EMERGENCY RESOLUTION OF THE BOARD OF COUNTY COMMISSIONERS (“BOCC”) OF PITKIN COUNTY, COLORADO, APPROVING A
GRANT AGREEMENT WITH THE CENTRAL FEDERAL LANDS FEDERAL HIGHWAY DIVISION UNDER THE FEDERAL LANDS ACCESS PROGRAM, FOR FUNDING FOR THE BRUSH CREEK PARK & RIDE IMPROVEMENTS
RESOLUTION NO. 004-2023
RECITALS
WHEREAS, Pursuant to Section 2.8.3 (Actions) of the Pitkin County Home Rule Charter (“HRC”) official action by formal resolution shall be required for all actions of the Board of County Commissioners (“BOCC”) not requiring ordinance power on matters of significant
importance affecting citizens, and;
WHEREAS, Pursuant to Section 2.8.5 of the HRC the Board is authorized to approve emergency resolutions, which shall become effective immediately upon adoption, and;
WHEREAS, the Elected Officials Transportation Committee (EOTC) was formed in 1993 by Pitkin County, the City of Aspen and the Town of Snowmass Village to work collectively to reduce and/or manage the volume of vehicles on the road system and develop a comprehensive, long-range strategy that will insure a convenient and efficient transportation system for the Roaring Fork Valley, and;
WHEREAS, in 2016 the EOTC approved acceptance of a Federal Lands Access Program grant to improve the Brush Creek Park and Ride by expanding parking capacity and implementing operational efficiencies, to encourage more motorists traveling to Aspen and Snowmass Village to park their vehicles and utilize transit or car pools to complete their
upvalley journeys, and;
WHEREAS, the EOTC on October 27, 2022 approved the 2023 work plan and budget including construction of the Park and Ride improvements requiring a local match in the amount of $3,766,672 and;
BOCC finds that approval of this resolution is necessary for the immediate preservation of the public health, safety and welfare of the citizens of Pitkin County and therefore declares this resolution to be effective immediately pursuant to the HRC Section 2.8.5.
NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of Pitkin County, Colorado that it hereby adopts an emergency resolution approving a grant agreement with the Central Federal Lands Highway Division under the Federal Lands Access Program for funding for the Brush Creek Park & Ride improvements, and
authorizes the Chair to sign the Resolution and upon the satisfaction of the County Attorney as to form, execute any other associated documents necessary to complete this matter.
Contract No. 116.2023
Attached
2
INTRODUCED, READ AND ADOPTED AS AN EMERGENCY RESOLUTION ON THE 25th DAY OF JANUARY 2023 AND SET FOR CONFIRMATORY PUBLIC
HEARING ON THE 8th DAY OF FEBRUARY, 2023.
NOTICE OF CONFIRMATORY PUBLIC HEARING AND TITLE AND SHORT SUMMARY OF THE EMERGENCY RESOLUTION PUBLISHED IN THE ASPEN DAILY NEWS ON THE 26TH DAY OF JANUARY 2023.
NOTICE OF CONFIRMATORY PUBLIC HEARING AND THE FULL TEXT OF THE EMERGENCY RESOLUTION POSTED ON THE OFFICIAL PITKIN COUNTY WEBSITE www.pitkincounty.com ON THE 26TH DAY OF JANUARY 2023.
CONFIRMED AT A PUBLIC HEARING ON THE 8TH DAY OF FEBRUARY 2023.
POSTED BY TITLE AND SHORT SUMMARY ON THE OFFICIAL PITKIN COUNTY WEBSITE www.pitkincounty.com ON THE 9TH DAY OF FEBRUARY 2023.
PUBLISHED BY TITLE AND SHORT SUMMARY, AFTER CONFIRMATORY PUBLIC HEARING, IN THE ASPEN DAILY NEWS ON THE 16TH DAY OF FEBRUARY, 2023.
