Loading...
HomeMy WebLinkAboutbocc.con.058.248/30/2021 CDD Contract Information Contract Number Project Name Contractor Budget Line Item 40451513.546500 Procurement Method: Type: Contract Start Date Contract End Date Contract Type Retainage If this is a new contractor, please enter the New Vendor information into Munis for workflow approval. Contact Information: Department County Representative David Schneider County Representative Phone (970) 429-1880 Provide a brief description of the Contract or Change Order: Contract Value Summary: $ 24,745.88 $ - $ - $ 24,745.88 Airport Contract for the removal of the ASE Secure Exit Lane. Original Contract Amount Previous Change Order/Amendment Amount This Change order/Amendment amount Contract Total No Secure Exit Lane Removal North Peak Construction $ 24,745.88 Additional Budget Line Item(s) (Please fully allocate New Contract Total) $ - $ - $ - $ 24,745.88 None Construction 1/15/2024 2/29/2024 New Contract 058.24 Pitkin County Procurement Cover Sheet Please complete the Contract Cover Sheet when the contract/task order is complete and fully executed. Return all Contract Cover Sheets and Contracts/Change Orders/Amendments/Task Orders to Procurement Contract # 058.24 Rev. 2022.08.04 CDD 1 PITKIN COUNTY CONSTRUCTION CONTRACT THIS CONTRACT, made January 15, 2024 by and between the Board of County Commissioners of Pitkin County, Colorado, 530 E. Main St., Suite #302, Aspen, CO 81611, (hereinafter called the “County”) and North Peak, Inc., 305 Main St., Suite A, Grand Junction, CO 81611 (hereinafter called the “Contractor”) to perform the following work: Removal of Secure Exit Lane (“Project”). I. Term of Contract: The term of this Contract is from January 15, 2024 to February 29, 2024. Optional Contract Extension II. Scope of Work and Work Schedule: A. Scope of Work: • Remove existing Secure exit lane and place equipment on pallets for shipment by airport staff. • Prep and frame area for new Exit Lane that has a clearance of 97.25” (unit height 92.5”) Two areas on both sides of entryway need modification of framing and removal of building systems as needed. • Coordinate and Life safety and MEP’s contractors for appropriate Detach reset of equipment. • Once completed North Peak will hang tape and paint disturbed drywall edge to edge of continuous surfaces. • See Attachments “A” and “B” for further detail. B. All work performed under this Contract shall be done according to the following work schedule: • January 15 - Set all protection and containment, Disassemble existing Exit Lane system. • January 16 - Modify framing and make any adjustments to equipment in Ceiling as needed. • January 17 - Fire suppression system head relocation, MEP relocation as needed. • January 18 - Hang and Tape drywall prep for Paint. Complete remaining finishes as needed. • January 19 - Paint, remove protection and containment. Final cleaning Contract # 058.24 Rev. 2022.08.04 CDD 2 III. Payment: The County agrees to pay, and the Contractor agrees to accept, in full payment for the performance of this Contract, the total price of Twenty-Four Thousand Seven Hundred Fourty-Five dollars and Eighty-Eight cents ($24,745.88) in accordance with this Contract, subject to increase or decrease in accordance with the provisions of this Contract; but any payment by the County may be offset by any amount the Contractor owes the County for any reason. A. Payment Procedures 1) Contractor shall submit applications for payment weekly for work done to date. 2) Progress payments for Contracts exceeding one hundred fifty thousand dollars ($150,000.00) a. County shall make progress payments, within thirty (30) days of County’s approval of Contractor’s pay request. b. In accordance to amend Section 2 Colorado Revised Statutes (C.R.S.) § 24-91-103, for contracts exceeding one hundred fifty thousand dollars ($150,000.00) and if the Contractor is satisfactorily performing this Contract, progress payments shall be in an amount equal to ninety-five percent (95%) of the calculated value of completed Project work. If, in the opinion of the Project Lead and County, satisfactory progress is not being made on the Project, or if claims are filed under Section C.R.S. § 38-26-107, as amended, County may retain such additional amounts as County may deem necessary to assure completion of the Project or to pay such claims and any Project Lead’s and attorney’s fees reasonably incurred or to be incurred by County in defending or handling such claims. The withheld percentage of the Contract Price shall be retained until the Project is completed satisfactorily and finally accepted by County in accordance with the provisions of this Contract. Progress payments shall not constitute final acceptance of the Project. 3) County shall make final payment, including release of retainage, to Contractor in accordance with this Contract and Section C.R.S. § 38-26- 107, as amended. IV. Contractor Obligations: A. Supervision and Superintendence 1) The Contractor shall supervise and direct the Project competently and efficiently devoting such attention thereto and applying such skills and expertise as may be necessary to perform the Project in accordance with this Contract. The Contractor shall be solely responsible for the means, methods, techniques, sequences and procedures of construction. The Contractor shall be responsible to see that the finished Project compiles accurately with this Contract. Contract # 058.24 Rev. 2022.08.04 CDD 3 2) The Contractor shall appoint and identify to the County and Project Lead, a competent on-site superintendent to be kept on the Project at all times during its progress and who shall not be replaced without written notice to the County and the Project Lead except under extraordinary circumstances. The superintendent will be the Contractor’s representative at the site and shall have authority to act on behalf of the Contractor. All communications given to the superintendent shall be as binding as if given to the Contractor. B. Subcontractors, Suppliers and Others 1) The Contractor shall not employ any subcontractor, supplier or other person or organization (including those acceptable to the County and the Project Lead, whether initially or as a substitute) against whom the County or the Project Lead may have reasonable objection. 2) The identity of subcontractors, suppliers or other persons or organizations including those who are to furnish the principal items of materials and equipment must be submitted to the County in advance of any work performed or materials supplied under this Contract for acceptance by the County and the Project Lead. No acceptance by the County or the Project Lead of any such subcontractor, supplier or other person or organization shall constitute a waiver of any right of the County or the Project Lead to reject defective Project work. 3) The Contractor shall be fully responsible to the County and the Project Lead for all acts and omissions of the subcontractors, suppliers and other persons and organizations performing or furnishing any of the Project work under a direct or indirect contract with Contractor just as Contractor is responsible for Contractor's own acts and omissions. Nothing in this Contract shall create any Contractual relationship between the County or the Project Lead and any such subcontractor, supplier or other person or organization, nor shall it create any obligation on the part of the County or the Project Lead to pay or to see to the payment of any moneys due any such subcontractor, supplier or other person or organization except as may otherwise be required by laws and regulations. 4) All Project work performed for Contractor by a subcontractor will be pursuant to an appropriate contract between the Contractor and the subcontractor which specifically binds the subcontractor to the applicable terms and conditions of this Contract for the benefit of the County and the Project Lead. C. Patent Fees and Royalties. The Contractor shall pay all license fees and royalties and assume all costs incident to their use in the performance of the Project or the incorporation in the Project of any invention, design, process, product or device which is the subject of patent rights or copyrights held by others. Contractor shall indemnify and hold harmless the County and the Project Lead and anyone directly or indirectly employed by either of them from and against all claims, damages, Contract # 058.24 Rev. 2022.08.04 CDD 4 losses and expenses (including attorney's fees and court costs) arising out of any infringement of patent rights or copyrights incidental to the use in the performance of the Project or resulting from the product or device not specified in this Contract, and shall defend all such claims in connection with any alleged infringement of such rights. D. Permits. Unless otherwise provided in this Contract, the Contractor shall obtain and pay for all construction permits and licenses. The County shall assist the Contractor, when necessary, in obtaining such permits and licenses. The Contractor shall pay all governmental charges and inspection fees necessary for the prosecution of the Project. The Contractor shall pay all charges of utilities for connections to the Project, and the County shall pay all charges of such utility owners for capital costs related thereto such as plant investment fees. E. Laws and Regulations. The Contractor shall be familiar with and shall comply with all federal, state, and