Smuggler Superfund- Draft of Property Relocation Future Costs 1990
APR 2 7 1990 ENVIRON MENTAL HEALTH ASPEWPITKIN' Draft Future Costs Smuggler Mountain Pitkin County, Colorado 5 February 1990 Prepared by: Bureau of Reclamation Upper Colorado Regional office Grand Junction Projects office Prepared for: Envircnmental Protection Agency Region VIII e work item IAG #DW14933305-01 SMUGGLER MOUNTAIN COST ESTIMATE DATED FEBRUARY S, 1990 GENERAL The following estimates were completed in accordance with guidance recieved from EPA on December 15, 1989 and subsequent direction provided by telephone conversations. All estimates were completed utilizing standard engineering estimating procedures. It can not be over emphasized that this nor any other estimate is any better than the data from which the estimate is derived. This estimate has been completed based on the data referenced in the references section with numerous assumptions. No additional data verification beyond that provided in the initial data and map development has been completed. Significant assumptions that have been utilized in this estimate are as follows; 1. Remediation area is as shown on map 1. 2. Within this remediation area no surface area presently covered with a hard surface or structure requires remedial action. 3. The actual surface area requiring remediation was developed based on utilization of two methods combined. The first method was to base the percent of the actual remedial surface area as determined by assummption #2 above requiring remediation by a percentage of the soil samples above 1000ppm lead verses the total number of soil samples taken in the area. This method was adjusted up or down based on a detailed review of the soils data and its distribution within the specified area. Another words if all the samples greater than 1000ppm were located in a small portion of the overall area the percentage was reduced and conversely if the samples were distributed fairly over the area the percentage was raised. When evaluating any portion of the estimate it is important to review and understand the specific assumptions associated with that section. Each section includes the assumptions utilized. G item Cost 1. * Soil sampling of individual properties $ 450,000 -BOR/contractor support 35,000 2. * Access for soil sampling 35,000 3. * Cost of remedy: residential clean-up 4,600,000 - Excluding condominiums 4,000,000 4. * Oversight costs for remedial action 1,425,000 - Excluding condominiums 1,345,000 5. * Remedial design support 290,000 6. * Pipeline relocation 130,000 ; 7. * Demo project 195,000 B. * Air monitoring - Pre -construction 15,000 - During demo 15,000 - During construction 270,000 9. * Temporary relocation of residents 1,500,000 1 1. Soil Sampling of Individual Pr9p2rties Toil Sampling Based on the assumptions noted in the soil sampling and remediation % determination a total of 425 soil samples are needed. Based on EPA RPM'S indication that 1988 sampling activity costs approximately $450,000 and the fact that we have more sample points but to a depth of 12" and that we would not take samples at various depths, this value was considered appropriate. Until we finalize the soil sampling density, any refinements to this estimate are of little value as your base no. (no. of samples) is the critical value to complete a more accurate estimate. BOR Support Soil Sampling It is assumed that BOR would contract with an A&E to complete the soil sampling program with oversight of that contract. :1 It would take approximately 1 1/2 months to write delivery orders, complete detailed cost estimates, and negotiate the final cost with A&E., Assuming the contractor takes 2 months to complete the soil sampling and a BOR coordinator was on site during this entire period as well as another; 1/2 month to finalize contract payments, review of documentation, and coordinate final deliverables. Total time 4 months X 45,000/12 = $15,000 Travel 4,000 Equipment 1,000 Supplies 1,000 �� 1.65 indirects 14,000 35,00�3 2. Access for Soil Sampling Access for soil sampling is assumed to include three phases; 1 person 2 mcnths Phase I — write access form — Mail access form — Receive access form signed 2 people 1 mcnth Phase II -- (For areas signed access was not received) — Deliver access form by hand — Discuss form and impact of signing with residents 1 person 2 months Phase III — Receive soils data from contractor — Complete letter to resident with results for EPA signature — Maintain data base of soils as data is received 2 Based on these phases, it is assumed 2 people would be needed for 3 months each. 2 X 3 X 45.000/12 - 22,500 X 1.65 Indirects 37,1 say $35,000 9 SUMMARY OF REMEDIAL OQST RESIDENTIAL CLEAN -•Up Item Units Quantity Price Cost 1. Remove soil cu yd 17,700 12.00 212,400 (at condominiums) 400 48:800 2. Backfill cu yd 33,900 34.00 1,152,600 (at condominiums) 6,100 207,:400 3. Geotextile sq yd 102,000 0.85 86,700 4. Granular material cu yd 8,900 15.45 137,505 parking lot 5. Relocate club house 42,000 6. Hook-up to waterline each 5 10,000.00 50,000 7. Covering Slope sq ft 39,158 10.00 391,580 8. Decks/Skirting ft 3,120 3.00 9„360 9. Trees 211,000 (at condominiums) 94,000 10. Shrubs each 350 25.00 8,750 (at condominiums) 380 9,500 11. Flower beds sq ft 8,070 3.00 24,210 (at condominiums) 8,110 24,330 12. Sod sq ft 481,000 0.40 192,400 (at condominiums) 272,000 108,800 13. Pavement sq ft 110,000 1.75 192,500 14. Remove & replace misc. structures 75,000 15. Ground water monitoring 100,000 16. Mobilization 5%(3,334,835) 166,742 SUBTOTAL 3,501.,577 30% CONTINGENCIES 1,050,473 TO'T'AL 4,552,050 ESTIMATE 4,600,000 Remediation excluding condominiums. SUBTOTAL 30% CONTINGENCIES TOTAL ESTIMATE Assumptions for Cost Estimate of Residential Clean-up 1. Remediation includes: Excavation of one foot of contaminated material. Placing geotextile and one foot of clean fill. Condominium remediation will include six inches of clean fill. Clean fill will be placed on natural ground where possible. 3,052,747 915,824 3,968,571 4,000,000 2. Clean fill must be purchased. 3. Repositories at the tennis courts and Mollie Gibson area are utilized. 