Loading...
HomeMy WebLinkAboutbocc.con.amended.125.21 A 8/30/2021 CDD trKIN Pitkin County COUNT Procurement Cover Sheet cam, Please complete the Contract Cover Sheet when the contract/task order is complete and fully executed. Return all Contract Cover Sheets and Contracts/Change Orders/Amendments/Task Orders to Procurement Contract Information Contract Number 125.21 A Project Name Solar System Install at Emma Open Space Barn Contractor Sunsense Solar Budget Line Item 11836362.562000.10022 $ 12,705.77 $Additional Budget Line $ Item(s) $ _ (Please fully allocate New Contract Total) $ 12,705.77 Procurement Method: Informal Type: Construction Contract Start Date 5/10/2021 Contract End Date 12/15/2021 Contract Type Change Order/Contract Amendment Retainage No If this is a new contractor,please enter the New Vendor information into Munis for workflow approval. Contact Information: Department Open Space & Trails County Representative Paul Holsinger County Representative (970) 920-5237 Phone Provide a brief description of the Contract or Change Order: Amendment to Scope of Work to adjust for installation site change from Barn roof to ground level and to increase the solar power system size; extension of Contract Term to 12/15/2021 to allow for completion of revised Scope of Work; allocation of additional funding of$13,705.77 to adjust for increased solar system size. Contract Value Summary: Original Contract Amount $ 30,145.00 Previous Change Order/Amendment Amount $This Change order/Amendment amount $ 13,705.77 Contract Total $ 43,850.77 Contract#: 125.21 Rev. 2018.06.13 btf. Budget Line Item#: 11836362.562000.10022 1/441)1 i1'KIN COUNT • CHANGE ORDER/ CONTRACT AMENDMENT Change Order Number: 125.21 A OWNER: CONTRACTOR: Pitkin County, Colorado Sunsense Solar 530 E. Main St., Suite#302 1629 Dolores Way Aspen, CO 81611 Carbondale, CO 81623 The Provision of Photovoltaic Engineering, Procurement and Construction Services (the "Contract") dated May 25, 2021 between the Board of County Commissioners of Pitkin County, Colorado (the "County") and Sunsense Solar (the "Contractor"), is hereby amended as follows: Description of Change: 1. Revised Scope of Work to adjust for ground installation of solar equipment instead of roof mounting; 2. Increased size of solar power system to be installed due to improved space and weight capacity at ground level; 3. Allocation of additional funding in the amount of Thirteen Thousand Seven Hundred Five dollars and Seventy-Seven cents ($13,705.77) due to revised Scope of Work; and 4. Extension of Contract Term to December 15, 2021 to allow for completion of adjusted Scope of Work. Reason for Change Upon further inspection of the Project Site conditions pursuant to the Contract Scope of Work, County and Contractor determined that due to the structural limitations of the original installation site on the roof of the agricultural barn at Emma Open Space, the installation site of the solar photovoltaic energy system should be shifted to the ground level and that the revised installation site allowed for increased system size and capacity. Original Contract Amount $ 31,145.00 Previous Change Order/Amendment Amount $ This Change Order/Amendment Amount $ 13,705.77_ New Contract Total $ 43,850.77 *Increases over$25,000 and/or 10%(single increase or accumulative)of original contract must have County Manager signature. 1 Contract#: 125.21 Rev. 2018.06.13 btf Budget Line Item#: 11836362.562000.10022 In all other respects, the Contract is in full force and effect and remains unchanged by this Amendment. SUNSENSE SOLAR (k.ris Now), Sep-20-2021 Chris Howard Date Commercial Sales Manager PITKIN COUNTY, COLORADO RECOMMENDED FOR APPROVAL: f A tkbts ," Sep-13-2021 Paul Holsinger Date Agriculture and Conservation Easement Administrator MANAGER APPROVAL: flAdiduart Sep-20-2021 Rich Englehart Date Deputy County Manager *Increases over$25,000 and/or 10% (single increase or accumulative)of original contract must have County Manager signature. 2 Pitkin County- Open Space and Parks �. Solar Electric System General Estimate .!_Ja`J__-)��NJ=�� SOLAR I DESIGN I BUILD Sunsense Solar Solar Electric Contractor/Integrator 4.1111 r • i" h'M - �� �� • 1 ' P ;',141;140!. rlp , 1 t . agAiiiiirila, '- ; . / r.: ? To: Paul Holsinger Pitkin County Subject: Pitkin County- 100 Sopris Creek Rd --15.66kW Ground Mounted Solar Electric System Prepared by: Chris Howard PO BOX 301 Carbondale, CO 81623 (970) 963-1420 c.howard@sunsensesolar.com Sunsense Solar August 26, 2021 1 Pitkin County- Open Space and Parks �. Solar Electric System General Estimate a`J SOLAR I DESIGN I BUILD August 26, 2021, Paul, Harper, and the Residents, and Employees of Pitkin County, Sunsense, Inc (Sunsense) is pleased to provide the following summary and accompanying proposal for the Glenwood Springs Electric Systems Operations Center. Established in 1990, Sunsense is a Solar Electric Engineering, Procurement and Construction (EPC) Contractor covering all of Colorado and adjoining states based out of Carbondale, CO. Sunsense provides turnkey services for solar electric systems of all sizes and specifications. The Sunsense goal is to proactively build a long-term, sustainable business based on quality, consistency, and reliable service to our clients. The Pitkin County community is likely familiar with Sunsense capabilities, bandwidth, and commitment to community involvement in the Roaring Fork Valley, the selection of Sunsense for numerous Roaring Fork Valley solar PV projects for the past 30 years has established a foundation for strong working relationship between many businesses including municipalities, schools, and residences in our community. Sunsense has a strong backbone of commercial projects in the Roaring Fork Valley and is looking forward to working with Pitkin County here in our home in the Roaring Fork Valley We understand how important sustainability is to our community and we look forward to helping the county reach some of their financial and sustainability goals. Based on prior experiences and current market conditions, Sunsense has provided its best estimate in the accompanying proposal. Sunsense understands that changes to layouts or engineering could be altered due to unforeseen obstacles or updated goals. We look forward to discussing the details of this project and are happy adapt to any future changes if they occur. Respectfully, Chris Howard Commercial Sales 970-963-1420 c.howard@sunsensesolar.com Sunsense Solar August 26, 2021 2 Pitkin County- Open Space and Parks �. Solar Electric System General Estimate a`J SOLAR I DESIGN I BUILD Project Summary Please see our financial snapshot and production analysis provided by Energy Toolbase. Energy Toolbase is our trusted partner for financial modeling and PV production analysis. PV production is based on tilt, azimuth, and average sun hours in specific geographic locations. This 30-year weather data is collected and researched by the National Renewable Energy Laboratory in Golden, CO. Sunsense has taken a safe approach to discounting winter months due to losses from snow coverage. Sunsense has been tasked with creating a flush mounted array to a corrugated metal roof with no tilt up. Sunsense is happy to value engineer alternatives if warranted later. Please note that this general estimate is valid for 60 days and is based on current product availability and market prices. Project deposit and or contract can secure product and pricing. Please know Sunsense may need to adjust associated costs based on product availability and unforeseen obstacles to their current state for decisions made outside of 60 days from the date of this estimate. Scope of Work • All major project components included. • Required AHJ electrical/building permits. • Project Management/oversight. • AC and utility interconnection. • All associated AC &DC BOS. • Administration. General Assumptions • Sunsense is providing this Preliminary Estimate prior to final engineering and is aware that system layout and electrical engineering may be amended. • Construction period is still to be determined but is assumed to be during the third or fourth quarter of 2021 pending timely delivery of materials and avoidance of obstacles beyond the control of Sunsense. • Engineer on record to determine structural load capacity of roof and to provide approval for said loads. • Production Estimates are based on National Renewable Energy Laboratory 30 Year Weather Data and are not guaranteed. • Rate structure analysis is based on the current Holy Cross Energy rate structure and energy consumption is based on the most current rolling 12 Sunsense Solar August 26, 2021 3 Pitkin County- Open Space and Parks �. Solar Electric System General Estimate a`J SOLAR I DESIGN I BUILD months. Sunsense is aware that consumption will likely increase due to the new building addition. • It is assumed that the designed system will not produce more than 120% of the building. • Financial Analysis, Rebates, and Tax Benefits are for information purposes only and not guaranteed. Please consult with your advisor for discussion of eligibility. • Layout to be approved by Pitkin County AHJ and or Fire Department. • Exact electrical Interconnection strategy TBD but 208 voltage is known. • Sunsense has quoted what is currently believed to be the best value tier 1 module, quality racking, and reputable inverter manufacturer, but we are open to discuss alternative products. • After thorough review Sunsense feels that this system design optimizes production. Inclusions • All applicable rental equipment is included in this quote. • Sunsense staff will cover Project Management, Site Supervision, and AC Electrician. • Sunsense is to provide electrical PV drawings. • Sunsense is to provide all documentation relating to interconnection agreement with utility and permitting. Exclusions • Installation of all mechanical attachments if required (anchors) including attaching, flashing, and waterproofing to be performed by roofer on record. • Any associated snow removal. This pertains to any/all staging or access areas as well as rooftops. • Pre and Post Installation roof inspections will be conducted and recorded if work is completed on the roof. • Changes to ground layout due to unforeseen obstacles or obstructions could warrant changes to this proposal thus require alternate foundation solutions or alternate trenching routes. • Exact AC Interconnection strategy TBD following final engineering. • Monitoring strategy TBD. IT technician will need to run ethernet to inverter. • This proposal excludes and replaces the prior proposal for the 13.6kW roof mounted array and replaces with this 15.66kW Ground Mounted array due to the structural integrity of the building. • Sales and Use Tax is excluded. Sunsense Solar August 26, 2021 4 Pitkin County- Open Space and Parks �. Solar Electric System General Estimate a`J �`J=�� SOLAR I DESIGN I BUILD Pitkin County Open Space - 15.66kW Proposed System