HomeMy WebLinkAboutbocc.con.amended.125.21 B iTKIN Pitkin County
Procurement Cover Sheet
COUNT
Q/D.CV
Please complete the Contract Cover Sheet when the contract/task order is complete and fully executed.
Return all Contract Cover Sheets and Contracts/Change Orders/Amendments/Task Orders to Procurement
Contract Information
Contract Number 125.21 A
Project Name Solar System Install at Emma Open Space Barn
Contractor Sunsense Solar
Budget Line Item 11836362.562000.10022 $ 4,915.00
$Additional Budget Line $ _
Item(s) $ _
(Please fully allocate New Contract Total)
$ 4,915.00
Procurement Method: Informal
Type: Construction
Contract Start Date 5/10/2021
Contract End Date 3/31/2022
Contract Type Change Order/Contract Amendment
Retainage No
If this is a new contractor, please enter the New Vendor information into Munis for workflow approval.
Contact Information:
Department Open Space &Trails
County Representative Paul Holsinger County Representative (970) 920-5237
Phone
Provide a brief description of the Contract or Change Order:
Amendment to Scope of Work to adjust for ballasted system install; extension of Contract Term to 3/31/2022 to
allow for completion of revised Scope of Work; allocation of additional funding of$4,915.00.
Contract Value Summary:
Original Contract Amount $ 30,145.00
Previous Change Order/Amendment Amount $ 13,705.77
This Change order/Amendment amount $ 4,915.00
Contract Total $ 48,765.77
Contract#: 125.21 Rev. 2018.06.13 btf
Budget Line Item#: 11836362.562000.10022
iTKIN
COUNT
CHANGE ORDER/CONTRACT AMENDMENT
Change Order Number: 125.21 B
OWNER: CONTRACTOR:
Pitkin County, Colorado Sunsense Solar
530 E. Main St., Suite#302 1629 Dolores Way
Aspen, CO 81611 Carbondale, CO 81623
The Provision of Photovoltaic Engineering, Procurement and Construction Services (the
"Contract") dated May 25, 2021 between the Board of County Commissioners of Pitkin County,
Colorado (the "County") and Sunsense Solar(the "Contractor"), is hereby amended as follows:
Description of Change:
1. Revised Scope of Work to adjust for ballasted system installation of solar equipment
pursuant to the proposed layout in Attachment A, instead of roof mounting or ground
install;
2. Allocation of additional funding in the amount of Four Thousand Nine Hundred and
Fifteen dollars and Zero cents ($4,915.00) due to revised Scope of Work; and
3. Extension of Contract Term to March 31, 2022 to allow for completion of adjusted Scope
of Work.
Reason for Change:
In light of supply delays and unanticipated subcontractor costs, County and Contractor agree to a
revised installation that will allow Contractor to perform all installation work internally.
Original Contract Amount $ 31,145.00
Previous Change Order/Amendment Amount $ 13,705.77
This Change Order/Amendment Amount $ 4,915.00
New Contract Total $ 49,765.77
*Increases over$25,000 and/or 10%(single increase or accumulative)of original contract must
have County Manager signature. 1
Contract#: 125.21 Rev. 2018.06.13 btf
Budget Line Item#: 11836362.562000.10022
In all other respects, the Contract is in full force and effect and remains unchanged by this
Amendment.
SUNSENSE SOLAR
a iS ('kbWart, Dec-09-2021
Chris Howard Date
Commercial Sales Manager
PITKIN COUNTY, COLORADO
N , NNW Nov-30-2021
Paul Holsinger Date
Agriculture and Conservation Easement Administrator
*Increases over$25,000 and/or 10% (single increase or accumulative)of original contract
must have County Manager signature. 2
Pitkin County- Open Space and Parks _
Solar Electric System General Estimate =J JJ`J3Ca011
SOLAR I DESIGN I BUILD
Sunsense Solar
Solar Electric Contractor/Integrator
1 7 aar ��i _� r -- ii ,
i p,
,4: _.Y ? '` 1'
• '." Qi�, 1�' ;te}'!i„ .ems, 1 t.._..�- •
t: �•` :. mear.r.
l
, titit--- 1 - 1 - . 'V ie:4, ,
To: Paul Holsinger
Pitkin County
Subject: Pitkin County- 100 Sopris Creek Rd
—15.66kW Ground Mounted Ballasted PE Stamped
Solar Electric System
Prepared by:
Chris Howard
PO BOX 301
Carbondale, CO 81623
(970) 963-1420
c.howard@sunsensesolar.com
Sunsense Solar November 11, 2021 1
Pitkin County- Open Space and Parks
Solar Electric System General Estimate v!Ji\Jo CnJol
SOLAR I DESIGN I BUILD
November 11, 2021
Paul, Harper, and the Residents, and Employees of Pitkin County,
Sunsense, Inc (Sunsense) is pleased to provide the following summary and
accompanying proposal for the Glenwood Springs Electric Systems Operations
Center.
Established in 1990, Sunsense is a Solar Electric Engineering, Procurement and
Construction (EPC) Contractor covering all of Colorado and adjoining states based
out of Carbondale, CO. Sunsense provides turnkey services for solar electric systems
of all sizes and specifications. The Sunsense goal is to proactively build a long-term,
sustainable business based on quality, consistency, and reliable service to our
clients.
The Pitkin County community is likely familiar with Sunsense capabilities,
bandwidth, and commitment to community involvement in the Roaring Fork Valley,
the selection of Sunsense for numerous Roaring Fork Valley solar PV projects for the
past 30 years has established a foundation for strong working relationship between
many businesses including municipalities, schools, and residences in our
community.
Sunsense has a strong backbone of commercial projects in the Roaring Fork Valley
and is looking forward to working with Pitkin County here in our home in the
Roaring Fork Valley We understand how important sustainability is to our
community and we look forward to helping the county reach some of their financial
and sustainability goals.