4. No ground acquisition costs are assumed for the Tennis Court Repository. 5. Parking lot at Mollie Gibson Shaft area is to be covered with gravel. 6. Adequate base material exists where pavement is to be placed. 7. Costs for parking lot granular material, club house relocation, waterline hook- up, slope covering and mobile home skirting is the same as in the 8/21/89 estimate. 8. Mobilization costs are 5% of construction costs. Site Boundary (Updated 1/11/90) Area Estimates Digitized on Teknicad N i/ Possible Area Cap in Area for Action Unit _ Area Covered Place Tailings Removal Hunter Creek Condo & V.B. Court 673,595 316,580 335,640 21,375 Centennial Condo 723,840 228,346 467,931 27,063 Mollie Gibson Repository 124,671 11,972 112,699 0 Mollie Gibson Shaft 89,666 5,238 76,966 7,462 Racquet Club 133,983 52,403 58,166 23,414 Smuggler Run Mobile Park 103,533 38,564 12,940 52,029 Smuggler Mobile Home Park 385,115 198,058 0 187,057 other IA 492,260 142,687 121,017 228,556 i 1B 26,113 3,052 10,074 12,987 1C 350,324 82,221 90,246 177,857 s 1D 209,621 34,947 171,056 3,618 1E 127,277 25,028 57,482 44,767 N i/ 5 Remediation Area Estimates Action Unit $ to Remediate Ca2 in Place Remove Hunter Creek Condo 70 234,948 14,963 & Volleyball Court Centennial Condo 16 74,869 4,330 Total 309,817 19,293 k Mollie Gibson Repository 0 0 0 Mollie Gibson Shaft 75 57,725 5,597 Racquet Club 80 46,533 18,731 Smuggler Run Mobile Park 78 10,093 40,583 Smuggler Mobile Home Park 73 0 136,552 Other 1A 80 96,814 182,845 1B 100 10,074 12,987 1C 25 22,562 44,464 1D 90 153,950 3,256 lE 70 40,237 31,336 Total 437,988 476,351 Geotextile Area = 437,988 + 476,351 ft = 101,593 yd say 102,000 yd 9ft2,,� 5 Condominiums (6" Cover) 11 Cover CETT, FILL ESTIMATES Cut: 19,293 ft2(.5 ft.) 357 yd3 27 ft3i,�P3 Fill: (309,817+19293 ft2H .5 ft) - 6,095 yd3 27 ft3zv Cut: 476,351 ft2(1 ft) - 17,643 yd3 27 ft 3 Fill: (437,988+476,351ft2)(lft) 33,864 yd' 27 f t3 /yd3 Total Cut = 18,000 yd3 Total Fill = 39,959 yd3 say 40,000 yd3 6 14 Smuggler Mountain Estimated Area Within Action units to be Capped in Place Digitizer results from Teknicad Action Unit Mollie Gibson Repository Mollie Gibson Shaft Racquet Club Smuggler Run Smuggler Mobile Home Park IA 1D 1E Area (ft2) to be capped in place 112,699 86,166 58,166 12,940 0 9,848 31,536 25,993 3,892 1,847 2,518 7,006 1,565 4,863 3,658 28,291 10,074 68,436 5,907 8,737 7,166 165,930 5,126 39,949 112,699 76,966 58,166 12,940 0 121,017 10,074 90,246 171,056 2,583 42,532 +14,950 - 57,482 Areas were estimated by studying photos and topo. maps of the site. Areas were chosen where drainage and proximity to structures and pavement would not deter capping the waste in place. Areas were then digitized on the Teknicad. 7 Linear Feet of Interface Between Covered and Remediation Area Hunter Creek Condominiums Bldgs. 1-4 4 X 460 - 1,840 ft. Bldgs. 5-8 4 X 400 — 1,600 Bldgs. 9-10 2 X 760 - 1,520 Bldg. 11 640 Bldg. 12 520 Bldg. 13 680 Tennis Courts & pad 600 Road/Parking lot 4,800 Sidewalks 2 X 2250 - 4.500 Total 16,700 ft. yolleyW1 Court Road/Parking Lot 400 ft. C� L Centennial Condos Buildings 15 X 550 = 8,250 Roads/Parking trots = 5,800 Sidewalks 2 X 3,800 7,600 Total 21,650 Cut Volume Estimate Assume 5:1 Slope transition from interface d Pavement & F - Cut area = 1/2 (.5)(2.5) _ .63 ft' or = 1.25, X .5' Hunter Creek & Volleyball Court (16,700 + 4001).63 ft2 = 395 yd' 27ft3/yd3 Area = 1.25 (17,100)=21,375 ft Centennial Condos 21,650(.63ft2) 0 50/yd3 27ft31W 21,650' X 6251 = 27,063ft2 ri SMUGGLER MOUNTAIN PROJECT COST ESTIMATE FOR TREE PROTECTION AND REPLACEME DESCRIPTION Quanity Unit Price EVERGREENS total no. = 150 Protect evergreen trees (Pure guesstimate) 85/0 128 11000 Remove (24" tree) 10% 15 700 Replace with 10' high 10% 15 600 Remove Only 5% 8 700 HIGH VALUE DECIDOUS 100 Protect and/or excavate (Pure guesstimate) 60% 60 1000 Remove 20% 20 700 Replace with 4" caliper 20% 20 1600 0 Remove 5% 5 700 Replace with 2" caliper 5% 5 600 0 Remove Only 5% 5 700 LOW VALUE DECIDOUS 380 Protect and/or excavate (Pure guesstimate) 20% 20 1000 Remove 20% 20 700 Replace with 4" caliper 20% 20 1600 0 Remove 50% 50 700 Replace with 2" caliper 50% 50 600 0 Remove Only 10% 10 700 Subtotal Contingencies (i.e. Aspen cost factor) +30% Rounded NT Extension; 127,500 10,500 9,000 5,250 60,000 14,000 32,000 3,500 3,000 3,500 20,000 14,000 32,000 35,000 30,000 7,000 $406,250 528,125 $530,000 Smuggler Mountain - Estimated Impact of Trees to Project Cost Deciduous Tree Evergrns Low High Truthing Area Count(1) (2) Value(3) Value (4) Cottonwood Lane (South Side) 25 5 15 5 Maple Lane (North Side) 28 13 14 1 Total 53 18 29 6 Percent 34% 55% 11% (1) Count based on tree symbols and verfied against snapshots. Tree symbols are about a +/- 5% accurate in showing trees that are greater than 4" diameter (2) Mainly pine and spruce (3) Tree such as aspens, willows and cottonwoods that are fast growing and have a high probability of being replaced with large nursery stock. (4) Trees that are slow growing and strong wooded or 'low valued' trees that are very large (> 12") or in a critical location (i.e. near an entrance or cast shade on an patio). qR J -346 627 0 Deciduous Tree Evergrns Low High Area C6N Count(1) (2) Value(3) Value (n) A 53 18 29 6 Al 31 41 11 11 6 13 C 9 9 D 10 0 Ela 59 8 43 E1b 73 10 Eta 24 7 6 F1 7 7 F2 14 4 3 F3 16 0 2 G 3 3 H1a 25 8 Hlb 9 6 H1c 29 14 H2 11 3 1 65 9 15 Ji 2 2 J2 44 19 K1 14 7 7 K2 32 12 6 K3 32 3 4 Totals 627 102 ill 68 °/o from sample 213 3a3 71 Empirical Adjstmt 630 150 300 100 -346 627 0 `��\•_,. � •` i� DTIC-:� �� � �� r ��)`�j'J `\ � �� f ," �I.[ 41 1p Ol • �" l�tir ' \�:.'1 ` ^": �%�� ,.r.\�/� y�` ' �` �' r/ \ ;;; ;• � �. `-�J'/'' :!,f :!