Layout a - � _ e. • *36 435 watt LG Bifacial Solar Modules Sunsense Solar August 26, 2021 5 Pitkin County- Open Space and Parks Solar Electric System General Estimate SOLAR I DESIGN I BUILD Pitkin County Open Space 415.66kW Proposed System Financials Payment Options Cash Purchase IRR-Term 4.8% LCOE PV Generation $0.064/kWh Net Present Value ($1,241) Payback Period 16.9 Years Total Payments S43,851 Total Incentives SO Net Payments S43,851 Electric Bill Savings-Term S89,109 Upfront Payment S43,851 Combined Solar PV Rating Po.er Rating: 15,660 Yv-DC Po.ver Rating: 13,990 W-AC-CEC Cumulative Energy Costs By Payment Option $104000 $84000 4 6 S6Q000 ...1111411111111 4i 5 $44030 V $20,000 SO Year 0 Year 4 Year 8 Year 12 Year 16 Year 20 Year 24 Year 28 ■A,oiled Utilty Cost ■Casi Rrcha;e Sunsense Solar August 26, 2021 6 Pitkin County- Open Space and Parks Solar Electric System General Estimate SOLAR I DESIGN I BUILD Pitkin County Open Space --15.66kW Proposed System Production General information Solar PV System Rating Facility: Facility#1 Power Rating: 15,660 W-DC Address: 100 Sopris Creek Rd Basalt CO 81621 Power Rating: 13,990 W-AC-CEC Solar PV Equipment Description Energy Consumption Mix Solar Panels: 15.7 kW-DC Premium Modules Annual Energy Use: 21,000 kWh Inverters: Standard Inverter Solar PV Equipment Typical Lifespan Solar Panels: Greater than 30 Years Inverters: 15 Years Solar PV System Cost and incentives Solar PV System Cost S43,851 Net Solar PV System Cost S43,851 ■Utility -3,506 kWh(0.00%) 1 Solar PV 24,506 kWh(100.00%) Monthly Energy Use vs Solar Generation 4,c00 3,000 (3 z000 II Ill 1,000 0 ■ ■ ■Energy Use(kWh) Solar Generation 0( h) Sunsense Solar August 26, 2021 7 Pitkin County- Open Space and Parks Solar Electric System General Estimate 0da0, / SOLAR I DESIGN I BUILD Pitkin County Open Space - —15.66kW Proposed System Cashflow IRR Term 4.8% Net Present Value IS1.241 i Payback Pericc 6.9 Years ROI 103.2% PV Degradation Rate 0.50% Discount Rate 5.0% Energy Cost Escalation Rate 2.5% Federal Income Tax Rate 21.0% State Income Tax Rate 8.0% Tota Project Costs S43,851 Years Project Costs Electric Bill Savings Total Cash Flow Cumulative Cash Row Upfront 542 S5" $43.851 $43,851 1 S2.210 52.210 $41,641 $2,254 52.254 $39,386 3 S2.299 52,299 537,088 4 $2,344 52.344 534,743 5 52.391 52.391 -$32.352 6 $2,438 52.438 $29,914 7 S2.486 $2.486 $27,428 8 $2,535 5 2,535 $24,893 9 52.585 52.585 $22.307 10 52,636 52636 $19,671 11 $2.688 S 2,688 $16,984 12 $2.740 52,740 $14,24.3 13 $2,794 S 2.794 $11,449 14 52,849 52849 58,600 15 $2,904 52904 55,696 16 52,961 52.961 -52,735 17 $3,019 53,019 $284 18 53,077 53.077 53.361 19 $3,137 53,137 56.498 20 53,198 53,198 59.695 21 $3,260 53.260 $12,955 22 - 53,322 53,322 516,277 23 $3,386 53,386 $19,664 24 53.452 53,452 S23,115 25 $3,518 53518 526,633 26 $3,585 53,585 S30,219 27 $3,654 53.654 533,873 28 $3,724 53,724 $37,597 29 $3,795 53.795 $41,392 30 $3,867 53.867 $45,259 Totals: -$43,851 589,109 545,259 Sunsense, Inc views our partnership with Pitkin County as pivotal to the Roaring Fork Valley and neighboring valley's aggressive transition towards a sustainable future. Sunsense, Inc prides itself on high quality EPC services and a punctual operations and maintenance division that result in high performance, great aesthetics, and system longevity. We thank you for your consideration. Please feel free to inquire with questions. Sunsense Solar August 26, 2021 8 Pitkin County- Open Space and Parks - • Solar Electric System General Estimate Oi'S. aO1 SOLAR I DESIGN I BUILD J I LGNON®H LG435N2T-E6 Eli/ 435W The LG NeON°H is designed to absorb sunlight both from the front and the rear sides of its NeON°cell by Icing a transparent backsheet The dual faces of the cell result in higher energy generation. 25 `®u. . ,. ., ti . YEAR ._ . PIMMV•RMOMMO - l WROPAhrry 40 Features 1 25-Year Limited Product Warranty - Bifacial Energy Yield The PgeON°H is covered by a 25-year \ i LG NeON°H modules use highly efficient limited product warranty v ) bifacial solar cell Through the technology, LG NeON°H can achieve up to 30% more energy than standard PV modules Better Performance on a Sunny Day More Generation on a Cloudy Day CIP LG NeON'H now pei(u,ns better on I The LG NeOr✓s H performs well on sunny days;thanks to its improved l cloudy days.weak sunlight conditions temperature coefficient cause a low energy reduction_ When you go solar,ask for the brand you can trust:LG Solar About LG � ab dew, ® LG g,mo,..,.... w.. b...uw.�._.,. �-nnao.�DS,,.ca ,. .*.o.o. 02'0U.Sc rr w�, FM w,�.��.���r, .4....•.w..o.m,*...e.,.X,.��...�.wS'*i* *. ..- .1�W1 b M1.e Mvaw tr., W err.wc•.Iv.eN.w]I art•..No NK)M'ar.�.w.Free N•cNl M,tiNJ wcM:b.o,a Ns Te.v--.- Lle]Good •Nw1�n/o'J.TT]we A•A�..naw.aa�.,mawri.q nrwm•wwmN.wry Sunsense Solar August 26, 2021 9 Pitkin County- Open Space and Parks - Solar Electric System General Estimate 0123a051 SOLAR I DESIGN I BUILD LG NeON®H LG435N2T-E6 General Data Electrical Properties Cell Pawl.( 12P4) MossIado+M+iP Waal IOr r Dllti{ Call Mir LC. SIC. 13F100• 8f.2004* CdICoV*.ren to Ci(6.24) 16441ms Pas(Pam) IWJ 435 465 465 tA..be dWaea 9E4 68M Mdty(Wpe) M 407 107 107 ladle OYwleie(L'Wm M 2130m a 1p12ns a/0 mm IMP Oast arm) IAA 1070 1144 1217 Waal 2214 Open Ora Saes Ns) M 487 _ Ia7 187 Was(lltlre/AWN) 28s.VTa.pead Ores*A AB Crreq VanClal Cumnt Oat) (AJ II I 1192 1268 add*(Ws) Lcapont O a&E8krsy (0) 196 210 223 Peas(Marra) Amami silts Par M.s8190naleh t (0) 75:5 laces 4a(rwraen Oars) IP 68 rah 3 Was Oars Pamir tams MI 0_.3 Cara 04,98) 14O0cn.2EA •a1c:areas.•re Luckier r•.1arn lw'HeM,.Col.muumuu 25S,Al IA °mud=(T7P•8•1d•) MC Vk ...roofs-el snares r sellmar sir uw..ea.n.•e.a rare a raar s 1tw-9J9Vn'-lt•11.,e-JcVNI.^'W,.309.111.0'e-IN 1t eV 20014sIfer 14406 Certification end Warranty I.,J.Ur-....mod la drn.e...e x rarer IEC61215.1/-1-1/22016,IEC 61730.1/32016 O,era.ilg Con croon: Cuba U.61730 Opasreq lar andur• MI -40 .90 e09001 K011001 50001 ydn Sprn Vass M 1p00(1gy1500(UL) [PEAS I800101 L illatCcrers.Lt EC6170110125s056 9searn5erle.Rraq (A' 10 A.�A.bnsenia IEC fi27162013 lAd.wd 4 Id'(r.a) Ian S/OOf113 Marla flu lbWss 7..I(IA 1703) 66arsrdirlad Men) [Den', 3,OOD163 Rs Minn Cie.C(Ut 790) Ida 11Atle Padua lbmt7 25 Yaws 1 Mono Dugan Unary L *ernq• Packaging Configuration •.el 1,,nt••mar 1,5"Nr1•pr 4i11y1s 91111 sr Nu.Must a sir lml hlwaa.4 .84 P.PIS (FA; 75 Pasts dl.rats pa 40'Cater (EA; SSD lambs a/%%AI gm.S9'Cserr (EA; 750 Temperntlre Cheracteritic: swats 8a q.rara 0 W. trial ;160.U201 ,213 1811019 MI 4233 lady..Ba(..r.s.(1.eW.H) (..) 15.441.178 e" DIM] Alt bye Gros r*sat N21 61O v: (%ICJ J 426 h WC OM ash.B.Lama Sega r0) 1]15 '1,14_•1 prase Wpmc4s.er r 1.O.n..t rasps 17JOWAd,satesr.ser.MT. r.rood 1 Na Wan.I A•5 Dimension:(mmlnch) Electrical Properties(NMOT) Torn II.raw or wee.e.. L0A39M2144 a ► Pa.l Puns aw�is�AM Murd•Na.a SIC 8110C• eF1200• Maass Pass M Pas(Paa) (W' 327 349 372 ie.n.33 n7.a/ - 1..a:2al�a' I Oa/1.9I PPP 9.8 Pus") 382 382 382 DOW. / J. M Cur.PP Ca Om") 14; 855 911 973 - Op.Omit Vann Din) (Yl 139 459 I5.9 cn..nc l.r � ' 4* 9 .5 aCare8Oe) (A; 8In 960 1022 a'.':n1T, YE-rue INN I-V Curve_ p 1 a �a !i n. r.srrea. = 1e d �i tom 'eor I- �er+naai 1�) • e tr.) ear Jf3 8 6r ama g .re i . C -t}III,'—,{y�•1 t 9r a SA zr rr sir c j C ..sit Y1 ® LSEhare USA lac Pr.dct asorrar eq.h nto a en aural trans LG 200 arms Ness 2LE6pdf 200om Mdeee6 pre. /.4439 laYsl.r.L 6.7069 IG..95h 031121 Life':Goo[ .a..l}rlemn a 2021 to EJ cuss,USA,.c All,.1st.runs Sunsense Solar August 26, 2021 10 Pitkin County- Open Space and Parks - Solar Electric System General Estimate 012ZaO1 SOLAR I DESIGN I BUILD SMA SUNNY BOY 5000-US/ 6000-US/ 7000-US/ 8000-US illili • —-- ,t • • • ASSEMBLED IN ONTARIORP CERTIFIED TO-40' C/F J o Codified Maio Safe Simple •ER Lod tcUL 1741/IEEE 1547 •9%rod elbo.ry •►a..ad anemic ynd and C22 2 No 107.101 •Op.Ced' crew improve whops Amm• ac ap.ra seem •ircpa.d DC dtcorwct rW;• SUNNY BOY 5000-US/ 6000-US/ 7000-US/ 8000-US Versatile performer certified to CS,'• Jndords The Sunny Boy 5000-US,600 -US,7000-US and 8000US inverters...re w•t.te;!o C22 2 No. 107 1-01 and feature excellent elhciency Graduated power classes provide Ren,briy.n system desrgn Automahc gnd voltage detection•and an ntegrated DC daconnect,co ch s+npldy nstdlatan,eraunng safely as wet os wing tone.These models feature galvonoc rsolotion and con be used with all types d modules—crystalline a,well os thm-Fdm. •USh..vUS733230er Sunsense Solar August 26, 2021 11 Pitkin County- Open Space and Parks Solar Electric System General Estimate 021.2 1, 1 )Gv7 SOLAR I DESIGN I BUILD Tmldmmd dabs Sumy Soy 3000US Swayan 1•y 6000US Say 1.y 700005 Sunny Lay 1000415 aa1.[ VOW. anr.< W.V. 3411Ac anr.a ar.a amrr Sena VOW IC vrr.t lama 10C1 Ma moavamrd.d IV pow I•..4J.510 6250 W 7300 W 6730 W 10000 W Mn DC powr N as•-1) 3300 W 6130 W 7403 W 6600 W Ma DC mama. 600 V 600 V 600 V 600 V DC.mned.e6n9. 310V 310V 310V 343V MM oolap.romp. 230 V-410 V 250 V-MO V 230 V-MO V 300 V-MO V MM DC.ala/w,md.q. 230 V/300 V 230 V/300 V 250 V/300 V 300 V/363 v Mac epa on.a/me amp ll DC d:mn..el 21A/20A 25A/20A 30A/20A 30A/20A 36 A•aaah..d armed 36 A•corakmml manta 36 A•,a.b..d maned 36 A•oonb:wd mama, N.nd..d MM..alma/ 1/41DC daaarewl famed may,pm MP/Pads O•A of(AC/ AC need pow 3000 W 6000 W 7000 W 7040 W S000 W Mn AC apparent pa... 3000 VA 6000 VA 7000 VA 1000 VA Nord AC.dmg./ad.:._.,. tar/• amr/• nr, r,. m. ., r, r r _ r,• AC vamp* aow n n rm. l. .a• a . 1 MI . a . . � . . r 11 r .an1 a11. .a.. y p 9 AC M 6...anv.tuna A W 60 N393-603 6011A56 3-60 3 14 60114.393.603Na 6014 39 3-603 1Y Ma.apd aar.ma 24A 21A ISA 29A 23A 22A 34A 29A 23A 32A RPM/lector loom.1 I I I I llama madman/«.a4a•a4 ants 1/2 1/2 1/I 1/2 1/2 1/1 1/2 1/2 I/1 1/2 1/1 I(.memm <4% <41 <4% <4% y Ala.dasa.y 967% 9611% 961% 969% 96d1i 970% 971% 969% 970% 963% 960% - (IC alhomq 93.0% 953% 953% 955% 933% 960% 955% 960% 960% 960% 96.0% 14•ar044m d.w.. DC.a.n.aba9 paNaAon • • • • AC shad a.aa pre.aW. • • • • .Galarmaly aalaad/alpdn •/.rar.ma4ma%.* •/- - •/- •/- PmmtAm clam./ovra•►.p....gory I/■ I/11 1/• 1/■ Gamma dale Di.w.n.lW/M/q...m(a) 470/613/240 1113/24/91 DC Dammam _- _- IW/N/D1w w1.1 117/297/190 17/12/751 HAap d.rran.IW/N/Dl++lwl 390/310/100 (16/23/3131 DC Dame whim& u.=(W/N/DI...64 370/240/210 113/9/111 Walp14/DCDaaamar3 raid 644 1141W)/334e ISM 6619 I143116/3319 1111.1 hap ample/DC Dmpowam i.ample 671p (147 L)/411(9e) 691y 1152bl/411 19111 Comma%r.pr•.... .11a1 pawed -40 mC.•43'C (-40'1..113'1) Mn..amemran%mad) 44 dee) 43 dllA) 46414) 494(A) Inland aane.•p4aa al WO 0 1 W 0 I W 0 1 W 0.1 W • 1,4.440 U am.b.m u ammmlamm I.1 tamkama, U•adores C.c ag cmraepm 00C.d 004.d oleo. gacpd (bar.s pampa rare/aamn..aa ono PIMA 31/MMA 31 N(MA 31/MMA 31 PIMA 31/PIMA At PIMA 31/PIMA 31 ImOunts Nap6y W Ina/yap,. •/- •/- •/- 41/- Iam.6ar 1S413/LL,.•.A• 0/0 0/0 0/0 0/0 Wanw1.10/IS/20Pm. •/0/0 •/0/0 •/O/O •/0/0 C.14ams and swam Inam mailable a ma..4 U11741.Ill 1347,FCC Pat 13 l0r.A L Iq CSA C22.2 No 107 101 MOH 16 wart.dap..