Based on prior experiences and current market conditions, Sunsense has provided
its best estimate in the accompanying proposal. Sunsense understands that changes
to layouts or engineering could be altered due to unforeseen obstacles or updated
goals.We look forward to discussing the details of this project and are happy adapt
to any future changes if they occur.
Respectfully,
Chris Howard
Commercial Sales
970-963-1420
c.h oward@sunsensesolar.com
Sunsense Solar November 11, 2021 2
Pitkin County- Open Space and Parks
Solar Electric System General Estimate
SOLAR I DESIGN I BUILD
Project Summate
Please see our financial snapshot and production analysis provided by Energy
Toolbase. Energy Toolbase is our trusted partner for financial modeling and PV
production analysis. PV production is based on tilt, azimuth, and average sun hours
in specific geographic locations. This 30-year weather data is collected and
researched by the National Renewable Energy Laboratory in Golden, CO. Sunsense
has taken a safe approach to discounting winter months due to losses from snow
coverage.
Sunsense has been tasked with creating a flush mounted array to a corrugated metal
roof with no tilt up. Sunsense is happy to value engineer alternatives if warranted
later.
Please note that this general estimate is valid for 60 days and is based on current
product availability and market prices. Project deposit and or contract can secure
product and pricing. Please know Sunsense may need to adjust associated costs
based on product availability and unforeseen obstacles to their current state for
decisions made outside of 60 days from the date of this estimate.
Scope of Work
• All major project components included.
• Required AHJ electrical/building permits.
• Project Management/oversight.
• AC and utility interconnection.
• All associated AC & DC BOS.
• Administration.
General Assumptions
• Sunsense is providing this Preliminary Estimate prior to final engineering
and is aware that system layout and electrical engineering may be amended.
• Construction period is still to be determined but is assumed to be during the
third or fourth quarter of 2021 pending timely delivery of materials and
avoidance of obstacles beyond the control of Sunsense.
• Engineer on record to determine structural load capacity of roof and to
provide approval for said loads.
• Production Estimates are based on National Renewable Energy Laboratory
30 Year Weather Data and are not guaranteed.
• Rate structure analysis is based on the current Holy Cross Energy rate
structure and energy consumption is based on the most current rolling 12
Sunsense Solar November 11, 2021 3
Pitkin County- Open Space and Parks
Solar Electric System General Estimate v!J-\J t C1&3/
SOLAR I DESIGN I BUILD
months. Sunsense is aware that consumption will likely increase due to the
new building addition.
• It is assumed that the designed system will not produce more than 120% of
the building.
• Financial Analysis, Rebates, and Tax Benefits are for information purposes
only and not guaranteed. Please consult with your advisor for discussion of
eligibility.
• Layout to be approved by Pitkin County AHJ and or Fire Department.
• Exact electrical Interconnection strategy TBD but 208 voltage is known.
• Sunsense has quoted what is currently believed to be the best value tier 1
module, quality racking, and reputable inverter manufacturer, but we are
open to discuss alternative products.
• After thorough review Sunsense feels that this system design optimizes the
available south facing roof space.
Inclusions
• All applicable rental equipment is included in this quote.
• Sunsense staff will cover Project Management, Site Supervision, and AC
Electrician.
• Sunsense is to provide electrical PV drawings.
• Sunsense is to provide all documentation relating to interconnection
agreement with utility and permitting.
• Stamped Engineered Drawings for Ballasted Array
Exclusions
• Installation of all mechanical attachments if required (anchors) including
attaching, flashing, and waterproofing to be performed by roofer on record.
• Any associated snow removal. This pertains to any/all staging or access
areas as well as rooftops.
• Pre and Post Installation roof inspections will be conducted and recorded if
work is completed on the roof.
• Design and Installation costs based on current construction of building.
Changes to ground layout or added obstructions could warrant changes to
this proposal.
• Exact AC Interconnection strategy TBD following final engineering.
• Monitoring strategy TBD. IT technician will need to run ethernet to inverter.
• Sales and Use Tax is excluded.
Sunsense Solar November 11, 2021 4
Pitkin County- Open Space and Parks
Solar Electric System General Estimate -=J 1J-i\J3rffa011
SOLAR I DESIGN I BUILD
Pitkin County Open Space - 15.66kW Proposed System Layout
7,
r IP / / / / ///////////////, 1 1 i 1 l///////////t/
t . r r
*36 435 watt LG Bifacial Solar Modules
Sunsense Solar November 11, 2021 5
Pitkin County- Open Space and Parks
Solar Electric System General Estimate
SOLAR I DESIGN I BUILD
Pitkin County Open Space -15.66kW Proposed System Financials
Payment Options Cash Purchase
IRR-Term 4.0%
LCOE PV Generation S0.072/kWh
Net Present Value (S6,157)
Payback Period 18.5 Years
Total Payments S48,766
Total Incentives SO
Net Payments S48,766
Electric Bill Savings-Term S89,109
upfront Payment 548,766
Combined Solar PV Rating
