HomeMy WebLinkAboutbocc.con.amended.227.19 KContract #: xxx.2018
Budget Line Item #: xxx.xx.00000.xxxxx
�jTKIN
v
COUNT
-- ("0C-N53
CHANGE ORDER / CONTRACT AMENDMENT
Change Order Number: 227.19 K
OWNER:
Pitkin County, Colorado
530 E. Main St., Suite #302
Aspen, CO 81611
CONTRACTOR:
FCI Constructors, Inc
PO Box 1767
Grand Junction, CO 81502
Rev. 2018.06.13 bif
The Provision of Pitkin County Courthouse Renovation Phase II - Construction (the "Contract")
dated July 3, 2019 between the Board of County Commissioners of Pitkin County, Colorado (the
"County") and FCI Constructors, Inc (the "Contractor"), is hereby amended as follows:
Description of Change:
1. BVR 020 — Fund custom color options for the District Courtroom lift $
2. BVR 021 —Drywall repairs in rooms 204B & 206 as a result of roof leaks $
3. BVR 022 — Changing color of floor stain on main floor and Civil changes
per RFI 123
TOTAL THIS CHANGE ORDER $
(0.00)
(0.00)
(0.00)
0.00
*Increases over $25,000 and/or 10% (single increase or accumulative) of original contract must
have County Manager signature. 1
Contract #: xxx.2018 Rev. 2018.06.13 btf
Budget Line Item #: xxx.xx.00000.xxxxx
Reason for Change:
1. BVR 020 — Funding for custom color options on the lift in the District Courtroom. The
total amount taken from contingency is $2,260.00.
2. BVR 021 -Funding for drywall repairs that had to be made in rooms 204B and 206 as a
result of roof leaks during the re -roofing process. The total amount taken from
contingency is $7,839.00.
3. BVR 022 — Funding for changing the stain color on the exposed wood floor on the main
level and also funding civil changes made per RFI 123. The total taken from contingency
is $26,781.00.
Original Contract Amount
$ 4,386,872.00
Previous Change Order/Amendment Amount
$ 2,066,262.00
This Change Order/Amendment Amount
$ 0.00
New Contract Total
$ 6,453,134.00
*Increases over $25,000 and/or 10% (single increase or accumulative) of original contract must
have County Manager signature. 2
Contract #: xxx.2018 Rev. 2018.06.13 btf
Budget Line Item #: xxx.xx.00000.xxxxx
In all other respects, the Contract is in full force and effect and remains unchanged by this
Amendment.
FCI CONSTRUCTORS, INC
Digitally signed by Brian Young
DN: C=US, E=byoung@fciol.com,
Brian Young O="FCI Constructors, Inc.", OU="FCI
Constructors, Inc.", CN=Brian Young
Date: 2022.12.21 06:22:42-07'00'
Date
PITICN COUNTY, COLORADO
RECOMMENDED FOR APPROVAL:
Oigit&ty signed by Jodi L Smith
ON: C=US, E=Jodi.smith@pitkincounty.com, O=Pithin
Jodi L S m i t h CountyRepresentatiGov, veOU, CN�l=Faciodi litiesL Direetor/OvmersSmith
Reason: I attest to the accuracy and integrity of this
document
Date. 2022.12.21 09:05:08-0T00'
MANAGER APPROVAL:
Date
Date
*Increases over $25,000 and/or 10% (single increase or accumulative) of original contract must
have County Manager signature. 3
.IFC
Constructors, Ina
BVR-020
Detailed, Grouped by Each Number (w/ PM, Arch, and Owner
Approval)
Project # 10-19-023 FCI Constructors, Inc.
506 E. Main Street, Aspen, CO 81611 Tel: 970-434-9093 Fax 970-434-7583
Pitkin County Courthouse Remodel
[C tesorY
s�='-
Reference
Morning Star Elevator Change Order #3 dated
7/27/22
Pedo Number
This BVR is being issued o fund costs associated with changes to the lift in District Court during the shop drawing process. These changes included
custom match color to closer match the "gray" trim and changing the lower level ramp to a auto folding style to clear the doorway opening.
The total amount of $2,260 is to funded from contingency for costs noted in this BVR.
Pending Approval
Itemized Details:
rdsneral bescription
Quote Reed Proposed
$2,260.00
Moming Star Elevator
Description of Work: Platform Lift - MORNING STAR
All labor and material required to install auto folding ramp at level one and powder coating of the lift RAL #7030 custom color.
FCI Constructors, Inc.