ATTEST: BOARD OF COUNTY COMMISSIONERS
By _________________________ By: _____________________________
Julia Ely Francie Jacober, Chair Deputy County Clerk Date: ______________
APPROVED AS TO FORM: MANAGER APPROVAL
___________________________ _________________________________ John Ely, County Attorney Phylis Mattice for Jon Peacock, County Manager
Form Revised 01-01-2022
Jan-27-2023
Federal Highway Administration
Federal Lands Highway
AGREEMENT
DTFH68-16-E-00052
Modification #005
PARTIES TO THE AGREEMENT
Reimbursing Organization
Pitkin County
76 Service Center Road
Aspen, CO 81611
Organization to be Reimbursed
Federal Highway Administration
Central Federal Lands Highway Division
12300 West Dakota Ave
Lakewood, CO 80228
POINTS OF CONTACT FOR THE AGREEMENT
Reimbursing Organization
Finance Point of Contact
Name: Gabriel Galicia
Address: 123 Emma Road, Suite 106
Basalt, CO 81621
Phone: 970-920-5206
E-mail: Gabriel.galicia@pitkincounty.com
Organization to be Reimbursed
Finance Point of Contact
Name: Suzanne Schmidt
Address: 12300 West Dakota Ave
Lakewood, CO 80228
Phone: 720-963-3356
E-mail: suzanne.schmidt@dot.gov
Reimbursing Organization
Program Point of Contact
Name: Linda DuPriest
Address: 76 Service Center Road
Aspen, CO 81611
Phone: 970-920-5202
E-mail: linda.dupriest@pitkincounty.com
Organization to be Reimbursed
Program Point of Contact
Name: Tammy Eggers
Address: 12300 West Dakota Ave
Lakewood, CO 80228
Phone: 720-963-3687
E-mail: tammy.eggers@dot.gov
PERIOD OF PERFORMANCE LEGAL AUTHORITY
FROM: August 4, 2016
TO: December 31, 2025
23 U.S.C. 201 and 204
TOTAL AGREEMENT AMOUNT
Original Agreement Amount: $10,000.00
Modification #001: $0.00
Modification #002: $1,990,000.00
Modification #003: $2,572,140.00
Modification #004: -$1,034,012.00
Modification #005: -$27,225.00
Total Agreement Amount: $3,510,903.00
PAYMENT TERMS AND SCHEDULE
EFT
DESCRIPTION OF SUPPLIES, SERVICES, AND DELIVERABLES
This Modification #005 increases Pitkin County’s match amount. See attached Statement of Work.
AUTHORIZED APPROVALS
For Reimbursing Organization For Organization to be Reimbursed
Signature Date Signature Date
Contracting Officer
Feb-10-2023
Date: 2023.02.14
14:32:24 -07'00'
Contract No. 116.2023
Statement of Work
Project: CO FLAP PIT SH89(1) Brush Creek Parking
Reimbursable Agreement No.: DTFH6816E00052
MODIFICATION # 005
1
I. Introduction: Pitkin County will provide funding to the Federal Highway Administration,
Central Federal Lands Highway Division (CFLHD) to perform scoping activities for
the CO FLAP PIT 82(1) Brush Creek Parking project. Pitkin County will be referred
to as the Requesting Agency. CFLHD will be referred to as the Servicing Agency.
Modification # 002: Work will also include preliminary engineering, construction, and
construction engineering.
Modification # 003: Changes the overall budget, and contributions of FLAP and
Requesting Agency match.
Modification # 004: Changes the overall budget by increasing the contingency and
eliminates the CMAQ funding from the Reimbursable Agreement. The CMAQ funding
will be increased and contributed through a separate FTA.
Modification # 005: Changes the overall budget by decreasing total project cost to award
Schedule A only.
II. Location: Pitkin County, Colorado
III. Work Required: The work required will include the development of a scoping summary,
scoping report, and preliminary estimate for design, construction, and construction
engineering to verify the scope and cost for the proposed project.
Modification # 002: Develop contract (plans, specifications, and estimate) for the
advertisement and award of a construction project to complete this work and provide
contract administration and construction engineering services.
The full scope of the proposed project is to include preliminary engineering,
construction and construction engineering of Brush Creek Parking Lot expansion
project. The proposed improvements would include paving approximately 200 parking
stalls, installing lighting, accessible bathroom facilities. Additional potential
improvements may include a kiosk, and electric vehicle charging stations. The
allocation of funding for the non-traditional improvements as it relates to eligibility for
Federal Lands Access Program funding will be determine during scoping.