local laws, ordinances, rules, and regulations applicable to furnishing and performance of the Project including rules, regulations, and ordinances the County promulgates at any time. Except where otherwise expressly required by applicable laws and regulations, neither the County nor the Project Lead shall be responsible for monitoring the Contractor's compliance with any Laws or Regulations. F. Taxes. The Contractor shall pay all existing and future applicable federal, state and local sales, consumer, use and other similar taxes whether direct or indirect. Federal excise tax may not apply to materials purchased by the County. The Contract price shall include all other federal, state, and/or local direct or indirect taxes, which do apply. The Contract price shall include the cost of compliance with all other Federal Laws and Regulations at no additional cost to the County (except as provided in this Contract). The Contractor shall not be reimbursed separately for any taxes, which may apply except as provided in this Contract, and the Contractor shall be responsible for all taxes, which may apply. The County is tax exempt from Federal Excise Tax and Colorado State or local sales or use taxes. The Contractor and its subcontractors shall apply to the Colorado Department of Revenue for a Certificate of Exemption indicating that the Contractor or subcontractor's purchase of construction material or building materials is for use in a building, structure, or other public work owned and used by the County. G. Use of Premises. 1) The Contractor shall confine construction equipment, the storage of materials and equipment and the operations of workers to the Project site and land and areas permitted by this Contract, law, ordinances, and permits. The Contractor shall assume full responsibility for any damage to any such land or area, or to the County or occupant thereof or of any land or areas contiguous thereto, resulting from the performance of the Project. Should any claim be made against the County or the Project Lead by any such owner or occupant because of the performance of the Project, Contractor shall promptly settle with such other party. The Contractor shall, to the Contract # 058.24 Rev. 2022.08.04 CDD 5 fullest extent permitted by Laws and Regulations, indemnify and hold the County harmless from and against all claims, damages, losses and expenses (including, but not limited to, fees of engineers, architects, attorneys and other professionals and court costs) arising directly, indirectly or consequentially out of any action, legal or equitable, brought by any such other party against the County or the Project Lead to the extent based on a claim arising out of the Contractor's performance of the Project. 2) During the progress of the Project, the Contractor shall keep the premises free from accumulations of waste materials, rubbish and other debris resulting from the Project. At the completion of the Project, the Contractor shall remove all waste materials, rubbish and debris from and about the premises as well as all tools, appliances, construction equipment and machinery, temporary structures, stumps or portions of trees, and surplus materials, and shall leave the site clean and ready for occupancy by the County. The Contractor shall restore to original condition all property not designated for alteration by this Contract. 3) The Contractor shall not load or permit any part of any structure to be loaded in any manner that will endanger the structure, nor shall the Contractor subject any part of the Project or adjacent property to stresses or pressures that will endanger it. H. Safety and Protection. 1) The Contractor shall be solely responsible for initiating, maintaining and supervising all safety precautions and programs in connection with the Project. The Contractor shall take all necessary precautions for the safety of, and shall provide the necessary protection to prevent damage, injury or loss to: a. All employees in the Project area and other persons and organizations who may be affected thereby; b. All the Project materials and equipment to be incorporated therein, whether in storage on or off the site; and c. Other property at the site or adjacent thereto, including trees, shrubs, lawns, walks, pavements, road-ways, structures, utilities and underground facilities not designated for removal, relocation or replacement in the course of construction. 2) The Contractor shall be required to assume sole and complete responsibility for job site conditions during the course of construction of the Project, including the safety of all persons who may enter on the job site for any reason and the security of all property located on the job site. This requirement shall apply at all times during the course of the Contract and not only to normal Project work hours. 3) The Contractor shall at all times conduct the Project in such manner as will incur the least practicable interference with traffic and existing utility systems. No section of any road shall be closed to the public, nor any utility Contract # 058.24 Rev. 2022.08.04 CDD 6 system put out of service except after permission, has been granted by the Project Lead. Each item of the Project shall be prosecuted to completion without delay and in no instance will the Contractor be permitted to transfer its forces from an uncompleted Project to a new Project without prior written notification of the Contractor to the Project Lead. a. Unless this Contract specifically provides for the closing to traffic of any local road or highway while construction is in progress, such road or highway shall be kept open to all traffic by the Contractor. The Contractor shall also provide and maintain in a safe condition temporary approaches, crossings, or intersections with roads and highways. The Contractor shall bear all expense of maintaining traffic over the section of road affected by the Project to be done under this Contract, and of constructing and maintaining such approaches, crossing, intersections and any necessary features without direct compensation, except as otherwise provided. b. The Contractor shall provide, erect and maintain all necessary barricades, signs, danger signals and lights to protect the Project and the safety of the public. The Contractor’s responsibility for necessary barricades, signs, and lights shall not cease until the Project has been accepted. I. Shop Drawings and Samples. 1) After checking and verifying all field measurements and after complying with applicable procedures specified in this Contract, the Contractor shall submit to the Project Lead for review and approval in accordance with the approved schedule of shop drawing submissions, three (3) copies (unless otherwise specified) of all shop drawings, which will bear a stamp or specific written indication that the Contractor has satisfied the Contractor's responsibilities under this Contract with respect to the review of the submission. All submissions will be identified as the Project Lead may require. The data shown on the shop drawings will be complete with respect to quantities, dimensions, specified performance and design criteria, materials and similar data to enable the Project Lead to review the information as required. 2) The Contractor shall also submit to the Project Lead for review and approval with such promptness as to cause no delay in Project, all samples required by this Contract. All samples will have been checked by and accompanied by a specific written indication that the Contractor has satisfied the Contractor's responsibilities under this Contract with respect to the review of the submission and will be identified clearly as to material, supplier, pertinent data such as catalog numbers and the use for which intended. 3) Before submission of each shop drawing or sample, the Contractor shall have determined and verified all quantities, dimensions, specified Contract # 058.24 Rev. 2022.08.04 CDD 7 performance criteria, installation requirements, materials, catalog numbers and similar data with respect thereto; and reviewed or coordinated each shop drawing or sample with other shop drawings and samples and with the requirements of the Project and this Contract. 4) At the time of each submission, the Contractor shall give the Project Lead specific written notice of each variation that the shop drawings or samples may have from the requirements of this Contract, and, in addition, shall cause a specific notation to be made on each shop drawing submitted to the Project Lead for review and approval of each such variation. 5) Where a shop drawing or sample is required by the specifications, no related Project work shall be commenced prior to the Project Lead’s review and approval of the shop drawing or samples. 