HomeMy WebLinkAbout2017.12.21 OSTB work session minutes_S MINUTES
OPEN SPACE AND TRAILS BOARD
SPECIAL WORK SESSION
December 21 2017
Pitkin County Library
120 N. Mill St.,Aspen
OSTB Present:
Graeme Means Howie Mallory Hawk Greenway Tim McFlynn Wayne Ives
Dist. 1 Dist. 2 Dist. 3 Dist. 4 Dist. 5
Chair
Staff Present: Gary Tennenbaum, Dale Will, Lindsey Utter, Jessie Young, Janet Urquhart,
Richard Neiley
BOCC Present: Greg Poschman
Media Present: Elizabeth Stewart-Severy, Aspen Public Radio; Scott Condon, The Aspen
Times; M. John Fayhee, Aspen Daily News; GrassRoots TV crew
Others present: members of the public, including Gideon Kaufman, Chuck Downey, Mike
Pritchard, Tom Cardamone, Lisa Tasker
Wayne Ives called the meeting to order at 9:32 a.m.
Carbondale to Crested Butte Trail
Wayne Ives introduced the work session as the board's first opportunity to discuss the proposed
Carbondale to Crested Butte Trail as a group at a meeting. He framed the session as an
opportunity for the board to give direction to staff and ask for more information. The agenda was
divided into a discussion of the planning process and discussion of issues. Each of the board
members then introduced themselves.
Process—Graeme Means said he felt the process had become too heated and controversial and
called for a collaborative process. He suggested a consultant or point person to lead the public
process. The trail is an idea that will involve a long-term process and a lot of future input, he
said, suggesting the project be divided into sections that get greater focus. Wayne Ives agreed,
saying stakeholders in the Crystal Valley need the ability to be more involved. Moving forward,
the planning process needs to proceed more slowly, he said.
Richard Neiley entered the meeting at 10 a.m.
Tim McFlynn also endorsed the involvement of a consultant with expertise in public process,
noting the trail is the most costly and controversial project the open space program has ever
considered. The public has called for a more transparent, collaborative process and a consultant
could help, he said. Howie Mallory agreed, calling for a"holistic" approach that includes not
only a consideration of a trail, but of other conservation and environmental needs in the Crystal
12/21/2017 OSTB Work Session Minutes
Page 1 of 5
Valley. Mallory also called for expediency, rather than letting the planning process bog down.
Ives, too, said he wants to see momentum on the project continue.
Board members, with the exception of Hawk Greenway, agreed on the hiring of a consultant.
Greenway opposed the hiring of a consultant and said he does not want to see the project set
back 2 to 5 years or studied to death. The heated debate is a good sign—of public interest and a
wide range of opinions, Greenway said. The public's call for a"no trail"option was valid input,
Greenway added. He also said it was not always clear to the public that the alignment does not
have to be all one option or the other; and the county could have done a better job of showing
where it owns a trail easement and where it does not. Greenway complimented the Open Space
and Trails staff and said he sees no need for a consultant. McFlynn agreed the staff has been
exemplary.
Greg Poschman entered the meeting at 10:20 a.m.
Gary Tennenbaum asked the board if the consultant is envisioned to shepherd the trail planning
through the draft plan process. Yes, Tim McFlynn responded. Wayne Ives suggested the project
is complex enough that the process may require an extra step before a plan is drafted. McFlynn
agreed and asked that the trail project be on all of the board's future regular meeting agendas for
a check-in(other board members did not specifically endorse the agenda request). McFlynn said
public process might make a good topic for the board's next annual retreat.
Issues—The topic of issues was divided into several subtopics, including feasibility of
alignments, wildlife and habitat impacts, costs, habitat improvement, aesthetics and areas of
consensus on trail alignment.
