HomeMy WebLinkAboutGM.scoring accepting.park.place READING ON DRAFT RESOLUTION OF THE BOARD OF COUNTY
COMMISSIONERS OF PITKIN COUNTY, COLORADO ACCEPTING THE
ASPEN/PITKIN COUNTY GROWTH MANAGEMENT COMMISSION
RECOMMENDED SCORING OF THE PARK PLACE COMMERCIAL PARKING
GARAGE GROWTH MANAGEMENT APPLICATION, 707 EAST HYMAN AVENUE,
CITY OF ASPEN
TO:
THRU:
FROM:
RE:
DATE:
MEMORANDUM
Pitkin County Board of County Commissioners
Lance Clarke, Deputy Community Development Director, Pitkin County
Chris Bendon, Senior Long Range Planner, City of Aspen
Park Place Commercial Parking Garage - 707 East Hyman Ave., Aspen
Acceptance of Growth Management Commission Scoring
December 3, 2003
SUMMARY:
Hyrnan Avenue Holdings, LLC, represented by Stan Clauson Associates, LLC, is
requesting the City of Aspen grant land use approvals to construct a 99-space
commercial parking facility.with an accessory office and two (2) affordable housing
units.
The parcel is i2,000 square feet consisting of Lots A, B,
C and D of Block 105, City and Townsite of Aspen, and
is located in the Office (O) Zone District. The property
is currently developed with an "A-Frame" structure, 707
East Hyman, and the "Hannah-Dustin'' building, 300 So.
Spring. Both are currently office buildings. No changes
are proposed for the Hannah Dustin Building. The
commercial parking facility is proposed to replace the 950
square foot A-Frame.
Th~ parking operation is proposed as an entirely automated system. Cars are placed
on "pallets" and then mechanically moved within the building. No internal ramping
is involved and drivers do not actually enter the garage. A small office houses an
attendant Who aids patrons with the system.
The GMQS process requires scoring by the Growth Management Commission
(GMC). Projects must achieve minimum "threshold" scores in various categories in
order to proceed. The GMC reviewed this project and assigned a passing score to
each of the scoring criteria (scoring summary attached). The process now requires
acceptance of the scoring by both City Council and the Pitkin County Board of
County Commissioners, then granting of the allotments by the Aspen City Council.
The BOCC is being asked to accept the scoring assigned by the GMC. In the
alternative, the BOCC can choose to not accept the scoring and the applicant can
appeal that decision to a joint City Council/BOCC hearing.
Staff recommends the BOCC adopt Resolution. No. , Series of 2003.
Park Place memo page 1
APPLICANT:
Hyman Avenue Holdings, LLC. Represented by Stan Clauson, AICP
LOCATION~ LOT SIZE~ ZONING:
707 East Hyman Avenue. The parcel is I2,000 square feet consisting of Lots A, B, C
mad D of Block 105, City and Townsite of Aspen, and is located in the Office (O)
Zone District.
I~ROPOSED LAND USE:
Hannah/Dustin building (west building) - Office (also current use)
A-Frame (east building) - Commercial parking, affordable housing, accessory office.
REVIEW PROCEDURE:
Growth Management Scoring - Section 26. 470, Aspen Land Use Code.
Actions required for approval of allotments. "Since the Growth Management Quota
System applies throughout the Aspen Metro Area, no growth management allocation
shall be awarded unless the City Council and Board of County Commissioners both
accept the recommendation Of the Growth Management Commission."
RECOMMENDATION:
Staff recommends adoption of BOCC Resolution No.
, Series of 2003.
RECOMMENDED MOTION:
"I move to adopt Resolution No.
, Series of 2003."
ATTACHMENTS:
Exhibit A - Proposed Resolution and Scoring Summary
Exhibit B - Development Application
Park Place memo page 2
RESOLUTION OF THE BOARD OF COUNTY COMMISSIONERS OF PITKIN
COUNTY, COLORADO, ACCEPTING THE ASPEN/PITKIN COUNTY GROWTH
MANAGEMENT COMMISSION RECOMMENDED SCORING OF THE PARK PLACE
COMMERCIAL PARKING GARAGE GROWTH MANAGEMENT APPLICATION, 707
EAST HYMAN AVENUE, CITY OF ASPEN.
Resolution No. -2003
RECITALS
On November I 1, 2003, the Asper~Pitkin County Growth Managemem Conm~ission ("the
GMC") held a duly noticed public hearing at which time evidence mhd testimony was presented
with respect to the Park Place Corm,nercial Parking Garage Growth Management application.
2. The Park Place Commercial Parking Garage Growth Management Application is a
development application received by the City of Aspen Community Development Department
from Hyman Avenue Holdings, LLC, Joba~ Cooper Managing Partner, owner and applicant,
represented by Stan Clauson Associates, LLC, for a Groxvth Management allocation of 4,000
square feet of net leasable space for a proposed ~ommercial parking facility housing ninety-nine
cars, two affordable housing units, an accessory parking attendant office, and an existing office
building. The parcel is described as Lots A, B, C, and D, Block 105, City and Towntsite of
Aspen, Pitkin Comhty, Colorado, also described as the Hannah-Dustin Condominiums
according to the plat thereof recorded in Plat Book 17 at Page 78 Pitkin County Cleric mhd
Recorder. The parcel is currently developed with an "A-Frame" structure, 707 East Hyman
Avenue, generally located on Lots C and D, and the "Hannah-Dustin" building, 300 So. Spring
Street, generally located on Lots A and B. Both are currently office buildings. Minimal
changes are proposed for the Hannah Dustin Building and site. The commercial parking facility
is proposed to replace the A-Frame; and,
The GMC scored the application pursuant to the criteria for commercial and office
development, Section 26.470.100 of the Aspen Land Use Code. The Commission assigned
scores meeting and exceeding the minimmn' threshold scores necessary for commercial growth
management allotment and said scores are attached as Attachment A of this documeut.
Pm'suant to Section 26.470 of the Aspen Land Use Code, both the City Council and the Pitkin
County Board of County Co~ranissioners must accept the scoring assigned by the GMC in
order for the City Council to award growth management development allotments.
NOW, THEREFORE BE IT RESOLVED by the Pitkin County Board of County
Commissioners that it does hereby accept the assigned scoring of the Park Place Commercial
Parking Garage Growth Management application.
APPROVED AND ADOPTED ON THE
[signatures on following page]
day of ,2003.
Resolution No. -2003
Page 2
ATTEST:
Lyndee R. Dean
Clerk to the BOCC
APPROVED AS TO FORM:
Jolm Ely,
County Attorney
Attachment A - GMC Scoring
BOARD OF COUNTY COMMISSIONERS
OF PITKIN COUNTY. COLORADO
By.
Jack Hatfield, Chainnan
Date
APPROVED AS TO CONTENT:
Cindy Houben.