� [�' ���I�, \\• ; w•1 I�k �fJrl ''-' `•' .r •�' C/ 'VN-7— ZIP lit 1� _ �I' I.' \� n , :`� •-1\I \ ��r` � \�/ � rJlj t��l�f .Ir r f =� c . a x,11 ��%s � ��,• . -. � •ll �,:i1t�, � \ 1; 76 Trees Cost Estimate Action Unit Area (ft2) % to Remediate Hunter Creek & Volleyball 673,595 70 Centennial Condo 723,840 16 Mollie Gibson Repository 124,671 0 Mollie Gibson Shaft 89,666 75 Racquet Club 133,983 80 Smuggler Run Mobile Park 103,533 78 Smuggler Mobile Home Park 385,115 73 Other IA 492,260 80 1B 26,113 100 IC 350,324 25 ID 209,621 90 lE 127,227 70 Area x % - 587,331 Area x % - 1,321,545 , Area Total - 3,439,948 ft2 Total - 1,908,876 ' - Assume cost to remediate trees is proportional to the area to be remediated in each action unit. - From cost estimate by Larry Bean subtotal - $406,250 Area % to remediate - 1,908,876 = 55% 3,439, M - Assume 75% of trees are to be remediated .75 (406,250) = 304,687.50 Condos 304,687.50 X 587,331 - 93,748 say 94,000.00 1�$,876 Site 304,687.50 X 1,321,545 - 210,940 say 211,000.00 1,908,876 Check 93,748 + 210.940 - 304,688 10 Mobile Home Parks Estimates of Shrubs and Flowerbed Areas Estimated by studying photos Address max # 4 # 6 " # 8 " #10 It #12 " #16 It #18 it #15 " # 7 It 312 Oak Lane 318 " " 311 " " 303 " It Total Average +25% for shrubs & flowerbeds not visible in photos 104 Mobile Homes Shrubs 0 .3 0 6 10 1 5 2 0 0 0 3 3 33 33/14 - 2.36 Flower (ft)2 15 40 0 75 175 30 60 125 50 0 20 10 120 720 720/14 K 51.4 .6 12.9 Say 3 shrubs 65 ft 104 (3) - 312 shrubs X 75% - 234 104 (65) - 6.760 ft 2 flowerbed 6760 X .75 - 50570 ft' 11 Address 707 Gibson 927 Gibson 931 Gibson 980 Gibson 860 Gibson 700 Gibson 920 Matchless Drive 940 Matchless Drive 950 Matchless Drive 518 Spruce Street 548 Spruce Street 560 Spruce Street 533 Spruce Street 548 Race Street 510 Walnut 515 Walnut Residential Area Estimates of Shrubs and Flowerbed Area Estimated number of shrubs 1 2 0 a 0 0 5 0 3 0 5 3 3 12 8 0 42 Average - 42/16 - 2.6 Assume 25% more shrubs + 25% And flowerbed area than is visible in photos. Total 3 Estimated area of flowerbeds (ft2) 0 0 0 100 0 0 150 0 120 60 180 0 350 60 0 0 1020 1020/16 - 64 + 25% 80 ft2 Number of buildings in all areas except condos and mobile home parks - 50 50(3) - 150 shrubs X 75% - 113 50 (80) - 4000 ft2 X 75% - 3000 ft' 12 Centennial and Hunter Creek Condominiums Estimate of Flowerbed Area and Number of Shrubs - Assume the area of flowerbeds and number of shrubs per 1000 ft at centennial and Hunter Creek condominiums is the same as at the mobile home parks. Shrubs/1000 ft 2 at mobile home park 3 shrubs/lmobile home X 104 mobile home .64 shrubs 103,531 t at Smuggler run + t Smuggler 1000 2 65 ft2/mobile home X 104 mobile homes - 13.8 ft2 flowerbed 103,531ft + 1000ft2 Shrubs at Condominiums Hunter Creek .64 (674) - 431 70% rem X 431 - 302 Centennial .64 (724) - 463 16% X 463 - 74 Say 380 Flowerbeds at Condominiums Hunter Creek 13.8 (674) - 9301 ft X .7 - 6510 ft' Centennial 13.8 (724) - 9991 ft' X .16 - 1599 ft3 TITU— Say 8,110 ft 13 Sod Quantity Estimates Estimated by studying maps and photos ACtion Unit Hunter Creek Condo + V.B. Court Centennial Condo Mollie Gibson Repository Mollie Gibson Shaft Racquet Club Smuggler Run Mobile Park Smuggler Mobile Home Park Other 1A 1B iC ID 1E % of Remediation Area for Sod Sod Area 85 212,424 75 59,399 271,823 0 0 0 0 0 0 90 45,608 100 136,552 65 181,778 100 23,061 65 43,567 5 7,860 60 42,944 481,370 Total 753,193 Say 760,000ft2 14 Soil Sampling and % Remediation Summary Sheet Area No. Samples % to Paved Area Description Reg. Remediate (ft)2 la 94 80 46,759 (11,875 of which is T.C. area) lb 5 100 -0- 1c 83 25 3,800 Id 13 H.C. 100% 13,950 Remaining 80% -0- le 5 70 3,120 Smuggler Run Mobile 19 78 4,620 Smuggler Mobile 141 73 32,485 Mollie Gibson Sht. 5 -0- 12,130 Centennial Condos 20 16 -0- Hunter Creek condos 40 70 -0- (including V.B. court) Totals 425 116,860 Say 110,000 ft2 15 Detailed Estimate Soil Sampling Requirements Area la (includes Racquet Club) Area la will be split into 3 subareas: 1) Tennis club area 2) Single Family Area 3) Condo Area These areas are indicated on the area map. One value will be developed for the entire area however for application throughout this area. Area la -1 Tennis Club Area Total No. of Samples 30 Samples above 1,000PPM 18 however 7 below next to above use 25 25/ - of samples No additional samples are required in Northwest Quadrant. This area requires remediation. Additional sampling est. @ 10 approximately 2 residential lots. Percentage of remedial area to cleanup - 85% Area la -2 Total No. of Samples 17 No. over 1,OOOPPM 8 over - 8/17 - 47 say 50% Area includes apparently 17 properties of these 1 (area in extreme eastern boundary of area) appears to be tested with 4 samples below 1,OOOPPM and thus not require additional sampling required. 16 X 5 - 80 samples req. 13 present (4in 1 property not any remediation) 80 - 13 - 67 samples say 70 % to remediate is difficult to project do to the large area and few sampling Points. Based on this will use 85% same as Area la -1. 16 Area 1a-3 Total No. of samples 43 No. of samples under 27 � -use 65% Area includes approx. 10 properties 10 X 5 - 50 samples as the distribution is fairly good . No. needed - 50 - 43 - 7 Use 2 times this for est. purposed 2 X 7 - 14 Area IA cont. Summary: Soil lSS-amples Required (Estimate) 1a-2 - 70 1a-3 - 14 Total 94 for area la % of area to be estimated as requiring remediation (this does not include buildings, roads, or other hard surfaced areas) % of Area potentially available for remediation Name of Area Est. Area * in Est. % of % Req. Weighted % sq. in. Total Area Remed. la -1 4"x3.5" - 14 14/58 - 24 85 20.4 la -2 8x2 - 16 21/58 - 36 85 30.6 2.2.5 - 5 - 21 la -3 9x2 - 18 23/58 - 40 65 26 2.5x2 - 5 - 23 58 77% For Entire Area Use 80% *'Phis area is only used to evaluate % and thus measured in sq. in. directly from map and does not equate to any real area measurement such as acre or sq. yds. Are` b Area 1b is WA #1, one property. No samples have been taken on this property. Additional Samples Req. 5 17 As no samples have been taken it safely assumed that 100% of this area will require remediation. This is not supported by Plate 3 of the Fred C. Hart Surface Soil Condition. However, this is felt appropriate as the overall impact on the estimate is minimal as the area is small. Williams Addition Area Area 1C No area can be included totally directly or excluded directly based on present soil sampling. No. of lots WA 2 - 22 or 21 SS 1 - 2 or 2 Total Samples Taken - 32 Greater than 5,000PPM - 3 10% Greater than 1,000PPM - 5 15% 25 over 1,000PPM If we