Power Rating: 13,560 W-DC
Power Rating: 13,990 W-AC-CEC
Cumulative Energy Costs By Payment Option
S10C-0CC
S8G OCC
S6C:0CC
—411411111111
540.000
iJ
S20 000 -
SO
Year0 Year year 8 Year12 e_ e_ _c
III - _ - -'_ _'_
Sunsense Solar November 11, 2021 6
Pitkin County- Open Space and Parks
Solar Electric System General Estimate
SOLAR I DESIGN I BUILD
Pitkin County Open Space --15.66kW Proposed System Production
General Information Solar PV System Rating
FaCIiILy: acffl;T PCvver R:a" _ Cc. -DC
Address: 100 SoDris Creek Rd Basal_CO 81621 Power Ra:; _ .3.99: :.-AC-CEC
Solar PV Equipment Description Energy Consumption Mix
Solar Panels: 15.7 kW-DC Pre-- Jm Modules
Inverters: Standard Inverter
Solar PV Equipment Typical Lifespan
Scar Panels: Grea:er:ha-
inverters: '5 Years
Solar PV System Cost and Incentives
Solar FV System Cost TtH
Net Solar PV System Cost 548,766
_Y -3,505 kWh(0.00%)
I: _-=. 24,505 kWh(100.00%)
Monthly Energy Use vs Solar Generation
3 0C: •
=Ec
occ
■ ■
Sunsense Solar November 11, 2021 7
Pitkin County- Open Space and Parks /
Solar Electric System General Estimate v!J_.\J t C1&3/4
SOLAR I DESIGN I BUILD
Pitkin County Open Space - -15.66kW Proposed System Cashflow
IRR-Tern 4.3F; I,e:Freser:Vawe ($6.157) Payback Period 185 r'ears
ROI 827% PV Degradation Rate 0.50% Discount Rate 5.0%
Energy Cost Escalation Rate 2.5% Federal Income Tax Rate 21.0% State Income Tax Rate 8.0%
Total Project Costs $48,766
Years Project Costs Electric Bill Savings Total Cash Row Cumulative Cash Row
Upfront -S48,766 - -S48,766 -$48,766
1 - $2,210 $2,210 -$46,556
2 - $2,254 $2,254 -$44,302
3 - $2,299 $2,299 -$42,003
4 - $2,344 $2,344 -$39,658
5 - $2,391 $2,391 -$37,267
6 - $2,438 $2,438 -$34,829
7 - $2,486 $2,486 -$32,343
8 - $2,535 $2,535 -$29,808
9 - $2,585 $2,585 -$27,223
10 - $2,636 $2,636 -$24,587
11 - $2,688 $2,688 -$21,899
12 - $2,740 $2,740 -$19,158
13 - $2,794 $2,794 -$16,364
14 - $2,849 $2,849 -$13,515
15 - $2,904 $2,904 -$10,611
16 - $2,961 $2,961 -$7,650
17 - $3,019 $3,019 -$4,632
18 - $3,077 $3,077 -$1,554
19 - $3,137 $3,137 S1,583
20 - $3,198 $3,198 54,780
21 - $3,260 $3,260 S8,040
22 - $3,322 $3,322 $11,362
23 - $3,386 $3,386 $14,749
24 - $3,452 $3,452 $18,200
25 - $3,518 $3,518 $21,718
26 - $3,585 $3,585 $25,304
27 - $3,654 $3,654 $28,958
28 - $3,724 $3,724 S32,681
29 - $3,795 $3,795 S36,476
30 - $3,867 $3,867 $40,343
Totals: -S48,766 $89,109 S40,343 -
Sunsense, Inc views our partnership with Pitkin County as pivotal to the Roaring
Fork Valley and neighboring valley's aggressive transition towards a sustainable
future. Sunsense, Inc prides itself on high quality EPC services and a punctual
operations and maintenance division that result in high performance, great
aesthetics, and system longevity. We thank you for your consideration. Please feel
free to inquire with questions.
Sunsense Solar November 11, 2021 8
Pitkin County- Open Space and Parks _.-/---
Solar Electric System General Estimate -= �J=J JJi� c r-
SOLAR I DESIGN I BUILD
foilLG N ON®H
LG43SN2T-E6 MIN 0
435W
The LG NeONe His designed to absorb sunlight both from
the front and the rear sodez of its NeoNe cell by Laing a
transparent backtheet The dual faces of the cell result in
higher energy generation.
c �L us
25
YEAR _ . - /
111O010'IU101a11C1 Y-�
WARRANTY -�-_ - --
Features
25-Year Limited Product Warranty(+��1 TheBifacial Energy Yield
'.eorje H is covered by a=5-year lA LG NeONe H modules use highly efficient
limited product warranty bifacial solar celL Through the technology,
LG NeONe H can achieve up to 30%
more energy than standard PV modules.
Better Pei fog n.ence on a Sunny Day i— More Generation on a Cloudy Dap
LG NeON•H now performs better on 1h The LG NeONe H performs well on
sunny days,thanks to its improved cloudy days;weak sunlight conditions
temperature coefficient cane a low energy reduction_
Whenyou go solar,ask for the brand you can trust:LG Solar
About LG Elemor:e USA,Inc
_.cisevccdc•la. *caw in.. ,..VW mot. maven.a ,=Par 1,<passim.e ow,cea..•.r.m'he ccorp,,nt an..,ir•r. 0 LG
enny era rr_-OW' n 1Val a4pOd 01 L.C.lire..,ow,4o. .ey wer.ew.rx,,ito ew•q.d mats..roaw F 200 Lt.W eeaalAi
n Ire V. .•rw to S ow. ,ee„•a re.. ,li arena tr..M.(M yrw.a.w.x.r.o•4.coe,,wLY,a1 Y.ul we.r.0.?0
I..ar.lv3,lJta w JJ-gr..,r yes.::,l.m.e ant..mrrs w We ear.....mr Life s Good
Sunsense Solar November 11, 2021 9
Pitkin County- Open Space and Parks _
Solar Electric System General Estimate =J J��J3a��
SOLAR I DESIGN I BUILD
LG NeON®H
LG435N2T-E6
General Des. Elect-iced Propertied
CAI 1.63•49•4(Mr001594) 6500r146r0T-4024 Ldltsrd2'9g
...,
Up Ulm lr, .'C• 50'.100•• aFu00••
CAI Corla..ti.. 144 CAE 16.24; Wm-,11e40(100) (l 435 465 495
Mather dbalm. 9EA 41P99011'411.00 M 407 407 407
MW+OwwY..IL W.M 2I30/0E.l34)mm.AOInn ' C"^n(l.*wl IAf '070 II44 1217
W44197 27 kg 0,..Crcn lf4(Vac) M 407 497 487
Cf.v(1104e/94.1404) :0-m11r94.l41 74 A6 1.040 Slat uwa l unwt CYc) IN 1115 1191 I'64
94.6•1e(C-kEi 700.34.0.1 4051 L'104400 (711 7E6 II 333
ha.(r4an•0 Ahead Minnow AR 80040Co.adet f*1 751S
44r041&n 17.0001104 0.40.4) I960•A13 900.Clete 008••linos 1N 0--3
C410.(1090) 1,40040m.2E4 •Stc;Str..t40 lnveat Yves l2o3100n',CAla.mws.a:S C 4/'1
.r•••••••ewes'IIS
Cams.(Me/M.ie) 14C.V ML reel ceder4 et u.10340 al uw emom Ans Ca be o e-sana
ICOM"'•IWlan.-..n,N,.'^el 1 AD 1N49.'16-0,1 X.e1,11410..'v 011W
Certification,and Warranty
.6c61215-17.1-1/2501619L61 730-1/2 301 5 Operating CooGtion.