Community Development Director
Eric Cohen, Chair 11 7
Roger Haneman t2 6
Ruth 13 8
son 11 6
John Rowland 8 7
Steve Skadron 10 5
Peter Martin 11 8
· Mike Augello 9 7
Peter Thomas 8 7
John Howard 9 7
18 14
18 14
21 14
17 t4
15 14
15 14
19 14
16 14
15 14
16 14
Average Score 10.2 6.8 17.0 14.0
Threshold 7.2 4.0 18.8 9.0
Pass/Fail Pass Pass Pass Pass
12 7 19 14
12 6 18 14
13 8 21 14
12 7 19 14
8 7 15 14
10 '5 15 14
12 8 20 14
10 7 17 14
8 7 15 14
9 7 16 14
0.0 10.6 6.9 17.5 14.0
7.2 4.0 16.8 9.0
Pass
Pass
Pass Pass
0.0
Scoring Categories
A - Quality of Design. 18 points avaialble.
B - Availability of Public Facilities and Services. 10 points available.
C - Provision of Affordable Housing. 15 points available
D - Bonus points. 4 points available.
Minimum Scoring Thresholds
A - 40% of available points
B - 40% of available points
A+B - 60% of available points
C - 60% of available points
D - no minimum.
APPLICATION
Park Place - Commercial parking Facility
15 September 2003
Applicant:
Hyman Avenue Holdings, LLC
Location:
707 East Hyman Avenue in Aspen
(P1D# 2737-182-27-001)
Zone District: Office District
.4 Growth Management Application for
Commercial and Office Development
Represented-by: Stan Clauson Associates, LLC
200 E. Main Street
Aspen, CO 81611
970-925-2323
Chris Bendon, Aspen Community Development Departmem
15 Septeraber 2003
Page 2
This project has previously gone through Sketch Plan Review pursuant to Section
26.304.060 B2 of the Aspen Land Use Code on 21 October 2002, at which time the
Planning and Zoning Commission and the City Council had an opportunity to preview
the project and provide comments. It is also in the process of being heard by the
Planning & Zoning Commission for its Conditional PUD and related approvals. Several
supplementary reports recently provided to the P&Z, but not in the original application,
are provided as appendices to this application. These include a traffic study and noise
analysis. The 1986 Aspen/Pitkin County Transit/Transportation Development Plan,
which supports parking development in this area, has not been included here. Please
refer to the Conditional PUD application for this document.
The proposed Park Place Commercial Parking Facility will bring the subject property into
compatibility with the mixed use development that has occurred in the neighborhood.
The property is currently under-utilized and without streetscape amenities along Hymun
Avenue. Moreover, surface parking on the property adds a chaotic appeamn~ to the
are~ The proposed facility would correct these issues, while the entire downtown core
would benefit from additional parking in this location. The parking facility will reduce
demand for the limited on-street parking in Aspen and will compensate for employee
generation by incorporating two affordable remal units.
We look forward to an opportunity to presem this application, which we believe will
enhance the downtown Aspen experience for tourists and residents alike. We remain
ready to answer any questions that you or the review boards may have regarding the
application.
Very truly yours,
A SO ,A S,
Attachments:
A. Land Use Application Form, Dimensional Requirements Form, Project Overview,
and Standards Report
B. Traffic Study, prepared by Felsburg, Holt & Ullevig
C. Noise Analysis, prepared by Wyle Laboratories
D. Vicinity Map
E. Property Survey
F. Architectural Plans and Elevations
G. Landscape Plan
H. Architeetaral Rendering
I. Letter of Authorization
J. Legal Deseription/Proof of Ownership
K. Pre-application Conference Summary,'d~/~d 3 June 2003
ATTACHMENT A
LAND USE APPLICATION
APPLICANT:
Park place--Co~ Parking Fam]ity
707 East Hyman Avenue; Lots C & D, Block 105, Aspen Townsite
(Indicate street address, lot & block number, legal description where appropriate)
Address:
Phone #:
John Cooper, Managing Pa~er; Hyman Avenue Holdings, LLC
402 Midland Avenue, Aspen, CO 81611
970 379-3434
REPRESENTATIVE:
Name: Stan Chuson Associates, LLC
Address: 200 East Main Street, Aspen, CO 81611
Phone #: 970 925-2323
TYPE OF APPLICATION: (please check all that apply):
[] cmat~Use [] Conceptu~PUD [] Conceotua~HistodcI)evt.
[] Special R~view [] Final PUD (& PUD Amendment) [] Final Historic Development
[] GMQS Allotment . [] Final SPA (& SPA Amendment) [] Historic Demolition
[] GMQS Exemption [] Subdivision [] Historic Desiglmtion
[] ESA - 8040 Greenline, Stream [] Subdivision Exemption (includes [] Small Lodge Conversion/
Margin, Hallam Lake Bluff, condraninimnimfion) Expansion
Mountain View Plane
[] Lot Split [] Temporary Use [] Other:
EXISTING CONDITIONS: (description of existing bngdlnSs, uses, previous approvals, etc.)
Exkqting property consists of Lots A, B, C, & D; Towusite Block 105. Lots A & B contain an office building,
Known as the Hanm~Dustin Building. Lots C & D contain an A-frame structure in office use and sm-Face parking.
PROPOSAL: (description ofproposed buildings, uses, modifications, etc.)
Lots A & B would be subdivided fi~m Lot.s C & D. Lots C & D would be developed as a rack-storage
Have you attached the following?
[] Pre-Applimfion Conference Sun-amry
[] Attaclanent #1, Signed Fce Agreement
[] Response to Attachment #2, Dimensional Requirements Form
[] Response to Attachment #3; Minlm~ma Submission Coments
[] Response to Allaclanem g4, Specific Submission Contents
[] Response to gnachment #5, Review Slandards for Your Application
FEES DUE: $._2,520.00
DIMENSIONAL REQUIREMENTS FORM
Applicant:
Location:
Zone District:
Lot Size:
Lot Area:
Park Place - Cqmmercial Parking Facility
John Cooper, Mmmging Partner; Hyman Avenue Holdings, LLC
707 Eas~, Hyman Avenue; Lots C & D, Block 105, Aspen Townsite
(0) ,
Lots A, B, C, and D = 12.000 s.f. to be subdivided into 2 lots of 6,000 s.f. each
Lots C & D = 6,000 sq, ft.
(for the purposes of calculating Floor Area, Lot Area may be reduced for areas within
the high water mark, easements, and steep slopes. Please refer to the definition of Lot
Area in the Municipal Code.)
Commercial net leasable:
Number of residential units:
Number of bedrooms:
Existing: 927 s. f.
Existing: O
Existing: 0
Proposed: 4,836 s.f.
Proposed.'2
Proposed:
Proposed % of demolition (Historic properties only): N/A
DIMENSIONS:
Floor Area: Existing: 927s;f. Allowable: 6,000s;f. Proposed: 7, 773s;£
Principal.bldg. height: Existing: 20ft. Allowable: 25ft. Proposed: 35fl.
Access. bldg. height: Existing: N/A Allowable: 21ft. Proposed: 21ft.