Wayne Ives said he would like to see cost estimates for a more modest trail platform—something
that isn't 10 feet wide, and possibly the cost of a singletrack trail extending up the valley from
the terminus of the existing Crystal Trail. If there is no contiguous trail, he asked what segments
could stand alone. Graeme Means suggested a contiguous trail is unrealistic in the near term and
said he favors looking at connecting neighborhoods rather than regions. Means also said he
supports narrower, soft-surface trails to connect neighborhoods and a widened shoulder on Hwy.
133. Where there is not support for a trail segment, that sentiment should be honored, he said.
Lisa Tasker entered the meeting at about 10:30 a.m.
Howie Mallory said he favors trail connectivity but acknowledged it may need to be achieved
incrementally. The issue of private property has yet to be dealt with, he said. Mallory said he
sees the trail segments as Carbondale to Redstone, and Redstone and beyond. He said he does
not envision it as entirely a singletrack trail and that soft surface lends itself to a social trail,but
not one for bicycle transit. He suggested the highway alignment be looked at for transit and that
widened shoulders could make multiple alignments more doable.
Mallory and Hawk Greenway both said they consider Filoha Meadows Nature Preserve to be off
the table for a trail alignment. All five board members agreed Filoha Meadows should not be
considered for the trail.
12/21/2017 OSTB Work Session Minutes
Page 2 of 5
Greenway also said he sees no point to a non-contiguous trail and he asked staff to come up with
a trail proposal that avoids sensitive areas such as Filoha Meadows. Tim McFlynn said there are
private lands and subdivisions where it may not be possible to put a trail. Those areas, like
important wildlife areas, could accommodate a soft-surface trail but not bicycles, he added.
McFlynn called for a trail plan that respects private lands until there is an analysis that shows a
public right-of-way exists. Ives agreed. He also said few people would ride from Carbondale to
Crested Butte,but that connecting Carbondale and Redstone makes sense if it is feasible. Howie
Mallory called for involving the Colorado Department of Transportation in a discussion about
establishing a trail corridor along the highway. The highway platform of today should not be
considered the platform of the future, he said.
Wayne Ives asked staff for more information about CDOT's requirements related to widened
highway shoulders, about the potential for a trail corridor on the west side of the highway and
about the cost of a more modest trail platform. The other four board members concurred with
this request.
On the subject of wildlife impacts, Graeme Means said the option for Alignment A along the
highway would be an expensive project that has environmental, construction and riparian
impacts. He also said seasonal trail closures could be effective in some areas and should be
considered as the various segments get further study. Tim McFlynn noted the open space board's
charter mandates the protection of wildlife habitat, connectivity and corridors, and that the
program's biodiversity policy applies to more than simply wildlife. The trail discussion should
be about more than protecting Filoha Meadows, he said. Wayne Ives agreed. The concern is not
just winter wildlife habitat,but also wildlife connections from place to place and to the river,
Ives said. Additional human use, and especially via a paved bike trail, would violate the
biodiversity policy in some places, Ives said.
Tom Cardamone entered the meeting at about 11 a.m.
Howie Mallory said there is no question a trail would have impacts on wildlife. He noted the
board has no information about what those impacts would be and asked for data and specificity
on impacts before ruling out trail segments. A trail platform cannot be singled out as the only
impact to wildlife, Mallory added, noting the Crystal Valley's bighorn sheep population has been
in decline without impact from a trail. Open Space and Trails shares responsibility for wildlife
with Colorado Parks and Wildlife, the Forest Service and others, Mallory said,urging the
program to engage those other agencies on the issue. Tim McFlynn noted the Open Space and
Trails program is working with the Colorado Natural Heritage Program to identify important
conservation areas.
Wildlife habitat improvement will be part of a trail plan, said Gary Tennenbaum. The staff has
already recognized that need as a component of the plan, he said. Hawk Greenway urged
working with Colorado Parks and Wildlife on wildlife management in addition to habitat. Howie
Mallory asked about goals for riparian restoration. That, too, will be included in the trail plan,
Tennenbaum said. Areas have already been identified; there is much that can be done in
conjunction with a trail project, he said.