This Agreement does not obligate (commit to the expenditure of) Federal funds for
construction nor does it commit the parties to complete the project. This agreement
documents the intent of the parties and commits the Requesting Agency to provide its share
of eligible project costs. The Requesting Agency understands that any final decision as to
design and construction will be made by the Programming Decisions Committee (PDC)
after completion of the scoping effort and any environmental analysis required under the
National Environmental Policy Act (NEPA). Any decision to proceed with the design and
construction of the project will depend on the availability of appropriations and matching
funds at the time of obligation and other factors, such as issues raised during the NEPA
processes, a natural disaster that changes the need for the project, or a change in
Statement of Work
Project: CO FLAP PIT SH89(1) Brush Creek Parking
Reimbursable Agreement No.: DTFH6816E00052
MODIFICATION # 005
2
Congressional authorization.
Modification # 002: Refer to Project Memorandum of Agreement for more information
regarding roles and responsibilities.
IV. Non-Federal Share of Costs: The estimated project costs for scoping are as follows:
Modification # 005: Updated costs as follows:
Item Estimated Cost Comments
Preliminary Engineering (PE) and
Environmental Compliance $590,000
ROW Acquisition & Utility
Relocation $0
Any ROW costs are outside the scope
of this agreement. There are no utility
relocation costs assumed at the time
of this agreement. Costs for new
utilities are included in the CN
estimate.
Construction Contract (CN) $5,474,775 Construction of Schedule A only
Construction Engineering (CE $800,000
Contingency $618,000 Contingency
Total $7,482,775
PROJECT FUNDING
Funding Source Estimated
Funding Comments
Federal Lands Access Program $2,426,726 FLAP is fixed at $2,426,726
Pitkin County $3,510,903 Cash Match through Reimbursable
Agreement; DTFH68-16-E-00052
CMAQ $1,545,146 Transfer thru FMIS from CDOT. Fixed
Amount
Total $7,482,775
Pitkin County will provide cash funds to cover the remaining project costs above
CMAQ and FLAP contributions. If the project is less than the project total, Pitkin
County must meet the minimum match requirement. The costs include construction
contract completion, closeout, and resolution of any disputes, through separate
funding agreements.
Statement of Work
Project: CO FLAP PIT SH89(1) Brush Creek Parking
Reimbursable Agreement No.: DTFH6816E00052
MODIFICATION # 005
3
The Requesting Agency will provide non-federal local matching and CDOT will
provide the CMAQ funds in the amounts shown above in the funding table. If during
implementation of the project it is determined that amount shown above in the funding
table will be less than 17.21% of the total Federal Lands Access Program eligible
costs required to complete the work, CFLHD and Requesting Agency will either
mutually agree to reduce the scope of the project, or execute a modification to this
agreement to increase the local match amount to achieve a minimum 17.21% local
match amount.
The Requesting Agency is not required to reimburse CFLHD for any costs incurred
prior to the date of this Agreement.
V. Period of Performance: All work associated with this agreement will be completed no
later than December 31, 2017.
Modification # 001: All work associated with this agreement will be completed no later
than December 31, 2018.
Modification # 002: All work associated with this agreement will be completed no later
than December 31, 2025.
Modification # 003: Does not change the current period of performance of December
31, 2025.
VI. Technical Representative: Agreement Points of Contact for this Agreement are:
Tammy Eggers
Project Manager
Central Federal Lands Highway Division
Federal Highway Administration, U.S. Department of Transportation
12300 West Dakota Avenue
Lakewood, CO 80228
720-963-3687
tammy.eggers@dot.gov
Linda DuPriest
Regional Transportation Director
Pitkin County
76 Service Center Road
Aspen, CO 81611
970-920-5202
linda.dupriest@pitkincounty.com
VII. Roles and Responsibilities
Statement of Work
Project: CO FLAP PIT SH89(1) Brush Creek Parking
Reimbursable Agreement No.: DTFH6816E00052
MODIFICATION # 005
4
For scoping:
A. CFLHD will:
1) Conduct scoping field review;
2) Prepare a scoping documents necessary to verify scope and costs of
project;
3) Provide the PDC scoping documents for consideration of placement in
the final program of projects.; and
4) Manage the overall effort on this agreement regarding scope, schedule
and budget in coordination with the Requesting Agency.