On-Siteparking: Existing: 20-30 Required: 6 Proposed: 99
% Site coverage: Existing: N/A Required: N/A Proposed: N/A
% Open Space: Existing: N/A Required: N/A Proposed: N/A
Front Setback: Existing: 10ft. Required: lOft. Proposed: 6.5
Rear Setback: Existing: 15ft. Required: 14£t. Proposed: Off.
Combined F/R: Existing: 25ft. Required: 25ft. Proposed: 6.5 ft.
Side Setback: Existing: 5ft. Required: 4{t. .Proposed: 5ft.
Side Setback: Existing: 5ft. Required: 5ft. Proposed: 3ft.
Combine,dSides: Existing: 10ft. Required: loft. . Proposed: 8ft.
Existing non-conformities or encroachments: Parking .areas encroach in setbacks and on
Ci _ty.propertv.
Variations requested: Floor area, height, front setback rear setback, and side yard
setbacks.
Project Overview
Park Place is a project that will address an essential need for off-street parking in Aspen's
commercial core. The Rio Grande parking garage is often fall, while other off-street
parking in the business district is limited to private lots or spaces associated with
commercial buiklings. ·
It ~s evidem that parking still remains an issue in Aspen today
Park Place is intended to address this issue and offer some relief for the current
downtown parking situation~
As part ora 1986 study, the City adopted a plan to alleviate on-street parking by
constructing various ' ·
A ' . facilities that would provide parking and would allow acees
spen s commercml core. The Rio Grande parking garage was built as a result of that
plan. Although intended as a comprehensive solution with several com4>oln~sy, sto
remaining aspects of that plan were never realized, incindin~, th~ . the
parking garage within the block surrounded '- -- ~ ,, --v construction ora
The proposed Park Place---Commereial Parking Facility is located within this designated
btoc~, oy cooper, ~pring, Hymen, and Original.
Park P/ace will make 99 parking spaces available near Aspen's commercial core and
within walking distance to the Silver Queen Gondola. The facility will be a state-of-the.
art facility that will use an automated vertical lift to stack vehicles within an enclosed
e ~ar~k~ ~._.~.e~ to ae~c~v.e ~ most. efficient use of space on a
available ~----~ *~ o},,~ wm oe avm~ame mr purct~ase, making parking
to the owner whenever it is needed. When that space is not utilized, it will
become available and rented to the public. Not only will this help to satisfy the parking
needs of local business workers and long term visitors,
parking congestion in the city limits, but it will relieve on-street
As demonstrated in the following GMQS apphcatlon, Park Place will provide an essential
community benefit. .
The structure will accommodate two deed restricted residential units,
with a total of four bedrooms, situated along the streetseape to emphasize
components of the surrounding area. The project will also provide a sidewalk aiong the
fi.om the residential
of the Property, complete with full landscaping and ornamental tree plantings
will alleviate a current . This
project gap in the pedestrian infrastructure, which will integrate the
as part of the neighborhood and create cohesiveness.
Park Place Commercial Parking Facility
Land Use Code Standards Report
'age f
Land Use Code Standard Report
Offered below are responses to relevant standards as identified in the Land Use Code:
1. Responses to Section 26.480.080 (C) (1) Development allotment and application
procedures
a. How the proposed development shall be connected to the public water system,
including information on main size and pressure; the excess capacity available in
the public water system; the location of the nearest main; and the estimated water
demand of the proposed development.
Response: The proposed development will connect with the city water system via Hyman
Avenue, which according to the City of Aspen Water Department is operating at a
pressure of approximately 70 PS1. This is well above the typically required 35 P$1for
development in the area The Water Department did not anticipate a problem providing
the required water supply to the Park Place project, as the daily demand would be
generated from the residential units only and a public restroom available to patrons and
employees.
b. How the proposed development shall be connected to the public sewage
treatment system; the access capacity available in the public sewage treatment
system; the nearest location to the building site of a tnmk or connecting sewer
line; and the expected sewage treatment demand of the proposed development.
Response: Park Place will be connected to the public sewage system located along
Hyman Avenue. The applicant will pay any necessary conncction fees associated with
the proposed development. The structure will contain two residential units, with a total
of foar bathrooms and two kitchens, along with a public rest room serving the office
facility. Additionally, drainage frorn parked vehicles will be accommodated with
appropriate oil and silt separation. This demand can adequately be accommodated by the
existing City of Aspen sewage system.
c. The type of drainage system proposed to handle, surface, underground and
runoffwaters from the proposed development, and the effect of the development
on historic drainage patterns.
Response: The Park Place facility will provide drywell drainage systems for building and
surface run-off in accordance with the requirements of the City Engineering Department.
The building will have a flat roof and cover the greater part of the lot, with no significant
effect on drainage patterns in the area.
d. The type of fire protection systems to be used (such as hydrants, sprinklers,
wet standpipes, etc.); and the distance to the nearest fire station and its average
response time).
Park Place Commercial Parking Facility
Land Use Code Standards Report
Page 2
Response: Park Place will be located less than four blocks from the nearest fire station,
which means that average response time in case of an emergency will be almost
instantaneous. The nearest fire hydrant is located at Hyman Avenue and Spring Street,
which is less than 1 O0 feet from the proposed Park Place facility. Internal fire
suppression systems will be provided as required by the NFPA and the City Fire
Marshall. Standpipes will be provided on site. Construction will be subject to more
stringent 3-Hour fire ratings.
The interior and exterior walls of the parking structure will be fire proof to meet the
standards of the Uniform BmTding Code (UBC), crud afire wall will be placed between
the parking area and the residential units. An emergency generator will be installed as
part of the system to protect against electrical failure. Approved sprinkler systems,
illumination systems, evacuation/roof access, hose bibs, and alarms will be implemented
and installed to the satisfaction of the Aspen Fire Protection District. Appropriate
ingress/egress will be provided for both residential units as required by the Uniform
Building Code.
e. The total developmem area of the proposed development, the type of housing
development proposed; total number of units and bedrooms, helming employee
housing; and a tabular analysis outlining the proposed development's compliance
with the dimensional and use requirements of this title.
Response: The development will include a Category I, one bedroom rental unit as well
as a Category 3, three bedroom rental unit. The dimensional requirements of the units
meet the standards of the PUD application submitted for this development.
f. The estimated traffic count increase on adjacent sta~ets resulting from the
proposed development; and description of the type and condition of roads to serve
the proposed development; the total number of vehicles expected to use or be
stationed in such development; the hours of principal daily use on adjacem roads;
the on- and off-street parking to be supplied to the proposed development;
location of alternate transit (bus route, bike paths, etc.); any automobile
disincentive techniques incorporated in the proposed development; whether roads
or parking areas will be paved; and methods to be used for snow and ice removal
on streets and parking lots.