►r•,Ida Dame at mammal a.nd.oa •5 adad Law 0 Opal Leer.. -Na a.a4akl. Iypa daoran. 5I3000053I 366000(0.11 5170001E'1 51103035-I I .------•----i 1a:..:.:.....salt POr 1005,51 Accessories • 10,44.1•••44.• ikers•Am F _ - #J 4m6a11•Sa4N 1ai.eNVN V • f • r C i! rD1i aNCoolore. ..amb. M1 r_1.. N. 3 -T I I 3 1 ,. 1000 4000 7000 6003 7000 1 p '.../' ... 777111111 Toll Free.1 877 506 1756 www.SMA-Canada.ca SMA Canada,Inc. Sunsense Solar August 26, 2021 12 Pitkin County- Open Space and Parks Solar Electric System General Estimate SOLAR I DESIGN I BUILD JMS-F SUNSPEC RAPID SHUTDOWN DEVICE Irk. . — Q y . . 4. vh " • • • N\\ 11 1 • CosteRedire Simple and robust Safe and certified Reduced risk • ,tre pI p4pondpley naoloeo.r • NMI/fine bawd communicauon • Cer•ihed and lined for • Techn,cai support ion,Sr tA's 01 • oddeand component: for compatibility we4 comphonce to ranked:erne,'o•poni:aeon necessary redvcn,balance of C.Svn,',pec vq+ol for rood • Ul 1741 Pap. Shu,down • MN S..,Spec terrified sd won WOO,tom :rudown System Egon)... .ten po+ed.•.A on:A. • Shot down pV module.+hene.er NEC 201'600 1_:ei: ;,,,,;,pet certified inverter S..n.pec tiro a interrupted Modu'.e level Shs�do-n JMS-F SUNSPEC RAPID SHUTDOWN DEVICE The easy module level rapid shutdown solution The SunSpec Certified Rapid Shutdown System(model 1MS•F),avoiiable from SMA, is the most cost-effective and reliable solution for fulfilling NEC 2017 module level shutdown requirements.The module-level device is certified for compatibility with the SunSpec communication signal and SMA inverters, making compliance simple and easy. By using the existing DC lines between the inverter and PV array for power line communications,installation and labor ore significantly reduced.No addrhonol wires or communication equipment is needed The solution also features up to 50% fewer in+ernol components vs alternatives,rewlting in greater lifetime reliability wwwSMA-Amenco-com Sunsense Solar August 26, 2021 13 Pitkin County- Open Space and Parks Solar Electric System General Estimate 0da0, / SOLAR I DESIGN I BUILD Tedr.cd dab JM54 b,pu(DC) Paid DC mut pa e. 000 N'o men-.e.PV maO.Ae opee orar.dhop. 60 V mown:,.p.r+o?aae 10 V Vac-cm<arnwa.:inp..cvrew l-., 15 A .vac-ay-*Qt'arcv+royr curve ti 15 A Ouepra'DC) OVpu pavers Ryes O W 10600 W Mmwreen aura'dear 00 V Surrdby new range 1 V Maiwre gown.bbo0e 1500 V Alonalle mi..airy conne�onc 0 ra 30 YAW deice•. Mechanical Die.enia.L/w/H:r eee(n) EO.685.27 1 13.5a 346 60.91 Ve a{ndufwR cabin' 0.95 b(47S p) apt/amp-ems-eon MC4 Owns wee IenpF 1.2 w Operaap.rpson.re.argr -40'C ro.75*C I-40•►10,167'FI Erdacwe Rirq Type 46(a per U.50E1 Peke e+.r.d. a I r OR ICO% P.a.res and co.npLonce Csrdoeean IA 1741 Rbpid Shni ne Eqa nwe Ca 1060<enw-ode Ibwer Li,.C ennan.ca.,.';P,CI I ..Spec Rapti V.ndwn Carrr.wcrnce Raexd Dn.0pee aera6 d l Reid drrdonn iee 10 wad% Wtr.a y lea+aa SMA SwViu lair) 25 won S,n Spec wend SMA w.enwe S,nrq boy lA I;0urI SPUi41) arty Trip..CORE141S ISTP 3 1) D .`, I 1 S Type dr.,gralon J MS! S :JAA.par ninon 11961.60001 %doge 0.0reeY 40 - f SYSTEM DIAGRAM BRACKET DIMENSIONS tlI IN M===O==DUIE 11 11 1HI ,000 05mm 7.Smm i4 . i i it JMS-F SUNSPEC 51 DEVICE �i Q sF / W Ill ... OP '- SUNSPEC CERTIFIED ` ' " ' ' " 4i PV INVERTER r% r---"' I I l f i ' /SUNNY ` iT 7ii ic SUNNY TRIPOWER d; 1;1 BOY CORE1 I i ` ---Se TMc PIC Iva! iy I IN _:Nevi e \ a i; UTILITY GRID ' i I • PV ET INVERTER 71 RAPID SHUTDOWN 1 e ` ' INITIATOR SWITCH c r Ii t Toll Free-1 888 4 SMA USA t; www.SMA-America.com SMA America, LLC Sunsense Solar August 26, 2021 14 Pitkin County- Open Space and Parks Solar Electric System General Estimate SOLAR I DESIGN I BUILD SUNMSII OWN THE GROUND SunBeamt' Ground Mount System s `t s I Our SunBeam'" Ground The SunBeamTM Ground Mount Mount System is robust, = Advantage versatile, and specifically Easily scalable from kilowatts to engineered for multiple multimegawatts PV Arrays configurations. ./ Foundation solution for every soil The system is ideal for solar condition installers looking for a ✓ Components optimized for strength, durable and efficient system durability and fast installation that can accommodate a wide 1 UL 2703 Listed by Intertek variety of soil conditions. ✓ Easily integrated with aluminum support for an elevated roof mount solution Sunsense Solar August 26, 2021 15 Pitkin County- Open Space and Parks Solar Electric System General Estimate da�� / SOLAR I DESIGN I BUILD Key Features of SunBeam SUNMSYa We've Got four Rcickl SunBeam". system con be integrated with steel support a sea':"e and simple ground-mounted solution.A heavy-duty beam allows longer spans,which reduces the number of posts.Configurations 10 to 50-degree tilt,2 to 5 up,portrait or landscape. 4410 II' Augers and Ground Screws Our augers are suitable for use in weak to moderate strength soils and areas with a high-water table.Our ground screws are ideal for use in hard packed earth or soils with large amounts of cobble and gravel. Ground Screw Earth Auger Technical Data Application Ground Mount Material High grade aluminum,galvanized steel and 304 stainless steel hardware Module Orientation Portrait and Landscape Tilt Angle Range between 10 to 50 degrees Foundation Types Post in concrete, helical earth auger,ground screw anchor and ballast Structural Integrity Stamped engineering letters available Certificate UL2703 listed by ETL Warranty 20 years SunModo, Corp. Vancouver, WA., USA •www-sunmodo.com • 360-844.0048 • info@sunmodo.com Sunsense Solar August 26, 2021 16 Pitkin County- Open Space and Parks • Solar Electric System General Estimate SOLAR I DESIGN I BUILD SOLAR I DESIGN I BUILD 5-Year Limited Workmanship Warranty Sunsense stands behind this warranty policy and will make every effort to work with our clients to provide the highest quality service under fair and reasonable terms. 1.Limited Warranty Coverage. Sunsense Inc.warrants to the purchaser and all trans`erees of the structures to which products/equipment are installed andior repairs are made as follows: •Product Installation:Sunsense Inc.warrants the installation of products to be free from defects in workmanship from the date of Final Inspection of the productrequipment for a period of 5 years of normal use_This workmanship warranty does not include any damages or defects in the product except to the extent solely caused due to installation of the product by Sunsense Inc.authorized employees. •Repairs:Sunsense Inc.warrants only the repairs made to be free from deers in workmanship from the date of the completed repair for a period of f year of normal use.This workmanship warranty does not include any damages or defects in the producs;equipment used to make the repair except to the extent solely caused due to installation of the product by Sunsense Inc.authorized employees. Sunsense Inc_will have the right to inspect the areas a:issue to determine the cause of the alleged defers. I`the defects are determined to be within the scope of the workmanship warranty.Sunsense Inc.will make the necessary repairs a:Sunsense Inc.expense.Manufacturers equipment warranty applies to all supplied equipment.Sunsense Inc.specifically does no:warrant the installed products. Sunsense Inc.repair of the defect SHALL BE THE SOLE EXCLUSIVE REMEDY available to the covered person or entity with respect to any defect.Sunsense Inc.will not refund or pay any costs in connection with repairs made by anyone other than Sunsense Inc. 2.Conditions of Warranty:Sunsense Inc.liability to the covered person or entity shall be subject to the`ollowing terms and conditions a) The claimant must provide proof that they are the covered person:entity. b) The covered personlentity must provide written notice to Sunsense Inc.within 10 days after discovery of any claimed defect covered by this warranty and before beginning any permanent repair.The notice must describe the location and details of the defect and such information as is necessary for Sunsense Inc.to investigate the claim_ c) Upon discovery of a possible defect,the covered person/entity must immediately and at the covered person.%entity's expense provide for protection of all property that could be affected until the defect is remedied. 3.Exclusions:This warranty does not cover damage or defects resulting from or in any way attributable to{al neglect,Ibl misuse,Ic:abuse,I:d;repair or alteration made by anyone other than Sunsense Inc.(el settlement or structural movement and/or movement of materials to which installed products are attached,Ifl damage from incorrect design of the structure.Ig; failure to follow the instructions IhI acts of God including,but not limited to,hurricanes,tornados,floods,earthquakes,severe weather or natural phenomena,(including,but not limited to,unusual climate conditions;, il lack of proper maintenance,Ijl any cause other than workmanship defects attributable to Sunsense Inc. Sunsense does not guarantee a specific amount of energy production.Estimates are based on historical average weather data. 4.Disclaimer:The statements in this Warranty constitute the only warranty extended by Sunsense Inc.for its workrr ansh ip.NO OTHER WARRANTY SHALL BE MADE BY OR ON BEHALF OF Sunsense Inc. Address Under Warranty: Start Date: Sunsense Inc.Authorized Rep(Print Name): Title. Authorized Signature. Sunsense Solar August 26, 2021 17 SOLAR I DESIGN I BUILD PHOTOVOLTAIC ENGINEERING, PROCUREMENT AND CONSTRUCTION SERVICES AGREEMENT This Photovoltaic Engineering, Procurement, and Construction Agreement ("Agreement') entered into this 26th day of August 2021 (the"Effective Date") is made by and S t/SeENrNSE INC., a Colorado corporation (hereinafter"Sunsense Solar or Sunsense") and PITKIN COUNTY (hereinafter"Purchaser). Sunsense Solar and Purchaser may be referred to individually as a "Party" or collectively as the "Parties". ROLES AND RESPONSIBILITIES EPC Contractor: Sunsense Solar Contact: Chad Roach—Operations Manager chad@sunsensesolar.com (970) 963-1420 Purchaser: Pitkin County Contact: Paul Holsinger—CE Administrator Paul.holsinger@pitkincounty.com (970) 581-3776 RECITALS WHEREAS, Purchaser desires to engage Sunsense Solar to perform certain engineering, procurement and construction services for a solar photovoltaic energy system comprising the Work (hereinafter defined); and Sunsense Solar desires to perform the Work, in accordance with the terms and conditions set forth below; AGREEMENT NOW THEREFORE, in consideration of the foregoing recitals (which hereby are made a part of this Agreement) and the mutual covenants and promises contained herein, the Parties agree as follows: 1. PROJECT AND SCOPE OF WORK. The address of the project site is 100 Sopris Creek Rd Basalt, CO 81621 (the"Project'). Sunsense Solar agrees to design and construct the improvements (the "Work') specifically described on Exhibit A hereto (the "Scope of Work'). This Agreement, together with Sunsense Solar's Final Proposal to the Purchaser and any drawings or ancillary project documents may be referred to herein collectively as the "Project Documents". 