Crtamera L2.61736 014e11497091+009 fti! -40 -93
60 9C01.150 14001,60 50201
036685 19001 10•000.500."0440" M I320 0i'l502020
Stll Mn Condit•10 00417012012 taat96 7�°��~a~•7 fA) 1C
A1mlo Cv.1v.e 94 IEC6 2 7 16 2013 I�AwI9la War(M1I.1d WPC S40C1113
41r1.i N.Ir.Co11..0 7a.t tut 1703) 49rlrid Slit la1C79+r1 (N� 3,Omc a
W aa•9 Oe[(Ut 190)
Sala MYi9laid:a9elrr 25 104ra
5Aa9Y4H.Agtettril ars L....vs.,..ey Packaging Coniiguretior.
*real to74'•ro13A•Ik New l•ar J1S11.'•r 964%a^'1�'IYn4sr r•'3411 M. of4.r EA. (EA: 25
Wain,d W91•.I<r Cos..v (64: 560
(EA1 750
Temperature Characteristic r..1�d*.A6...Si'cod...
OPT. (Y1 42 a 3 17.dgiq a4 OYve.0..W r PO 2160.1,110.1,213
19410,01 WOl.v.a.0..a'.N) is) 954441.476
9001 I eel 4133
I+�l ozb 4040 0ae0.ee 99.014 P91 610
Is (xKl coA 1649.04 Ilm L.404 94004 fat t345
•5t4..1i007r846.0140.eg01.0.0.1 n4.-.0.0c NM'Mtge Vane-+:l.
Are...11 N\1t.xr:AV'.•.
Dimenaoas(men finch)
Elect,ic•I Properties.(NMO11 Innn.4ln is1)9t•tarl ..
IlMaW 51C• 44,700• 4F.100•• ray e.ewcn.sd.Y'ro'Yo MO OM
Wirer barM0E0 Alf 327 349 371 .6.Oa1a T7.n/ ••
Mara IY9g.( oo/ M 302 391 3E /2 ail.40 / .
gp Mr.CEnzni p ) (Ai 955 914 973 - -
0n.se N••Ore C9oa*hap(Va.1 M 459 459 459 7.9;//
'
Part Onus Orme NO (Al a96 960 I022 'n•'Aaw9.
I-V Curve: `Ti F I
I .. �l.94/Me � I I a
nit t
lr ION n r t d
illM"
C 4r MO i
III
ISM i , : !,.; !
9r •
9r as WI far 49r a a f n 61-' .._.__ 7
0040
® 1.6 EYcttalo 1.15A N. nld.el.a.feA,..win.v4at a 46.9..ele.re l ta LG 200 sere Dawn1ra35n_7-E6 tdr
2000N3b. 06 031911
LYledrl.r II 96006f
Lite's Good .rat irel..an 0 2021 L0 9.ecv.a u54.K 41I.4001009.1
Sunsense Solar November 11, 2021 10
Pitkin County- Open Space and Parks
Solar Electric System General Estimate
SOLAR I DESIGN I BUILD
SUNNY BOY 5000-US/6000-US/ 7000-US/ 8000-US FAI
11111
ASSEMBLED IN ONTARIO
CERTIFIED/0.10'C/E
toy&
Cmied Ildat 1.b Wages
•m...ae v1/an iw ••nr+.w •..w.........pig
owl 22I w 1o1 SAo •qa.•r w..••wr• .•••••ammo.
ammo*.wi.• •ow..DC•..•••..•r.
SUNNY BOY 5000-US/6000-US/7000-US/8000•US
Vefsot,e Fe.')rmer cen',ecf to CSA sto,,dordi
t�.Sury Bar 3000JS e0004.1S 100DUS and R000US oftomion o.wild a Q2 2 No 107 101 and how*
swam.ic++cr Goodwood paw den..peed.I.•d.io o.tow door A•.p.lc yid.el.q doodbo•o!
.npe.d X A.c..•acr.-, ...IA •e•do.n...unSi wl.h a..I a w., W.Nod...d. 4oe.,oolw/nc
'show..d co.to used•oh d type d eodd..-cyKrc a•wl u.w..Y.
Sunsense Solar November 11, 2021 11
Pitkin County- Open Space and Parks _
Solar Electric System General Estimate =J J�\J=�� ��
SOLAR I DESIGN I BUILD
1...•..I Ar. 1st.M'1�A Lay M•O MUA Iwo"L►MOOS Lowy S. 100►An
NMI I•M I •►•• ant mom .••a ran a me /lot ».. r.•
AA 107.2
w -W woo ems►WO I O•• 3300. ln•W IOw•W
a•a Iw..+.•.•.I' WO W 61101 .AMW Y•IW
/AA DC oap •__• OppV 0301 000V
LA ammo•4/1• I•)• 300V 110• Itle
..'r'T )ae AMY MtY.AM♦ 11A•.AMV DO.-ApY
Var.DC oboe:Also. 210V,301IY Mee/MOW no./oat LOv/)ale
4....•/Aro•/r4•7 0061 Aga )103)0A 33y300 2DA/2041, 310A/)01,
M A•.watl rood NA••o•mil••lod Di4••••••••wool I.A•molar'hand
loll•./M•i.