Response: It is important to understand that a parkingfacility is not considered a traffic
generator, considering people do not designate a parking facility as a point of
destinatior~ Traffic generation for the Park Place facility will only result from the
affordable ho~tsing components of the project. The total traffic generation is estimated to
be less than 5 trips per day per residential unit, which is actually less than is generated
by the office space that currently occupies the lot. Trips will be redaced further if these
residential units are occupied by employees of Park Place. A traffic analysis has been
appended to this applicatior~
Park Place Commercial Parking Facility
Land Usc Code Standards Report
Page 3
g. The method by which affordable housing will be provided, in conformance
with the provisions of the AsperdPitkin County Affordable Housing Guidelines,
and a description of the type and amount of housing to be provided.
Response: Affordable housing will be provided on site and situated along the streetscape
to enhance the residential aspects of the neighborhood. As mentioned above, the Park
Place development will include a Category I, one bedroom rental unit as well as a
Category 3, three bedroom rental unit. At least one unit is interuted for occupancy by
employees of Park Place.
Response to Section 26.470.700 Growth Management Scoring Criteria -
C~mmercial and office development (C) Criteria.
A development application requesting development allotments for commercial or office
development shall be assigned points by tho Growth Management Commission pursuant
to the following standards and point schedules:
1. Quality of design (msximum eighteen (18) points). Each development shah be
rated based on the exterior quality of its buildings and the quality of its site design, and
assigned points according to the following standards and considerations:
0 - A totally deficient design
1 - A major design flaw
2 - An acceptable (but standard) design; or
3 - An excellent design
The following features shall be rated accordingly:
a. Architectural design (maximum three (3) points). Considering the
compatibility of the proposed development (in terms of scale, siting, massing,
height, and building materials) with existing, neighborhood developments.
Response: The proposed Park Place facility was designed to enhance the aesthetic
qualities of the neighborhood by incorporating modern architectural features with a
variety of materials to compliment existing development of the area. The office and
residential units will be built along the facade of the building to enhancing the mixed
uses that already exist in the neighborhood Since the utility components of the Park
Place facility will be almost entirely hidden from the streetscape, a score of 3 is
requested.
b. Site design (maximum three (3) points). Considering the quality, character,
and appropriateness of the proposed layout, landscaping, and open space areas,
the amount of site coverage by buildings, the extent of underground utilities, and
the arrangement of improvements for efficiency of circulation, including access
for service, increased safety and privacy, and provision of snow storage areas.
Park Place Commercial Parking'Facility Page 4
Land Use Code Standards Report
Response: The space required for the parkingfacility allowed no additional square
footage for open space. However, the property will be greatly improved by adding a
sidewalk with landscaping (including cottonwood trees) along Hyman ~dvenue. .41l
utilities will be placed underground and access will be provided from either Hyman
Avenue of the rear alley. Snow storage may be accommodated on the adjacent property,
hich wdl be formalized in an access agreement. The applicant would request a score of
2for this section.
c..Energy conservation (maximum three (3) points). Considering the use of
passive and/or active energy conservation techniques in the construction and
O
pemt~on of the proposed development, including but not limited to insulation,
glazing, passive solar orientation, efficient heating and cooling systems and solar
energy devices; the extent to which the proposed development avoids wasting
energy by excluding excessive lighting and inefficient wood burning devices; and
the proposed development's location with regard to the potential for solar gain to
result in energy conservation~
Response: The northern orientation of the site does readily lend itself to solar utilization.
The residential units will be designed to comply with the Aspen/PitMn County Efficient
Building program and will incorporate efficient low flow fixtures' lighting, heating
systems, as well as energy efficient glazing and insulation systems. The applicant
requests a score of 2.
d. _Amenities (maximum~three (3)P~mts) Considering the provision of usable
open space, pedestrian and bicycle ways, benches, bicycle racks, bus shelters, and
other common areas for users of the Proposed development.
Response.. As mentioned previously, the applicant is committed to inco
sidewalk along Hyman Avenue. Pedestrian safety will o ~ _ rporate a,, ,.
quality of the ~ --~ be ,reproved and the aesthetic
neighborhood will be enhanced with the incorporation ora sidewalk
incorporating landscaping and tree plantings. A score of 3 is reCOmmended since the
proposed development will result in a significant visual enhancement of the area.
rog{s) m me proposed development to prevent infi'm ement
designated scenic viewplanes g on
Response: The previously submitted PUD appBcation for Park Place requests a height
variance to 35feet for the parking structure, which will be similar to that of the adjacent
Benedict Commons building. The residential units situated along Hyman Avenue will
comply with the City's height limitation of 27 feet.
f...Trash and utility access areas~(maximum three (3~oh,t~ Considering the
extent ' · . . '
to which reqmred trash and uti/ay access areas are screened from public
~7; are,s, ized to meet the needs of the proposed development and to
~c utility ~lacemen,- o~,, ~ ...... ~
-- --, ~,.~ ~ easny accessea; allow trash bins to be moved by
Park Place Commercial p-~ing Facility
Land Use Code Standards Report Page 5
service personnel, provide users with recycling bins, and provide enclosed trash
bins, trash compaction or other unique measures.
Response: Most of the trash generated from Park Place will be associated with the two
proposed residential units and therefore the need for trash services will be minimal. The
applicant is willing to provide an easement for the placement of a Park Place dumpster
on the adjacent Hannah Dustin building site. A score of 2 is requested for this section.
2. Availability of public facilities and serviCes (maximum ten (10) points). Each
development application shall be rated on the basis of its impact upon public facilities
and services by the assigning points according to the following standards and
considerations:
0 - Proposed development requires the provision of new public facilities and services at
increased public expense;
1 - Proposed development may by handled by existing public facilities and services, or
any public facility or service improvement made by the applicant benefits the proposed
development only, and not the area in general; or
2 - Proposed development improves the availability of public facilities and services in
the area without increased, undue public expense.
In those cases where points are given for the simultaneous evaluation of two (2) services
(i.e., water supply and '
fire protectu>n) the determination of points shall be made by
averaging the scores for each feature.,
a. Water ~upply/fire protection (maximum two (2) points). Considering the
ability of the water supply system to serve the proposed development and the
applicant's commitment to install any water system extension or treatment plant
or other facility upgrading required to serve the proposed development. Fire
protection facilities and services shall also he reviewed, COnsidering the ability of
the appropriate fire protection district to provide services according to estabhshed
response time without necessary of upgrading available facilities; the adequacy of
available water pressure and capacity for providing fire fighting flows; and the
commitment of the anolieant to
er v ~' v,u~ m* pro[ecuon laCllllies WhiCh may be
necessary to serve the proposed development.
Response: The existing water supply for the property is feed by a main on Hyman
Avenue, which will provide adequate supply for the project. The current pressure at this
location is 75
b. Sanitary sewer (maximum two (2) points). Considering the ability ofthe
sanitary sewer system to serve the proposed development and the applicant's
commitment to install any sanitary system extension or treatment
facility upgrading required to serve the proposed development, plant or other
Response: The project will be connected to the City of .4spen sewer system.