Description of Work:
Unforeseen Conditions Contingency
($2,260.00)
The amount of $2,260 to be deducted from this contingency to fund costs associated with changes to the lift for district court.
Requested Days: 0
Total Change: ($2,260.00)
DIglI&Fy signed by Brian Young
DN: C=US, E=byoung@fciol.com,
FCI PM Approval: R I'1 A rl Vnl I r1 Cl C="PCI Constructors, Inc.", Owner Approval: °�,�, ,,r• E ®
b�.F M. Jodi Cc
L Smith
`� CN=Brian Young madman
Date: Date. 2022.08.26 09:52:49-06'00' Date: , 1:,:m,z,fowav
Architect Approval:
w Lsig.EyJM, L SM.
W:•.. E-J ..In@ptlErtmu,rymm 0=viuin
Jodi L Smith aft
Date: 6M7L12201215.12.90
This proposal includes work clearly itemized herein and attached sub -contractor quotes
Should delivery of materials effected by this change delay the work, time extension and General Conditions cost rights are reserved
The right to cumulative impact costs is reserved
This proposal is good for seven days from date of issuance
Prolog Manager Printed on: 8/5/2022 Current Projects Page 1
MORNING STRR ELEVATOR
CONTRACT CHANGE ORDER
11641 Ridgeline Dr, Unit 100
Colorado Springs, CO 80921
ISSUED TO:
FCI Constructors, Inc.
DATE:
'7/27/2027
ATTENTION:
Brian Young
JOB NAME:
Pitkin Counq Court
Email
byounqafciol.com
JOB #
Email
mmciain@fciol.com
Change #
3
11101
ITEM #
DESCRIPTION OF WORK
NET AMT
1
2
3
4
Change the lift color from standard to RAL 7030 Custom
Change the ramp at level one from stationary to auto folding
Change the lower level gate from RH to LH
Labor for auto fold ramp
$ 1,595.00
$ 170.00
N/C
$ 495.00
TOTAL APPROVED THIS CHANGE ORDER
$ 2,260.00
TIME EXTENSION APPROVED THIS CHANGE
NA
ORIGINAL CONTRACT AMOUNT
PRIOR CHANGE ORDERS
TOTAL APPROVED THIS CHANGE ORDER
TOTAL ADJUSTED CONTRACT AMOUNT
DOWNPAYMENT RECEIVED
AMOUNT OWED ON CONTRACT
APPROVED BY:
Richard Maikow
Morning Star Elevator
APPROVED BY:
Date
$ 22,378.00
$ 25,906.00
$ 2,260.00
$ 50,544.00
$ 36,090.31
$ 14,453.69
Brian Young Date
FCI Constructors, Inc. cr,r
Page 1 of 1
FCI
Constructors, Inc.
BVR-021
Detailed, Grouped by Each Number
i
Pitkin County Courthouse Remodel Project # 10-19-023
506 E. Main Street, Aspen, CO 81611
Tel: 970-434-9093 Fax: 970-434-7583
FCI Constructors, Inc.
5110r2t122
Chat wry%
Budget Variance Report
Notes
Reference
SDI PCO #12 dated 8/17/22
PCCO !Number
This BVR is being issued to fund costs associated with drywall demo and patching due to roof leaks from existing drains and unsealed seam at the
valley at the spire. These leaks were discovered by FCI and repaired by the roofer. Locations were water tested after the repairs to confirm the leaks
were all addressed. Drywall damage was contained to the ceilings of rooms 204B and 206. The total amount of $7,839 is to be funded from
Contractors Contingency.
Included in this cost
-Labor
-Material
Itemized Details:
enera�escnption
Quote Rec d Proposed
Superior Drywall, Inc.
Description of Work: Metal Studs/Drywall - RESCOM
$7,839.00
All labor and material required to make drywall repairs due to roof leaks per T&M tickets dated 8/8 - 8/11/22.
FCI Constructors, Inc. ($7,839.00)
Description of Work: Contractors Contingency
The total amount of $7,839 is to deducted from Contractors Contingency to fund costs associated with drywall repairs due to roof
leaks.