assume 5 samples average per lot in this area Samples Req. _ (23 X 5)- 32 = 83 This maybe high based on the relatively low % of samples taken so far with higher than action level values. Area 1d The area is basically 3 properties WA 23 & 24 and Hunter Creek on the Northern portion. The Hunter Creek area is assumed to require remediation without further sampling. Area is parking area; recommend pavement in place. Samples taken 9. � 23 no samples were taken on this property - Req. 5 Total taken to date = 9 + 14 - 23 WA 24, 14 samples were taken on this property, of which 11 were above the 1,000PPM level. Most of these were in the southeast area this area should be remediated without additional sampling. This is a large lot and thus 8 additional samples are assumed necessary. Total additional samples 8 + 5 = 13 Eta Estimated area % to remediate Now Req. - 50% Est. of Add. - 30% Use M Req. Rem. % Paved - H.C. Area Remaining % -- Cap in place as determined by Cliff. V. calculations. Area le ( Enlarged to north from previous estimate) Lots in this area include Cent. #17 & 18 and WA 26 and WA 25. This area has had 10 samples taken by previous feasibility work plus sampling completed by Ralph Braden (for WA 26) and Centennial owners. WA 26 5 Samples Loc. 1, 2, 3 above 1,000PPM However, method & depths below 12" level. Centennial Sampling - 3 samples All were above 1,000PPM; however, sampling started at 9" depth. Total samples taken 18 Over 1,000PPM 8 % over 1,000 PPM 8/18 r - Within Braden's property approx. 75% was proposed for Remediation in accordance with his proposed action to EPA. - Based on distribution of 44% above 1,000 PPM and relative consistency of the northern 5 samples being clean 1 in 5 above. Assume southern 2/3 of area requires remediation. Say 70% Number of additional samples based on lower area being remediated with no more sampling est. @ 5 samples. Smuggler Run Mobile Home Park Lots in; based on previous sampling Ajax Ave. 1, 3, 7, 9, 11, 13, 15, 18, 20, 22 or L, D, M, N, 0, P, 0, I, J, K Smu ler Mobile Home Lots in; based on previous sampling Oak Lane 307, 308, 311, 315, 316, 317, 319, 322,f 323, 325 Cottonwood Lane 209, 211, 215, 216, 218, 219, 221, 224, 227, 231 Maple Lane 101, 107, 110, 112, 114, 115, 116, 117, 118, 119, 125, 129, 134, 138, 140, 142 19 Assuming 3 samples will be taken for all other mobile home lots the following sampling is required; S.R. S.M. Add. S No. of lots with no samples - 5 40 135 No. of lots with 1 neg. samples - 2 10 24 No. of lots with 2 neg. samples - 0 1 1 7 51 160 Use % - 75% for Smuggler Run (See Cliff vaterlans 73% for Smuggler Mobile estimate dated 11/2/89) Mollie Gibson Shaft Area Number of Samples - 20 Number > 1,000PPM - 9 % over —4T— However by analyzing the areas, clearly the eastern 1/2 of the area appears to require remediation as well as a significant portion of the northern quadrant. Thus est. % to remediate 75% Additional Samples - 5 Centennial Condos Total No. Samples 69 No >1000PPM 11 % over No. of additional samples would appear to be necessary in 2 main areas: 1) along Park Circle Road 2) southern portion of area le. Est. of additional sampling req. - 20 This number seems high based on low density of previous samples > 1000PPM. However to get an appropriate grid to meet Clement & Assoc. pattern which is in development at this time this quantity is my best professional estimate at this point. Hunter Creek Condos See work completed 11/7/89 in Soils Data Review, Soil Samples Hunter Creek by Ray Plieness. % to remediate - 60% (Based on 6" depth) 20 However, the distribution of the samples > 1000PPM would indicate only the areas around buildings 7 & 8 require no remediation and the areas around buildings 5 & 6 require only minor corrective action. Based on this 70% would require remediation Utilize 70% as the conservative value. No. of additional samples is really a guess for now assume 40 samples. 21 Area Description Detailed Estimate Paved Areas/Summary Sheet Paved Areas included on Soil Sampling & % Remediation Summary Sheet Paved Areas are based on information provided in aerial photos completed on 1/88 by U.S. Army corps of Engineers. The areas which are shown as gravel driveway or showing used as a driveway (by cars parking etc.) were assumed to be paved. To obtain actual quantity total area to be paved (assuming all) were multiplied by the respective % to remediate. 22 1. Mobile Home Parks Sze ler Run 4 lots were used as a means to come up with an estimate of the area required to pave assuming all parking areas are paved. 2 from south side of Ajax Ave. - Mobiles No. 18 & 2 2 from north side of Ajax Ave. - Mobiles No. 11 & 13 Total area for 18 & 20 - (9 X 20 X 2) + (20 X 9) - 540 ft2 Total area for 11 & 13 - (30 X 25)/2 + (25 X 45)/2 - 940 ft2 Total - 1,480 ft2 Ave per lot - 1,480/4 - 370 ft2 370 ft2/lot X 16 lots x .78 (% of Area) - 4620 ft2 to remediate to pave Smuggler Mobile Home Park 8 lots will be utilized to obtain an average per lot for this area Lots utilized Oak Lane 315 & 316 Cottonwood Lane 215, 216, 219, 227 Maple Lane 116, 117 Mobile Home Parks (cont.) Oak Lane 315 & 316 [(20 X 20) + (10 X 12)1+ (40 X 12) - 800 Cottonwood Lane 215 (37 X 20) - 740 216 (35 X 11) - 385 219 (45 x 19) - 855 227 (15 x 38) - 570 Maple Lane 116 (40 X 10)/1 + (10 X 13) - 330 117 (25 X 12) + (8 X 10) - 380 Ave per lot - 4060 /8 - 507.5 Use 500 ft2 TIM 500 ft2/lot X 89 lots X .73 (% of area to remediate) ,. 32,485ft2 2. Mollie Gibson Shaft Area Assumed only around property at extreme northwest area boundary to be paved. 3. Mollie Gibson Repos. Roadway to top of hill at mine entrance considered paved due to potential dust problems. 