6) The cost of furnishing all shop drawings and samples shall be borne by Contractor. V. Performance and Payment Bond. A. Contractor shall furnish a performance and payment bond in the amount of one half of the total Contract value for all Contracts over fifty thousand dollars ($50,000.00), as required by C.R.S. § 38-26-105, et seq. all Bonds shall be in the form acceptable to the County. All Bonds signed by an agent must be accompanied by a certified copy of the authority to act. B. If the surety on any Bond furnished by Contractor is declared bankrupt or becomes insolvent or its right to do business is terminated in any state or it ceases to meet the requirements of paragraph A of this Section, Contractor shall within five (5) days thereafter substitute another Bond and Surety, both of which must be acceptable to the County. VI. Indemnity. A. The Contractor agrees to indemnify, hold harmless and, not excluding the County's right to participate, defend the County, its subsidiary, parent, associated and/or affiliated entities, successors, or assigns, its elected officials, trustees, employees, agents, volunteers, and any jurisdiction or agency issuing permits for any work included in the project, hereinafter referred to as indemnitee, from all suits and claims, including attorney's fees and cost of litigation, actions, loss, damage, expense, cost or claims of any character or any nature arising out of the work done in fulfillment of the terms of this Contract or on account of any act, claim or amount arising or recovered under workers' compensation law or arising out of the failure of the Contractor to conform to any statutes, ordinances, regulation, law or court decree. It is agreed that the Contractor will be responsible for primary loss investigation, defense and judgment costs where this Contract of indemnity applies. In consideration of the award of this Contract, the Contractor agrees to waive all rights of subrogation against the County its subsidiary, parent, associated and/or affiliated entities, successors, or Contract # 058.24 Rev. 2022.08.04 CDD 8 assigns, its elected officials, trustees, employees, agents, and volunteers for losses arising from the work performed by the Contractor for the County. B. The Contractor further shall investigate, process, respond to, adjust, provide defense for and defend, pay or settle all claims, demands, or lawsuits related hereto at its sole expense and shall bear all other costs and expenses related thereto, even if the claim, demand or lawsuit is groundless, false or fraudulent. VII. Insurance. Contractor and subcontractors shall procure and maintain until all of their obligations have been discharged, including any warranty periods under this Contract are satisfied, insurance against claims for injury to persons or damage to property which may arise from or in connection with the performance of the work hereunder by the Contractor, its agents, representatives, employees or subcontractors. The insurance requirements herein are minimum requirements for this Contract and in no way limit the indemnity covenants contained in this Contract. The policies shall include, or be endorsed to include, the following provision: On insurance policies where the County is named as an additional insured, the County shall be an additional insured to the full limits of liability purchased by the Contractor even if those limits of liability are in excess of those required by this Contract. The County in no way warrants that the minimum limits contained herein are sufficient to protect the Contractor from liabilities that might arise out of the performance of the work under this Contract by the Contractor, its agents, representatives, employees, or subcontractors. The Contractor shall assess its own risks and if it deems appropriate and/or prudent, maintain higher limits and/or broader coverages. The Contractor is not relieved of any liability or other obligations assumed or pursuant to the Contract by reason of its failure to obtain or maintain insurance in sufficient amounts, duration, or types. Commercial General Liability Completed Operations coverage must be kept in effect for up to three (3) years after completion of the project. A. Coverage and Limits of Insurance: Contractor shall provide coverage with limits of liability not less than those stated below. An umbrella and/or excess liability policy may be used to meet the minimum liability requirements provided that the coverage is written on a “following form” basis. 1) Statutory Workers’ Compensation: Colorado statutory minimums a. Policy shall contain a waiver of subrogation against the County. b. This requirement shall not apply when a contractor or subcontractor is exempt under Colorado Workers’ Compensation Act, AND when such contractor or subcontractor executes the appropriate sole proprietor waiver form. Minimum Limits: Coverage A (Workers’ Compensation) Statutory Contract # 058.24 Rev. 2022.08.04 CDD 9 Coverage B (Employers Liability) $ 500,000 $ 500,000 $ 500,000 2) Commercial General Liability – ISO 1CG 0001 form or equivalent (With County named additional insured) Minimum Limits: General Aggregate $ 2,000,000 Products/Completed Operations Aggregate $ 2,000,000 Each Occurrence Limit $ 1,000,000 Personal/Advertising Injury $ 1,000,000 Fire Damage (Any One Fire) $ 50,000 Medical Payments (Any One Person) $ 5,000 Coverage to include: • Premises and Operations • Explosions, Collapse and Underground Hazards • Personal / Advertising Injury • Products / Completed Operations • Liability assumed under an Insured Contract (including defense costs assumed under contract) • Independent Contractors • Designated Construction Projects(s) General Aggregate Limit, ISO CG 2503 (1997 Edition or equivalent) • Additional Insured—Owners, Lessees or Contractors Endorsement, ISO Form 2010 (2004 Edition or equivalent) • Additional Insured—Owners, Lessees or Contractors Endorsement, ISO CG 2037 (2004 Edition or equivalent) • The policy shall be endorsed to include the following additional insured language on the Additional Insured Endorsements specified above: “County, its subsidiary, parent, associated and/or affiliated entities, successors, or assigns, its elected officials, trustees, employees, agents, and volunteers named as an additional insured with respect to liability and defense of suits arising out of the activities performed by, or on behalf of the Contractor, including completed operations”. 3) Auto Liability: Bodily injury and property damage for any owned, hired, and non-owned vehicles used in the performance of this Contract. Minimum Limits: Statutory Coverage Bodily/Property Damage (Each Accident) $ 1,000,000 4) Contractors Pollution Liability: The County requires this coverage whenever work at issue under this Contract involves potential pollution risk to the environment or losses caused by pollution conditions (including Contract # 058.24 Rev. 2022.08.04 CDD 10 asbestos) that may arise from the operations of the Contractor described in the Contractor’s scope of services. Policy shall cover the Contractor’s completed operations. Contractors Pollution Liability coverage (including Completed Operations) must be kept in effect for up to three (3) years after completion of the project. Coverage shall apply to sudden and gradual pollution conditions resulting from the escape of release of smoke, vapors, fumes, acids, alkalis, toxic chemicals, liquids, or gases, natural gas, waste materials, or other irritants, contaminants, or pollutants (including asbestos). If the coverage is written on a claims-made basis, the Contractor warrants that any retroactive date applicable to coverage under the policy precedes the effective date of this Contract; and that continuous coverage will be maintained or an extended discovery period will be exercised for a period of three (3) years beginning from the time that work under this Contract is completed. a. The policy shall be endorsed to include the following as Additional Insureds: “Pitkin County, its subsidiary, parent, associated and/or affiliated entities, successors, or assigns, its elected officials, trustees, employees, agents, and volunteers named as an additional insured with respect to liability and defense of suits arising out of the activities performed by, or on behalf of the Contractor, including completed operations”. Minimum Limits: Per Loss $ 1,000,000 Aggregate $ 1,000,000 5) Professional Liability: The Contractor shall maintain Professional Liability covering wrongful acts, errors and/or omissions, including design errors, if applicable, for damage sustained by reason of or in the course of operations under this Contract resulting from professional services provided by the Contractor as part of the Contract. Contractors Professional Liability (Errors and Omissions) policy must be kept in effect during the project and for up to three (3) years after completion of the project. The policy/coverages shall be amended to include the following: a. Coverage shall apply for three (3) years after project is complete. b. Policy is to be on a primary basis; if other professional coverage is carried. Per Loss $ 1,000,000 Aggregate $ 2,000,000 6) Builders Risk Insurance or Installation Floater – Completed Value Basis Contract # 058.24 Rev. 2022.08.04 CDD 11 Unless otherwise provided, the Contractor shall purchase and maintain, in a company or companies lawfully authorized to do business in the jurisdiction in which the Project is located, Builders' Risk Insurance in the amount of the initial Contract Sum, plus value of subsequent modifications, change orders, and cost of material supplied or installed by others, comprising total value of the entire Project at the site on a replacement cost basis without optional deductibles. a. Policy must provide coverage from the time any covered property becomes the responsibility of the Contractor, and continue without interruption during construction, renovation, or installation, including any time during which the covered property is being transported to the construction installation site, or awaiting installation, whether on or off site. b. Such Builders' Risk Insurance