12/21/2017 OSTB Work Session Minutes
Page 3 of 5
With regard to project cost, Tim McFlynn called the engineering estimates of the project
"daunting" and noted some costs are difficult to estimate, such as acquiring private lands. He
noted that, in the open space program's history, eminent domain has not been employed and
asked how a preferred alignment can be identified without knowing where a trail can and cannot
go. The costs of mitigating impacts, such as enforcement of seasonal closures in perpetuity, need
to be considered, he added. McFlynn also questioned how the cost of the project would affect
other Open Space and Trails projects.
Hawk Greenway agreed the private land issue needs to be addressed. Use of eminent domain,
while not off the table, is highly unlikely, he said. The potential use of private parcels must be
addressed in order to understand where the trail could go, he said. Greenway said he believes it's
possible to "thread the needle,"using bridges to hop from the highway corridor(Alignment A)to
Alignment B, east of the Crystal River. Determining the cost of circumventing private property
will help determine how much a section of trail is worth as the program negotiates with property
owners, he said.
Graeme Means offered a calculation on how much the open space program could spend on trails
for the next 20 years. If trail spending is fixed at 25 percent of what the program has available for
trails; and 65 percent of that sum went to the Crystal Trail, that's about$1.33 million per year for
the Crystal Trail, he said. The trail project is "enormous" and its cost could prevent the program
from pursuing other projects, Means said, suggesting the board focus on what it is willing to
spend annually on the project, given the financial realities of the program. The board needs to
decide how much it wants to put toward the trail each year, he said.
Howie Mallory said he hopes there are partners who can help make the project happen, including
the Colorado Department of Transportation on the highway platform, Healthy Rivers and
Streams for riparian improvements, and various agencies on wildlife issues. Mallory said a
multi-year capital plan is reasonable to accomplish a project.
Gary Tennenbaum reminded the board that funding of projects is decided annually and that funds
for a multi-year project can only be allocated a year at a time. Bonding can bind a board to a
multi-year project, Mallory said. Tennenbaum said staff will analyze the Crystal Trail project
costs in conjunction with other future projects expenses.
Wayne Ives said he's not sure the board needs hard numbers on the Crystal project yet, since
construction isn't imminent. Tim McFlynn said it would be helpful to know how Crystal Trail
costs could impact other projects and things the program is already doing. He suggested a
spreadsheet that shows the trail project's impact on the program's overall capacity. Howie
Mallory agreed, asking staff for a"what if'based on a percentage of funding allocated to trails.
Maintenance costs are also a consideration, Tennenbaum said.
Dale Will noted one of the strengths of the open space program is that it can be opportunistic,
taking advantage of changes that can't be anticipated.
Regarding aesthetic impacts of a trail, Hawk Greenway noted a lot of the public indicated a soft-
surface trail would be acceptable, particularly on the east side of the river. Graeme Means said he
12/21/2017 OSTB Work Session Minutes
Page 4 of 5
doesn't want to see an urban trail going up the Crystal Valley and called on the open space
program to concentrate on "low-key connections." Howie Mallory said the board needs to
consider the user experience as well as the impact of e-bikes. Hard- versus soft-surface trails
represent different experiences, he said. E-bikes belong only on a hard surface in the highway
corridor and not on any soft surface, Mallory said. Tim McFlynn agreed, adding that he feels the
east side of the river is not the place for any mechanized devices. The county-owned open spaces
on the east side of the river should be used by quieter user groups, he said.
A video of the meeting is available at https://www.youtube.com/watch?v=S6SYwKt7YWM
ADJOURN
The OSTB special work session of Dec. 21, 2017 was adjourned at approximately 11:58 a.m.
Approved: Attest:
Wayne ves, Chair J Urquhart
Pitkin County Open Space &Trails Board T Stewardship and Outreach Coordinator
12/21/2017 OSTB Work Session Minutes
Page 5 of 5