Wad d•M••IAArar I/AWL'AI••n�
O•A•d AAC1
Ac ammo prow MD OM 11 .eO•W Ala.r •/IOW
Om AC•na•w woo MOOa I0/064 LOOM OOO»
•M•a•dY 411111p/••a.r r•,• r•.• 11,.:• r.:• O•.• I...• r..• r•• w•.• .t•• ..•;•
AC wisp MO. a a.I..MI.Ad a. a•I•T. ••e as aa,a a•a •I•-•I• t. •.• W a•
AC•td 1p•y,rip 101011)-IO31• M.t 11-00.1 III r/t MU-SOS lb IOW)12.001110
aM•.•Nmart AAA AlA I4A )IA DA 2I• DIA RA 211I III
Ammo*AA 1•••1 . 1 1 1
L.- -/mo.•••r Am* •/1 I/I Ill III I/2 I/1 It) ./) •/1 I/) .It
•At •A •At •A
I•r.n
Yr•111•w6 I47% MR %•► IC It II/R VIII Oilt MtA 10a4 AM SIt
K.•p...•• 91)I At St II It 1110t Mot AIM 011t •%at 91101 y•1 Os(A
t.••t•r•Orono
DC•••••••I••••••~memo • • • •
K•••••=•/+a• • • • •
0.14a006•di1 i 4•i•Amami 40 ••. a/. •✓ II/-
A.O.•wAo/w.renoften, I;• I/• I/• '/■
moo.•date
DV IM/Woo=IM Ata/DUIMID 41a1/14/A
ACaawr draws O I DI/Di•a•l.1 Iv/W/II•I)/Ili//!1
Ad••trld••AV/0/0I••••• PIO/NO/ONO min/)IN
at•.ommir•ryArMI•I/ Mr'•••••••a Up/TI•/AO 11I/9/111 -
I9444.DCb -••W 0.10 lode M/Il`NM •014I 04101/11411M ,
Aline••.••t 0C Oltrr•.•O••••• Aty 04011/ll0 NM OII•MIN/Ale MY ,
Como.haw•••• AA^.I -AD•( m11"C 44.00./ •.l)1
•Y•sorrIowa 41SA1 AS MA A041 MIWO
haao......n•••w w•y • W Y I W •t a l I W
L••••1•.••tI QIC.A 0•1044 441 C1AGd
A•.t•r•pol•W 6697/•oar•out •AW)I'NINA II III►•/Mai IS t.•W fI/1•Ar• WY II/I4106 le
I••••a
l.•r vvr p.l• •• 0/ •. N
haul••5551/IthrrM •!• AI• 930 JAI
W5•••/ III II/)Ott•• •ta/O 40/0 •'n,ro eta le
C.l••• rr I..w••iA111a••=1 11.170LMI WAX Mart It C30031♦►10J ICA
•IdI IA norm/4 r•r r Om.am aid...doom
•I••••d Iron Oarrl/vNA _16/0.1•0
IVO Arm•.•• f•)0001D11 !•aala•1I SiAMMO I al00an.,
1 E:=;�
i
aWl #
10.110.4.1
• q I / E t U.�r.rw r r
ta••..a...r
t r E - . WI.*••t
r � ' " ' P •
m tau teo qp
I
roll Frail•1 177 506 1 7S4
wv.w.SMA-Conoala.ca SMA Canada, Inc.
Sunsense Solar November 11, 2021 12
Pitkin County- Open Space and Parks
Solar Electric System General Estimate =J JJ\J
SOLAR I DESIGN I BUILD
JMS-F SUNSPEC RAPID SHUTDOWN DEVICE WIP
•
111#1
•
ti
l
• Swi..r...War eede..a •se.r W ben.ca...... •C.A.and end b •7..•.er.•.d.n O••S.e•'.e:
••s edi.e•e c..o.w a.id 1.awer6.�..• e.••L..e.r barn/�r•w.•�.Mr
......►,...r...r..b.•• w.%••%e••y a b.-a.. u.��.•�:d And.... •hW es and afire.
•.�•a.a h.d•.. :CUM,ammo. .1r.....6•:...
• 1......•h.•enb.�..�... •d1C:Qn,.eat=gill :..«.••••........`.
....:r.4 be./.wn•ree .•.d.rr n....She**.
JMS-F SUNSPEC RAPID SHUTDOWN DEVICE
"he ea:y module P.PI rcc:d,hutdown :o,uton
11.. C.+ied aop.d:1.a1da.•r.S,%....(ead.l JM -r1,o•oka.ban SMA,n f.e mo.t 000NN.o•.n trd
n.lable ocknon k.444.11ng NEC 2017 modal,b..l du down tocurememft The wod.1.J..r d..co a o.ni ed for
co•rpa.balry watt b Sunt.pec cowwno•ca.n wind and SMA.- *i...d.g co.p:m.c•s;wpl•o.d nos, by
awl d..wow*DC I.w b.nw.n As own*.and vx away fa pa...Iw.eownwn.cem.u,.asolan.ow and labor a.•
ry.ikoN/y reduced No addd.a.d-nna a cow•nw:ca.on www•.••'d.needed The baboon deo hau.•r up ao 50%
f•ow Waal cowponem y ohemeomm.r•sdewg M gnaw Nana r.abd+y
Md..io..rw
Sunsense Solar November 11, 2021 13
Pitkin County- Open Space and Parks _
Solar Electric System General Estimate -=J JJ`J=�� c �
SOLAR I DESIGN I BUILD
r. Mit
Iwo IDC1
for DC~re MO w
err.M ore ro re roe a0•
•m•.•r..e+++mp IV a
Mery d••.rr-M•VIM�. IS A
••.•r•1r••.•r w.a•.... I S
OWS••oon
Oy.•ar•rmop 0wrS00w
kAsala.MO 4,11P 40.