Park Phce Commercial Parking Facility
Land Use Code Standards Report
Page6
c. Public transportation/roads (maximum two (2) points). Considering the ability
of the proposed development to be served by existing public transit routes. The
review shall also consider the capacity of major streets to serve the proposed
development without substantially altering existing automobile and pedestrian
traffic patterns, creating safety baTards or maintenance problems, overloading the
existing street system or eansing a need to extend the existing road network and
consider the applicant's commitment to install the necessary road system
improvements to serve the increased usage attributable to the proposed
development.
Response: The Park Place development Will be served by Hyman Avenue, which can
adequately accommodate the users of the parking facility. It has been cited in a City of
Aspen parking analysis, that vehicles have been observed to travel up to four times the
minimum length of a trip in a prolonged effort to find available parking space. It was
estimated that during peak hours, half the number of cars traveling on the street in Aspen
are searching for parking. More readily available parking can reduce traffic by reducing
the number of cars that are roaming the streets in search of on-street parking spaces.
The additional parking amenities will be provided to public at absolutely no cost to the
City of Aspen. The applicant requests a score of 2.
d. Storm drainage (maximum two (2) points). Considering the degree to which
the applicant proposes to maintain historic drainage patterns on the development
site. If the development requires use of the City's drainage system, the review
shall consider the commitment by the applicant to install the necessary control
facilities and to maintain the system over the long-term
Response: The existing drainage on the site Will not be negatively affected in any way.
Additional drainage intakes Will be constructed in accordance with the requirements and
standards of the City of Aspen Engineering Department. The applicant requests a score
of 2.
e. Parking (maximum two (2) points). Considering the provisions o f parking
spaces to meet the commercial, office, and/or residential needs of the proposed
development as required by Chapter 26.515, and considering the design of the
parking spaces with respect to their visual impact, amount of paved surface,
convenience, and safety.
Response: The Park Place parking facility will accommodate 99 vehicles, including
those associated with the residential units and office space. This will serve adjacent uses
and those internal to the project while, at the same time, provide additional parking
opportunities for businesses, residents, and visitors in the Commercial Core. A score of
2 is suggested for this section.
3. Provision of affordable housing (maximum fifteen (15) points).
Park Place Commercial Parking Facility
Land Use Code Standards Report
P~e7
a. General. Each developmem application shall be assigned points for the
provisions of housing which complies with the housing size, type, income and
occupancy guidelines of the City, and the provisions of the Affordable Housing
Guidelines.
b. Assignmem of points. Points shall be assigned as follows:
(I) Zero (0) to sixty (60) percent of the additional employees generated by the
proposed developmem: One (1) point for ~each six (6) percent housed;
(2) Sixty-one (61 ) to one hundred (100) percent o f the additional employe, es
generated by the proposed development: Ten (10) points for the first sixty (60)
percent housed, plus one (1) point for each additional eight (8) percent housed.
Response: The employment generated by this proposed development is about 5 year-
round FTE personnel. The proposed residential units include a total of 4 bedrooms thus
accommodating 4 people. The applicant should be awarded 12 points for this sectior~
4. Bonus Points (maximum four (4) points). Bonus points may be assigned when it is
determined that a proposed development has not only met the substantive standards of
Sections 26.470.100 (A) through (C), but has also exceeded the provisions of these
Sections and achieved an outstanding overall design meriting recognition. An award of
additional bonus points shall not exceed ten (100 percent of the total points awarded
under Section 26.470.100 (A) through (C).
Response: No points are requested for this sectior~
Park plaCe ~0mmercial Parkin~ Facility
Land Use Code Standards Report
Page 8
ATTACHMENT B
FELSBURG
HOLT &
ULLEVIG
engineering paths to rransportauon solutions
August 28, 2003
Mr. Stan Clauson, AICP, ALSA
Stan Clauson Associates, LLC
200E. Main Street
Aspen CO 81611
RE:
Traffic Analysis
Park Place Parking Garage
FHU Reference No. 03-169
Dear Mr. Clauson:
Felsburg Holt & Ullevig has prepared this letter to summarize the traffic ~mpacts associated with
the proposed 99-space Park Place Commercial Parking Facility (Park Place garage) to be
located at 707 East Hyman Avenue in Aspen, Colorado. This letter summarizes the existing
land use and traffic impacts associated with the small office building and parking area currently
on the site, the existing traffic volumes on Hyman Avenue in the vicinity of the site, the number
of trips forecasted for the proposed garage, and the traffic ~mpacts to the adjacent streets
assoc ated with those trips.
Existing Land Use
Currently, the site consists of a 927 square foot A-frame office building and small surface
parking lot that can accommodate approximately 15 vehicles. On a typical day, this lot is used
to capacity. The Institute of Transportation Engineers (ITE)~, Sixth Edition was
used to forecast the existing daily and peak hour trips associated with the office building. The
existing parking lot trips were estimated based on information provided by the City of Aspen for
the Rio Grande Parking Garage. In that garage during peak times of the year, each space is
used approximately 1.5 each day, with the peak demand occurring between 11 AM and 2 PM,
which is outside of the morning and afternoon peak hours of adjacent street traffic (one hour
between 7 and 9 AM and 4 and 6 PM). Since traffic impacts are typically measured during the
peak hour of street traffic, it was estimated that approximately 15 percent of the total daily traffic
would occur during those mormng and afternoon peak periods. These characteristics were
applied to the existing surface lot on the site.
Table 1 shows the number of daily and peak hour trips currently associated with the site. As the
table indicates, the existing land uses on the site generate approximately 105 daily trips, 12 AM
peak hour trips, and 12 PM peak hour trips.
303.721.1440
fax ~x03.721 0832
fhu@fhueng.com
Greenwood Corporate Plaza
795I E. Maplewood Ave. Ste 200
Greenwood Village, CO 80111
August28,2003
Mr. Stan Clauson
Page 2
Table 1 Existing Trips Generated by the Site
Office 927 SF 40 5 4 1 5 1 4
Parkin~l Lot 15 Spaces 45 7 6 1 7 2 5
Total Trips 105 12 10 2 12 3 9
Existing Traffic Volumes
Traffic volumes on East Hyman Avenue in the vicinity of the site were obtained from the city.
Summer counts were conduced in 1997 and winter counts were conduCted in 1994. These
counts were factored to 2003 conditions based on the traffic growth factor calculated by the
Colorado Department of Transportation (CDOT) for Original Street (SH 82) immediately east of
the site. Based on this factor, Hyman Avenue currently experiences approximately 3,500
vehicles per day (vpd) in the summer and approximately 2,300 vpd during winter. The summer
volume on Hyman is1,700 to 1,900 vpd lower than the summer volume on either Cooper
Avenue (4,900 vpd) or Hopkins Avenue (4,700), one block north and south of the site,
respectively, and is approximately 3,000 vpd lower than the volume on Durant Avenue (6,500
vpd), two blocks north of the site. All four streets appear to have similar mixes Of commercial
and residential land use. Thus, it appears that Hyman currently experiences traffic volumes that
are somewhat lower that the typical volumes on other local streets in the downtown area.