B. Requesting Agency will:
1) Provide relevant documents regarding this project to CFLHD for use in
project development;
2) Participate in the field scoping activities;
3) Review all scoping documents prepared by CFLHD; and
4) Provide funding as referenced in this document.
Modification # 003: Refer to the Project Memorandum of Agreement for
additional Roles and Responsibilities.
VIII. Financial Administration: A. Total Agreement Amount:
Not to exceed $10,000.
Modification # 003. Not to exceed $4,572,140
Modification # 004. Not to exceed $3,538,128
Modification #005. Not to exceed $3,510,903
B. Funding Citations: 23 U.S.C. 201 and 204.
C. Reimbursable Payment:
CFLHD will invoice the Requesting Agency on a monthly basis.
Regardless of the estimate, the Requesting Agency will provide the required
match, as documented above in the Project Funding Table, of the total Federal
Lands Access Program eligible costs expended on the project through
construction contract completion, closeout, and resolution of any disputes, in an
amount not to exceed that provide in this Agreement.
CFLHD is limited to recovery of the matching share of actual costs incurred, as
reflected in the invoice provided by the CFLHD. CFLHD shall not incur costs
which result in matching funds exceeding the maximum cost stated in this
Agreement without authorization by the Requesting Agency in the form of
written modification to this agreement.
Upon receipt of the invoice of costs incurred and authorized, the Requesting
Statement of Work
Project: CO FLAP PIT SH89(1) Brush Creek Parking
Reimbursable Agreement No.: DTFH6816E00052
MODIFICATION # 005
5
Agency will issue payment via one of the methods listed below.
D. Method of Billing:
CFLHD will bill the Requesting Agency, in accordance with the payment terms
and schedule as agreed upon in the Agreement.
CFLHD requests that these payments be made through the US Treasury's
website https://pay.gov. Pay.gov can be used to make secure electronic
payments to any Federal Government Agencies via credit card or direct debit.
Payment shall be submitted referencing the FHWA/CFLHD-ID Agreement
Number: DTFH6816E00052
Option 1 (Preferred Method)
Plastic card or Automatic Clearing House Payment (ACH Direct Debit)
Go to Treasury’s website – https://pay.gov
Search for Agency Name (Transportation Department)
Select the appropriate Transportation Agency (Federal Highway
Administration)
Follow the form instructions to make your payment. Note, if making an ACH
payment from your bank account, please select ACH Direct Debit as the payment
type.
Option 2
Mail check payment to the following address for Paper Check Conversion
(PCC) processing:
Make Check Payable To:
DOT FHWA
Modification # 005:
Mailing Address:
DOT/FEDRAL HIGHWAY ADMINISTRATION
C/O MIKE MONRONEY AERONAUTICAL CENTER
65000 S. MacArthur Blvd.
ATTN: AMZ-324, HQS BLDG RM 265
Oklahoma City, OK 73169-6918
o Notice to customers making payment by check:
Please notify Regina Monroe at 720-963-3460 or
regina.monroe@dot.gov if mailing a check.
When you provide a check as payment you authorize us
either to use information from your check to make a one-
time electronic fund transfer from your account or to
process the payment as a check transaction.
Statement of Work
Project: CO FLAP PIT SH89(1) Brush Creek Parking
Reimbursable Agreement No.: DTFH6816E00052
MODIFICATION # 005
6
When we use information from your check to make an
electronic fund transfer, funds may be withdrawn from your
account as soon as the same day we receive your payment
and you will not receive your check back from your
financial institution.
Privacy Act- A Privacy Act Statement required by 5 U.S.C. § 552a(e)(3)
stating our authority for soliciting and collecting the information from your
check, and explaining the purposes and routine uses which will be made of
your check information, is available 1Torn our internet site at
(PCCOTC.GOV), or call toll free;: at (1-800-624-137 to obtain a copy by
mail. Furnishing the check information is voluntary, but a decision not to
do so may require you to make payment by some other method.