2. PAYMENT. In exchange for the Work, Purchaser agrees to pay the amount determined in accordance with the pricing and payment schedule set forth in Exhibit B (the "Pricing Schedule"). Purchaser shall remit payments within thirty (30) days' receipt from Sunsense Solar of a proper invoice for work completed through the date of the invoice in such form and content as Purchaser shall reasonably require. The payments set forth in the Pricing Schedule are referred to in aggregate as the "Contract Price". 3. NOTICE. Any notice required to be given hereunder shall be done in writing to the addresses set out herein. All notices shall be deemed to be given and received upon the first to occur of (a)actual receipt or(b) 3 days after deposit of such notice with the US Postal Service, certified mail, return receipt requested in a properly addressed postage pre-paid envelope. Notice may 1 be given by (a) personal or commercial delivery service or courier or(b) certified mail, return receipt requested as noted above. If to Sunsense Solar: If to Purchaser: Scott Ely Paul Holsinger Sunsense, Inc. Pitkin County 1629 Dolores Way Suite E 100 Sopris Creek Rd Carbondale, CO 81623 Basalt, CO 81621 4. TITLE AND RISK OF LOSS. a. Passage of Title. Right to use the material installed shall not pass to Purchaser until final payment has been made to Sunsense Solar. b. Risk of Loss. Sunsense Solar shall retain care, custody and control of the Work and all materials, supplies, equipment and machinery related thereto (the "Materials") and bear the risk of loss related to the Work and Materials until Final Completion. Upon Final Completion, the risk of loss related to, and care, custody and control of, the Work and Materials shall pass to Purchaser. 5. CHANGE ORDERS. a. Modifications. The Contract Price, Scope of Work or other terms of this Agreement may not be modified, except pursuant to a Change Order made pursuant to the procedures set forth immediately below or other contract amendment made pursuant to Section 40; provided however, that Sunsense Solar shall be compensated for all work that is reasonably necessary or incidental to the Scope of Work. b. Change Order Procedures. The requesting party shall submit a written proposal and an estimate detailing any impact upon the Contract Price. The receiving party shall use commercially reasonable efforts to respond to the written proposal within two (2) Business Days after receipt thereof. The Parties shall not unreasonably withhold consent to a Change Order. c. Agreement by the Parties. If the Parties reach agreement with respect to an adjustment in the Contract Price, the Parties shall execute a Change Order itemizing and authorizing such adjustments no later than two (2) Business Days thereafter. If executed by both Parties, such proposal shall constitute a Change Order. The adjustments reflected in a Change Order shall be binding on the Parties. If the Parties are unable to agree upon the terms of a Change Order, then either Party may submit the matter to dispute resolution proceedings pursuant to Section 34. 6. SUBCONTRACTORS. Sunsense Solar may subcontract any portion of the Work at its sole discretion, but such subcontracting shall not relieve Sunsense Solar of any obligations hereunder. 7. ASBESTOS AND HAZARDOUS MATERIALS. This Agreement does not contemplate any work, removal, testing, or inspection relating to asbestos or other hazardous materials. Sunsense Solar shall not be responsible if, in the course of the Work, asbestos or hazardous materials are uncovered, and Sunsense Solar shall have the right to halt work immediately in that event and until Purchaser has corrected the condition. 8. COMPLIANCE WITH APPLICABLE LAWS; ETHICS. Sunsense Solar shall comply with all applicable Federal, State, county, and local laws, including, without limitation, all statutes, rules, 2 ordinances, orders, conventions, regulations and codes including any requirements of public or governmental authorities, ("Laws' , including, without limitation, all applicable Laws regulating environmental matters, hiring, wages, hours and conditions of employment, subcontractor selection, discrimination, occupational health and safety, worker's compensation, social security, Federal, State and local income tax withholding, unemployment insurance, the Occupational Safety and Health Act, the Immigration Reform and Control Act of 1986, the Americans with Disabilities Act, and any matters associated with the transport, import, export, licensing, approval, or certification of the supplies for the Work. Except as otherwise provided in this Agreement, Sunsense Solar shall have the obligation to procure necessary permits, certificates, approvals, inspections, and licenses, when needed, in the performance of this Agreement. 9. SAFETY. Sunsense Solar shall be solely responsible for safety of its operations and its employees and shall take all reasonable safety precautions with respect to its Work. In addition to its own standards, Sunsense Solar shall comply with all safety policies and procedures initiated by Purchaser or any of Purchaser's contractors that also may be working onsite for the safe, orderly and efficient conduct of all operations upon the project site and upon any other Purchaser property. These policies and procedures also may relate to drugs, alcohol and controlled substances. Sunsense Solar shall comply with all applicable Laws of any public authority for the safety of persons or property, including, but not limited to, the Federal Occupational Safety and Health Act("OSHA"). The parties place the highest importance and priority on health and safety for the Work performed by Sunsense Solar. Sunsense Solar shall ensure that all of its employees and any subcontractors are made aware of all environmental safety, fire, and health requirements and regulations applicable to the Work. Sunsense Solar shall throughout the execution of the Work be responsible for the safety and protection of the Work, the work of any of its subcontractors on site, any other persons and all public or private property. Without limiting the foregoing, choosing and implementing the appropriate OSHA approved method and plan of fall protection is under the control and responsibility of Sunsense Solar. Further the provision of all fall protection equipment is the responsibility of Sunsense Solar with respect to its Work. Sunsense Solar and all of its subcontractors and their respective employees shall be subject to reasonable rules and regulations promulgated for the project from time to time by Purchaser, provided any such rules and regulations are for the orderly conduct of the project only and shall not in any way be deemed to modify or reduce Sunsense Solar's safety requirements. 10. FACILITIES; TEMPORARY UTILITIES. Purchaser shall provide restroom facilities at or near the project site, whether permanent or temporary unless otherwise negotiated with Sunsense Solar. Purchaser shall coordinate with Sunsense Solar regarding any need for temporary utilities such as power and water and shall provide these utilities during the period that Sunsense Solar will be onsite performing the Work. 11. SOLE RESPONSIBILITY. Sunsense Solar has and retains sole responsibility over the manner of work, employment, direction, assignment, compensation, and discharge of all of its personnel performing the Work. Allowing use of any equipment of Purchaser is hereby agreed between the parties will not be construed as evidence of control or retention of control, it being the intent of the parties that Sunsense Solar is an independent contractor and who alone has the control and right to control its activities including, but not limited to, safety. 12. PAYROLL OBLIGATIONS. Sunsense Solar is solely responsible for all matters relating to compensation and benefits of all its personnel and any subcontractors who perform the Work. This responsibility includes, but is not limited to: (1)timely payment of compensation and benefits, including, but not limited to, applicable overtime, medical, and dental, and (2) all matters relating to compliance with all employer obligations to withhold employee taxes, pay employee and employer taxes, and file payroll tax returns and information returns under local, 3 State, and Federal income tax laws, unemployment compensation insurance and state disability insurance tax laws, and social security and Medicare tax laws, and all other payroll tax laws or similar laws with respect to all Sunsense Solar's personnel performing the Work. 13. BACKGROUND CHECKS. Sunsense Solar shall implement commercially reasonable measures to hire workers with appropriate backgrounds for the Work. 14. CONSENT FOR ACCESS. When entry onto property that is adjacent to (but not within)the project site is necessary for Sunsense Solar's completion of the Work, Sunsense Solar shall verify that appropriate consent has been obtained for Sunsense Solar to enter upon such property prior to beginning any work on such property. 15. QUALIFIED PERSONNEL. Sunsense Solar shall at all times enforce discipline and good order among Sunsense Solar's employees and any subcontractors and shall not employ for work, any unfit person or anyone not skilled in the task assigned. If Purchaser requests Sunsense Solar to remove any person provided by Sunsense Solar to perform the work on Purchaser's premises,-Sunsense Solar shall immediately comply with such request. Such person shall leave Purchaser's premises promptly and Sunsense Solar shall bar such person from re-entry on Purchaser's premises without Purchaser's consent. 16. BUSINESS CONDUCT. Sunsense Solar project manager, supervisor or foreman shall report to Purchaser prior to commencing any Work on the project and report again prior to commencing any Work after any absence of more than five (5)calendar days from the project in order to advise Purchaser of the particular phase of Work Sunsense Solar is about to perform. Sunsense Solar's project supervisor or foreman shall attend meetings as scheduled by Purchaser for the purpose of scheduling and coordinating all activities on the project, discussing or implementing safety programs, and any other lawful purposes. 17. ONSITE COORDINATION. Sunsense Solar will be responsible for meeting all necessary onsite coordination requirements with Purchaser and Purchaser's contractors that also may be working onsite concurrently. Details as to these specific requirements, relating to parking, use of shared equipment, locations where Sunsense Solar may use for laydown and staging of its supplies, materials, and equipment, etc. will be determined during a coordination meeting or meetings to occur prior to commencement of the Work. At this meeting, the parties will appoint and identify authorizing representatives and delegates to facilitate the coordination between the parties throughout the construction period. 