shall be maintained, unless otherwise provided in the Contract Documents or otherwise agreed in writing by all persons and entities who are beneficiaries of such insurance, until final payment has been made or until no person or entity other than the County’s has insurable interest in the property to be covered, whichever is later. c. The Builders' Risk insurance shall include interests of the County and if applicable, affiliated or associate entities, the General Contractor, subcontractors and sub-tier contractors in the Project. d. The Builders' Risk Coverage shall be written on a Special Covered Cause of Loss form and shall include theft, vandalism, malicious mischief, collapse, false-work, temporary buildings, transit, debris removal including demolition, increased cost of construction, architect’s fees and expenses, flood (including water damage), earthquake, and if applicable, all below and above ground structures, piping, foundations including underground water and sewer mains, piling including the ground on which the structure rests and excavation, backfilling, filling, and grading. e. The Builders’ Risk shall include a Beneficial Occupancy Clause. The policy shall specifically permit occupancy of the building during construction. Contractor shall take reasonable steps to obtain consent of the insurance company and delete any provisions with regard to restrictions within any Occupancy Clauses within the Builder’s Risk Policy. The Builder’s Risk Policy shall remain in force until acceptance of the project by the County. f. Equipment Breakdown Coverage (a.k.a. Boiler & Machinery) shall be included as required by the Contract Documents or by law, which shall specifically cover insured equipment during installation and testing (including cold and hot testing). Contract # 058.24 Rev. 2022.08.04 CDD 12 g. The deductible shall not exceed $25,000 and shall be the responsibility of the Contractor except for losses that involve all Acts of God such as flood, earthquake, windstorm, tsunami, volcano, etc. 7) Special Coverages (check as appropriate and insert amount): a. ☐ Performance Bond $ i. ☐ Labor and Material $ ii. ☐ Payment Bond $ b. ☐ Professional Errors and Omissions c. ☐ Aircraft Liability d. ☐ Owner’s Protective e. ☐ Boiler and Machinery f. ☐ Loss of Use Insurance g. ☐ Crime, including Employee Dishonesty Coverage, or Fidelity Bond B. Proof of Insurance: 1) Each insurance policy required by the insurance provisions of this Contract shall provide the required coverage and shall not be suspended, voided or canceled except after thirty (30) days prior written notice has been given to the County, except when cancellation is for non-payment of premium, then ten (10) days prior notice may be given. Such notice shall be sent directly to Pitkin County Procurement 530 E Main Street, Suite #304, Aspen, CO 81611. If the insurance carrier will not provide the required notice, the Consultant/Contractor and or its insurance broker shall notify the County of any cancellation, or reduction in coverage or limits of any insurance within seven (7) days of receipt of insurers’ notification to that effect. Simultaneously with the Certificates of Insurance, the Contractor shall file with the Project Lead a certified statement as to claims pending against the required coverages, reserves established on account of such claims, defense costs expended and amounts remaining on policy limits. 2) In addition, these Certificates of Insurance shall contain the following clauses: a. The Contractor’s insurance shall be primary and non-contributory with any insurance or self-insurance purchased by the County. b. The insurance companies issuing the policy or policies hereunder shall have no recourse against the County of Pitkin for payment of any premiums or for assessments under any form of policy. c. Any and all deductibles or self-insured retentions in the above- described insurance policies shall be assumed by and be for the amount of, and at the sole expense of the Contractor. d. Location of operations shall be: “all operations and locations at which work for the referenced Project is being done.” Contract # 058.24 Rev. 2022.08.04 CDD 13 3) Certificates of Insurance for all renewal policies shall be delivered to the Procurement Department at procurement@pitkincounty.com, at least fifteen (15) days prior to a policy’s expiration date except for any policy expiring on the expiration date of this Contract or thereafter. 4) The County reserves the right to request and receive a copy of any policy and any policy endorsement at any time during the term of this Contract. VIII. Exemptions and Preferences. A. All purchases of construction or building or any other materials for any contract shall not include Federal Excise Taxes or Colorado State or local sales or use taxes. Pitkin County is exempt from such taxes under registration numbers 98-02624 and 84-78000-5K. B. Pursuant to state statute and to the extent permitted by law, Colorado labor shall be employed to perform the Project to the extent of not less than eighty percent (80%) of each type or class of labor employed on such project; except for highway construction, which is subject to C.R.S. § 43-2-208, which provides that all laborers shall be bona fide residents of Colorado with a preference to residents of the County where the Project is performed. IX. Protection and Restoration of Property and Landscape; Hazardous Materials. A. Protection and Restoration of Property and Landscape. 1) The Contractor shall be responsible for the preservation of all public and private property and shall carefully protect from disturbance or damage all land and property, as well as any monuments and property marks until the Project Lead has witnessed or otherwise referenced their location and shall not remove them until directed. 2) The Contractor shall be responsible for all damage or injury to property of any character, during the prosecution of the Project, resulting from any act, omission, neglect, or misconduct in its manner or method of executing the Project, or at any time due to defective Project work or materials, and said responsibility shall not be released until the project shall have been completed and accepted. 3) When or where any direct or indirect damage or injury is done to public or private property by or on account of any act, omission, neglect, or misconduct by the Contractor in the execution of the Project, or in consequence of the non-execution thereof by the Contractor, it shall restore, at its own expense, such property to a condition similar or equal to that existing before such damage or injury was done, by repairing, rebuilding, or otherwise restoring as may be directed, or it shall make good such damage or injury in an acceptable manner. Contract # 058.24 Rev. 2022.08.04 CDD 14 4) Materials storage, equipment parking, vehicle parking and stockpiling excavated materials shall be allowed only in those areas designated by the Project Lead. 5) If the Contractor disturbs any of the landscape not called for removal, it shall restore those areas as directed by the Project Lead at the Contractor's expense. B. Hazardous Materials 1) The County shall not be responsible for the cost of and the removal or cleanup of Hazardous Materials found in any materials brought to the Project site, after the Project site is turned over to the Contractor. 2) The Contractor shall provide the Project Lead with a written certification each time materials or equipment is brought onto the Project site that such materials or equipment do not contain Hazardous Materials. X. County Work at the Project Site. A. The County may perform other work related to the Project at the site by the County’s own forces, have other work performed by utility owners or let other direct contracts therefor which shall contain terms similar to these. The Contractor shall perform and coordinate its activities with other contractors to avoid conflict and minimize disruptions. B. The Contractor shall afford each utility owner and other contractor who is a party to such a direct contract (or the County if the County is performing the additional work with the County's employees) proper and safe access to the site and a reasonable opportunity for the introduction and storage of materials and equipment and the execution of such work, and shall properly connect and coordinate the work with theirs. The Contractor shall do all cutting, fitting and patching of the Project that may be required to make its several parts come together properly and integrate with such other work. The Contractor shall not endanger any work of others by cutting, excavating or otherwise altering their work and will only cut or alter their work with the written consent of Project Lead and the others whose work will be affected. The duties and responsibilities of Contractor under this paragraph are for the benefit of such utility owners and other contractors to the extent that there are comparable provisions for the benefit of the Contractor in said direct contracts between the County and such utility owners and other contractors. C. If any part of the Contractor's Project depends for proper execution or results upon the work of any such other contractor or utility owner (or the County), the Contractor shall inspect and promptly report to the Project Lead in writing any delays, defects or deficiencies in such work that render it unavailable or unsuitable for such proper execution and results. The Contractor's failure to report such conditions will constitute an acceptance of the other work as fit and proper for integration with the Contractor's Project except for latent or non-apparent defects and deficiencies in the other work. Contract # 058.24 Rev. 2022.08.04 CDD 15 XI. Changes in the Project and Use of Change Orders. A. The County may, from time to time, request changes in the scope of services of the Contractor to be performed hereunder. 