the safety concerns.
Mitigation Strategies/Solutions:
The committee discussed strategies that may expand the potential land -use options
through creative problem solving and alternative transportation options such as shuttles
and bicycles. The proximity of the buildings to the trail network and population centers
may allow for more non -motorized trips and uses that capture the interest or serve the
needs of existing trail users.
Shuttle/bus — A shuttle or bus might be an effective way to transport people to the site
without significant vehicular trip generation. Shuttles might be used for events or everyday
operations/visits from downtown Basalt, Willits or the park-and-ride lot at Two Rivers
Road. For example, on a busy night or for small events, visitors could take a shuttle to the
site rather than their personal vehicles. The use of Emma Trail (which was once a road) for
vehicular access is not an option at this time; its width is too narrow to accommodate both
vehicles and other modes safely.
2.2.3 BUILDING SYSTEMS AND CRITICAL INFRASTRUCTURE
Septic and On-site Wastewater Treatment System (OWTS) (aka: Leach Field): A new
OWTS was installed in the fall of 2018. The system is engineered to allow it to serve the
3 -bedroom Mather House and future undetermined expansion of the Emma Townsite.
Connection to this OWTS for future use of the Townsite structures will require the
installation of additional tank(s) and permits from the Pitkin County Environmental Health
Department. The OWTS is sized to accommodate 1,999 Gallons Per Day (GPD), allowing
for design flow of the Emma Townsite building(s) not to exceed 1,549 GPD. (C1368 OWTS
Design Packet 4 21 18.pdf)
Water Well: A functioning water well, with a pumping rate of 15 gallons per minute,
is located approximately 400 feet east of the Mather House. Currently, the well is only
permitted to serve the Mather House for "residential water for one single-family unit as
well as the unit's lawn and garden (about 17,100 square feet)." The well does not have
previous history of, nor is it currently permitted to be used for the watering of domestic
animals/poultry/livestock. In the fall of 2018, OST installed a new waterline that connects
from the well to the Mather House. At that time, a "Y" in the line was incorporated which
runs to a frost -free hydrant on the west side of the Mather House lawn. Once plumbed,
the Emma Townsite building could easily connect to the "Y" (via the frost -free hydrant)
for its water supply. A new well permit would need to be filed with the Colorado Division
of Natural Resources in order to do so. This would not require an additional water pump
system; the Mather House's system should be sufficient to run both buildings.
Emma Townsite 1 Strengths, Challenges and Opportunities 24
West
Access
Emma Townsite
Tor Open Space
'gzaoo
Accessory
Building
Warehouse/ ``iMather'
West • F'House
mma Store
• /East
•
Heritage Orchard
CDOT ROW
East
Access
Emma
Schoolhouse
Parking: There are a few options for parking vehicles on the site that would comply
with Historic Preservation Standards. There is a triangular CDOT parcel that has been
specifically identified for building access and parking to serve the store buildings, as
well as additional space in the rear of the buildings. If additional parking is needed,
there may be potential to park vehicles at the Two Rivers Road park-and-ride or within
Old Town Basalt and have people walk, bike or shuttle to the buildings. Using the park-
and-ride facility, however, would require discussion with RFTA.
MAP 8: The building
systems and critical
infrastructure would
need to be addressed
depending on the
buildings' future use.
Emma Townsite 1 Strengths, Challenges and Opportunities 25
3. STEERING COMMITTEE RECOMMENDATIONS
The Steering Committee spent multiple meetings discussing ideas for future use of the
buildings, the implications of those uses and, ultimately, what uses would and would not
be compatible with a successful future in the buildings. The Vision Statement, drafted
by the committee, was considered as a guide during all discussions and was referred
to many times as the committee wrestled with the balance of historic roots, Emma
character and community spirit. The following is a list of the parameters for future
use(s) resulting from the work of the Steering Committee and the existing conditions/
constraints described in Section 2.1 and 2.2. Additional supported and non -supported
uses are included as examples from the visioning process and Steering Committee
discussions.
The Steering Committee wants to encourage creative reuse of the buildings, but also
ensure that any potential future uses are fiscally sound, sustainable and have a viable
management structure. Open Space and Trails does not have the capacity on its own to
renovate the buildings and/or manage tenants.