Proposed Land Use
As proposed, the site would be developed as a 99-space garage, with two affordable housing
units. The garage is consistent with the land use identified for the site in the Aspen/Pitkin
County Transit/Transportation Development Program, 1986-2000 (Leigh, Scott & Cleary, 1986),
which identified a 300-space parking garage for the site. To maximize space usage, a
mechanical system would be used to park cars. Drivers would park their car on one of two
mechanical lifts, exit the car, and the lift would move the car into an available spot.
Table 2 summarizes the trip forecast with the proposed land uses. ITE Trip Generation, 6t~
edition was used to forecast trips associated with the affordable housing. As for the garage,
based on our understanding of the operation, all of the garage spaces would be available for
purchase or long-term rental by local residents. It was assumed that approximately 20 percent
of the spaces wouJd be used by part-time local residents to store their vehicles when out of town
and thus would generally be unavailable for use on a daily basis. The remaining 80 percent (80
spaces) would be used on a daily basis by local residents, merchants, employees, and visitors.
These daily spaces would be in a manner similar to the Rio Grande garage; i.e., each space
used approximately 1.5 time each day, with approximately 15 percent of the daily demand
occurring dudng the morning and afternoon peak hours of the adjacent streets. Based on these
August 28, 2003
Mr. Stan Clauson
Page 3
assumptions, the proposed land uses would generate approximately 250 daily trips, 37 AM peak
hour trips, and 37 PM peak hour trips.
Table 2 Proposed Park Place Trip Generation
Affordable Housing 2 Units 10 1 0 1 1 I 0
Parkin~ Lot 80 Spaces 240 36 29 7 36 11 25
Total Trips 250 37 29 8 37 12 25
Traffic Impacts
Table 3 summarizes the net trips generated by construction of the Park Place Garage. These
trips represent the trips generated by the garage, minus the existing trips from the site. The
total represents the new trips that would be added to Hyman Street. However, it should be
noted that these trips are not new trips to the downtown Aspen area, but rather represent
existing traffic that currently uses other parking locations. In fact, construction of the garage
may result in a minor reduction in overall traffic in the downtown area, because some of the
vehicles that would use the garage currently circle the area in search of on-street parking. With
the new facility, these vehicles would drive directly to the lot and be removed from circulation.
Table 3
Net Trip Generation from the Park Place Site
Proposed Park Place Garage 250 37 29 8 37 12 25
Existin~l Site Land Uses 105 12 10 2 12 3 9
Net Total Trips 145 25 19 6 25 9 19
As the table indicates, Hyman Street in the vicinity of the site would experience'approximately
145 additional daily trips as a result of the Park Place Garage. This represents a three percent
increase over the existing daily traffic volume on that block. The total daily traffic volume of
3,645 vpd on Hyman Street would still be approximately 1,250 vpd less than the daily volume on
Cooper Avenue and 1,050 vpd less than the daily volume Hopkins Avenue, one block north and
south of the site, respectively. Therefore, the parking garage would not change Hyman Street's
character as a lower volume local street in downtown Aspen.
August 28, 2003
Mr. Stan Clauson
Page 4
Queuing
The estimated total time required to park each car using the lift system would be approximately
90 seconds (from the time the vehicle drives onto the lift to the time the lift retums for the next
vehicle); thus, with two lifts a total of 80 vehicles could be parked each hour (3600 seconds/hour
/ 90 seconds/vehicle * 2 lifts = 80 vehicles/hour). A waiting area with room for four vehicles
would be provided on the site for vehicles entering the garage and waiting for the lift. To
minimize queuing, these entering vehicles would be given priority with the lifts, and drivers
would pay upon exiting.
Based on projected peak period arrival rates and the lift processing time, during the morning
and evening peak hours of adjacent street traffic the maximum queue at the lifts would be two
vehicles, which would be contained within the four-car storage area. During the busiest hour of
the day (mid-day peak) during the busiest time of year, it is estimated that a maximum of half of
the daily spaces (40 spaces) would turn-over (40 trips in, 40 trips out). During these periods,
the maximum queue would be 4 vehicles, which also would be contained within the site.
Conclusions
Based on the results of the analysis, the proposed Park Place garage would generate
approximately 145 net daily trips from the site. This represents a three percent increase over
existing daily traffic volumes on that block of Hyman Avenue, but still would result in total daily
traffic volumes there that are significantly lower than the adjacent local streets. The garage
could also result in a lowering of overall downtown Aspen traffic by reducing the number of
vehicles circulating for on-street parking spaces. Peak period queuing by vehicles entering the
site would be contained within the waiting area provided on site.
I trust this information is sufficient for you to make an informed decision on traffic impacts
associated with the project. If you haye any further questions, please call.
Sincerely
Senior Transportation Engineer
MIDAMERICAN ELEV
ATTACHMENT C
August 27, 2003
Mr. 3ack Utschewskl
MM-American Elevator Company
5701 General Wa~;hington Drive
Alexandria, Virginia 2231Z
Post-iff Fax Note 7671
OoJDe~
Reference: Summit Grand Parc - ParKing Machine Noise
This letter summarizes the noise level measurements performed by Wyle
Leborab3des at the Summit Grand Parc building in Washington~ D,C.
This building has a parMn9 machine. The res[dent drives tI~eir vehicle 3nra 'roorn
#2,~ The parking machine is then engaged. The platform in the room r~tates
slightly and the vehicle is lowered to the appropriate level of the garage. Upon
axE, the resident calls for the vehicle. The parlci~g machine uses a ct"eno to
re'cdeve the vehicle and place it on a different platform, That plab"orm is then
r~Ised up to "room ~L~, and the residen~ drives out:.
overall A-weighted and one-third octave band sound levels were measured ~:wlce
each second in the lobby and r~ ~he garage as the parking machine was operated.
Sound levels ere often expressed in one-third octave bands. The range of human
healing ~s approximately from ~0 ~o 20,000 Hz, The A-weighS:ed sound level ~ the
most commonly used noise metric, The A-weightJng filter was designed to
simulate the frequency senslt[vity of the human ear at Iow to moderate loudness.
Two sounds with ~he same A-weighted sound level should be judge~ equally 10ad
by mo~ people.
Sound levels were measured during brief periods between ~0:30 and 1i:30 a,m.
on August 27, 2003. The measurements were not performed when people were
using cbc eluvator5 or lobby, Occas]onally', there was some noise from ~he
reception desk and o~ce area on the opposite side of bhe tobby. Ambient noise
was generally attributable to s~reet ~raffic, ventilation systems, and the distant
office workers.
The garage measurements were performed in the parking garage approxlma~ely
ban feet Dom the overhead door at ~he entrance ~o room #2 (the room that drivers
enter ffrs~ before parking). Sound Ievels were measured in file garaqe as the
ma~ine was opera,ed in the exit and entrance cycles. No vehicle was on-~he
platform during the tests.