1) The Project Lead shall issue a notice informing the Contractor of a planned change in the Project and requesting the Contractor's detailed price proposal and adjusted schedule of work. The Contractor shall submit a priced proposal for performing the proposed change in the Project within five (5) days of notice or such other time acceptable to both parties. When the Contractor and the County reach agreement on the adjustments to the Contract price and/or Contract time, and changes in the Project, such adjustments shall be promptly recorded in an executed Change Order. B. All Contractor initiated change requests shall be submitted to the County and the Project Lead in a letter or written notice with the reference notation “Contractor Change Request”. If the Contractor: (i) receives any oral or written instructions, directives or interpretations of Contract Documents, or determinations from the Project Lead or, (ii) identifies what it believes are design errors or omissions in the Contract Drawings or Specifications, or (iii) encounters a differing site condition; or, (iv) is delayed in the progress of the Project; or, (v) becomes aware of any other matter or circumstance which it believes would require a change in the Contract Price or Contract Time, the Contractor shall give the Project Lead prompt written notice of such matters. 1) All Contractor change requests shall be dated, numbered sequentially, and shall describe the action or event which the Contractor believes may require an extension in time, price or other modification. The Contractor shall also provide descriptions of possible Contractor actions or solutions to minimize the cost of the Contractor change request and, provide an estimate of the adjustment in the Contract Price and/or Contract Time, which it believes is appropriate. 2) Contractor Time Requirements a. With respect to orders, instructions, directives, interpretations, determinations, or the discovery of any errors or omissions in this Contract, a Contractor change request shall be submitted before the Contractor acts on them, but in no event more than ten (10) consecutive calendar days after they were received or discovered. b. With respect to any differing site conditions, a Contractor change request shall be submitted before the conditions are disturbed, but in no event more than ten (10) consecutive calendar days after the conditions are first discovered. c. With respect to delays, a Contractor change request shall be submitted as soon as the Contractor has knowledge of the delay, but in no event more than ten (10) consecutive calendar days therefrom. d. With respect to any matters or circumstance which the Contractor believes would require a change, including delays, a Contractor Contract # 058.24 Rev. 2022.08.04 CDD 16 change request shall be submitted as soon as the Contractor has knowledge of the matter or circumstance, but in no event more than ten (10) consecutive calendar days after the Contractor becomes aware of such circumstance or matter. 3) Submittal Requirements and Waiver of Claims a. If the Contractor does not submit a Contractor change request within the time required above, any action by the Contractor related to such order, direction, instruction, interpretation, determination, design error or omission, or other matter, including delays or differing site conditions, will not be considered by the County as a change to the Project and the Contractor waives any claim for an adjustment on the Contract Price or the Contract Time. b. The Contractor shall, at the time a Contractor change request is submitted provide the Project Lead with a complete and itemized proposal of Contract price and time adjustments. The proposal shall also contain a detailed explanation, citing all applicable provisions in this Contract, which supports the Contractor change request. If the Contractor does not submit its itemized proposal within the time described above or within such extension, which the Project Lead, in his/her discretion may have granted in writing, it waives any claim for an adjustment in the Contract price or Contract time arising out of the act or event described in the Contract change request. c. If a Contractor change request is denied by the Project Lead, in whole or in part, any claim for an increase in the Contract price or Contract time arising out of the act or event described in the Contractor change request is waived unless the Contractor timely complied with the provisions of paragraphs 2(a-d) of this Section. XII. Warranty and Guarantee; Tests and Inspections; Correction, Removal or Acceptance of Defective Project Work A. Warranty. 1) The Contractor warrants and guarantees to the County that all Project work, whether supplied, furnished, installed, provided, or performed by Contractor, a subcontractor, or supplier, will be in accordance with this Contract and will not be defective and that all Project work shall be performed in a skillful and workmanlike manner. Additionally, the Contractor shall warrant that all equipment which is incorporated into the Project or any subsystem shall be new, free from liens and defects in design, have clear title, be free from faulty materials and workmanship, and shall conform in all aspects to the terms of this Contract, to the drawings issued for manufacture by the Contractor, and shall be in conformance with the those technical specifications provided in Section II (Scope of Work) of this Contract and Contractor's Proposal. Except where longer periods of warranty are indicated Contract # 058.24 Rev. 2022.08.04 CDD 17 for certain items, Contractor warrants Project work, whether furnished, installed, provided, performed or supplied by Contractor, a subcontractor or supplier, to be free from faulty materials and workmanship and that each piece of equipment or any part thereof incorporated into the Project or any subsystem shall conform to the aforementioned warranty and guarantee provisions and be free from failure for a period of not less than Enter Length of Time (Open to Negotiations) from date of Final Payment. Landscaping replacement shall be warranted for two (2) growing seasons. 2) With respect to all warranties, express or implied, from subcontractors, manufacturers, or suppliers for Project work performed and materials furnished under the Contract, the Contractor shall: a. Obtain all warranties that would be given in normal commercial practice. To the extent that the subcontractor's, manufacturer's, or supplier's, standard warranty exceeds the minimum County requirements as set forth in this Section or elsewhere in this Contract, the subcontractor's, manufacturer's, or supplier's standard warranty shall apply. b. Require all warranties to be executed, in writing, for the benefit of the County, if directed by the Project Lead; or c. Enforce all warranties for the benefit of the County, if directed by the Project Lead. d. Assign all warranties and guarantees in writing to the County upon the request of the County. B. Access to Project. The Project Lead and the Project Lead’s representatives, other representatives of the County, testing agencies and governmental agencies with jurisdictional interests shall have access to the Project, at any time for their observation, inspecting and testing. Contractor shall provide proper and safe conditions for such access. C. Tests and Inspections. 1) The Contractor shall cooperate with material testing persons and firms, and for required inspections, and compliance and approval tests for the work performed by the Contractor or its subcontractor. 2) If any laws, ordinances, rules, regulations, code or order of any public body having jurisdiction requires any Project work (or part thereof) to specifically be inspected, tested or approved, the Contractor shall assume full responsibility therefore, pay all costs in connection therewith and furnish the Project Lead the required certificates of inspection, testing or approval. The Contractor shall also be responsible for and shall pay all costs in connection with any inspection or re-testing required in connection with the County’s or the Project Lead’s acceptance of a supplier of materials or equipment proposed to be incorporated in the Project, or of materials or equipment submitted for approval prior to the Contractor's purchase thereof for incorporation in the Project. The cost of all inspections, testing, re-testing and approvals in addition to the above which are required by this Contract shall be paid by the Contractor (unless otherwise specified). The County will conduct and pay for the Contract # 058.24 Rev. 2022.08.04 CDD 18 conformance tests on materials installed in-place, and the Contractor shall pay for re-testing of all failing and non-conforming materials thereafter. 