This proposal includes work clearly itemized herein and attached sub -contractor quotes
Should delivery of materials effected by this change delay the work, time extension and General Conditions cost rights are reserved
The right to cumulative impact costs is reserved
This proposal is good for seven days from date of issuance
Prolog Manager
Printed on: 12/19/2022
Current Projects Page 1
• F C I BVR-021
Constructors, Inc. Detailed, Grouped by Each Number
Eby signed by Brian Young
DN: C=US, E=byoung@rciol.com,
FCI PM Approval: -Fair [ ^ O CI Constructors Inc'
1 1 G� 1 T Q Vn� 9U- FCl Constructors, Inc.',
CN=B fan Young
Date: Date: 2022.12.19 15:41:09.07'00'
Architect Approval:
Date:
„w!et byJ L&dt
Jodi L Smith
=SM.maAmummy and
Owner Approval:
Date:
Requested Days: 0
Total Change to Contingency: $0.00
vgary by lea LSM5
arc C•tta mgv..aymn parr.
0.1,1k, CourryGOV.Gw, ou aaaiea
Jodi L Smith '"`-°`
�w.o- an.agarW Nt.,nvd
151724-0N0
This proposal includes work dearly itemized herein and attached sub -contractor quotes
Should delivery of materials effected by this change delay the work, time extension and General Conditions cost rights are reserved
The right to cumulative impact costs is reserved
This proposal is good for seven days from date of issuance
Prolog Manager Printed on: 12/19/2022 Current Projects Page 1 -
rye
I,
■
I
Superior Drywall, Inc.
To: FCI CONSTRUCTORS, INC
P.O. BOX 1767
GRAND JUNCTION, CO 81502
Phone: (970) 434-9093 Fax: (970) 434-7583
Contact: Brian Young
Description: Repairs at water damaged surfaces per attached WA's
Page 1 of 1
REQUEST FOR CHANGE ORDER
Ref.# PCO-00012
GC # REPAIRS AT WATER C
Date Aug 17, 2022
Job # 320145
Project: Pitkin County Courthouse - Phase 3
535 E. Main Street
Aspen, CO 81611
Labor
WA 8649
WA 6991
WA 6995
WA 6996
WA 6996
Material
FIBERGLASS MESH TAPE 3" X 150'
PAPER JOINT TAPE
All Purpose Joint Compound, Ready -Mixed, 4.5 gal Pail
AMERICAN GYSPUM 5/8" TYPE X
CORNER BEAD 1-1/4"
# of Men Qty Hrs Total Hrs Rate Total
Size
500'
BOX
4X8
10'
3 10.00 Hrs 30.00 60.00
3 10.00 Hrs 30.00 60.00
3 9.00 Hrs 27.00 60.00
3 9.00 Hrs 27.00 60.00
1 2.00 Hrs 2.00 60.00
$1,800.00
$1,800.00
$1,620.00
$1,620.00
$120.00
Total Labor
Quantity UOM Unit Price
$6,960.00
Total
1.00 ROLL
1.00 ROLL
2.00 EA
5.00 SHT
5.00 PCS
8.19 EA
.0176 FT
17.55 EA
.5499 SQFT
.5265 LF
Total Material
AUTHORIZED BY:
ON BEHALF OF: FCI CONSTRUCTORS, INC
PROJECT MANAGER: RICHARD D. GEISHART
ESTIMATOR: RICHARD D. GEISHART
Labor Total:
Material Total:
Sub Trade Total:
Cleanup Total:
Equipment Total:
Misc. Total:
$8.19
$8.80
$35.10
$87.98
$26.33
$166.40
$6,960.00
$166.40
$0.00
$0.00
$0.00
$0.00
Sub Total:
Mark Up:
$7,126.40
$712.60
10.00%
Total: $7,839.00
P.O. Box 881 , Eagle, Colorado, 81631
Run on: August 17, 2022 11:43 AM
T:970-328-7125 Fax: 970-328-7124 http://sdi-builds.com
Bill to:
J
WORK AUTHORIZATION
SUPERIOR DRYWALL, INC.
PO Box 881
1286 Chambers Ave., Ste. 200
Eagle, CO 81631
970-328.7125
f6j--
0214. P hyzZ
Work A dr., !an M
N°
8649
Sol Job /
Pryo�et 11 qms
// r
J //
Form completed by
Authorized by: AA: kc..
Phone S:
Description of work:
_p4•IGL-'•ti bac.1xci-+0' I�i-'s
Name
IYOsir
ilsRlxek,e
IkAZ.1
LABOR
Trade
MATERIAL
cea .-5 I yr..t(
r
Hours Worked
MP I O'
air I 0
1r I21
Rate
TOTAL LABOR
Amount
ZO
QTY Description
I eL. lsimf A3 fir
Price
Amount
r R'L ani-
& +5.,r.s a F 33
7'7 c
S Im [.• r`..r.,i''c a 7'►-+
5-7
f *I —of
4
TOTAL MATERIAL
I
QTY
Description
EQUIPMENT
APPROVAL SIGNATURE:
i•
Price
TOTAL EQUIPMENT
TOTAL AMOUNT
THIS SHEET
Amount
NOTE: This revision becomes pan ot. and in conformance with, the existing contract.
wain , - Green &ling Copy Yellow Customar Copy Plink Ofl ce Track:no Copy Goldenrod Joh Foreman •. i,nn.