23 Area - (170 X 20) + (12/12/)/2 + (40 X 15) + (20 X 12)/2 + (100 X 23) + (35 X 30)/2 + (55 X 25) + (25 X 25)/2 + (145 X 20) + (15 X 20)/2 + (25 X 15)- 12,130 ft' 4. Centennial Condos - No areas require paving S. Hunter Creek Condos (Actually in area ld) Area - (90 X 90)/2 + (65 X 90) + (90 X 90)/2 Area - 13,950 ft moved to area Id est. 6. Area la (includes tennis court area) Areas from Aerial Photo No. 10 (40 X 15)/2 + (20+10)/2 X 251 + (80 X 13) + (30 + 16) + (60 X 20) + (15 X 50) + (75 X 20) + (120 X 20) + (15 X 85) + (10 X 90) + (45 X 20) Approx. Area Area Photo No. 10 - 13,245 Areas from Aerial Photo No. 7 (125 X 95) + (75 x 17) + (30 X 12) + (120 X 40) + (130 X 25) Tennis Court Park Area + (135 X 50) + (55 X 25)/2 + (65 X 13) + (20 X 15) + (30 X 25) + (35 X 20) + (65 x 5) + (25 X 15)/2 + (45 X 30) + (20 X 45) +(30 x 15) + (70 X 15) + (23 X 10) + (28 X 25) + (70 X 19)+ (40 x 15) + (35 X 15) + (30 X 20) + (70 X 20) Area from Photo No. 7 - 11,875 + 30,015 - 41,890ft2 41,890ft2 X .80 (% to Remediate) - 33,510ft2 + 13,245 - 46,755 7. Area lb no area to pave. 8 • Area 1C (190 X 20) + (70 X 30)/2 + (25 X 50) + (400 X 10) + (130 X 20) + (100 X 25) - 15,200ft2 X .25 (% to remediate) = 3800ft2 9 • Area Id From No. 5 Hunter Creek - 13,950ft2 24 4 1 10. Area lc Ralph Braden property not included as paved as this property to be redone and already planned. From Photo No. 4 (70 x 20) + (90 X 30)/2 + (85 X 10) + (lk X 15)/2 + (50 X 15) + 4,460 x .70 (% to remediate) = 3,120ft 25 Fences & Miscellaneous Structures Cost Estimate The quantities of fence and miscellaneous structures where remediation is to take place were estimated by studying photos and maps of the site. Fence - 7,000 LF Storage Sheds - 50 Swing Sets - 30 From MEANS, to remove & reset chainlink fence - 7.85/LF Assume $10.00 to remove and reset wood fence in Aspen. Assume extra 1 hour labor at $30.00/hr. to remove and replace each storage shed and swing set. Fence 7,000 ft. X 10.00/ft + - 70,000.00 Shed & Swings (50 + 30) X 30.00 - 2,400.00 Total 72,400.00 Say 75,000.00 26 Future Costs Estimates Quarterly Monitoring Discussion with Bureau of Reclamation (Reclamation) water quality expert Jim Yahnke indicated that ground water monitoring should continue on a quarterly basis until a review of additional data indicates differently. At this time he feels a quarterly review is necessary. This is consistant with the ROD dated September 1986. The ROD site remedy included quarterly monitoring for five years after remedial action. Thus this will be the approach utilized to estimate this factor. The estimate completed by Fred C. Hart Associates and documented in Remedial Investigation/Feasibility Study dated March 1986 (Admin. Record 011650) will be indexed utilizing Reclamation construction index factors. This maybe a lower value than needed as additional wells and inflation over this period are not accounted for, thus a factor of 25% will be added as a general value to account for these factors. $10,400 X 1.09 X 1.25 X 7 - 99,381 (Est. attached) (general factor) (years) Say $100,000 Index Factor January 86 to October 89 composite index 166/15 7 years as ROD indicates — 5 years after cap is placed, assuming 2 years construction period thus 7 years. 27 TABLE 8-1 ESTIMATED ANNUAL C&M COST FOR ALT E RNA Y No. I CR ED MGMT-MMG (0256F) It em No- Oescrl ott on Unit QUantit`l Unit Com (s) Total Con f 1 Sampling - Labor Sample 16 120 1,920 2 Sampling - Equipment Flour 32 25 800 3 Sample Analysis Sample 16 200 3,200 4 Annual Sampling Report Preparation (Engineering) Flour 37 60 2,220 5 Annual Evaluation (Engineering) Flour 37 60 2,220 Total Estimated Annual O&M Cost = $10,360 (say) 510,400 (0256F) Field Operations Plan Construction Oversight Fiscal Yanr loan Assumes pipeline relocation and prototype construction in fall of 1990. Also soil sampling during summer of 1990._ Fiscal Year 1991 opTION NO. 1 Fiscal Year 91 Or TION N0. 2 Smuggler Team Lead. G3-205 EPA: GI -240 Design Plot Inspect. Oversight GJ -220 BOR Contr. Other Contr 0*mer Tech. Onsite CoordReview . Public (Relati Option #1 is preferred as it provides 2 people for the critical elements of Public relations and general oversight at Aspen. Allows time to have one of these people offsite in coordination or leave (sick or annual). Funds Status oversight Costs Bureau of Reclamation Only Estimate from funds requirements dated 12/21/89. 1. Pipeline Relocation 6 X 45,000/12 22,500 months $/year month/yr ' Travel & TDY 10,000 Equipment 2,000 Supplies 1,000 $1571� 2. Demo Project (as separate project) Say $35,000 X 1.65 Indirects 4 X 45,000/12 = 15,000 Travel 20,000 Equipment 2,000 Supplies 2,000 29,000 Say $30,000 X 1.65 Indirects This assumes construction at a different time than other construction oversight. 3. Soil Sampling Ind. Access 8 x 45,000/12 30,000 Travel 5,000 Equipment 1,000 Supplies 3,000 IT,-UW Say $40,000 X 1.65 Indirects Say $70,000 Bureau of Reclamation Only Estimates based on proposed field operations plans dated 12/20/89. 4. Neighborhood Construction 2/H.C. & Cent. Using $45,000/yr. per employee, 65% Indirects 31 Equipment (Guess) = 25,000 Supplies (Guess) 25,000 sr, M Total FY 1991 = 283,500 81,600 50,000 -415,1 X 1.65 M; -i 5 Say $690,000 Employee Years FY 1992 1 Field Eng. �23oyee Years FY 1991 1 Field Eng. 100% 1 1 Supr. Const. Rep 80% _ .8 1 Designer 100% = 1 2 BOR Const. Insp. 50% 1 1 BOR Oversight 50% _ .5 1 Contract. Admin. 100% 1 1 Technician/Clerk 100% 6. 6.3 X 45,000 =, $283,500 FY 1991 shorter durations for * staff. Travel 6 months X 20 days/month X 6 X $109/day = $78,000 & TDY on TDY $150/wk. Travel X 6 X 4 3,600 Equip. same as FY 91 25,000 1,60 Equipment (Guess) = 25,000 Supplies (Guess) 25,000 sr, M Total FY 1991 = 283,500 81,600 50,000 -415,1 X 1.65 M; -i 5 Say $690,000 Employee Years FY 1992 1 Field Eng. 100% - 1 1 Supr. Const. Rep 50%* _ .5 1 Designer 50%* _ .5 3 BOR Const. Insp. 50% = 1.5 1 Contract. Admin. 100% - 1 1 Technician/Clerk 100% 5.5 Same as FY 1991 shorter durations for * staff. 5.5 X 45,000 = $247,500 Travel same as FY 91 81,600 Equip. same as FY 91 25,000 Supplies same as FY 91 25,000 Total TIF, M X 1.65 T25 -,M 6 Say $625,000 TOTAL NEIGHBORHOOD OVERSIGHT COST = 690,000 + 625,000 = 1,315,000 32 5. Total Oversight Total Oversight Est. Neighbor 1,315,000 Demo 50,000 Pipeline 58,000 $iZ# Say $1,425,000 A significant portion of this (approximately 20%) is for temporary duty & travel expenses. 