18. CORRECTIVE OR REMEDIAL WORK. Sunsense Solar shall promptly perform all corrective or remedial work(including, without limitation, repair or replacement of any work damaged thereby) required by Purchaser in order to make the Work conform to the requirements of the Agreement and any warranties and guarantees, and shall execute and deliver to Purchaser such other and further documents as are reasonably requested by Purchaser to further evidence such conformance. 19. RELATIONSHIP OF PARTIES. Purchaser and Sunsense Solar are independent parties and nothing in the Agreement will make either party the employee, agent, or legal representative of the other for any purpose. The Agreement does not grant either party any authority to assume or to create any obligation on behalf of or in the name of the other. Sunsense Solar will be solely responsible for rights, liabilities, obligations, and all employment and income taxes, insurance premiums, charges, and other expenses it incurs in connection with its performance of the Agreement. All employees and agents of Sunsense Solar or its respective subcontractors are employees or agents solely of Sunsense Solar or such subcontractors, and not of Purchaser, and are not entitled to employee benefits or other rights accorded to Purchaser's employees. Purchaser is not responsible for any obligation with respect to employees or agents of Sunsense Solar or its subcontractors. 4 20. INSURANCE. Sunsense Solar will meet the following minimum insurance requirements in performing the Work under the Agreement. Purchaser shall be covered as an additional insured under the Commercial General Liability coverage. No required coverage shall be terminated without not-less-than 30 days prior written notice to Purchaser by the insurer. Sunsense Solar shall not commence any work under the Agreement until all insurance requirements contained have been complied with as outlined below, and until evidence of such compliance is satisfactory to Purchaser as to form and content. Any and all insurance required by this Agreement shall be maintained during the entire construction period, including any extensions thereto, and until all Work has been completed to the satisfaction of Purchaser. Prior to commencement of work Sunsense Solar shall deliver insurance certificates to Purchaser evidence all required coverage. a) COMMERCIAL GENERAL LIABILITY. $2,000,000 per Occurrence, General Aggregate, Product and Completed Operations Aggregate, Personal &Advertising Injury. b) AUTOMOBILE LIBAILITY. $2,000,000 combined single limit covering property damage and bodily injury. c) WORKERS' COMPENSATION. $1,000,000 each accident, each employee, each disease—policy limit or as required by local law or statute. d) PROFESSIONAL LIABILITY. $2,000,000 each claim. 21. INSPECTIONS; NON-CONFORMING GOODS/SERVICES; AUDIT. Purchaser may inspect Sunsense Solar's supplies, materials, equipment, and any of Purchaser's property related to the Agreement. Purchaser's inspection of supplies, materials, and equipment prior to delivery or within a reasonable time after delivery, does not constitute acceptance of any work-in- process or finished goods. 22. WARRANTY. Sunsense Solar's Warranty is attached hereto as Exhibit C. 23. EXISTING VIOLATIONS AND CONDITIONS; UNFORESEEN CONDITIONS. Sunsense Solar is not responsible for any existing violations of applicable building regulations, codes, ordinances, or laws, whether cited by the appropriate authority or not. Sunsense Solar is not responsible for any abnormal or unusual preexisting conditions. Additionally, Sunsense Solar shall not be held responsible for(i) any unforeseen conditions that may result in additional costs in order to perform the Work, or(ii) conditions caused by other contractors of Purchaser whose actions may result in changing the existing or represented conditions under which Sunsense Solar is to perform the Work. In this regard, PURCHASER SHALL INDEMNIFY AND HOLD SUNSENSE SOLAR HARMLESS FROM AND AGAINST ALL LIABILITIES, DAMAGES, CLAIMS, DAMAGES, DEMANDS, ACTIONS (LEGAL OR EQUITABLE), AND COSTS AND EXPENSES COLLECTIVELY"CLAIMS", INCLUDING WITHOUT LIMITATION ATTORNEY'S FEES, OF ANY KIND OR NATURE, TO THE EXTENT SUCH CLAIMS ARE DUE TO NEGLIGENT ACTS OR OMISSIONS OR WILLFUL MISCONDUCT BY PURCHASER, PURCHASER'S CONTRACTORS OR THEIR SUBCONTRACTORS, AS IT RELATES TO ONSITE ACTIVITIES THAT AFFECT SUNSENSE SOLAR'S PERFORMANCE UNDER THE AGREEMENT. 24. UTILITIES. The Purchaser is responsible for water, gas, sewer, and electric utilities, from the appropriate agency to the metering device, unless otherwise agreed to in writing. The Contract Price does not include an electrical service amperage upgrade ("heavy up")or the installation of any electrical sub-panel to the existing panel, either of which shall be charged out separately as provided under"Extra Work." 25. DELAYS, FORCE MAJEURE. Sunsense Solar agrees to start the work no later than 30 days' after the conditions precedent set forth in Exhibit B have been satisfied and diligently pursue the Work through to completion, but shall not be responsible for delays for any of the following 5 reasons: failure of the issuance of all necessary building permits within a reasonable length of time (except to the extent such delay is due to Sunsense Solar's delay in applying for such permits), funding of loans, disbursement of funds into funding control or escrow, acts of neglect or omission of Purchaser or Purchaser's employees or Purchaser's agent, acts of God, stormy or inclement weather, strikes, fires, embargoes, inability to obtain power, lockouts, boycotts, or other labor union activities, extra work ordered by Purchaser, acts of public enemy, riots or civil commotion, pandemics or epidemics, inability to secure material through regular recognized channels, imposition of government priority or allocation of materials, failure of Purchaser to make payments when due, delays caused by inspection or changes ordered by the inspectors of authorized governmental bodies (which delays are not due to Sunsense Solar's work, action, or inaction), or for acts of independent contractors, or holidays, or any set of circumstances that renders a project site unsafe, or other causes beyond Sunsense Solar's reasonable control (collectively, "Beyond Control Causes"). If Sunsense Solar fails to attain final completion on or before the agreed date and Sunsense Solar believes such failure is due to a Beyond Control Cause and the parties cannot agree on adjusted final completion date, the Parties (or either of them) may submit the matter to mediation, then failing settlement, to arbitration, for resolution of the final completion date and damages, if any, that either party may establish as a result of any such delay. 26. DAMAGE OR DESTRUCTION. If the Work or any portion of it is destroyed or damaged by fire, storm, flood, landslide, earthquake, theft, or other disaster or accidents and Purchaser elects to rebuild, any work done by Sunsense Solar to rebuild, etc., shall be paid for by Purchaser through a Change Order to the Agreement and dealt with as herein provided for under"Extra Work." 27. PURCHASER'S PROPERTY. It is the Purchaser's responsibility to remove or protect any personal property and Sunsense Solar will not be held responsible for damages or loss of said items. 28. EASEMENTS OR OTHER RESTRICTIONS. Prior to construction, the Purchaser is to give Sunsense Solar a copy of any easements, restrictions, or rights of way relating to Sunsense Solar's Work. 29. PERMITS. Upon execution of this Agreement, Sunsense Solar will apply for, then obtain and pay for all required permits related to the Work. Purchaser will pay any other assessments and charges required by public bodies and utilities. 30. TERMINATION FOR BREACH OR NONPERFORMANCE. Purchaser may terminate all or any part of the agreement, upon 30 days' written notice to Sunsense Solar, if: a) Sunsense Solar makes a general assignment for the benefit of its creditors, is generally unable to pay its debts as they become due, commences or files a voluntary case or petition in bankruptcy, is adjudicated as bankrupt or insolvent or files any petition or answer seeking any reorganization, arrangement, composition, readjustment, liquidation, dissolution or similar relief under the present or future federal, state or other bankruptcy or insolvency statute or law, or seeks, consents to or acquiesces in the appointment of any bankruptcy or insolvency trustee, receiver or liquidator of Sunsense Solar or of all or any substantial part of its properties; b) Any action, case or proceeding is commenced against Sunsense Solar seeking (i) any reorganization, arrangement, composition, readjustment, liquidation, dissolution or similar relief under any insolvency laws or(ii)the appointment, without the consent or acquiescence of Sunsense Solar, of any trustee, receiver or liquidator of Sunsense 6 Solar or of all or substantially all of its properties, which proceeding or appointment shall continue un-stayed for a period of one-hundred-twenty(120)days; c) Sunsense Solar fails to maintain the insurance coverage required under this Agreement; d) Sunsense Solar abandons the Work; or e) Sunsense Solar is in material breach of its obligations under this Agreement and Sunsense Solar fails to cure such defect, and give Purchaser written notice and proof thereof within thirty (30) days of Sunsense Solar's receipt of written notice from Purchaser. Sunsense Solar may terminate all or any part of the agreement, upon written notice to Purchaser, if: a) Purchaser fails to pay any payment required to be made pursuant to this Agreement, which is not the subject of a good faith dispute, and such failure continues for thirty (30) days after receipt of written notice of such non-payment from Sunsense Solar; b) Purchaser makes a general assignment for the benefit of its creditors, is generally unable to pay its debts as they become due, commenced or filed a voluntary case or petition in bankruptcy, is adjudicated as bankrupt or insolvent, files any petition or answer seeking any reorganization, arrangement, composition, readjustment, liquidation, dissolution or similar relief under the present or future federal, state or other bankruptcy or insolvency statute or law, or seeks, consents to or acquiesces in the appointment of any bankruptcy or insolvency trustee, receiver or liquidator of Purchaser or of all or any substantial part of its properties; c) Any action, case or proceeding is commenced against Purchaser seeking (i) any reorganization, arrangement, composition, readjustment, liquidation, dissolution or similar relief under any insolvency laws or(ii)the appointment, without the consent or acquiescence of Purchaser, of any trustee, receiver or liquidator of Purchaser or of all or substantially all of its properties, which proceeding or appointment shall continue unstayed for a period of one-hundred-twenty (120)days; or d) Purchaser is in material breach of its obligations under this Agreement and Purchaser fails to cure such the Defect and give Sunsense Solar written notice and proof thereof within thirty (30)days' of Purchaser's receipt of written notice from Sunsense Solar. 