1t
rut' g
r,
.91
0
i
ii
Bill to:
WORK AUTHORIZATION
SUPERIOR DRYWALL, INC.
PO Box881
1286 Chambers Ave.
Suite 290
Eagtr, CO 81631
970-328.7.7125
f
work
..nna
N°
6991 _
Six Job e
P N)•2
t
Authorized by: Ili r -e—
Phone 8:
Description of work: .yy er
fr We*�fr'e rr ![ S �.P ��� e7 L.J t I 1
LABOR
A!,-..,..-fe
Name
Trade
Hours Worked
,..A5E-i
Rate
Amount
,,c:, -c
1
/
TOTAL LABOR
37
I
aTY
QTY
Description
Description
MATERIAL
EQUIPMENT
Price
TOTAL MATERIAL
Price
TOTAL EQUIPMENT
TOTAL AMOUNT
THIS SHEET
NOTE: This revision becomes part of. ana n conformance, with the existing contract
Yeas ow+ a*.„,„ away tapy rrue. Poe *Xs ri*ctrptop, Gold/mad JOD rwm"4•.-1 Cps
Amount
Amount
1
Bill to.
WAUV AlITU rlDI7ATinwl
WORK AUTHORIZATION
SUPERIOR DRYWALL, INC.
PO Box 881
1288 Chambers Ave.
Suite 200
Eagle, CO 81631
970.328-7125
Date /l 2 Z
_
WorkA w�u na Na6995
�■
SOi Jobe
PtoIect; J) r� Cr'. r1/y!
C 0 w
� i
Form completed by __.--.
Authorized by:
Phone #:
Description of work:
/*h. £•ram welrc,1
T*
LABOR
Name
Roay
Trade
Hours Worked
'T
Rate
Amount
kt.a., s i, i
Q
TOTAL LABOR
Z 7 I
OTY
CITY
Description
Description
APPROVAL SIGNATURE:
P
MATERIAL
EQUIPMENT
Price
TOTAL MATERIAL
Price
TOTAL EQUIPMENT
TOTAL AMOUNT
THIS SHEET
Amount
Amount
NOTE: Thla revision becomes part of, end in conformance with, the existing contract
rein rfl.^x Grow' El409 Caro, Yellow Custom, Crap, Pea CeRce Twine copy Golomme. Job Commove Cop}
_r.
Bill to:
WORK AUTHORIZATION
SUPERIOR DRYWALL, INC.
PO Box 881
1286 Chambers Ave.
Suite 200
Eagle, CO 81631
9T0428-7125
Date 1/ 11/ a �
Work Mthonakon #
N2 6996
SDtJob# 0:4KA [yuetty Leaf/.hatr5
Project Name
4111111.5
Form completed by Re 5 -W, Call i I In
Authorized by: I.
Phone #:
Description of work:
4'ra+,44 and- hafiColtsesnt `, f44464. f r vu sh G�lu►eti
LABOR
r Name
Trade
Hours Worked
Rate
Amount
Rep.,/
q
r+alr.
q
Ilenn►e i
q
ilk t ; n
a
TOTAL LABOR
psi i
F
QTY
QTY
Description
Description
APPRtjVAL *NATURE:
fcr
MATERIAL
EQUIPMENT
Price
TOTAL MATERIAL
Price
TOTAL EQUIPMENT
TOTAL AMOUNT
THIS SHEET
Amount
Amount
NOTE: This revision becomes part of, and In conformance with, the existing contract.
Whhe f?"V•nal limn BifinQ Copy Yellow Customer cep, Pink. Brice Srecrmp Copy Goldenrod iol For.rna,n 1 Caoy
l
.FCI
Constructors, Inc.