i ilW ali.44 •V
mompr.oar Argo 110)V
OPooroa.r re e..rms. •a SO!•MApr
lerroe
0•ww l F.•11'0.•w IN 110•IIf.23I(7!•SM•Q•I
WaM WM..O •I 01!6 N1f r
Owe.a.Vmp t2r
Cyreep rumor re -O'Coo..-S'C 1-aD'/a.IM"V1
swan.+r/ 1aa a•lore U.KC
W.1••=a01Iy, 0a0',COI
a s r.o OW 1�yr
Crimea a'-.I SOW Doer 4r•
G.....••a11r.rale aro Lao:••••.•••a.•!K1
l•i.0 twa:err Car•. _ere Twos rise
•.tr••ON'ear M.%WS form IS men
:rc.:Oac a•—:m....wa . a IL ra..-114.64'I i
;_1p.,COW 14i M.ruint
f
'r.. I•.• OW1
,......arm•..ir 1 1N I.000t
'A.M.•.•••• •C
S1'STEMOIAOIAM 1111/KIIM DIME►as.O.K I I
Hi t 03mm ?S maw aI
i�a—T—d i 1S
1MS C c • / J PEACE
il
0 11 I
000. U
SUNSPCCERTIf D ' •
PVINVERIER i �• ••�� •- I I
SUNNY - °{I
SONY T1P R —, I I f t
EOY COILI 1
• _..tree KFri4r.Pr err
iI
1111 il
If
---
I;
i I. 1
rY
II
w+o SHUt(10N1v la
IlviTu 0I SA VC.•
Toll hee-1 888 1 SMA USA Z
www.SMA-Amenca.com SMA America. LLC f!
Sunsense Solar November 11, 2021 14
Pitkin County- Open Space and Parks
Solar Electric System General Estimate Di`J=;� c �
SOLAR I DESIGN I BUILD
r ��AFA
SOLAR RACKING
iiiii/oppli
...iii io°°°°°°°°IP:.....' ---- - . illi.7.-----
•
%I-•7�"tee - 'r,�► }
,
R.'tio
GEOBALLAST
i*^ ,'' _, ... FOUNDATION
NO MORE PRE-ASSEMBLED air Geoballast Foundation was developed
after years of AP Alternatives installing
CONCRETE RAPID SETUP ballastee solar projects.The utilization of wet
By�rirg locally souced mks or paws,srrpry The galvarc�steel wre bar form a delnered s e simply would had so marry hidden extra
dump the weigh n and you're done-No more b the site aver 70%pre-assembled and only steps that job c Met a y increase a man
hours on every . AAer a large amoot of
wading on concrete buds-rening concrete purps, takes a few minutes for the box b he Unfolded, engneewrg and R&D,APA was at It to take the
%washing out truckslpurps onsate No more labor and the abhor ttbe to be awed for the idea of a standard Gabion Basket and transform
hours tr setting up lerrporary concrete mobs.No Geaballast boa to be tidy assembled.Then the that idea into the most cost effective ballasted
more waiting 24 hous for ca r eie to are Tte tatb•t Th he prat n the proper position in the solution in the solar industry.
taw and speed of your?at is 10C%n year antra sw and to filled with the quarry rock
1.
Sunsense Solar November 11, 2021 15
Pitkin County- Open Space and Parks _
Solar Electric System General Estimate -=J JJ`J=5� c �
SOLAR I DESIGN I BUILD
WHAT MAKES THE GEOBALLAST SYSTEM SO SPECIAL?
CRYSTALLINE &THIN FILM
COMPATIBLE
All major crystalline and thin film
module types are supported
,. _ _ READY RACK &
TELESCOPING POST • ADVANCED MODULAR
Both posts have adjustable positions COMPATIBILITY
to match site requirements
. PRE-ASSEMBLED
WIRE FORM
ROCK WEIGHT •` • -'.'-` - The ballast is shipped 70%
Quarry rock provides the weight l assembled which allows for low
necessary to anchor the system t, - cost and quick deployment
r ANCHOR TUBE
The bent tube is the connection between
_ ., �::; . the ballast and the rest of the racking
FLAT PACK TO READY TO FILL `.a.
The wxefam ballast is shipped f
•
preassembled,unfolds easiry and is fully # ,.+�``¢
assembled with spkal wire .�
. ter. :
Racking Drerehisn:Ccmpatbre obi 2
"�°"�tand°inerdscapedesigta STANDARD QUARRY
Snow Load:0psr to 7opsl(higher load .
coin:a:oIt1e) ,, ,� ROCK OR PAVER BLOCKS
Wind Load:Up to 130ng1+ ` Rock or paver blocks can be sourced
Tit Angle: Custmer Specified �S-3D t from quarries local to the site.
Depees l
Ba a: Cffe m alternatime to drimen - -
a-.:hc T,cr ni=%
Budding Code Compliatd:BC 2015
PE Started Drawings:APA drauw l
can be PE aarrced Sur all 50 stairs and
rambles. 14
•1J
Y
L }
LA RA.KIN., •�i 4.-
A19.267.5280 7 SALESr •APALTERt1ATI D.00M --
Sunsense Solar November 11, 2021 16
Pitkin County- Open Space and Parks
��Solar Electric System General Estimate
SOLAR I DESIGN I BUILD
SOLAR I DESIGN I BUILD
5-Year Limited Workmanship Warranty
Sunsense stands behind this warranty policy and will make every effort to work with our
clients to provide the highest quality service under fair and reasonable terms.
I.Limited Warranty Coverage.
Sunsense Inc.warrants to the purchaser and all transferees of the structures to which products+equipment
are installed and:or repairs are made as follows:
•Product Installation:Sunsense Inc_warrants the installation of products to be free from defects in
workmanship from the date of Final Inspection of the producvequipment for a period of 5 years of
normal use.This workmanship warranty does not include any damages or defects in the product except
to the extent solely caused due to installation of the product by Sunsense Inc.authorized employees.
•Repairs:Sunsense Inc.warrants only the repairs made to be free`rom de`ects in workmanship from the
date of the completed repair for a period of 1 year of normal use.This workmanship warranty does not
include any damages or defects in the products'equipment used to make the repair except to the extent
solely caused due to installation of the product by Sunsense Inc.authorized employees.
Sunsense Inc.will have the right to inspect the areas a:issue to determine the cause of:he alleged defects.