IX. Modifications: Any modifications to the Agreement must be made in writing and agreed
to by both parties. Such modifications are not binding unless they are in writing and
signed by personnel authorized to bind each of the agencies.
X. Termination: This agreement will terminate upon the date specified in Section V or upon
30 calendar days after written notification to the other party. If this agreement is
terminated by either party, the Requesting Agency’s liability shall extend only to pay
for its share of the actual and reasonable costs of the items/services rendered and the
costs of any non-cancelable obligations incurred in accordance with the terms of this
agreement prior to the effective date of termination. If this agreement is terminated by
CFLHD its liability shall extend only to the release of its work products and related
materials to the Requesting Agency by the effective date of termination.
FEDERAL LANDS ACCESS PROGRAM
PROJECT MEMORANDUM OF AGREEMENT
January 17, 2023
Modification 001
CO FLAP PIT SH89(1) Brush Creek Parking
Page | 1 of 10
Project / Facility Name: CO FLAP PIT 82(1)
Project Route: Brush Creek Parking
State: Colorado
County: Pitkin
Owner of Federal Lands to which the Project Provides Access: U.S. Forest Service – White River
National Forest
Entity with Title or Maintenance Responsibility for Facility: Pitkin County
Type of Work:
Preliminary Engineering: Environmental compliance, preliminary and final design, all necessary
permits
Right of Way: Acquire all necessary right of way and easements needed for the project
Construction/Construction Contracting: Acquisition of construction contractor to perform work in
accordance with the construction contract (plans, specifications, and estimate)
Construction Engineering: Administration of the construction contract
This Agreement does not obligate (commit to) the expenditure of Federal funds nor does it commit the
parties to complete the project. Rather, this Agreement sets forth the respective responsibilities as the
project proceeds through the project development process.
Parties to this Agreement: FHWA-Central Federal Lands Highway Division (CFLHD), and Pitkin
County
The Program Decision Committee approved this project on 2/16/2017
Date
AGREED:
Francie Jacober, Chair, Board of County Commissioners Date
Pitkin County
Judy Salomonson Date
Chief of Business Operations
FHWA-CFLHD
Feb-01-2023
JUDY SALOMONSON Digitally signed by JUDY
SALOMONSON
Date: 2023.02.10 17:35:50 -07'00'
FEDERAL LANDS ACCESS PROGRAM
PROJECT MEMORANDUM OF AGREEMENT
January 17, 2023
Modification 001
CO FLAP PIT SH89(1) Brush Creek Parking
Page | 2 of 10
A. PURPOSE OF THIS AGREEMENT
This Agreement documents the intent of the parties and sets forth the anticipated responsibilities of each
party in the development, construction, and future maintenance of the subject project. The purpose of the
Agreement is to identify and assign responsibilities for the environmental analysis, design, right-of-way,
utilities, acquisition and construction as appropriate for this programmed project, and to ensure maintenance
of the facility for public use if improvements are made. The parties understand that any final decision as to
design or construction will not be made until after the environmental analysis required under the National
Environmental Policy Act (NEPA) is completed (this does not prevent the parties from assigning proposed
design criteria to be studied in the NEPA process.) Any decision to proceed with the design and construction
of the project will depend on the availability of appropriations at the time of obligation and other factors,
such as issues raised during the NEPA process, a natural disaster that changes the need for the project, a
change in Congressional direction, or other relevant factors.
If Federal Lands Access Program funds are used for the development or construction of this project, Pitkin
County agrees to provide a matching share equal to a minimum of 17.21 percent of the total cost of the
project, as detailed more fully in Sections J and K below.
B. AUTHORITY
This Agreement is entered into between the signatory parties pursuant to the provisions of 23 U.S.C. 204.
C. JURISDICTION AND MAINTENANCE COMMITMENT
The Pitkin County has jurisdictional authority to operate and maintain the existing facility and will operate
and maintain the completed project at its expense.