31. CONDITIONS FOR FINAL PAYMENT. In addition to and without limitation upon any other requirements of this Agreement pertaining to payment for Work performed, Sunsense Solar's right to final payment shall not arise unless and until the following conditions precedent have been satisfied: (1) completion of all "punch-list"work and other work required to bring the Work into compliance with the Agreement unless work or other obligations to be performed by Purchaser or Purchaser's contractor(s) has delayed or postponed Sunsense Solar's ability to fully engage or energize the system (i.e., complete the AC interconnection); (2)delivery to Purchaser of all manuals, all guarantees and warranties including those for material and equipment as required by the Agreement, and any documents required by Federal, State or local statutes; (3)furnishing to Purchaser satisfactory evidence by Sunsense Solar that all labor equipment and material obligations and any other indebtedness incurred by Sunsense Solar in connection with its Work have been paid in full (including all-bills-paid affidavits in such form 7 and content as may be reasonably required by Purchaser) and (4)furnishing to Purchaser the written consent of surety, if any, to final payment. 32. FINAL COMPLETION; PURCHASER ACCEPTANCE. When Sunsense Solar believes that it has achieved "Final Completion" by satisfying the conditions under Section 31 above, it shall deliver to Purchaser a signed Final Completion Certificate in the form attached hereto as Exhibit D. Such certificate shall include sufficient detail to enable Purchaser to determine that Sunsense Solar has achieved Final Completion. Then Purchaser shall within fourteen (14) Business Days following receipt of such certificate either: (a) countersign the Final Completion Certificate, indicating its acceptance of the achievement of such completion; or(b) if reasonable cause exists for doing so, notify Sunsense Solar in writing that such completion has not been achieved, stating in detail the reasons therefore. If Purchaser fails to deliver timely notice under the preceding clause (b), Purchaser shall be deemed to have accepted such completion. If Purchaser delivers timely notice under the preceding clause (b), Sunsense Solar shall promptly take such action, including the performance of additional work to achieve such completion, and upon completion of such actions shall issue to Purchaser another notice pursuant to this Section 32. Such procedure shall be repeated as necessary until completion has been achieved. In the event that Purchaser and Sunsense Solar are unable to agree regarding the existence or correction of any deficiencies identified by Purchaser, the disputed matter or matters shall be resolved pursuant to the dispute resolution procedures set forth in Section 34. 33. ENTIRE AGREEMENT. This Agreement, including incorporated documents, constitutes the entire Agreement of the parties. Any and all other prior or contemporaneous agreements, whether written or oral, are merged herein, and are provided in written form as part of the Agreement, specifically as they relate to flow down responsibilities and scope of work requirements for Sunsense Solar. No other oral or written agreements between Sunsense Solar and Purchaser, regarding work to be performed exist. 34. DISPUTE RESOLUTION. a) Internal Escalation. Prior to the initiation of formal proceedings, the Parties shall first attempt to resolve their dispute informally in accordance with this subparagraph a). Upon the written request of a Party, each Party shall appoint a designated representative whose task it shall be to meet for the purpose of endeavoring to resolve such dispute. The designated representatives shall meet as often as the Parties reasonably deem necessary in order to gather and furnish to the other all information with respect to the matter in issue that the Parties believe to be reasonably appropriate and germane in connection with its resolution. The representatives shall discuss the dispute (involving senior-level executives at each Party as deemed appropriate)and attempt to resolve the Dispute without the necessity of any formal proceeding. During the course of discussion, all reasonable requests made by one Party to the other Party for non-privileged information, reasonably related to the dispute and this Agreement, shall be honored in order that each of the Parties may be fully advised of the other's position with respect to the dispute. The specific format for the discussions shall be left to the discretion of the designated representatives. If the matter has not been resolved within thirty (30) Days from the referral of the dispute to senior executives, or if no meeting of senior executives has taken place within fifteen (15) Days after such referral, either Party may initiate mediation as provided hereinafter. If a Party intends to be accompanied at a meeting by an attorney, the other Party shall be given at least three (3) Business Days' notice of such intention and may also be accompanied by an attorney. Each Party shall bear its own costs for this dispute resolution phase. b) Technical Disputes. If any dispute involves a technical issue, question or need for clarification that cannot be resolved by higher levels of management of the Parties 8 pursuant to subparagraph a) above, such as an engineering or design issue or a construction warranty issue (a "Technical Dispute"), then the Technical Dispute shall be resolved by an independent technical expert. If the Parties cannot agree upon a technical expert, then the matter will be referred to arbitration in accordance with subparagraph d) below. The disputing Party shall deliver to the technical expert and to the other Party a written notice stating: (1)the general nature of each Technical Dispute, (2)the amount and extent of such Technical Dispute, and (3) supporting data for such Technical Dispute. The opposing Party shall submit a written response to the disputing Party and the technical expert within ten (10) Business Days after receipt of the disputing Party's submittal. The technical expert may request reasonable additional information from each Party, which the Party shall provide simultaneously to the technical expert and the other Party. The decision of the technical expert shall be provided in writing to each of the Parties and shall be binding on the Parties. The technical expert shall determine such Technical Dispute as soon as practicable after the submission of the disputing Party's notice. Notwithstanding anything to the contrary contained or implied herein, if the technical expert has not delivered a decision in writing to the Parties within thirty (30) Business Days after the date of such notice, either Party may submit the Technical Dispute to arbitration pursuant to subparagraph d) below. The Parties shall share equally the cost of, and expenses incurred by, the technical expert in connection with the services provided by the technical expert as described in this subparagraph b). c) Mediation. In the event that any dispute arising out of or relating to this Agreement is not resolved in accordance with the procedures set forth in subparagraphs a) or b) above, such dispute shall be submitted to mediation by an independent mediator that is mutually approved by the Parties. d) Mandatory Arbitration. All claims, disputes and other matters in question not resolved by subparagraphs a), b) or c) above, shall be decided by arbitration by the American Arbitration Association or by a mutually agreed upon arbitrator and be conducted in accordance with the American Arbitration Association Construction Industry Arbitration Rules then obtaining or a mutually agreed upon set of arbitration rules. This agreement to arbitrate and any other agreement or consent to arbitrate entered into in accordance herewith shall be specifically enforceable under the prevailing arbitration law of any court having jurisdiction. Notice of demand for arbitration must be filed in writing with the other Party to the Agreement and with the AAA or other mutually agreed to arbitrator. The demand must be made within a reasonable time after the dispute has arisen. The award of the arbitrator(s)will be final and non-appealable. The arbitrator(s)shall have no authority to make any award prohibited by this Agreement. The award of the arbitrator(s)shall be specifically enforceable in a court of competent jurisdiction. Each Party shall bear its own costs for this dispute resolution phase. e) Governing Law, and Other Legal Considerations. i. Governing Law. This Agreement shall in all respects be interpreted under, and governed by, the laws of the State of Colorado including as to validity, interpretation and effect, without giving effect to conflicts of laws principles. 35. ASSIGNMENT. 9 a) Sunsense may assign this agreement in connection with a Change in Control. A "Change in Control" means the change in ownership of 50% or more of the voting securities of Sunsense or a sale of substantially all of the assets of Sunsense. b) By Purchaser. Purchaser may not assign its rights or delegate its obligations hereunder without prior written consent of Sunsense Solar, which consent may not be unreasonably withheld; provided, however, Purchaser is permitted to: (i) make an outright or collateral assignment of its rights and interests under this Agreement to its financing parties; and (ii)assign its right, title and interest in this Agreement to an Affiliate or to purchaser of the Project, in each case, without obtaining prior written consent of Sunsense Solar. c) Any assignment not in conformity with this Section 35 shall be null and void. 36. SUCCESSORS AND ASSIGNS. Subject to Section 35 above, Purchaser and Sunsense Solar, and their respective partners, assigns, successors, subcontractors, executors, officers, agents, employees, representatives, and administrators are hereby bound to the terms and conditions of this Agreement. 37. SUNSENSE'S LIEN RIGHTS. Sunsense Solar, as contractor for the Project, will have certain lien rights under Colorado law. Purchaser shall furnish to Sunsense Solar on request any information relevant to Sunsense Solar's evaluation, notice, or enforcement of its lien rights. If any claim or dispute relates to or is the subject of a lien, the party asserting such claim or dispute may proceed in accordance with applicable law to comply with the lien notice or filing deadlines prior to resolution of the claim by arbitration. 38. NO REPRESENTATIONS. SUNSENSE SOLAR MAKES NO REPRESENTATIONS AS TO THE ELIGIBILITY OF THE PROJECT OR THE WORK FOR; OR THE AVAILABILITY OF, ANY TAX CREDITS, REBATES OR OTHER ECONOMIC INCENTIVES PROVIDED BY LOCAL, STATE, OR FEDERAL GOVERNMENT OR BY THE UTILITY PROVIDER. 