I`the defects are determined to be within the scope of the workmanship warranty.Sunsense Inc.will make
the necessary reoairs a:Sunsense Inc.expense.Manufacturers equipment warranty applies to all supplied
equipment.Sunsense Inc.specifically does not warrant the installed products.
Sunsense Inc.repair of the defect SHALL BE THE SOLE EXCLUSIVE REMEDY available to the covered
person or entity with respect to any defect.Sunsense Inc-will not refund or pay any costs in connection
with repairs made by anyone other than Sunsense Inc.
2.Conditions of Warranty:Sunsense Inc.liability to the covered person or entity shall be subject to the`ollowing
terms and conditions:
a) The claimant must provide proof that they are the covered personientity.
b) The covered person:entity must provide written notice to Sunsense Inc.within 10 days after discovery
of any claimed defect covered by this warranty and before beginning any permanent repair.The notice
must describe the location and details of the defect and such information as is necessary for Sunsense
Inc.to investigate the claim.
c) Upon discovery of a possible defect,the covered personrentity must immediately and at the covered
personientity's expense provide for protection of all property that could be affected until the defect is
remedied.
3.Exclusions:This Warranty does not cover damage or defects resulting from or in any way attributable to(al neglect,Ibl
misuse,I:c;abuse,(d)repair or alteration made by anyone other than Sunsense Inc.(el settlement or structural movement
and.or movement of materials to which installed products are attached,if)damage from incorrect design of the structure,Igl
failure to follow the instructions(h)acts of God including,but not limited to,hurricanes,tornados,floods,earthquakes,severe
weather or natural phenomena,(including,but not limited to,unusual climate conditions;,Ili lack of proper maintenance,Ill
any cause other than workmanship defects attributable to Sunsense Inc. Sunsense does not guarantee a specific amount of
energy production.Estimates are based on historical average weather data.
4.Disclaimer:The statements in this Warranty constitute the only warranty extended by Sunsense Inc.for its
workmanship.NO OTHER WARRANTY SHALL BE MADE BY OR ON BEHALF OF Sunsense Inc.
Address Under Warranty: Start Date:
Sunsense Inc.Authorized Rep(Print Name):
Title: Authorized Signature:
Sunsense Solar November 11, 2021 17
DocuSign
Certificate Of Completion
Envelope Id: 1 FCE9FBB62014B8992EC54D7A3379486 Status:Completed
Subject:Sunsense, Inc. I Pitkin County Change Order 125.21 B for Review and Signature
Source Envelope:
Document Pages:20 Signatures:2 Envelope Originator:
Certificate Pages:5 Initials:0 Pitkin County Procurement
AutoNav: Enabled 530 East Main Street
Envelopeld Stamping: Disabled Suite 203
Time Zone: (UTC-07:00)Mountain Time(US&Canada) Aspen,CO 81611
Procurement@PitkinCounty.com
IP Address:75.110.134.54
Record Tracking
Status:Original Holder:Pitkin County Procurement Location: DocuSign
11/30/2021 11:17:48 AM Procurement@PitkinCounty.com
Signer Events Signature Timestamp
Paul Holsinger Sent: 11/30/2021 11:21:12 AM
paul.holsinger@pitkincounty.com P U (kbt,Slln.y Viewed: 11/30/2021 3:15:22 PM
Agriculture and Conservation Easement Signed: 11/30/2021 3:15:38 PM
Administrator
Security Level: Email,Account Authentication Signature Adoption: Pre selected Style
(None) Using IP Address:75.70.181.52
Electronic Record and Signature Disclosure:
Accepted: 11/30/2021 3:15:22 PM
ID:adf9a921-4b50-4bea-91ca-2fd3cccffe54
Company Name:Pitkin County,Colorado
Chris Howard P� � I Sent: 11/30/2021 3:15:39 PM
C.Howard@sunsensesolar.com (LU'lS ('�OWAY'4, Viewed: 12/9/2021 10:35:15 AM
Commercial Sales Manager Signed: 12/9/2021 10:35:56 AM
Security Level: Email,Account Authentication
(None) Signature Adoption: Pre-selected Style
Using IP Address:75.70.100.246
Electronic Record and Signature Disclosure:
Accepted: 12/9/2021 10:35:15 AM
ID:6d703085-d01 f-4062-a032-0e50b56a58e6
Company Name:Pitkin County,Colorado
In Person Signer Events Signature Timestamp
Editor Delivery Events Status Timestamp
Agent Delivery Events Status Timestamp
Intermediary Delivery Events Status Timestamp
Certified Delivery Events Status Timestamp
Carbon Copy Events Status Timestamp
Pitkin County Procurement COPIED Sent: 12/9/2021 10:35:57 AM
procurement@pitkincounty.com Resent: 12/9/2021 10:36:01 AM
Procurement Viewed: 12/9/2021 3:51:30 PM
Pitkin County
Security Level: Email,Account Authentication
(None)
Carbon Copy Events Status Timestamp
Electronic Record and Signature Disclosure:
Not Offered via DocuSign
Accounts Payable COPIED Sent: 12/9/2021 10:35:58 AM
AP@pitkincounty.com Viewed: 12/9/2021 12:47:19 PM
Accounts Payable
Pitkin County
Security Level: Email,Account Authentication
(None)
Electronic Record and Signature Disclosure:
Not Offered via DocuSign
Witness Events Signature Timestamp
Notary Events Signature Timestamp
Envelope Summary Events Status Timestamps
Envelope Sent Hashed/Encrypted 11/30/2021 11:21:12 AM
Certified Delivered Security Checked 12/9/2021 10:35:15 AM
Signing Complete Security Checked 12/9/2021 10:35:56 AM
Completed Security Checked 12/9/2021 10:35:58 AM
Payment Events Status Timestamps
Electronic Record and Signature Disclosure
Electronic Record and Signature Disclosure created on:3/20/2020 3:28:13 PM
Parties agreed to:Paul Holsinger,Chris Howard
ELECTRONIC RECORD AND SIGNATURE DISCLOSURE
From time to time, Pitkin County(we, us or Pitkin County)may be required by law to provide
you with certain written notices or disclosures. Described below are the terms and conditions for
providing to you such notices and disclosures electronically when we send you documents for
electronic signature.