D. FEDERAL LAND MANAGEMENT AGENCY COORDINATION
Pitkin County has coordinated the project development with the U.S. Forest Service – White River National
Forest. The U.S. Forest Service – White River National Forest support of the project is documented in the
Colorado Federal Lands Access Program Project Application for this project submitted by Pitkin County
to FHWA-Central Federal Lands Highway Division. Each party to this agreement who has a primary role
in NEPA, design, or construction shall coordinate their activities with the U.S. Forest Service – White River
National Forest.
FEDERAL LANDS ACCESS PROGRAM
PROJECT MEMORANDUM OF AGREEMENT
January 17, 2023
Modification 001
CO FLAP PIT SH89(1) Brush Creek Parking
Page | 3 of 10
E. PROJECT BACKGROUND/SCOPE
General Project Description.
The project is located at the intersection of Colorado State Highway 82 and Brush Creek Road in
Pitkin County, approximately 7 miles north of Aspen, Colorado. The project proposes to grade and
pave 200 additional parking spaces and add safety lighting, bathroom facilities, and an information
kiosk.
Highway Design and Safety.
The project is located adjacent to State Highway 82. As a transit center and parking lot it does not have
the same roadway design considerations or safety issues as a roadway. Improvements to the intersection
were made as part of the BRT project and the capacity exists for turning movements required to and from
SH 82. No additional roadwork will be completed. The terrain is flat and the alignment is sufficient so the
proposed parking lot will match the existing size, shape, and profile of the existing graveled area. The
facilities and kiosks will be built in previously disturbed areas with minimal site grading.
Pavement.
The existing overflow parking lot is currently a gravel surface and is maintained by Pitkin County. It
is assumed that the proposed project will place 4” of aggregate base and 4” asphalt surface to match
the structural section the existing paved parking lot. Additionally, the asphalt in the existing paved
parking area will be removed and replaced. The millings will be placed in the North Overflow
parking area.
FEDERAL LANDS ACCESS PROGRAM
PROJECT MEMORANDUM OF AGREEMENT
January 17, 2023
Modification 001
CO FLAP PIT SH89(1) Brush Creek Parking
Page | 4 of 10
ROW.
The project is on land currently owned by the Colorado Department of Transportation and maintained
by Pitkin County. It is anticipated that the town of Aspen may purchase the land. CFLHD will work
with the Town of Aspen, Pitkin County and CDOT for any ROW needs.
Utilities.
There is currently overhead power located in the area of this project. Additional power will need to be
installed for the safety lighting. Also, additional utility installations (power, sewer and water) will be
needed for the bathroom facilities and information kiosk.
Survey.
Full topographic survey is required for the length of the parking area sufficient to account for minor
vertical alignment adjustments. The terrain is flat to rolling and no vegetation is present.
Geotechnical.
It is anticipated that minor geotechnical analysis will be needed for this project. The east end of the
parking lot is near a steep slope leading to the Roaring Fork River which may require slope stabilization.
This will be determined once construction limits are determined.
Hydrology/Hydraulics.
There are no hydraulic features within the project limits and no signs of current drainage issues. The
parking lot will be designed such that the water will sheet flow from the parking lot. Low impact
development water quality features will be utilized to the greatest extent possible to mitigation water
quality changes.
Environment and Permits.
CFLHD will serve as the lead agency for NEPA compliance. A NEPA analysis (EIS-ROD) was
completed for the project area in 1993. It is assumed that the NEPA document for this project will be a
Categorical Exclusion. The proposed parking area has been previously disturbed and was studied and
mitigated under the earlier EIS, so only minor environmental activities will be needed for reevaluation. It
is not anticipated that any additional unmitigated resources are within the project limits. Any permit needs
will be determined during the environmental process.
FEDERAL LANDS ACCESS PROGRAM
PROJECT MEMORANDUM OF AGREEMENT
January 17, 2023
Modification 001
CO FLAP PIT SH89(1) Brush Creek Parking
Page | 5 of 10
F. PROJECT BUDGET
Item Estimated Cost Comments
Preliminary Engineering (PE) and
Environmental Compliance $590,000
ROW Acquisition & Utility
Relocation $0
Any ROW costs are outside the scope of this
agreement. There are no utility relocation costs
assumed at the time of this agreement. Costs for
new utilities are included in the CN estimate.