39. AUTHORITY. The individuals executing this Agreement on behalf of the respective parties below represent to each other that all appropriate and necessary action has been taken to authorize the individual who is executing this Agreement to do so for and on behalf of the party for which his or her signature appears, that there are no other parties or entities required to execute this Agreement in order for the same to be an authorized and binding agreement on the other party for whom the individual is signing this Agreement and that each individual affixing his or her signature hereto is authorized to do so, and such authorization is valid and effective on the date hereof. 40. AMENDMENTS AND WAIVERS. Any term of this Agreement may be amended only with the written consent of Sunsense Solar and Purchaser, in the form of a Change Order or contract amendment signed by both Parties. A delay or omission by either Party hereto to exercise any right or power under this Agreement shall not be construed to be a waiver thereof. A waiver by either of the Parties hereto of any of the covenants to be performed by the other or any breach thereof shall not be construed to be a waiver of any succeeding breach thereof or of any other covenant herein contained. All waivers shall be in writing and signed by the Party waiving its rights. 41. SEVERABILITY. In the event of a term, condition, or provision of this Agreement is determined to be invalid, illegal, void, unenforceable, or unlawful by a court of competent jurisdiction, then that term, condition, or provision, shall be deleted and the remainder of the Agreement shall remain in full force and effect as if such invalid, illegal, void, unenforceable or unlawful provision had never been contained herein. 10 42. COUNTERPARTS; FAXED SIGNATURES. This Agreement may be executed in duplicate counterparts, each of which shall be deemed an original and both of which together shall constitute one and the same instrument. Counterparts may be executed in original, faxed or scanned form, and the Parties hereby adopt as original any signatures received via facsimile or email transmission of scanned copies. [Signature page follows] 11 List of Exhibits Exhibit A. SCOPE OF WORK, ASSUMPTIONS, AND EXCLUSIONS Exhibit B. PAYMENT AND PRICING SCHEDULE Exhibit C. WARRANTY Exhibit D. FORM OF CERTIFICATE OF FINAL COMPLETION Attachments Attachment 1. Revised Proposal for Ground Mount 12 EXHIBIT A SCOPE OF WORK,ASSUMPTIONS, AND EXCLUSIONS Scope of Work • All major project components included. • Required AHJ electrical/building permits. • Project Management/oversight. • AC and utility interconnection. • All associated AC & DC BOS. • Administration. General Assumptions • Sunsense is providing this Preliminary Estimate prior to final engineering and is aware that system layout and electrical engineering may be amended. • Construction period is still to be determined but is assumed to be during the third or fourth quarter of 2021 pending timely delivery of materials and avoidance of obstacles beyond the control of Sunsense. • Engineer on record to determine structural load capacity of roof and to provide approval for said loads. • Production Estimates are based on National Renewable Energy Laboratory 30 Year Weather Data and are not guaranteed. • Rate structure analysis is based on the current Holy Cross Energy rate structure and energy consumption is based on the most current rolling 12 months. Sunsense is aware that consumption will likely increase due to the new building addition. • It is assumed that the designed system will not produce more than 120% of the building. • Financial Analysis, Rebates, and Tax Benefits are for information purposes only and not guaranteed. Please consult with your advisor for discussion of eligibility. • Layout to be approved by Pitkin County AHJ and or Fire Department. • Exact electrical Interconnection strategy TBD but 240 voltage is known. • Sunsense has quoted what is currently believed to be the best value tier 1 module, quality racking, and reputable inverter manufacturer,but we are open to discuss alternative products. • After thorough review Sunsense feels that this system design optimizes production. Inclusions • All applicable rental equipment is included in this quote. • Sunsense staff will cover Project Management, Site Supervision, and AC Electrician. • Sunsense is to provide electrical PV drawings. 13 • Sunsense is to provide all documentation relating to interconnection agreement with utility and permitting. Exclusions • Installation of all mechanical attachments if required (anchors) including attaching, flashing, and waterproofing to be performed by roofer on record. • Any associated snow removal. This pertains to any/all staging or access areas as well as rooftops. • Pre and Post Installation roof inspections will be conducted and recorded if work is completed on the roof. • Changes to ground layout due to unforeseen obstacles or obstructions could warrant changes to this proposal thus require alternate foundation solutions or alternate trenching routes. • Exact AC Interconnection strategy TBD following final engineering. • Monitoring strategy TBD. IT technician will need to run ethernet to inverter. • This proposal excludes and replaces the prior proposal for the 13.6kW roof mounted array and replaces with this 15.66kW Ground Mounted array due to the structural integrity of the building. • Sales and Use Tax is excluded. EXHIBIT B 14 PAYMENT AND PRICING SCHEDULE • Purchaser shall remit payment for the Project in the amount of$_43,850.77 (the "Contract Amount"). The Contract Amount shall be invoiced on a milestone billing basis. Purchaser shall remit payment within 30 days' receipt of a proper invoice from Sunsense Solar. 15 EXHIBIT C SOLAR I DESIGN I BUILD 5-Year Limited Workmanship Warranty Sunsense stands behind this warranty policy and will make every effort to work with our clients to provide the highest quality service under fair and reasonable terms. 1.Limited Warranty Coverage: Sunsense Inc.warrants to the purchaser and all transferees of the structures to which products/equipment are installed and/or repairs are made as follows: •Product Installation:Sunsense Inc.warrants the installation of products to be free from defects in workmanship from the date of Final Inspection of the product/equipment for a period of 5 years of normal use.This workmanship warranty does not include any damages or defects in the product except to the extent solely caused due to installation of the product by Sunsense Inc.authorized employees. •Repairs:Sunsense Inc.warrants only the repairs made to be free from defects in workmanship from the date of the completed repair for a period of 1 year of normal use.This workmanship warranty does not include any damages or defects in the products/equipment used to make the repair except to the extent solely caused due to installation of the product by Sunsense Inc.authorized employees. Sunsense Inc.will have the right to inspect the areas at issue to determine the cause of the alleged defects. If the defects are determined to be within the scope of the workmanship warranty,Sunsense Inc.will make the necessary repairs at Sunsense Inc.expense.Manufacturers equipment warranty applies to all supplied equipment.Sunsense Inc.specifically does not warrant the installed products. Sunsense Inc.repair of the defect SHALL BE THE SOLE EXCLUSIVE REMEDY available to the covered person or entity with respect to any defect.Sunsense Inc.will not refund or pay any costs in connection with repairs made by anyone other than Sunsense Inc. 2.Conditions of Warranty:Sunsense Inc.liability to the covered person or entity shall be subject to the following terms and conditions: a) The claimant must provide proof that they are the covered person/entity. b) The covered person/entity must provide written notice to Sunsense Inc.within 10 days after discovery of any claimed defect covered by this warranty and before beginning any permanent repair.The notice must describe the location and details of the defect and such information as is necessary for Sunsense Inc.to investigate the claim. c) Upon discovery of a possible defect,the covered person/entity must immediately and at the covered person/entity's expense provide for protection of all property that could be affected until the defect is remedied. 3.Exclusions:This Warranty does not cover damage or defects resulting from or in any way attributable to(a) neglect,(b)misuse,(c)abuse,(d)repair or alteration made by anyone other than Sunsense Inc.(e)settlement or structural movement and/or movement of materials to which installed products are attached,(f)damage from incorrect design of the structure,(g)failure to follow the instructions(h)acts of God including,but not limited to, hurricanes,tornados,floods,earthquakes,severe weather or natural phenomena,(including,but not limited to, unusual climate conditions),(i)lack of proper maintenance,(j)any cause other than workmanship defects attributable to Sunsense Inc. Sunsense does not guarantee a specific amount of energy production.Estimates are based on historical average weather data. 4.Disclaimer:The statements in this Warranty constitute the only warranty extended by Sunsense Inc.for its workmanship.NO OTHER WARRANTY SHALL BE MADE BY OR ON BEHALF OF Sunsense Inc. Address Under Warranty: Start Date: Sunsense Inc.Authorized Rep(Print Name): Title: Authorized Signature: 16 EXHIBIT D FORM OF CERTIFICATE OF FINAL COMPLETION This Final Completion Certificate ("Certificate") is provided in accordance with the Photovoltaic Engineering, Procurement and Construction Agreement by and between Pitkin County ("Purchaser")and Sunsense Inc. ("Sunsense Solar")and dated ,_20 ("the Agreement"). Capitalized terms used in this Certificate and not otherwise defined herein have the meanings specified in the Agreement. In accordance with Sections 31 and 32 of the Agreement, Sunsense Solar hereby certifies that all of the requirements to achieve Final Completion as defined in Section 31 have been achieved (with the exception of Purchaser's acceptance by signature to this certificate). Attached hereto is a report provided in accordance with Section 32. Executed this day of , 20 . SUNSENSE INC. By: Name: Title: ACCEPTANCE: In accordance with Section 32, Purchaser, on this day of , 20 , hereby indicates its acceptance of the achievement of Final Completion. PURCHASER: By: Name: Title: 17 DocuSign Certificate Of Completion Envelope Id:0F49D95ACC2B49968A8F96879431 D609 Status:Completed Subject:Sunsense, Inc. I Pitkin County Contract 125.21 A for Review and Signature Source Envelope: Document Pages:37 Signatures:3 Envelope Originator: Certificate Pages:5 Initials:0 Pitkin County Procurement AutoNav: Enabled 530 East Main Street Envelopeld Stamping: Disabled Suite 203 Time Zone: (UTC-07:00)Mountain Time(US&Canada) Aspen,CO 81611 Procurement@PitkinCounty.com IP