Acknowledging your Access, Intent, and Consent to Receive and Sign Materials
Electronically
To confirm that you can access this information electronically, which will be similar to other
electronic notices and disclosures that we will provide to you,please verify that you were able to
read this electronic disclosure and that you also were able to print on paper or electronically save
this page for your future reference and access or that you were able to e-mail this disclosure and
consent to an address where you will be able to print on paper or save it for your future reference
and access. Further, if you consent to receive notices and disclosures exclusively in electronic
format on the terms and conditions described above,please let us know by clicking the 'I agree'
button below.
By checking the 'I Agree' box, I confirm that:
• I am establishing my intent to be bound to the transaction, and indicating that I am fully
aware of the purpose for which the signature is being provided.
• I can access and read this Electronic CONSENT TO ELECTRONIC RECEIPT OF
ELECTRONIC RECORD AND SIGNATURE DISCLOSURES document; and
• I can print on paper the disclosure or save or send the disclosure to a place where I can
print it, for future reference and access; and
• Until or unless I notify Pitkin County as described above, I consent to receive from
exclusively through electronic means all notices, disclosures, authorizations,
acknowledgments, and other documents that are required to be provided or made
available to me by Pitkin County during the course of my relationship with you.
Signing Documents without a Pitkin County DocuSign Account:
Pitkin County may not require all document signers to be authorized users of the Pitkin County
DocuSign Account. Please read the information below carefully and thoroughly, and if you can
access this information electronically to your satisfaction and agree to these terms and
conditions, please confirm your agreement by clicking the 'I agree'button at the bottom of this
document. When you don't have a DocuSign account, you will be provided the opportunity to
agree to the Legal Disclosure each time you open an "envelope" for signing, at this time, you can
download and retain this disclosure. Pitkin County will forward completed documents that
you've reviewed, processed or signed via email. Should you require copies of these signed
documents (e.g., if they get deleted from your email account) you should request those
documents from Pitkin County under the Colorado Open Records Act by contacting the Pitkin
County custodian who sent you the document for signature.
Signing Documents with a Pitkin County DocuSign Account:
Please read the information below carefully and thoroughly, and if you can access this
information electronically to your satisfaction and agree to these terms and conditions,please
confirm your agreement by clicking the 'I agree'button at the bottom of this document.
Getting paper or electronic copies
At any time, you may request from us a paper or electronic copy of any record provided or made
available electronically to you by us. For such copies, as long as you are an authorized user of
the DocuSign system you will have the ability to download and print any documents we send to
you through your DocuSign user account for a limited period of time (usually 30 days) after such
documents are first sent to you. After such time, if you wish for us to send you paper or
electronic copies of any such documents from our office to you, you may be charged a per-page
fee. You may request delivery of such paper or electronic copies from us by following the
procedure described below.
Withdrawing your consent
If you are an authorized DocuSign Account holder, you can decide to receive notices and
disclosures from us electronically, you may at any time change your mind and tell us that
thereafter you want to receive required notices and disclosures only in paper format. Described
below is the process for informing us of your decision to receive future notices and disclosure in
paper format and also how to withdraw your consent to receive notices and disclosures
electronically.
Consequences of changing your mind
If you elect to receive required notices and disclosures only in paper format, it will slow the
speed at which we can complete certain steps in transactions with you and delivering services to
you because we will need first to send the required notices or disclosures to you in paper format,
and then wait until we receive back from you your acknowledgment of your receipt of such
paper notices or disclosures. To indicate to us that you are changing your mind, you must
withdraw your consent using the DocuSign'Withdraw Consent' form on the signing page of your
DocuSign account. This will indicate to us that you have withdrawn your consent to receive
required notices and disclosures electronically from us and you will no longer be able to use your
DocuSign user account to receive required notices and consents electronically from us or to sign
electronically documents from us.
All notices and disclosures will be sent to you electronically
Unless you tell us otherwise in accordance with the procedures described herein, we will provide
electronically to you through your DocuSign user account all required notices, disclosures,
authorizations, acknowledgments, and other documents that are required to be provided or made
available to you during the course of our relationship with you. To reduce the chance of you
inadvertently not receiving any notice or disclosure, we prefer to provide all of the required
notices and disclosures to you by the same method and to the same address that you have given
us. Thus, you can receive all the disclosures and notices electronically or in paper format through
the paper mail delivery system. If you do not agree with this process,please let us know as
described below. Please also see the paragraph immediately above that describes the
consequences of your electing not to receive delivery of the notices and disclosures
electronically from us.
How to contact Pitkin County:
You may contact us to let us know of your changes as to how we may contact you electronically,
to request paper copies of certain information from us, and to withdraw your prior consent to
receive notices and disclosures electronically as follows:
To contact us by email send messages to Helpdesk@provelocity.com
To advise Pitkin County of your new e-mail address
To let us know of a change in your e-mail address where we should send notices and disclosures
electronically to you, you must send an email message to us at Helpdesk@provelocity.com and
in the body of such request you must state: your previous e-mail address, your new e-mail
address .
In addition, you must notify DocuSign, Inc to arrange for your new email address to be reflected
in your DocuSign account by following the process for changing e-mail in DocuSign.
To request paper or electronic copies from Pitkin County
To request delivery from us of paper or electronic copies of the notices and disclosures
previously provided by us to you electronically, you should request those documents from Pitkin
County under the Colorado Open Records Act by contacting the Pitkin County custodian who
sent you the document for signature.
To withdraw your consent with Pitkin County
To inform us that you no longer want to receive future notices and disclosures in electronic
format you may:
i. decline to sign a document from within your DocuSign account, and on the subsequent
page, select the check-box indicating you wish to withdraw your consent, or you may;
ii. send us an e-mail to Helpdesk@provelocity.com and in the body of such a request, you
must state your e-mail, full name, Postal Address, telephone number, and account
number.