Construction Contract (CN) $5,474,775 Construction of Schedule A only
Construction Engineering (CE $800,000
Contingency $618,000 Contingency
Total $7,482,775
G. ROLES AND RESPONSIBILITIES
Responsible Party Product/Service/Role Comments
FHWA-CFLHD Develop and sign this Memorandum of
Agreement
Manage project development schedule and
preliminary engineering costs
Lead agency for all environmental compliance
Prepare and approve environmental documents
and make project decisions based on the NEPA
documents
Preliminary engineering towards the
development of a PS&E construction contract
package
Obtain permits required for Federally
constructed projects
Advertise and award the contract (Bids will not
be solicited by FHWA-CFLHD until
maintaining agency has concurred with the plans
and specifications)
Construction engineering/administration of the
construction contract
Potentially enter into a formal partnering work
session and agreement with all parties involved
in the construction contract
FEDERAL LANDS ACCESS PROGRAM
PROJECT MEMORANDUM OF AGREEMENT
January 17, 2023
Modification 001
CO FLAP PIT SH89(1) Brush Creek Parking
Page | 6 of 10
Responsible Party Product/Service/Role Comments
Provide Project Engineer on site for construction
administration
Determine the need for any proposed changes to
contract documents, evaluate change impacts,
coordinate technical reviews as needed, and
ensure that the construction meets the
requirements intended in the PS&E
Ensure that the contractor will bear all expense
of maintaining traffic, other than snow removal
and normal state, county, and city maintenance
work
Verify adherence to environmental documents
Set up and lead final inspection upon completion
of construction
Pitkin County Review and sign this Memorandum of
Agreement
Attend reviews and meetings
Provide in a timely manner available data
including but not limited to traffic, accidents,
material sources, construction costs, agreements,
other technical data
Review and provide comments within two weeks
the plans, estimate, and specifications at each
phase of design and provide project development
support
Coordinate with FHWA-CFLHD on NEPA
related issues
In coordination with the FHWA-CFLHD project
manager, ensure that completed plans,
specifications, and estimates (PS&E) are
consistent with the intended outcome
Acquire any required state permits prior to
advertisement of the project
Provide ROW and utility information and
coordination
Acquire ROW and TCEs if necessary.
Complete all ROW activities prior to
advertisement of the project
Sign CFLHD Right of Way Certification
certifying that all rights on private property
FEDERAL LANDS ACCESS PROGRAM
PROJECT MEMORANDUM OF AGREEMENT
January 17, 2023
Modification 001
CO FLAP PIT SH89(1) Brush Creek Parking
Page | 7 of 10
Responsible Party Product/Service/Role Comments
necessary to construct, operate, and maintain the
road have been obtained.
Obtain all rights necessary to construct, operate,
and maintain the facility
Provide overall direction regarding agency
policy and administration for the project and
concur with the final plans and specifications
Coordinate utility relocations if necessary per
scope described above
Sign CFLHD Utility Certification
Develop a public information plan in
coordination with CFLHD and the FLMA
If required, enter into a formal partnering work
session and agreement with all parties involved
in the construction contract
Designate a representative who will be the
primary contact for FHWA’s construction staff
during construction
Consider proposed design changes, evaluate
change impacts, and provide construction
oversight as needed, ensuring that requests meet
the requirements intended in the PS&E
Attend a final inspection and approve and
provide final acceptance upon completion of
construction
Assume responsibility of the NPDES permit
until the Notice of Termination is filed and
accepted
Provide long term maintenance and operation of
the project upon completion
FEDERAL LANDS ACCESS PROGRAM
PROJECT MEMORANDUM OF AGREEMENT
January 17, 2023
Modification 001
CO FLAP PIT SH89(1) Brush Creek Parking
Page | 8 of 10
H. ROLES AND RESPONSIBILITIES—SCHEDULE
Responsible
Lead
Product/Service/Role Schedule
Finish
Comments
FHWA-CFLHD Preliminary Design Summer 2019
FHWA-CFLHD Environmental
Compliance Winter 2019 Development and completion
of NEPA Document
FHWA-CFLHD Final Design Fall 2020 Development of PS&E
FHWA-CFLHD Advertise, Award and
NTP Fall 2022
FHWA-CFLHD Administer Construction
Contract 2023 Construction Engineering
I. PROPOSED DESIGN STANDARDS
Final design standards will be determined through the NEPA process.