Address:216.237.91.144 Record Tracking Status:Original Holder:Pitkin County Procurement Location: DocuSign 9/13/2021 9:17:35 AM Procurement@PitkinCounty.com Signer Events Signature Timestamp Paul Holsinger Sent:9/13/2021 9:20:53 AM paul.holsinger@pitkincounty.com PatAt, (kbt,Slln.y Viewed:9/13/2021 9:31:56 AM Agriculture and Conservation Easement Signed:9/13/2021 9:32:31 AM Administrator Security Level: Email,Account Authentication Signature Adoption: Pre selected Style (None) Using IP Address:75.70.181.52 Electronic Record and Signature Disclosure: Accepted:9/13/2021 9:31:56 AM ID:a05d87b5-c9bd-41c8-9f93-92bfb286ef7c Company Name:Pitkin County,Colorado Chris Howard P� � I Sent:9/13/2021 9:32:33 AM C.Howard@sunsensesolar.com (LU'lS (�aWao'4, Resent:9/15/2021 2:26:46 PM Commercial Sales Manager Viewed:9/20/2021 10:23:21 AM Security Level: Email,Account Authentication Signed:9/20/2021 10:26:08 AM (None) Signature Adoption: Pre-selected Style Using IP Address:67.176.86.192 Electronic Record and Signature Disclosure: Accepted:9/20/2021 10:23:21 AM ID:6b419fe1-c707-482b-893b-ad56c7c759d1 Company Name:Pitkin County,Colorado Rich Englehart .',.' Sent:9/20/2021 10:26:10 AM rich.englehart@pitkincounty.com finiy z"'` Viewed:9/20/2021 10:28:32 AM Deputy County Manager Signed:9/20/2021 10:28:53 AM Pitkin County Signature Adoption: Pre-selected Style Signing Group:County Manager Group Security Level: Email,Account Authentication Using IP Address: 174.198.143.67 (None) Electronic Record and Signature Disclosure: Not Offered via DocuSign In Person Signer Events Signature Timestamp Editor Delivery Events Status Timestamp Agent Delivery Events Status Timestamp Intermediary Delivery Events Status Timestamp Certified Delivery Events Status Timestamp Carbon Copy Events Status Timestamp Pitkin County Procurement COPIED Sent:9/20/2021 10:28:55 AM procurement@pitkincounty.com Resent:9/20/2021 10:29:00 AM Procurement Viewed:9/20/2021 10:33:44 AM Pitkin County Security Level: Email,Account Authentication (None) Electronic Record and Signature Disclosure: Not Offered via DocuSign Accounts Payable COPIED Sent:9/20/2021 10:28:55 AM AP@pitkincounty.com Accounts Payable Pitkin County Security Level: Email,Account Authentication (None) Electronic Record and Signature Disclosure: Not Offered via DocuSign Witness Events Signature Timestamp Notary Events Signature Timestamp Envelope Summary Events Status Timestamps Envelope Sent Hashed/Encrypted 9/13/2021 9:20:53 AM Certified Delivered Security Checked 9/20/2021 10:28:32 AM Signing Complete Security Checked 9/20/2021 10:28:53 AM Completed Security Checked 9/20/2021 10:28:56 AM Payment Events Status Timestamps Electronic Record and Signature Disclosure Electronic Record and Signature Disclosure created on:3/20/2020 3:28:13 PM Parties agreed to:Paul Holsinger,Chris Howard ELECTRONIC RECORD AND SIGNATURE DISCLOSURE From time to time, Pitkin County(we, us or Pitkin County)may be required by law to provide you with certain written notices or disclosures. Described below are the terms and conditions for providing to you such notices and disclosures electronically when we send you documents for electronic signature. Acknowledging your Access, Intent, and Consent to Receive and Sign Materials Electronically To confirm that you can access this information electronically, which will be similar to other electronic notices and disclosures that we will provide to you,please verify that you were able to read this electronic disclosure and that you also were able to print on paper or electronically save this page for your future reference and access or that you were able to e-mail this disclosure and consent to an address where you will be able to print on paper or save it for your future reference and access. Further, if you consent to receive notices and disclosures exclusively in electronic format on the terms and conditions described above,please let us know by clicking the 'I agree' button below. By checking the 'I Agree' box, I confirm that: • I am establishing my intent to be bound to the transaction, and indicating that I am fully aware of the purpose for which the signature is being provided. • I can access and read this Electronic CONSENT TO ELECTRONIC RECEIPT OF ELECTRONIC RECORD AND SIGNATURE DISCLOSURES document; and • I can print on paper the disclosure or save or send the disclosure to a place where I can print it, for future reference and access; and • Until or unless I notify Pitkin County as described above, I consent to receive from exclusively through electronic means all notices, disclosures, authorizations, acknowledgments, and other documents that are required to be provided or made available to me by Pitkin County during the course of my relationship with you. Signing Documents without a Pitkin County DocuSign Account: Pitkin County may not require all document signers to be authorized users of the Pitkin County DocuSign Account. Please read the information below carefully and thoroughly, and if you can access this information electronically to your satisfaction and agree to these terms and conditions, please confirm your agreement by clicking the 'I agree'button at the bottom of this document. When you don't have a DocuSign account, you will be provided the opportunity to agree to the Legal Disclosure each time you open an "envelope" for signing, at this time, you can download and retain this disclosure. Pitkin County will forward completed documents that you've reviewed, processed or signed via email. Should you require copies of these signed documents (e.g., if they get deleted from your email account) you should request those documents from Pitkin County under the Colorado Open Records Act by contacting the Pitkin County custodian who sent you the document for signature. Signing Documents with a Pitkin County DocuSign Account: Please read the information below carefully and thoroughly, and if you can access this information electronically to your satisfaction and agree to these terms and conditions,please confirm your agreement by clicking the 'I agree'button at the bottom of this document. Getting paper or electronic copies At any time, you may request from us a paper or electronic copy of any record provided or made available electronically to you by us. For such copies, as long as you are an authorized user of the DocuSign system you will have the ability to download and print any documents we send to you through your DocuSign user account for a limited period of time (usually 30 days) after such documents are first sent to you. After such time, if you wish for us to send you paper or electronic copies of any such documents from our office to you, you may be charged a per-page fee. You may request delivery of such paper or electronic copies from us by following the procedure described below. Withdrawing your consent If you are an authorized DocuSign Account holder, you can decide to receive notices and disclosures from us electronically, you may at any time change your mind and tell us that thereafter you want to receive required notices and disclosures only in paper format. Described below is the process for informing us of your decision to receive future notices and disclosure in paper format and also how to withdraw your consent to receive notices and disclosures electronically. Consequences of changing your mind If you elect to receive required notices and disclosures only in paper format, it will slow the speed at which we can complete certain steps in transactions with you and delivering services to you because we will need first to send the required notices or disclosures to you in paper format, and then wait until we receive back from you your acknowledgment of your receipt of such paper notices or disclosures. To indicate to us that you are changing your mind, you must withdraw your consent using the DocuSign'Withdraw Consent' form on the signing page of your DocuSign account. This will indicate to us that you have withdrawn your consent to receive required notices and disclosures electronically from us and you will no longer be able to use your DocuSign user account to receive required notices and consents electronically from us or to sign electronically documents from us. All notices and disclosures will be sent to you electronically Unless you tell us otherwise in accordance with the procedures described herein, we will provide electronically to you through your DocuSign user account all required notices, disclosures, authorizations, acknowledgments, and other documents that are required to be provided or made available to you during the course of our relationship with you. To reduce the chance of you inadvertently not receiving any notice or disclosure, we prefer to provide all of the required notices and disclosures to you by the same method and to the same address that you have given us. Thus, you can receive all the disclosures and notices electronically or in paper format through the paper mail delivery system. If you do not agree with this process,please let us know as described below. Please also see the paragraph immediately above that describes the consequences of your electing not to receive delivery of the notices and disclosures electronically from us. How to contact Pitkin County: You may contact us to let us know of your changes as to how we may contact you electronically, to request paper copies of certain information from us, and to withdraw your prior consent to receive notices and disclosures electronically as follows: To contact us by email send messages to Helpdesk@provelocity.com To advise Pitkin County of your new e-mail address To let us know of a change in your e-mail address where we should send notices and disclosures electronically to you, you must send an email message to us at Helpdesk@provelocity.com and in the body of such request you must state: your previous e-mail address, your new e-mail address . In addition, you must notify DocuSign, Inc to arrange for your new email address to be reflected in your DocuSign account by following the process for changing e-mail in DocuSign. To request paper or electronic copies from Pitkin County To request delivery from us of paper or electronic copies of the notices and disclosures previously provided by us to you electronically, you should request those documents from Pitkin County under the Colorado Open Records Act by contacting the Pitkin County custodian who sent you the document for signature. To withdraw your consent with Pitkin County To inform us that you no longer want to receive future notices and disclosures in electronic format you may: i. decline to sign a document from within your DocuSign account, and on the subsequent page, select the check-box indicating you wish to withdraw your consent, or you may; ii. send us an e-mail to Helpdesk@provelocity.com and in the body of such a request, you must state your e-mail, full name, Postal Address, telephone number, and account number.