6. If Hunter Creek & Centennial completed their own activities, it would reduce the oversight estimate by .5 person years and 1 persons TDY & travel for 6 months during each year. .5 X 45,000 M 22,500 Travel & TDY 26,200 Supplies (same) f, Equip. (same) U 7M X 1.65 $b -M Say $80,000 Oversight cost without H.C. & Cent. (Under BOR contr.) = 1,425,000 - 80,000 = $1,345,000 7. Oversight for Hunter Creek & Centennial if PRP contracts. Est. at $80,000 as noted in No. 6 above. 33 Remedial Design Cost Estimate Assumptions: - Plans and specs previously developed are similar enough to current remedy that they can be modified for use. - Plot plans are developed by BOR. After discussion with Jane Blair, the following staff time was estimated: Finish technical division of specs 10 weeks Complete general drawings 4 weeks Finish Division 1 of specs 4 weeks Review Denver's Specs & Drawings Salvation Ditch 3 weeks Reclamation field review 6 weeks Prepare evaluation criteria 3 weeks 30 wee s 7.5 months X 45,000 a/year /12 months/year Travel & TDY = Equipment Suplies 40 7.5 months _ $ 28,126 5,000 2,000 1,000 X 1.65 Indirect Costs Say 60,000.00 Plot Plan Design It is estimated that 4 people will be needed to complete the plot plans during the stammer of 1990. 4 X 5 months X $45,00/12 = $ 75,000 Travel & TDY - 4 X 5 X 20 X $109 - 43,600 Equipment 10,000 Supplies 10,000 Total Estimated Indirects X 1.65 Total --6 $' -w w Say $230,000 Overall Design costs 230,000 + 60,000 - $290,000 40 f .,. 14EET +Tc jaC s F CT 1 VISIOIV . UN A-ml a, LIS DikWTION51, r a, s-} _ ?• s: 5 M� CODEi #r.xt �•1s-i. ,, art°"#'•a �rsr �..- ...,_ OI•ANT TY� NIT � _ _ PRICI: AMOU nr, C v ,,,� � ' x --�� . �:I ..1•:F•w;,,�.�; �,, ,�. "'"siii+�ss ,... �"�`: . --`�-�?`-'Xa�.3=�. �. '�� ' •' -off .! � '"' a �` ?t�ie� -' rc•` t�ssir'iREe' Z 4r- C� r . - ? - �, s_ - --.: ,E�:�s�jr�,�< w.• �v _ it � � ., : �� s `�'_ � `_..��;�+i� :. - «i.;�,,,.,i:_. ^'' � g * . t n - �_. S - r - - ._.-b - 7 :a'- ,r • rte_ _YM �.. � ��'i a c a� r, -1,. � _ '�`- . -' :,its;. '�� -? ���.:�-ts• Sia.. } cc _ . Wes M � Date _ � -. .. ....__ ._ - .-_� � ' __�•- ..� M a . !,i 1 • C„c.+w t - Y� h ✓ .. v>'M E ctiVu l�► r mac, SO '- •�U OD • R•� - QUANTITIES BY PRICES ,'I PREFARED/r7 G, GH13 CHECKED APPROVED _... _, _„�•,...y - Y ' /dR DATE �/ ' PRICE LEVEL �,.� Demo Project Cost Estimates Costs include only costs which are above and beyond cost to remedy area $110,000. Totals include $110,000 which is required under any approach. tion #1 Prototy22 Only under $25,000 Cost over $25,00 for minimum cost. tion #2 Prototy22 only Over $25,000 Demo Construction $110,000 Contracting Cost 7,000 Fence/Gates Repos. 4,000 Mobilization 18,000 Design 20,000 Construct. Admin. 50,000 ,000 say $210,000 tion #3 Salvation Ditch Pi line Relocation with Protot Demo Construction $110,000 Contracting Cost 4,000 (same as Saly. however negotiated) 34 Fence/Gates Repos. 4,000 Mobilization 9,000 (save equip for Salv.) Design 20,000 (some different, use 1/2 total) Construct Admin. 12,500 (assumes save time) $159, -SW (say $160,000) option #4 Neighborhood Construction with Protot Demo Construction $110,000 Contracting -0- (same as Neigh. only) Fence/Gates Repos. -0- (same as Neigh. only) Mobilization -0- (same as Neigh. only) Design -0- (same as Neigh. only) Construct. Admin. 12,500 $122, (say $122,000) tion #5 Prototype only ERGng ERGs Contracti Assumed increase of 15% over construction by bid for cost plus approach. This is only an estimate and may not hold true in Aspen. Demo construction $126,000 Contracting cost 2,500 Fence/Gates Repos 4,600 Mobilization 20,700 Design 10,000 Construct. Admin. 45,000 $208,80Y (110,000 x 1.15) (Open End contract.) (4,000 x 1.15) (18,000 x 1.15) (Reduced Scope) (Not Contracting Officer) (say $210,000) Reduce Demo by $11,000 x 1.30 - $14,300 Included for OSHA Superfund Training. 210,000 - 14,300 - 195,700 use DEMO PROJECT OVERSIGHT Est. of $195,000 1. Demo as Separate Project Options 2,5 Est. - $50,000 see est. dated 1/3/90 2. Demo as Part of Other Contract Options 3 & 4 Minimal additional personal and activities required. Construction admin. virtually same as with Salvation Relocation alone, contracting same. Estimated at 1/4 effort of separate contract .25 x 50,000 = $12,500 35 I I Overall Prototype Estimate 12/12/89 Assumptions: 1. Excavate 1' on 50% of remediation area. 2. Add engineering fabric and 1' clean fill. 3. Paving of roadway and parking areas 4. No resident relocation necessary 5. Prices for items are the same as 8/21/89 estimate 6. Backfill must be purchased I. Excavate and place in repository 50% x (Total Area - Buildings - Roads) x 1' x $12.00/yd3 50% (40,000-2500-1200-1250-900-25,000)x 1' x $12.00/yd - 5811.11 27 ft3/yd 3 (Areas estimated by scaling from map) 2. Backfill 26,150 ft (1 ft) x $34.00 - 32,929.63' 27 ft3/yd3 yd i 3• Sod 26,150 ft x $.40 - 10,460.00 ft 2 4. Trees Replace 6 x $50.00/tree + 18 x $500.00/tree - 11200.00 (for extra work around larger trees) 5. Engineering fabric 26,150 ft x $.85/yd - 2,469.72 9ft2 ` d2 6. Flower Beds 600 ft x $3.00/ft 2 - 1,800.00 7. Pavement 8000 ft2 x $1.75/ft2 - 14,000.00 8. Remove & Replace misc. Structures (Rough Estimate) - 1,000.00 10. EPA Health and Safety Training - 11 000.00 Subtotal 81,592.46 Say 82,000.00 30% Contingencies 25,000.00 Total 107,000.00 Say $110,000.00 36 Overall Estimate 1/2/90 See Estimate /89 Subtotal - 110,000 Fence $8.40/LF x 1.25 (Estimated extra x 200 €t fence (means) cost for Aspen) + $170/gate x 1.25 x 2 gates 2,525.00 x 1.3 - 3,300 use 4,000 Assume 10% for mobilization costs and 5% for increased cost due to productivity decrease for first properties remediated. 15% (82,000.00) * 12,300 x 1.3 x 1.10 + 17,590 use 18,000 Contracting cost (Rough Estimate from - 7,000 contracting people) Plus 3 months Design a Assoc. Travel Indirects - 20,000.00 Assume cost estimate for prototype on 12/12/89 ($110,000.00) is cost of remediating prototype area in conjunction with the entire site. Additional items on this estimate are added if the prototype is completed separately. 37 Detailed Cost Estimate Air Monitoring Air monitoring for preconstruction and construction is not finalized, thus an anticipated most likely scenario will be utilized for this estimate. The following scenario: 1. Four activities in different locations are the maximum at any given time (Ex. two mobile home locations, five each, and two locations in residential properties). 