3.1 PARAMETERS FOR FUTURE USE(S)
1. Advances the Vision Statement - "The Emma Store Buildings will honor their historic
agricultural roots, the natural environment and character of Emma, and provide a space
that is accessible to the community and celebrates the innovative spirit of this location."
2. Compatible with Traffic Generation Limits / Safety Requirements for Vehicular
Access/Egress - Any proposed future use must be compatible with the traffic generation
limits established by the State Highway Access Code and described in Section 1.4.2.
The land use/transportation context within the mid -valley has changed since the initial
Traffic Impact Study was completed in 2013 and a new study evaluating any proposed
use(s) is likely to be required. Creative ideas for how to use non -motorized or alternative
transportation options to access the site are encouraged. Other ideas might include
improvements to the pedestrian underpass to access the other side of Highway 82 or a
pedestrian bridge over the highway. Limits on the number of vehicles accessing the site
and the lack of parking will be important considerations in determining the type and
scale of future uses.
3. Compatible with Emma Caucus Master Plan - Appropriate uses for the adaptive re-
use of the historic structures are supported by the Caucus as long as they do not create
inappropriate impacts on traffic, energy, nighttime light impacts or noise. Some of the
uses generally supported by the committee may not fit perfectly within the Caucus' plan,
such as those that would attract more people/visits. Such uses would need to adequately
address impacts and manage the Caucus' concerns regarding access to the site and
traffic safety, as well as limited night lighting, fencing and signage. In general, "new
commercial, institutional or other intense, high traffic -generating uses are considered to
be incompatible with the rural residential character and the basic infrastructure of the
Caucus area" (Emma Caucus Master Plan).
4. Preference for a Multi -Use Space - The Steering Committee believes that for the
Emma Store buildings to have the most successful repurposed future, a variety of uses
should be housed together in a complementary and mutually supportive manner.
The multiple levels in the buildings and the accessory building allow for spaces to be
separated and programmed for different functions under the same roof. Multiple uses
Emma Townsite 1 Steering Committee Recommendations 26
1
1
PARAMETERS FOR FUTURE USE:
Advances the Vision Statement
"The Emma Store Buildings will
honor their historic agricultural
roots, the natural environment and
character of Emma, and provide
a space that is accessible to the
community and celebrates the
innovative spirit of this location."
4
Compatible with Traffic
Generation Limits / Safety
Requirements for Vehicular
Access/Egress
Any future use must be compatible
with the traffic generation limits
established by the State Highway
Access Code. The land use/
transportation context in the mid -
valley has changed since the 2013
Traffic Impact Study and a new
study evaluating proposed use(s) is
likely to be required. Creative ideas
for how to use non -motorized or
alternative transportation options
to access the site are encouraged.
Other ideas might include
improvements to the pedestrian
underpass to access the other
side of Highway 82 or a pedestrian
bridge over the highway.
Preference for a Multi -Use Space 1
The Steering Committee believes
that for the Emma Store buildings
to be a success, a variety of uses
should be housed together in a
complementary and mutually
supportive manner. The multiple
buildings and levels allow for
spaces to be separated and
programmed for different
functions. A variety of uses could
also help to serve a broader
community audience than a
singular use. It is possible that a
single use for the buildings that
meets the Vision Statement and
adds value to the community
and the site would be supported.
A dynamic space is the key to
success.
■
Compatibility with the Site/
Infrastructure Constraints
There are a number of challenges
inherent to the buildings
themselves and the surrounding
infrastructure, including limitations
of the septic and water systems,
parking area constraints, and
proximity to the highway. These
are described more specifically in
Sections 2.2.1 through 2.2.3.
A
Compatible with Emma Caucus
Master Plan
Appropriate uses for the adaptive
re -use of the historic structures are
supported by the Caucus as long as
they do not create inappropriate
impacts on traffic, energy,
nighttime light impacts or noise.
In general, "new commercial,
institutional or other intense,
high traffic -generating uses are
considered to be incompatible
with the rural residential character
and the basic infrastructure of
the Caucus area" (Emma Caucus
Master Plan). Potential uses that
would attract more people/visits
would need to address impacts and
manage concerns regarding site
access, traffic safety, night lighting,
fencing and signage.
6
Historic Building Requirements
Future uses must comply with
Pitkin County Historic Preservation
Guidelines and maintain the
building's exterior per the
requirements of the State Historic
Grant.