3) All inspections, tests or approvals other than those required by laws, ordinances, rule, regulations, code, or order of any public body having jurisdiction shall be performed by organizations acceptable to the Project Lead. 4) If any Project work (including the work of others) that is to be inspected, tested or approved is covered without written concurrence of the Project Lead, it must be uncovered for observation. Such uncovering and testing when required by the Project Lead shall be at the Contractor's expense. 5) Neither observations by the Project Lead nor inspections, tests or approvals by others shall relieve the Contractor from the Contractor's obligations to perform the Project in accordance with this Contract. D. Correction or Removal of Defective Work. If required by the Project Lead or the County, the Contractor shall promptly, as directed, either correct all defective Project work, whether or not fabricated, installed or completed, or, if the Project work has been rejected by the Project Lead or the County, remove it from the site and replace it with non-defective Project work. The Contractor shall bear all direct, indirect and consequential costs of such correction or removal (including but not limited to fees and charges of engineers, architects, attorneys and other professionals) made necessary thereby. E. Correction Period. If within two (2) years after the date of Final Payment or such longer period of time as may be prescribed by laws or by the terms of any applicable special guarantee required by the Contract Documents or by any specific provision of the Contract Documents, any Project work is found to be defective, the Contractor shall promptly without cost to County and in accordance with County's written instructions, either correct such defective Project work, or, if it has been rejected by County, remove it from the site and replace it with non-defective Project work. If the Contractor does not promptly (within seven (7) days from receipt) comply with the terms of such instructions, or in an emergency where delay would cause serious risk of loss or damage, the County may have the defective Project work corrected or the rejected Project work removed and replaced, and all direct, indirect and consequential costs of such removal and replacement (including but not limited to fees and charges of engineers, architects, attorneys and other professionals) will be paid by the Contractor. Contractor shall also pay for any damage to other Project work, other property, or person, which occurred as a result of the defective Project work. F. County May Correct Defective Work. If the Contractor fails within ten (10) consecutive calendar days after written notice of the Project Lead or the County to proceed to correct and to correct defective Project work or to remove and replace rejected Project work as required by the Project Lead or the County in accordance with paragraph D of this Section, or if the Contractor fails to perform the Project work in accordance with the Contract Documents, or if the Contractor fails to comply with any other provision of the Contract Documents, the County may, after seven (7) days' written notice to the Contractor, correct and remedy any such deficiency. In exercising the rights and remedies under this paragraph the County shall proceed expeditiously to the extent necessary to complete corrective and remedial action. The Contract # 058.24 Rev. 2022.08.04 CDD 19 County may exclude the Contractor from all or part of the site, take possession of all or part of the Project, and suspend the Contractor's services related thereto, take possession of the Contractor's tools, appliances, construction equipment and machinery at the site and incorporate in the Project all materials and equipment stored at the site or for which the County has paid the Contractor but which are stored elsewhere. The Contractor shall allow the County, the County's representatives, agents and employees such access to the site as may be necessary to enable the County to exercise the rights and remedies under this paragraph. All direct, indirect and consequential costs of the County in exercising such rights and remedies will be charged against the Contractor, and a Change Order will be issued by the County incorporating the necessary revisions in the Contract price. Such direct, indirect and consequential costs will include but not be limited to fees and charges of engineers, architects, attorneys and other professionals, all court costs and all costs of repair and replacement of work of others destroyed or damaged by correction, removal or replacement of the Contractor's defective Project work. The Contractor shall not be allowed an extension of the Contract time because of any delay in performance of the Project work attributable to the exercise by the County of the County's rights and remedies hereunder. XIII. Liquidated Damages. It is the County’s intent to complete this project no later than February 29, 2024. Liquidated damages of No dollars and No cents ($0.00) per calendar day shall be paid if project is not completed by that deadline. A. Time for Completion. It is hereby understood and mutually agreed, by and between the Contractor and the County, that the date of beginning Project work and the time of completion as specified herein are essential conditions of the Contract. The Contractor agrees that said Project shall be prosecuted regularly, diligently, and at such rate of progress as will ensure completion within the time(s) specified. It is expressly understood and agreed, by and between the Contractor and the County, that the time(s) for completion of the Project described herein are reasonable time(s) for the completion of the Project, taking into consideration the average climatic conditions prevailing in the locality of the Project. B. Time is of the Essence to the Contract. It is further agreed that time is of the essence in completing the Project, and that the Project Work Schedule and all dates set forth therein and where in this Contract, an additional time is allowed for the completion of the Project, the new time limit fixed by such extension shall be of the essence of the Contract. C. Liquidated Damages. Completion of the Project is of paramount importance to the County. If any portion of the Project is not completed in accordance with any time extensions granted by the County, the County will suffer damage, the extent of which will be impractical and extremely difficult to estimate accurately. Therefore, as part of the consideration for executing the Contract, it is hereby agreed that the Contractor shall pay to the County the liquidated damage amounts specified in the Contract. This particular provision shall not be construed as a penalty upon said Contractor for failing fully to complete said Project as agreed in the Proposal and this Contract nor is it intended, but as Liquidated Damages to compensate the County for all costs incurred as a result of such breach of Contract. Contract # 058.24 Rev. 2022.08.04 CDD 20 D. Delays in Project Completion of Construction Phase. Subject to the terms of "Excusable Delays", as contained in paragraph E of this Section, the Contractor expressly agrees to pay the County as a reasonable estimate of just compensation for damages contemplated with the clause, the amount set forth as liquidated damages for each consecutive calendar day that completion is delayed in the construction of the Project. E. Excusable Delays - Force Majeure. If, by reason of Force Majeure, any party hereto shall be rendered unable wholly or in part to carry out its obligations under this Contract then such party shall give notice and full particulars of such Force Majeure in writing to the other party within a reasonable time after occurrence of the event or cause relied upon, and the obligation of the party giving such notice, so far as it is affected by such Force Majeure, shall be suspended during the continuance of the liability then claimed, but for no longer period, and any such party shall remove or overcome such inability with all reasonable dispatch. The term Force Majeure as employed herein, shall mean acts of God, strikes, lockouts, or other industrial disturbances, acts of public enemy, orders of any kind of the Government of the United States or the State of Colorado or any political subdivision, except the County, or any civil or military authority, insurrection, riots, epidemics, landslides, lightning, earthquakes, fires, hurricanes, storms, floods, washouts, droughts, arrests, restraint of government and people, civil disturbances, explosions, breakage or accidents to machinery, pipelines, or canals, or other causes not reasonably within the control of the party claiming such inability. It is understood and agreed that the settlement of strikes and lockouts shall be entirely within the discretion of the party having the difficulty, and that the above requirement that any Force Majeure shall be remedied with all reasonable dispatch shall not require the settlement of strikes and lockouts by acceding to the demands of the opposing party or parties when such settlement is unfavorable to it in the judgment of the party having the difficulty. F. Cumulative Remedy. The liquidated damages referred to herein are intended to be and are cumulative and shall be in addition to every other remedy now or hereafter enforceable at law, in equity, by statute, or under Contract. XIV. Termination of Contract A. The County may terminate this Contract upon the occurrence of any one or more of the following events: 1) If the Contractor commences a voluntary case under any chapter of the Bankruptcy Code (Title II, United