Criteria Comments
Standard AASHTO
Functional Classification N/A Parking Lot
Surface Type Asphalt
Design Volume 27,000
J. FUNDING
PROJECT FUNDING
Funding Source Estimated Funding Comments
Federal Lands Access Program $2,426,726 FLAP is fixed at $2,426,726
Pitkin County $3,510,903 Cash Match through Reimbursable
Agreement; DTFH68-16-E-00052
CMAQ $1,545,146 Transfer thru FMIS from CDOT. Fixed
Amount
Total $7,482,775
Pitkin County is contributing the minimum match (17.21%) plus an over match amount.
K. MATCHING SHARE REQUIREMENTS
Pitkin County will provide cash funds to cover the remaining project costs above CMAQ and
FLAP contributions. If the project is less than the project total, Pitkin County must meet the
minimum match requirement. the amount shown above in the funding table, or 17.21% of the
total Federal Lands Access Program eligible project costs required through The costs include
FEDERAL LANDS ACCESS PROGRAM
PROJECT MEMORANDUM OF AGREEMENT
January 17, 2023
Modification 001
CO FLAP PIT SH89(1) Brush Creek Parking
Page | 9 of 10
construction contract completion, closeout, and resolution of any disputes, whichever is greater,
through separate funding agreements.
Matching or cost sharing requirements will be satisfied following the obligation of funds to the project as
detailed above in Section J.
L. PROJECT TEAM MEMBERS—POINTS OF CONTACT
The following table provides the points of contact for this project. They are to be the first persons to deal
with any issues or questions that arise over the implementation of each party’s role and responsibility for
this agreement.
Name/Title Organization Phone Number/Email
Linda DuPriest
Regional Transportation Director Pitkin County 970-920-5202
linda.dupriest@pitkincounty.com
Tammy Eggers
Project Manager FHWA-CFLHD 720-963-3687
tammy.eggers@dot.gov
M. CHANGES/AMENDMENTS/ADDENDUMS
The agreement may be modified, amended, or have addendums added by mutual agreement of all parties.
The change, amendment, or addendum must be in writing and executed by all of the parties.
The types of changes envisioned include, but are not limited to, changes that significantly impact scope,
schedule, or budget; changes to the local match, either in type or responsibility; changes that alter the
level of effort or responsibilities of a party. The parties commit to consider suggested changes in good
faith. Failure to reach agreement on changes may be cause for termination of this agreement.
A change in the composition of the project team members does not require the agreement to be amended.
It is the responsibility of the project team members to recognize when changes are needed and to make
timely notification to their management in order to avoid project delivery delays.
N. ISSUE RESOLUTION PROCEDURES MATRIX
Issues should be resolved at the lowest level possible. The issue should be clearly defined in writing and
understood by all parties. Escalating to the next level can be requested by any party. When an issue is
resolved, the decision will be communicated to all levels below.
FHWA Pitkin County Time
Tammy Eggers,
Project Manager
Linda DuPriest,
Regional Transportation Director 30 days
Wendy Longley,
Project Management Branch Chief
Brian Pettet,
Director of Public Works 60 days
FEDERAL LANDS ACCESS PROGRAM
PROJECT MEMORANDUM OF AGREEMENT
January 17, 2023
Modification 001
CO FLAP PIT SH89(1) Brush Creek Parking
Page | 10 of 10
FHWA Pitkin County Time
Curtis Scott,
Chief of Engineering
Jon Peacock
County Manager 90 days
O. TERMINATION
This agreement may be terminated by mutual written consent of all parties. This agreement may also be
terminated if either the NEPA process or funding availability requires a change and the parties are not
able to agree to the change. Any termination of this agreement shall not prejudice any rights or
obligations accrued to the parties prior to termination. If Federal Access funds have been expended prior
to termination, the party responsible for the match agrees to provide a match in the applicable percentage
of the total amount expended on the project prior to the termination.