Emma Townsite 1 Steering Committee Recommendations
could also allow for activating the spaces during different times of day or times of year.
A variety of uses could also help to serve a broader community audience than a singular
use. It is not assumed that all of these uses must occupy the buildings all at the same
time, but that the successful future of the buildings involves a diversity of the uses
working together. It is possible that a single use for the buildings that meets the Vision
Statement and adds value to the community and the site would be considered and
supported. A dynamic space is the key to success.
5. Compatibility with the Site/Infrastructure Constraints - There are a number of
challenges inherent to the buildings themselves and the surrounding infrastructure,
including limitations of the septic and water systems, vehicle access limitations, parking
area constraints, and proximity to the highway. These are described more specifically in
Sections 2.2.1 through 2.2.3.
6. Historic Building Requirements - Future uses must comply with Pitkin County Historic
Preservation Guidelines and maintain the building's exterior per the requirements of the
State Historic Grant.
EXAMPLES OF POTENTIAL FUTURE USES
The following examples represent uses considered by the Committee that might fit the
above parameters for future uses, although most involve limitations due to the site
challenges described in Section 2.2. Additional uses may also be considered.
• Art/Heritage Crafts Center/Studio(s) — an artist's co-op, a place to learn
heritage arts, and/or artist's live/work spaces, for example.
• Agricultural -Related Community Uses—classes, dinners, local agricultural
product processing (no meat), limited farm product sales, for example.
• Museum — history, ranching, farm equipment, or living agricultural museum
and teaching center, for example. The committee has concerns that a museum
would not be a successful stand-alone use and would become stagnant, but
that it is something that could be a portion of a more dynamically programmed
variety of uses.
• Small-scale Community Gathering Space — a space that is available for
community gatherings, small events (with creative solutions to transportation/
access that do not rely on individual vehicle use), education classes or book
clubs.
• Housing as an Accessory Use — artist or agricultural worker housing, for
example. The Committee does not support housing as a singular or dominant
use of the site; however, accessory housing that supports other uses of the site
may advance the Vision Statement.
• Small-scale Offices or Incubator Space — with the potential for two stories in
the west building, the committee discussed how the second floor could be
non-profit or small-scale, for-profit offices with a completely separate use on
the first floor, for example.
• Small-scale Shop / Retail Sales as an Accessory Use — The committee does not
support a restaurant, cafe or retail shop as the primary use, but a small-scale
shop that supports the other uses within the building or passers-by on the trail
could be considered. A coffee/sandwich shop/cart or "buvette," or sales related
to one of the primary uses such as a museum shop, artist co-op sales or limited
agricultural sales are examples of potential complementary uses.
Emma Townsite 1 Steering Committee Recommendations 28
EXAMPLES OF USES THAT ARE NOT SUPPORTED
The following is a list of specific uses the committee discussed and decided would not be
an appropriate fit for the space, as they do not meet the parameters for future use. The
list is not exhaustive.
• Restaurant — this use is prohibited under the Caucus plan, and concerns were
expressed about traffic generation and demands on the septic system. A small-
scale coffee/sandwich shop was supported to complement other uses in the
buildings.
• Brewery — concerns were expressed about the commercial use and scale, and
septic limitations.
• Meat -Processing Facility — no slaughterhouse, for example. This is against
the Caucus plan. Other forms of local agricultural processing are supported in
collaboration with other building uses.
• Visitor's Center — concerns were expressed about traffic generation, parking
and this not being the right location for such an amenity.
• Housing as a Singular Use — concerns were expressed that if the site was only
housing, it would not be available for the greater community to visit. Housing
is supported if it is part of a variety of uses in the buildings.
3.2 PARTNERSHIPS
Regardless of the future uses in the Emma Store buildings, partnerships for future
improvements will be necessary. The scale of funding will depend on the future uses in
the buildings. Opportunities to keep in mind for POTENTIAL partnerships may include,
but are not limited to:
• State Historic Preservation grants
• Colorado Preservation, Inc.
• Private foundations
• Private individuals
• Pitkin County Open Space and Trails, within the parameters of its Mission,
Charter and Historic Structures Policy.
Emma Townsite 1 Steering Committee Recommendations 29
3.3 A PATH FORWARD - NEXT STEPS
At this time, the committee feels it is important to find a critical mass of the right mix
of uses, or a singular use that meets the vision, coalesced around advocating for and
activating the buildings, and that has the momentum and vision to manage and keep
the buildings active.