States Code), as now or hereafter in effect, or if Contractor takes any equivalent or similar action by filing a petition or otherwise under any other federal or state law in effect at such time relating to the bankruptcy or insolvency; 2) If a petition is filed against Contractor under any chapter of the Bankruptcy Code as now or hereafter in effect at the time of filing, or if a petition is filed seeking any such equivalent or similar relief against Contractor under any other federal or state law in effect at the time relating to bankruptcy or insolvency; 3) If the Contractor makes a general assignment for the benefit of creditors; Contract # 058.24 Rev. 2022.08.04 CDD 21 4) If a trustee, receiver, custodian or agent of Contractor is appointed under applicable law or under Contract, whose appointment or authority to take charge of property of Contractor is for the purpose of enforcing a Lien against such property or for the purpose of general administration of such property for the benefit of Contractor's creditors; 5) If the Contractor persistently fails to perform the Project in accordance with this Contract including but not limited to, failure to supply sufficient skilled workers or suitable materials or equipment or failure to adhere to the work schedule established in this Contract; 6) If the Contractor disregards laws, ordinances, rules, regulations, or orders of any public body having jurisdiction. B. Termination Prior to Expiration of Contract Term. The County has the right to terminate this Contract, with or without cause, by giving written notice to the Contractor of such termination and specifying the effective date thereof. Such notice shall be given at least ten (10) days before the effective date of such termination. In such event all finished or unfinished documents, data, studies and reports prepared by the Contractor pursuant to this Contract shall become the County’s property. Contractor shall be entitled to receive compensation in accordance with the Contract for any satisfactory Project work completed pursuant to the terms of this Contract prior to the date of termination. Notwithstanding the above, Contractor shall not be relieved of liability to the County for damages sustained by the County by virtue of any breach of the Contract by the Contractor. XV. Independent Contract Status. A. The parties to this Contract intend that the relationship between them contemplated by the Contract is that of independent contractor. Contractor, and any agent, employee, or servant of Contractor shall not be deemed to be an employee, agent, or servant of Pitkin County. B. Contractor is not required to offer his services exclusively to Pitkin County under this Contract. Contractor may choose to work for other individuals or entities during the term of this Contract, provided that the basic services and deliverable products required under this Contract are submitted in the manner and on the schedule defined under this Contract. C. Contractor warrants that all work produced will conform to all applicable industry standard of care, skill and diligence in the performance of Contractor’s obligations under this Contract. D. Contractor shall not attempt to oversee or supervise the work or actions of any Pitkin County employee, servant or agent in the course of completing work under this Contract. E. Contractor is not entitled to any Workers’ Compensation benefits through Pitkin County and is responsible for payment of any federal, state, FICA and other income taxes. F. The Contractor shall be required to complete and submit to the County, a Form W-9 Taxpayer Identification Number Request. XVI. Computation of Time. Contract # 058.24 Rev. 2022.08.04 CDD 22 A. When any period of time is referred to in this Contract by days, it will be computed to exclude the first and include the last day of such period. If the last day of any such period falls on a Saturday or Sunday or on a legal holiday, such day will be omitted from the computation. B. All times stated in this Contract are of the essence. XVII. Records and Cost Pricing Data. A. The Contractor shall maintain in a safe place at the site one record copy of all Drawings, Specifications, Addenda, Written Amendments, Change Orders, Project Directive Changes, Field Orders and written interpretations and clarifications in good order and annotated and updated weekly to show all changes made during construction. These record documents together with all approved samples will be available to the Project Lead for reference. Upon completion of the Project, these record documents and samples will be delivered to the Project Lead for the County. B. The Contractor shall maintain all data and records pertinent to the Project performed under this Contract, in accordance with generally accepted accounting principles, and shall preserve and make available all data and records until the expiration of three (3) years from the date of final payment under this Contract, or for such longer period, if any, as is required by applicable statute or by other articles of this Contract. The County shall have access to all such data and records for such time period to inspect, audit and make copies thereof during normal business hours. The Contractor covenants and agrees that it shall require that any subcontractor utilized in the performance of this Contract permit the authorized representatives of the County to similarly inspect and audit all data and records of said subcontractors relating to the performance of said subcontractors under this Contract for the same time period. C. If this Contract is completely or partially terminated, the records relating to the Project terminated shall be made available for three (3) years after any resulting final termination payment. D. Records pertaining to appeals or to litigation or the settlement of claims arising under or relating to the performance of this Contract shall be made available until disposition of such appeals, litigation, or claims. XVIII. Miscellaneous. A. Any use of subcontractors by the Contractor for performance of this Contract must be accepted in writing by the County. B. Severability. If any term, section, or other provision of this Contract shall, for any reason, be held to be invalid or unenforceable, the invalidity or unenforceability of such term, section, or other provision shall not affect any of the remaining provisions of this Contract, and to this end, each term, section and provision of this Contract shall be severable. C. Integration and Modification. This Contract represents the entire and integrated Contract between the County and the Contractor and supersedes all prior negotiations, representations, or contract, either written or oral. This Contract may be amended only by written Contract signed by both the County and the Contractor. Contract # 058.24 Rev. 2022.08.04 CDD 23 D. Contract Made in Colorado. The parties agree that this Contract was made in accordance with the laws of the State of Colorado and shall be so construed. Venue is agreed to be exclusively in the courts of Pitkin County, Colorado. E. Attorney’s Fees. In the event that legal action is necessary to enforce any of the provisions of this Contract, the substantially prevailing party shall be entitled to its costs and reasonable attorney’s fees. F. Governmental Immunity. Contractor agrees and understands that Pitkin County is relying on and does not waive the monetary limitations or terms or any other rights, immunities, and protections provided by the Colorado Governmental Immunity Act, C.R.S., § 24-10-101, et seq., as from time to time amended, or otherwise available to Pitkin County or any of its officers, agents or employees. Further, nothing in this Contract shall be construed or interpreted to require or provide for indemnification of the Contractor by the County for any injury to any person or any property damage whatsoever which is caused by the negligence or other misconduct of the County or its agent or employees. G. Current Year Obligations. The parties acknowledge and agree that any payments provided for hereunder or requirements for future appropriations shall constitute only currently budgeted expenditures of Pitkin County. Pitkin County’s obligations under this Contract are subject to Pitkin County’s annual right to budget and appropriate the sums necessary to provide the services set forth herein. No provisions of the Contract shall constitute a mandatory charge or requirement in any ensuing fiscal year beyond the then current fiscal year of Pitkin County. H. Notice. Any notice required or permitted under this Contract shall be in writing and shall be provided by electronic delivery to the e-mail addresses set forth below and by one of the following methods 1) hand-delivery or 2) registered or certified mail, postage pre-paid to the mailing addresses set forth below. Each party by notice sent under this paragraph may change the address to which future notices should be sent. Electronic delivery of notices shall be considered delivered upon receipt of confirmation of delivery on the part of the sender. Nothing contained herein shall be construed to preclude personal service of any notice in the manner prescribed for personal service of a summons or other legal process. To Pitkin County: David Schneider 1001 Owl Creek Rd Aspen, CO 81611 Email: david.schneider@aspenairport.com with copies to: Pitkin County Attorney’s Office 530 E. Main St., Suite #301 Aspen, Colorado 81611 Email: Attorney@pitkincounty.com To Contractor: North Peak, Inc. 305 Main St., Suite A Grand Junction, CO 81611 Phone: (970) 331-5163 Email: levi@northpeakconstruction.com Contract # 058.24 Rev. 2022.08.04 CDD 24 I. Waiver. No waiver by either party of any right, term or condition of this Contract shall be deemed or construed as a waiver of any other right, term or condition, nor shall a waiver of any breach hereof be deemed to constitute a waiver of any subsequent breach, whether of the same or of a different provision of this Contract. XIX. Contractor’s Representations. A. In order to induce County to enter into this Contract, Contractor makes the following representations: 1) Contractor has familiarized himself with the nature and extent of this Contract, Project, locality, and with all local conditions and federal, state, and local laws, ordinances, rules and regulations that in any manner may affect cost, progress, or performance of Project. 