The lobby measurements were performed in the h~llway between the ?ecepUon
desk and the elevators. The door bet~veen that hallway and the garage was
closed. Sound levels were measured in each location during dh=latent cycles, not
simuE-aneously.
'~08/28/200S il:iS 177S48624~8
P~6g 02
Mr, Litschewsld
August 27, 2003
Page
Figure ! shows the A-weighted sound level each hall'-second, ~t can be seen from
Figure i that sound JeveJ.~ were essentially the same in tl~e loel~y wi~ the parking
machine operating as wftheut. It can also be seen t:het the $Oulld leYel in the
garage ~e~ typically betw~_~,n .RO and e,.c; dl~A, and Occasionally reached 70 I:o
813 dBA.
Figure Z shows the frequer~cy spectra averaged over the entire test period, a~d
Rgure 3 shows I:he frequency specb-a averaged over the loudest five-second
period. Again, it can be seen that soured levels were nearly ider~ical wlth the
parking machine and without [t in the lobby.
SubJectlvel¥, the parking machlr,e was barely eudible in the lobby.
Please calf me at 703/41~-4550 ext. ;LB if you require any additional information.
Sincerely,
Ga .r..'/.~hrlich~ P.E.
Senror Acou~ical Engineer
Figure 1, A-weighted Sound Leve'.s Each 0.5 Second
~ 60I
~30
~0
0
--=- Garage Dur'~-tg Exit
· -~-'Garal~e - During Enlry
, · Lobby' - A.r~ient
~ Lobby - Dudng Entry
SampleNumber
20
lO
Rgure 2. Average Frequency Spectra During Test
-a--Garage During Exit
· Garage - During Entry
- Lobby - Arnb)ent
· ~-Lob)3y - During Entry
One-Third Octave t~an~i Cantor Frequency, Hz
Figure 3. Frequency Spectra Durir~g Lot~dee! Five Second Period
6~
20-
tD
.... -~"-~obby- Dud?gEntry
I Lobby-Ambient
___J --m-Garage - During Enll3'
I'-~- Garage Oaring Exit
One-Third Octave aa~d Center Frequency, Hz
SOUND PRESSURE
Jet Take-Off
m ~i~t~c~ ~' ~ra
100 000 000 --
10000000 --
Rock ~ ~ ~ ~__
Group
SOUND PRESSURE LEVEL
14o dB
~ ~J ~ -~ Firecr /"
-- 120
Pneumatic
Chipper
Ay;rage St~et T~affic ~--~h~ ~ ~ ~
100000
10000 --
Library
100 --
--100 4
Noisy Workplace
-- 90
8O
-- 70
4 4 4 "~ 4 "~ Business Office
-- 5O
-- 40 q q Living Room
-- 3O
2O
'300 So: Spring
ATTACHMENT D
300 South Spring Street
Viuinity Map
,%
~45T
ATTACHMENT
"~EGEND AND N'OTE$
E
ATTACHMENT F
PARK
PLACE
~ ~yatem
3OO 80UTH
aep(m, oolorado
L2
MEOHANIOAL
PARK
PLACE
~ system
3O0 80IJTH
· spen. colorado
ELEVATION
L2
I"'1ECNAN I C,4,L
L~
L2
L~
MEOl-.IANIO,4,L
Gt~:)U"rl-I
PARK
PLACE
Ko~er~ System
a~l~n, oolorado
PARK
PLACE
~o~ system
~00 80UTH 8F'Fmq9
a~oen, colorado
_ ?'1ECN,~,NICAL
UJEE~T ELE'v'ATI(::~I
O
TRAS
UTILiT
VEHICLE RETRIVA
STAIR
LOt~B --
OFFICE
270 SQ FT,
VEHICLE
PARKING
SYSTEM
AREA
ENTRY / EXIT ENTRY / EXIT
60'-0"
"~P A R K PLACE
%qq~E VE L-- --
0
VEHICLE
PARKING
SYSTEM
STAIR
BATHROOM
APARTM
-- TWO LEVEL
BEDROOM
67.5 SQ, F
~T
-- 49'- 8?
BEDROOM
APARTMENT UNIT
KITCHEN' TWO LEVEL
LIVfNO AREA
-51 ,_~5_,,
~4
60'-0"
PARK PLACE
VEHICLE
PARKING
SYSTEM
KITCHEN
APARTMENT UNIT
TWO LEVEL
ROOM
ENTRY
~ BATHRO01
BEDROOM
APARTMENT UNIT
1682 SQ. FT.
LIVING AREA
PAF~K PLACE
-60'-0"-
HI V L
63'
63'
13'-10' 16'-4~
49,-9~
18'-7~
Not to Scale
ATTACHI'IENT G
ALLy¥ BLocI(- 105
Park Place
300 South Spring Street
Aspen, Colorado
Landscape and Site Plan
DATE:
REVISIONS:
SHEET:
AI'I'ACHHENT H
ATTACHHENT I
12 June 2003
Mr. Stan Clauson
Start Clauson Associates
200 E. Main St.
Aspen, CO 81611
To Whom it may Concern:
As the Managing member if Hyman Avenue Holdings, LLC, I give Stan Clauson
Associates, LLC and his staffpermission to represem us in discussions with the City of
Aspen regarding the developmem of the Park Place garage at 707 E. Hyman Avenue in
Aspen, Colorado. We have retained this firm to assist us in the planning phase of project.
ffyou have any questions regarding this matter, please contact me:
Sinc~ery, /7
Jdl~ Cooper, Managing Partner
Hyman Avenue Holdings, LLC
CITY OF ASPEN
WI::a='i""i' PAID
RTTACHHENTJ
CITy OF ~
C)ATE HRETT PAID
No.
WHEN RECORDED RETURN TO:
Name:
Address:
Hyman Avenue Holdings, LLC
C/o Kmbacher Sanders, PC
201 N. Mill Street, Ste. 201
Aspen, CO 81611
WARRANTY DEED
THIS DEED, made this 28th day of February, 2003, between GeOrge A. Vicenzi Trust, as to an
undivided 25% interest and Alan J. Goldstein, as to an undivided 75% interest of the said County
of Pitkin and State of Colorado, grantor, and Hyman Avenue Holdings, LLC, a Colorado Limited
Liability Company whose legal address is C.B. Management, PO Box 1747, 605 Sherman
Parkway Springfield, MO 65801-1747 of the said County of Pitkin and State of Colorado,
grantee:
WlTNESSETH, that the grantor, for and in consideration of the sum of Ten dollars and other
good and valuable consideration, the receipt and sufficiency of which is hereby acknowledged,
has granted, bargained, sold and conveyed, and by these presents does grant, bargain, sell, convey
and confn'm, unto the grantee, his heirs and assigns forever, all the real property, together with
Improvements, if any, situate, lying and being in the said County of Pitkin and State of Colorado
described as follows:
Lots A, B, C and D, Block 105
CITY AND TOWNSITE OF ASPEN
also described as follows:
THE HANNAH-DUSTIN CONDOMINIUMS, according to the Plat thereof recorded October 2,
1985 in Plat Book 17 at Page 78 as Reception No. 271969 and as defined and described by the
Condominium Deolaration for HANNAH-DUSTIN CONDOMINIUM recorded October 2, 1985
in Book 496 at Page 375 as Reception No. 271967.