To continue to build upon the energy the committee has dedicated toward the
future programming of the Emma Store buildings, the recommended next steps
for a path forward have been broken into three areas: Inspiration and Innovation,
Long -Term Future Use and Interim Use. Staff will seek out opportunities to invite the
public onto the site and into the buildings during both the Inspiration and Innovation
steps and the Long -Term Future Use steps as public involvement and endorsement
will be essential to the building's successful future.
INSPIRATION AND INNOVATION
Park Amenities and Emma Trail Realignment - OST will pursue some site
improvements/amenities to serve those accessing the site on the Emma Trail and
encourage more people to explore the property and historic buildings in a more
intimate way than just passing by. These amenities may include an enclosed port -
a -potty, interpretive elements, a water fountain, seating or picnic tables, and/or a
river overlook. OST will work with the Basalt Regional Heritage Society on future
interpretive elements.
As part of a phased approach to rerouting the Emma Trail, OST will first add a soft -
surface trail to provide a way to activate the site and open it up to more public
visitation without the more substantial investment of a paved trail realignment.
In the future, the trail may be completely relocated in order to create room for
improvements on the highway side of the buildings and bring the public through
the activated site. The interim soft -surface trail will allow more people to enjoy
the river side of the site and get acquainted with the quieter side of the buildings.
Additionally, OST will work with the Community Development Department to
evaluate the potential for a low -impact trail or stairway to connect from the
buildings to the Roaring Fork River.
University Partnerships - The Steering Committee recommends that Pitkin County
Open Space and Trails partner with interested architectural design program(s)
to help stimulate ideas and provide inspiration for the future of the Emma Store
buildings. The Emma Townsite was the focus of a week-long University of Colorado,
Denver Architecture design studio guided by Harry Teague Architects in May 2020.
The course generated some interesting ideas for the potential reuse of the buildings
and ways to activate the site (a summary of the students' work is included in
Appendix J). OST will work with UCD or seek out another architectural program to
execute a semester -long studio in order to provide a more in-depth/comprehensive
analysis and ideas for the buildings and the site. The project could include students
from multiple disciplines, or solely architectural students, with a goal of taking the
parameters outlined in this document as a guide, including the "site challenges"
and "potential future uses," and developing innovative site, building and access
solutions.
Emma Townsite 1 Steering Committee Recommendations 30
LONG-TERM FUTURE USE
Initiate a Process to Generate Proposals/Partnerships to Activate the Townsite -
When the timing is right, following the student design project, Open Space and Trails,
with input from the Steering Committee, will develop a process to seek proposals
or partnerships to activate the buildings. This could be in the form of a Request
for Proposals or a Request for Concepts process, or another way to accelerate the
identification of a "champion" who is passionate about the reuse and activation of
the buildings in a way that is compatible with the vision statement. The right fit will
be a champion who understands how important these buildings are to the valley
and has the initiative and resources to execute the rehabilitation and reuse of the
buildings. The County has the ability to pursue a long-term leasing strategy or to
subdivide and sell the townsite buildings if or when a future coalition of uses has
been identified. If the County maintains ownership of the buildings as a part of a
future public/private partnership, OST funds can be utilized pursuant to the Historic
Structures Policy (Appendix A) and the County can apply for additional grant funding
to assist with interior finishing, windows, and other basic building improvements.
Ideally, a future proposal would include multiple uses, honor the history of the site,
character of Emma and the spirit of this location, and create a space that is accessible
to the community. If this process does not generate responses that are viable and
advance the vision statement, the Steering Committee is comfortable waiting until
the timing and use are right. The Committee would like to remain engaged as future
uses for the building are considered.
Interior Improvements - Minor improvements to facilitate the interim use as a
storage space or public tours may be pursued to provide for the safety of the users.
Improvements to finish the interior space to a level that is habitable for future uses
are not currently recommended; due to the uncertainty of the needs of a future use
and the potential to relocate the buildings farther away from the highway.
INTERIM USES
In the meantime, until a champion for the space is identified, the Committee
supports the continued use of the buildings as a storage area for uses/activities that
fit within the Open Space and Trails mission.
Emma Townsite 1 Steering Committee Recommendations 31