BVR-022
Detailed, Grouped by Each Number (w/ PM, Arch, and Owner
Approval)
Pitkin County Courthouse Remodel
506 E. Main Street, Aspen, CO 81611
Project # 10-19-023
Tel: 970-434-9093 Fax: 970-434-7583
FCI Constructors, Inc.
eatein6l
Reference
PCCO Number
Notes
Fund Benchmark for changing floor stain color on main floor
Fund Stutsman - Gerbaz for changes per RFI 123 and added 4" conduits
Itemized Details:
genera escnprtlon
Quote Reed Propose)
Benchmark Wood Floors, Inc
Description of Work: Wood Flooring - BENCHMARK
Funding for Benchmark to change the color of stain on the exposed wood flooring on 1st floor.
$4,686.00
Stutsman-Gerbaz, Inc.
Description of Work: Sitework - STUTSMAN-GERBAZ
Funding for Stutsman-Gerbaz added work per RFI 123 and added 4" sleeves under sidewalks
$22,095.00
FCI Constructors, Inc.
Description of Work: Contractors Contingency
($10,837.00)
FCI Constructors, Inc.
Description of Work: Unforeseen Conditions Contingency
($15,944.00)
D42atly signed by Bdan Young
FCI PM Approval: DN: C=US, E=byD="FCI Constructors, Inc.",�fdol.com,
I
00" 'rcreo -stn,. ors, Inc.',
Date: CN=Brian Young
Date 2022.12.1916'00:51-QT00'
Architect Approval:
Date:
Jodi L Ctnith
Owner Approval:
Date:
Requested Days: 0
Total Change: $0.00
Jodi L Smith
DS un rp,w by Jbti L 4mb,
OsC C E.JORrnrtn5V5 ,ty.mn
D- C SyOw,o".yOf
51.11.
Rumor mn".a"<y.nb Mr
a .
wa :anixxo 1218,17arar
This proposal includes work dearly itemized herein and attached sub -contractor quotes
Should delivery of materials effected by this change delay the work, time extension and General Conditions cost rights are reserved
The right to cumulative impact costs is reserved
This proposal is good for seven days from date of issuance
Prolog Manager Printed on: 12/19/2022 Current Projects Page 1
ea N. BENCHMARK WOOD FLOORS, INC.
"Our Benchmark is Craftsmanship"
September 6, 2022
FCI Constructors Inc.
P.O. Box 1767
Grand Junction, Co 81502
Regarding: Pitkin County Courthouse Phase III
Wood Floor- Hall 100
Dear Brian,
We did receive your request to change scope of work on the border at Pitkin County Courthouse;
hall 100. To add stain color to Waterbased Urethane finish and apply to 154 sq. ft. of border. This
process will avoid having to sand wood floor to bare wood. The cost will total $4,686.00. This
includes travel, time, and materials. Please add this amount to contract and issue change order #3
if you want us to proceed with the work. Please call if you have any questions. Thank You
Sincerely,
E. Cortez
Benchmark Wood Floors Inc.
PO Box 51898. Albuquerque, NM 87181 Phone: 505.292.3238 • Fax: 505.332.7481
DESIGN CENTER 5620 Venice NE • Suite A • Albuquerque, NM 87113
STUTSMAN-GERBAZ INC.
30376 Highway 82
Snowmass, Colorado 81654
970-923-2734
RFI # 123 Curb wall and Area Inlet.
9/9/2022
FCI Pitkin County Courthouse
Aspen, CO
Excavate, prep & backfill curb wall.
Mobilize 1 Is @ $ 460.00 each. $ 460.00
308 6 hrs @ $ 165.00 p/hr $ 990.00 Excavate.
Truck 10.5 hrs @ $ 115.00 p/hr $ 1,207.50 Haul off fill
Fill dump fees 84 tons @ $ 6.90 p/ton $ 579.60
Labor 15 hrs @ $ 70.00 p/hr $ 1,050.00 Excavate.
308 3 hrs @ $ 165.00 p/hr $ 495.00 Place under wall road base.
Skid loader 2 hrs @ $ 125.00 p/hr $ 250.00 Place under wall road base.
Labor 7.5 hrs @ $ 70.00 p/hr $ 525.00 Place under wall road base.
Plate compactor 0.5 days @ $ 150.00 p/hr $ 75.00 Place under wall road base.