2. Real time monitoring on these four locations would be handled with two monitors being transported between two sites for 1/4 hour monitoring. 3. Personal monitoring would be started when real time monitors indicated an elevated value. This is assumed to be required at a maximum 20% of the time, as significant measures to reduce dust will be constantly undertaken. Monitoring in the four locations will be for the most at risk employee. 4. one high volume monitor will be utilized at each site while intrusive work is being undertaken. 5. Cost per day of high volume - $500/month rental, $100 day for lab work, $10/day maintenance. 6. Real time monitors purchased (2 @ $7,000). Two people basically 3 hours/day to move around site, maintain readings, and documenting. An average day then would have the following costs for air monitoring with purchased items cost based on 1 year active life. 38 1. 4 high volume - $500 x 4/30 days/month - $ 70/day 4 analytical analysis @ $100 each - $400/day 2. Personal monitoring - 5 pumps @ $4,000 $4,000/365 life in days x $.20 average days use - $ 2/day Analytical analysis (4 @ $100) x $.20 average use - $ 80/day 3. Real time monitoring Monitors 2 @ $7,000 ea/365 - $ 39/day 2 people @ 8 hrs. x $25/hr. - $400/day Total Estimate Preconstruction r estimate 1-30 da period No personal monitoring zone x say with 4 units; no real time During demo 1-30 da riod (1/2 monitoring re irements) 30 x - $14,900 say $15,000 During pie�construction 60 da period (1/2 monitoring requirements) 60ayssxx $35 - say $30,000 For neighborhood construction 8 months x-30 days - 240 da s 240 days x $991/day = say $240,000 Total - 15 + 15 + 30 + 240 = $300,000 39 Smaller Moun t e a Estimated elocution Costs Housing $341,000 Food 183,000 Security - 3 men - 3 shifts 216,000 FEMA Costs (Relocation) pre -planning $30,000 Administration staff 200,000 Vehicles 10,000 Office space 52,500 Materials and equipment 10,000 Total 302,500 Boarding Pets 11,000 Small Household Relocations 20,300 Clean-up of Canda's and Trailers per Household 20,300 Laundry and Cleaning of $25 per Household 5,075 ^Dther Misc. Costs - $100 per household 20,300 stilitlot and Othar Misc. $50 par ;household 10 150 Other Contingencies - 15% Rounded Total $1,129,625 1,299,000 $1,300,000 Assu:t tions 103 Trailers to terrlporarijy rolocate :00 Cthers to ask to be temporarily relocated — most with kids, 12 Days per trailer on trailer courts. Cther 100 households to r©locate over ssmee occurs. Cine span as trailer clean-up 5 trailers to be worked on at one time. 103 Trailers — 20.5 work site operations 5 Trailers POr/work site Rounded to 21 operations 2I Operations at 12 days each = 252 days or 8.4 months, : 'crk season is around 5 months in Aspen Assu.ning each season is 5 months, rhe 8.4 months needed would occur over (2) SU=ers (4,2 months each season). With downtime, rain, of other climatic .cnditior_s the 5 moths is necessary for each season. S`onths x 30 days/month — 150 days per season 300 days per project Most P obable Aiternativ9 Relocation Trailers - 103 Most have 2 to 3 bedrooms Relocate with same Cost per night = $140 per nighr x 12 nights $1580 for Temporary Housing 12 nights $:680 x 103 trailer household$ _ ;1630 x 100 others wanting relocation $173,0+0 1616-8�0 $34,,040 Food �'sder e $34 bay for employes 22.64 spouse � 2/3 11.00 under age 14 = 1/2 $73.64 Rounded $75 day per hou zeriold 75 x 12 days $900 per household 900 x 103 trailar households 900 x 100 others wancing relocation $ 92,700 Total _ $ 90•D00 $182,700 = Rau,aded $341,000 = Rounded $18,7,000 0 FEMA Administrntion Costs for itelocatiorr 1 Coordinator 1 Clerk 1 Secretary 1 Relocation counselor 1 Relocation counselor $38,000 for 9 months -- 17,000 for 9 months — 17,000 for 9 months 30,000 for 9 months -- 30,000 for 9 months Total Personnel =,$132,000 for 9 months — $99,000 x 2 sogaons = $198,000 Rounded —$200,000 Government vehicles = 3 vohiclos Office space at $2500 month x 21 months robruary 1991 - October 1992 — 21 months Matorials and Equipment Pre -planning 10,000 = 52,500 = 10,000 = 30, 000 Total —$302,500 :hs per construction season (2 seasons) 150 x (2) seasons = 300 days tys x 3 security people per shift with all day and night security or (3 shifts) — 9 people )le per shift, 3 shifts per day $10 per hour x 8 hours — $80 per person/per shift $80 x 3 people — $240 x 3 shifts — $720 per day $720 x 300 days — $216,000 ther Possible costs !_,rding Pets - (Condo's do not allow pets) 55 Day for 12 dsy9 — $72 per household A,ssu:ie 3/4 households have pat; .03 x .75 = 152.25 households ,32,25 households at $72 per household —$10,962 Rounded :Tull household relocations necessary for temporary housing ($100 per household) 100 x 203 --auz-up of trailers and/or condo's, homes $.00 per household x 203 :.a:indromats and cleaning costs $25 per household. .-her miscellaneous costs $700 per household x 203 costs of vacant homes SSO per household x 203 ::par contingancies of 15% of total of above ,:STIMAYE. LES} $11,000 20,300 20,300 5,075 20,300 10,150 159,375 * Assumes all uncovered area requires remediation and all require removal and backfill. 6" at condominiums and 12" with geotextile in remaining areas. Assumes all residents relocated for construction based on a quadrant approach. 42 PROJECTED FUTURE COSTS FOR SMUGGLER MOUNTAIN Case Item Cost 1. * Soil sampling of individual properties $ 450,000 -BOR/contractor support 35,000 2. * Access for soil sampling 35,000 3. * Cost of remedy: residential clean-up 6,700,000 - Excluding condominiums 5,500,000 4. * oversight costs for remedial action 1,425,000 - Excluding condominiums 1,345,000 5. * Remedial design support 290,000 6. * Pipeline relocation 130,000 7. * Demo project i 195,000 8. * Air monitoring - Pre -construction 15,000 - During demo 15,000 - During construction 270,000 9. * Temporary relocation of residents 7,000,000 * Assumes all uncovered area requires remediation and all require removal and backfill. 6" at condominiums and 12" with geotextile in remaining areas. Assumes all residents relocated for construction based on a quadrant approach. 