COUNTY OF PITKIN, STATE OF COLORADO
also known by street and number as: 300 S Spring St., Aspen, CO 81611
File Number:. 00030095
Warranty Deed - Photographic Record (Extended)
a iof2 479376
TRiI EIt DECL ATION RECEIVED 2/28/2ee3
TO HAVE AND TO HOLD the same unto the said Buyer, his personal representatives,
successors and assigns, forever. The said Seller covenants and agrees to and with the Buyer, his
personal representatives, successors and assigns, to WARRANT AND DEFEND the sale of said
property, goods and chattels, against all and every person or person whomever. When used
herein, the singular shall include the plural, the plural the singular, and the use of any gender
shall be applicable to ail genders.
IN WITNESS WHEREOF, the Seller has executed this Bill of Sale this ~-~ day of
George A. Vic' _~zi Trustee of~G~ A. Vicenzi Trust
STATE OF (~G~(~ ~_~
covm
The foregoing instrument was acknowledged before me this ~ day of ~xo~,-~ .
~_f)~. by George A. Vicenzi, Tmstec of the George A. Viconzi Trust
My commission expires
Notary Public:
· Witness my hand and official seal.
File Number: 00030095
S~ewart Title of Aspen. h]c.
Bill Of Sale - (-Extended)
Page 2 of 2
479376
P&ge: 2 of 4
ez/28/zeea el :~e~
SZLVI;~ DRVI$ PZTKIN COUNTY CO R 21.ee D 6~e.eo
COUNTY
The foregoing instrument was acknowledged before me this 02
o~.~:~ , by Alan L Goldstein
My commission expires
Not~p 'ublic~..~t~ ~-
Witness my hand and official seal.
File Numl:er: 00030095
StcqVaxt Title of,Aspen,
Acknowledsetr~nt. Seller
Page l of 3
EXHIBIT 1
EXCEPTIONS
1. Distribution utility easements (including cable TV).
2. Inclusion of the Property within any special taxing district.
3. The benefits and burdens of any declaration and party wall agreements, if any.
4. Unpatented mining claims; reservations or exceptions in patents, or an act authorizing the
issuance thereof; water fights, claims or title to water.
Taxes for the year 2003 and subsequent years not yet due and payable.
Exceptions and reservations as set forth in the Act authorizing the issuance of the Patent for
the City and Townsite of Aspen recorded March 1, 1897 in Book 139 at Page 216 as
Reception No. 60156.
Terms, conditions, obligations and provisions of Agreement by and between the City of
Aspen and Hannah Dustin Building Associates, a joint venture as set forth in instrumem
recorded October 2, 1985 in Book 496 at Page 371 as Reception No. 271966.
Terms, conditions, obligations, provasions and easements of Easement Agreement recorded
August 24, 1972 in Book 266 at Page 229 as Reception No. 153522.
Terms, conditions, obligations and provisions of Condominium Declaration for Hannah-
Dustin Condominiums as set forth in instrument recorded October 2, 1985 in Book 496 at
Page 375 as Reception No. 271967.
10. Terms, conditions, obligations and provisions of Subdivision Agreement as set forth in
instrument recorded October 2, 1985 in Book 496 at Page 409 as Reception No. 271968.
11. Easements, rights of way and other matters as shown and contained on Plat of Hannah-
Dustin Condominiums recorded October 2, 1985 in Plat Book 17 at Page 78 as Reception
No. 271969.
ATTACHMENT K
CITY OF ASPEN
PRE-APPLICATION CONFERENCE SUMMARY
PLANNER:
PROJECT:
REPRESENTATIVE:
OWNER:
TYPE OF APPLICATION:
DESCRIPTION:
James Lindt, 920.5095 DATE: 9.15.03
"Park Place" - Commercial Parking Garage GMQS Application
Start Clauson, Brian McNellis, Jeffeay Halferty
Peter Fornell
GMQS Scoring Application
Owner is in the PUD r~dew pn~,~ss to censtmet a commercial parking facility and associated
affordable housing at 707 E. Hyman Avenue. The facility will use a fully automated
mechanical systemlbr pmtdngvefiicles. In conjunction wi~ the PUD, Sulxtivision, and
Conditional Use portions of the application flaat have already been submitted, a ~ial
GMQS application is required.
Land Use Code Section(s)
26.470.080 GMQS
26.470.100
Review by:
Public Hearing:
~al Agencies:
Planning Fees:
Referral Agency Fees:
Total Deposit:
Total Copies:
Development Allotment and Application Procedures
Growth Management Scoring Criteria- Commercial and Office Development
Staff~ Growth Management Commission OaH), Cit~ Council (PIT), Board of Cotmt~
Commissioners
Yes, at both the Growth Management Commission and City Council. Applicant must post
property and mail notice at least 15 days prior to hearing. Applicant will need to provide proof of
posting and mailing with an affidavit at the public hearings.
Housing (other referral agencies are reviewing the PUD portion of the application).
Planning Deposit, Major ($2,520 for 12 hours of staff time)
Housing Major was included in PUD Application
$2520 (additional Planning hours are billed at a rate of $210/hour)
3O
TO apply, submit the following information:
1. Proof of ownership.
2. Signed fee agreement.
3. Applicant's name, address and telephone number in a letter signed by the applicant which states the name, address and
telephone number of the representative authorized to act on behalf of the applicant.
4. Street address and legal description of the parcel on which development is proposed to occur, COnsisting ora on'rent
certificate fi.em a title insurance company, or attorney licensed to practice in the State of Colorado, listing the names of all
owners of the propexty, and all mortgages, judgments, liens, easements, contracts and agreements affecting the parcel, and
demonstrating the owner's fight to apply for the Development Application.
5. Total deposit for review of the application.
6. Required Copies of the complete application packet and maps.
7. An 8 1/2" by 1 I" vicinity map locating the parcel within the City of Aspen.
8, Additional materials as required by the specific review. (Refer to cited code sections)
9. A written description efthe proposal and an explanation in written, graphic, or model form ofhow the proposed
development complies with the review standards relevant to the development application. Please include existing
conditions as well as proposed.
10. Applications shall be provided in paper format (number of copies noted above) as well as the text only on eithar ofthe
following digital formats. Cumpact Disk (CD)~preferred, Zip Disk or Floppy Disk. Microsoft Word format is preferred.
Text format easily convertible to Word is acceptable.
Notes:
1.
An estimate on employee demands should be included in the cenc~ptual application in pregoration for the GMQS application. A
refenal frem Housing will be sought. A Housing Board meeting may be required.
The foregoing smnmary is advisory in nature only and is not binding on the City. The summary is based on current zoning, which is
subject to change in the fotere, and upon factual representations that may or may not be accm~te. The summary does not create a
legal or vested right.