Truck 1 hrs @ $ 115.00 p/hr $ 115.00 Deliver 3/4" road base
3/4" road base 15 tons @ $ 20.74 piton $ 311.10
Moisture condition 1 load @ $ 65.00 each. $ 65.00 3/4" road base
308 5 hrs @ $ 165.00 p/hr $ 825.00 Backfill
Shaker plate 3 hrs @ $ 115.00 p/hr $ 345.00 Backfill
Skid loader 5 hrs @ $ 125.00 pair $ 625.00 Backfill
Labor 13 hrs @ $ 70.00 p/hr $ 910.00 Backfill
JJ compactor 1 days @ $ 150.00 p/hr $ 150.00 Backfill
Truck 5 hrs @ $ 115.00 p/hr $ 575.00 Deliver 3/4" road base
3/4" road base 69 tons @ $ 20.74 p/ton $ 1,431.06
Moisture condition 5 load @ $ 65.00 each. $ 325.00 3/4" road base
Supervise/Layout 4 hrs @ $ 130.00 p/hr $ 520.00
Total $ 11,829.26
Install 12" square area drain.
303 8 hrs @ $ 135.00 p/hr $ 1,080.00 Ex, backfill & grade around drain.
Skid loader 2 hrs @ $ 125.00 p/hr $ 250.00 Ex, backfill & grade around drain.
Labor 18.5 hrs @ $ 70.00 p/hr $ 1,295.00 Ex, install drain/fittings backfill & grade around drain.
Demo saw 0.5 days @ $ 200.00 p/hr $ 100.00
JJ compactor 0.5 days @ $ 150.00 p/hr $ 75.00
Truck 1.5 hrs @ $ 115.00 p/hr $ 172.50 Haul off fill
Fill dump fees 8 tons @ $ 6.90 p/ton $ 55.20
Truck 1 hrs @ $ 115.00 p/hr $ 115.00 Deliver 3/4" road base
3/4" road base 9 tons @ $ 20.74 piton $ 186.66
Moisture condition 0.75 load @ $ 65.00 each. $ 48.75 3/4" road base
Survey & Record 1 hrs @ $ 130.00 p/hr $ 130.00 drain and connection.
Supervision 1.5 hrs @ $ 130.00 p/hr $ 195.00 Ken
6" SDR 35 8 If @ $ 5.99 per/If. $ 47.92
6" 90 1 unit @ $ 59.97 each. $ 59.97
6" 45 2 units @ $ 52.57 each. $ 105.14
6" 22 2 units @ $ 50.96 each. $ 101.92
6" TEE 1 units @ $ 81.79 each. $ 81.79
6" couplers 2 units @ $ 56.45 each. $ 112.90
12" Inline Basin 1 unit @ $ 525.00 each. $ 525.00 With square hinged traffic rated grate
Total $ 4,737.75
Grand Total $ 16,567.01
Notes: ROCK CLAUSE, FROST CLAUSE, DEWATERING CLAUSE
Utility or spriniker line re -location is not included.
STUTSMAN-GERBAZ INC.
30376 Highway 82
Snowmass, Colorado 81654
970-923-2734
Invoice # 8232022
8/23/2022
FCI Pitkin County Courthouse
Aspen, CO
Install four 4" sleeves.
8/6/2022 302 1 hrs @ $ 125.00 per hour. $ 125.00 Install 4 4" sleeves
Labor 4 hrs @ $ 70.00 per hour. $ 280.00 Install 4 4" sleeves
4" SDR 26 pipe 56 If @ $ 5.89 per If. $ 329.84
Total $ 734.84
Electric trench under stairs to electric gate..
6/23/2022 301 3 hrs @ $ 115.00 per hour. $ 345.00 Excavate 22" X 12"
Labor 6 hrs @ $ 70.00 per hour. $ 420.00 Help ex & look out for utilities
6/29/2022 301 4.5 hrs @ $ 115.00 per hour. $ 517.50 ex for sonatubes in electric trench
Labor 8 hrs @ $ 70.00 per hour. $ 560.00 ex for sonatubes in electric trench
Supervision 1 hrs @ $ 130.00 per hour. $ 130.00
Truck 1 hrs $ 115.00 p/hr $ 115.00
Process 3/4" road base 1 Id @ $ 65.00 per load. $ 65.00
3/4" road base 17.5 tons @ $ 15.95 p/ton $ 279.13
Tax $ 19.26
Side dump 0.8 hrs $ 130.00 p/hr $ 104.00 rb to shop
7/23/2022 300 5 hrs @ $ 110.00 per hour. $ 550.00 Backfill elec trench, sonotubes-
Vermeer 5 hrs @ $ 120.00 per hour. $ 600.00 and re -grade landscape area.
Labor 15 hrs @ $ 70.00 per hour. $ 1,050.00
JJ compactor 0.25 days @ $ 150.00 per day. $ 37.50
Total $ 4,792.38
Grand Total $ 5,527.22