42 SUMMARY OF REMEDIAL COST RESIDENTIAL CLEAN-UP Maximum Case * Item Units Quantity Price Cost 1. Remove soil cu yd 49,470 12.00 593,640 (at condominiums) 10,090 12,080 2. Backfill cu yd 49,470 34.00 1,681,980 (at condominiums) 10,090 343,060 3. Geotextile sq yd 148,410 0.85 126,150 4. Granular material cu yd 8,900 15.45 137,505 parking lot 5. Relocate club house 42,000 6. Hookup to waterline each 5 10,000.00 50,000 7. Covering Slope sq ft 39,158 10.00 391,580 8. Decks/skirting ft 3,120 3.00 9,360 9. Trees 406,250 10. Shrubs each 462 25.00 11,550 (at condominiums) 894 22,350 11. Flower beds sq ft 10,760 3.00 32,280 (at condominiums) sq ft 19,292 57,880 12. Sod sq £t 1,335,690 0.40 534,280 (at condominiums) 272,000 108,800 13. Pavement sq ft 154,600 1.75 270,550 14. Remove & replace misc. structures 75,000 15. Ground water monitoring 100,000 16. Mobilization 5%(4,897,495) 244,870 SUBTOTAL 5,142,360 30% CONTINGENCIES 1,542,710 TOTAL 6,685,070 ESTIMATE 6,700,000 k Assumes all uncovered arearequires remediation and all require removal and backfill. 6" at condos and 12" with geotextile in remaining areas. 43 SUMMARY OF REMEDIAL COST FOR CONDOMINIUMS Maximum Case Hunter Creek Condominiums (6" Remediation) Item Units quanti�y Price Cost 1. Remove Soil cu yd 5,860 12.00 70,300 2. Backfill cu yd 5,860 34.00 199,200 3. Trees 100,000 4. Shrubs each 300 25.00 7,500 5 Flowerbeds sq ft 6,510 3.00 19,530 6. Sod sq ft 316,580 0.40 126,600 7. Mobilization 10% (523,130) 52,310 SUBTOTAL 575,440 30% CONTINGENCIES 172,630 TOTAL 748,070 ESTIMATE 750,000 Centennial Condominiums Item Units Quantity Price Cost 1. Remove soil cu yd 4,230 12.00 50,760 2. Backfill cu yd 4,230 34.00 143►820 3. Trees 25,300 4. Shrubs each 75 25.00 1,880 5. Flower beds sq ft 1,600 3.00 4,800 6. Sod sq ft .30 91,340 7. Mobilization 228,346 10% (101,675) 31,790 SUBTOTAL 349,690 30% CONTINGENCIES 104,910 TOTAL 454,600 ESTIMATE 455,000 44 SMWY OF REKMIAY, COST MOBILE FiCi+'¢. PARKS SUBTOTAL 641f476 30% CONmGwCIES 192f443 TOTAL 833,919 ESTIMATE $835,000 T d t -4o z nat3 on .0 a az: tr i and 06-9 -aaA no IWA r7 •7 •na_A _7 f QR7 1F� I Ann73n7I VnU'3V Units Quantity Price 'Cost =. Remove Soil cu yd 6,560 12.00 78,727 _. Backfill Cu yd 6,934 34.00 235,769 :. Geotextile sq yd 20,803 0.85 17,683 :. Decks/Skirting ft 3,120 3.00 9,360 . Trees 57.,763 .. Shrubs each 234 25.00 51, 850 '• Flower beds sq ft 5070 3.00 15,210 Sod sq ft 45,608 0.40 72',864 �. Pavement sq ft 37,105 1.75 64,934 =. Misc. Structures 25,000 1=. Mobilization 10%(583,160) 58,316 SUBTOTAL 641f476 30% CONmGwCIES 192f443 TOTAL 833,919 ESTIMATE $835,000 T d t -4o z nat3 on .0 a az: tr i and 06-9 -aaA no IWA r7 •7 •na_A _7 f QR7 1F� I Ann73n7I VnU'3V te soil sampling of individual properties 2. *Access for soil sampling * Cost of remedy3.. residential clean-up 4. * Oversight costs far remedial action S. * Remedial design Support 6. * pipeline relocation 7. * Air monitoring 9. * Temporary relocation of residents s� e: cc •�ti TOTAL cost $55,000 4,000 195,000 150,000 38,000 613,040 WGILS WM PARA item Cost 1. * soil sampling of individual properties $281,000 2. * Access for soil sampling 20,000 3. * Cost of remedy: residential clean-up 640,000 4. * oversight casts for remedial action 780,000 ,, * Remedial design support 194,000 6. * Pipeline relocation 37,000 7. * Air monitoring 174,000 8. * Temporary relocation of residents 640,004 TOTAL 2,766,000 Item 1. Remove Soil 2. Backfill 3. Geotextile 4. Granular material 5. Relocate Clubhouse b. Trees 7. Landscaping 8. Tennis Courts 9. Pavement 10. Mobilization MMIARY OF REMMTAL COST =WS COURT AREA Units Quantity Price Cost cu yd 207 12.00 2,484 cu yd 2,345 34.00 79,739 sq Yd 71036 0.85 5,960 cu yd 740 15.45 11,433 42,000 28,000 5,000 157,300 sq ft 16,375 1.75 28,656 101(370,597.) 37,059 SMTOTAL 407,651 30% C = iNGENaEs 122,296 TOTAL 529,947 ESTUTATE 530,000 Assumptions 1. Tennis Court ,Repository Constructed. 2. Cast for repository is included in the earth moving price. 3, Remedial area includes Racquet Club and Pliollie Gibson Shaft. Property AA -10 constitutes approxir3tely 901 of the area. 3 �aZIA _.^,�n^^ -o - s _8z = b i_ aini� o6-9 -��� SUBTOTAL 30% CONTINGEIICIES TOTAL ESTIMATE !�!tions I. Tennis Court Repository is no, con . structed. 2. Area includes Racquet Club and riollie Gibson Shaft, 3. Landscaping cost includes shrubs, flvvier beds and sod. yqq Cost 10,800 163,200 12,155 11,433 28,000 5,000 28,656 5,000 i 26,424 250,668 87,200 377,858 380,000 221�Y OF RF3MTAL COST :"E IIS COCJR'S ARFA W,77%K fTT REi'OSITCRY Item Units mat 1. Remove Soil cu yd ?00 12.G0 2. Backfill cu yd 4,800 34.00 3. Geotextile Sq yd 14,300 0.85 4. Granular Material cu yd 740 15,45 S. Trees 6. Landscaping 7. Pavement Sq it 16,375 8. disc, Structures 4• Mobilization SUBTOTAL 30% CONTINGEIICIES TOTAL ESTIMATE !�!tions I. Tennis Court Repository is no, con . structed. 2. Area includes Racquet Club and riollie Gibson Shaft, 3. Landscaping cost includes shrubs, flvvier beds and sod. yqq Cost 10,800 163,200 12,155 11,433 28,000 5,000 28,656 5,000 i 26,424 250,668 87,200 377,858 380,000 SUMMARY OF REMEDIAL COST FOR COAIDOMINIUMS Hunter Creek Condominiums Item Units Quantic Price Cost 1. Remove Soil cu yd 300 12.00 3,600 2. Backfill cu yd 4,600 34.00 156,400 75,000 3. Trees 4. Shrubs each 300 25.00 7,500 5. Flower beds sq ft 6,510 3.00 19,530 6. Sod sq ft 212,500 0.40 85,000 7. Mobilization 10%(347,030) 34,703 SUBTOTAL 381,733 30% CONTINGENCIES 114,520 TOTAL 496,253 ESTIMATE $500,000 Centennial Condominiums Item Units Quantity Price Cost 1. Remove soil cu yd 100 12.00 1,200 2. Backfill cu yd 1,500 34.00 51,000 19,000 3. Trees 4. Shrubs each 75 25.00 1,875 S. Flower beds sq ft 1,600 3.00 4,800 6. sod sq ft 59,500 0.40 23,800 7. Ttohi_Ii7.,tion 10%(101,675) 0,168 SUBTOTAL 1.1.1 300- COLNTIA3GE?CIES TOTAL ESTITSATE 150,000 H. power COMPUTATION SHEET o U.S. Government Printinn nffico. 1461 -77Q -d14 BY 9 GUS! DATE PROJECT SHEET OF CHKD BY DATE FEATURE DETAILS I E,owl r i '1 i v L4 0 Moot, ;v vio+-. I COMPUTATION SHEET BY DATE U•S. Gov errment Prinhng Office: 1981.77 PROJECT CHKD gy DATE ��=' �' ... ,,,•. SHEET—OF— DETAILS FEATURE ti'. OF— DETAILS r � w I