2) Contractor has carefully studied the site and has performed all necessary investigations, tests, and subsurface investigations to define the latent physical conditions of the construction site affecting cost, progress, or performance of Project. 3) Contractor has made or caused to be made examinations, investigations, and tests and studies of such reports and related data as it deems necessary for the performance of Project at the Contract price, within the Contract time, and in accordance with the other terms and conditions of this Contract; and no additional examinations, investigations, tests, reports, or similar data are or will be required by Contractor for such purposes. 4) Contractor has correlated the results of all such observations, examinations, investigations, tests, reports and data with the terms and conditions of this Contract. 5) Contractor has given Project Lead written notice of all conflicts, errors, or discrepancies that it has discovered in this Contract, and the written resolution thereof by Project Lead is acceptable to Contractor. 6) By executing this Contract, the Contractor represents that it has visited the site, familiarized itself with the local conditions under which the Project work is to be performed (including weather conditions which can be expected), and correlated its observations with the requirements of this Contract. 7) The undersigned representative of Contractor represents that it is an authorized representative of Contractor for the purposes of executing this Contract and that it has full and complete authority to enter into this Contract on behalf of Contractor. XX. Counterparts. This Contract may be executed in multiple counterparts, each of which shall constitute an original, but all of which shall constitute one and the same document. XXI. Public Contracts for Services and Public Contracts with Natural Persons. In conformance with the provisions of C.R.S. §§ 8-17.5-101, et seq., as amended and C.R.S. §§ 24-76.5-101, et seq., as amended: Contract # 058.24 Rev. 2022.08.04 CDD 25 A. PUBLIC CONTRACTS FOR SERVICES. §§8-17.5-101, et seq. C.R.S. [Not applicable to agreements relating to the offer, issuance, or sale of securities, investment advisory services or fund management services, sponsored projects, intergovernmental agreements, or information technology services or products and services] Contractor certifies, warrants, and agrees that it does not knowingly employ or contract with an illegal alien who will perform work under this Contract and will confirm the employment eligibility of all employees who are newly hired for employment in the United States to perform work under this Contract, through participation in the E-Verify Program established under Pub. L. 104-208 or the State verification program established pursuant to §8-17.5-102(5)(c), C.R.S., Contractor shall not knowingly employ or contract with an illegal alien to perform work under this Contract or enter into a contract with a Subcontractor that fails to certify to Contractor that the Subcontractor shall not knowingly employ or contract with an illegal alien to perform work under this Contract. Contractor (i) shall not use E-Verify Program or State program procedures to undertake pre-employment screening of job applicants while this Contract is being performed, (ii) shall notify the Subcontractor and the contracting State agency within 3 days if Contractor has actual knowledge that a Subcontractor is employing or contracting with an illegal alien for work under this Contract, (iii) shall terminate the subcontract if a Subcontractor does not stop employing or contracting with the illegal alien within 3 days of receiving the notice, and (iv) shall comply with reasonable requests made in the course of an investigation, undertaken pursuant to §8-17.5-102(5), C.R.S., by the Colorado Department of Labor and Employment. If Contractor participates in the State program, Contractor shall deliver to the contracting State agency, Institution of Higher Education or political subdivision, a written, notarized affirmation, affirming that Contractor has examined the legal work status of such employee, and shall comply with all of the other requirements of the State program. If Contractor fails to comply with any requirement of this provision or §§8-17.5-101 et seq., C.R.S., the contracting State agency, institution of higher education or political subdivision may terminate this Contract for breach and, if so terminated, Contractor shall be liable for damages. PUBLIC CONTRACTS WITH NATURAL PERSONS. §§24-76.5-101, et seq., C.R.S. Contractor, if a natural person 18 years of age or older, hereby swears and affirms under penalty of perjury that he or she (i) is a citizen or otherwise lawfully present in the United States pursuant to federal law, (ii) shall comply with the provisions of §§24-76.5-101 et seq., C.R.S., and (iii) has produced one form of identification required by §24-76.5-103, C.R.S. prior to the Effective Date of this Contract. Contract # 058.24 Rev. 2022.08.04 CDD 26 IN WITNESS WHEREOF, the parties have executed this Contract as of the date first set out herein above. NORTH PEAK, Inc. ________________________________________________ !#VENDOR SIGNATURE#! Date PITKIN COUNTY, COLORADO RECOMMENDED FOR APPROVAL: _________________________________________________ !#DEPARTMENT REPRESENTATIVE#! Date SECTION APPROVAL: ________________________________________________ !#SECTION LEADER#! Date David Schneider Operations and Security Manager Jan-05-2024 Dan Bartholomew Airport Director Jan-05-2024 Kevin Young Jan-10-2024 President Page 1 of 8 Agreement Between Owner and Construction Manager as Constructor [Cost of the Work Plus a Fee] AGREEMENT made as of the _3rd__ day of _January_, _2024_. BETWEEN the Owner: Aspen/Pitkin County Airport, ASE and the Construction Manager: North Peak Inc. North Peak, Inc. 305 Main St. Suite A Grand Junction, CO 81501 for the following Project: 233 E Airport Rd-Ste G, Aspen, CO 81611 The Owner and Construction Manager agree as follows. TABLE OF ARTICLES 1 GENERAL PROVISIONS 2 CONSTRUCTION MANAGER’S RESPONSIBILITIES 3 OWNER’S RESPONSIBILITIES 4 COMPENSATION AND PAYMENTS FOR CONSTRUCTION SERVICES 5 COSTS OF THE WORK FOR CONSTRUCTION 6 PAYMENTS FOR CONSTRUCTION SERVICES 7 INSURANCE AND BONDS 8 DISPUTE RESOLUTION 9 TERMINATION OR SUSPENSION 10 MISCELLANEOUS PROVISIONS 11 SCOPE OF THE AGREEMENT ARTICLE 1 GENERAL PROVISIONS § 1.1 The Contract Documents The Contract Documents consist of this Agreement, and Modifications issued after execution of this Agreement, all of which form the Contract and are as fully a part of the Contract as if attached to this Agreement or repeated herein. The Contract represents the entire and integrated agreement between the parties hereto and supersedes prior negotiations, representations, or agreements, either written or oral. If anything in the other Contract Documents, other than a Modification, is inconsistent with this Agreement, this Agreement shall govern. § 1.2.1 Relationship of the Parties The Construction Manager accepts the relationship of trust and confidence established by this Agreement and covenants with the Owner to cooperate with the Owner and the contracted architect (the “Architect”), including during the preconstruction phase of the Project and the construction phase thereafter, to exercise the Construction Manager’s skill and judgment in furthering the interests of the Owner; to furnish efficient construction Page 2 of 8 administration, management services and supervision; to always furnish an adequate supply of workers and materials; and to perform the contracted for services (the “Work”) in an expeditious and economical manner consistent with the Owner’s interests. The Owner agrees to furnish or approve, in a timely manner, information required by the Construction Manager and to make payments to the Construction Manager in accordance with the requirements of this Agreement. § 1.2.2 Owner’s Representation The Owner shall designate one representative to lead project efforts, answer all questions, and make all decisions on behalf of the remaining Owner’s parties. A secondary representative shall also be designated for the event that the primary representative is not available. The representatives must be designated below with adequate contact information. Primary Representative Name: David Schneider Address: 233 E Airport Rd-Ste G Aspen, CO 81611 Primary Phone Number: _970.429.1881___________________________ Secondary Phone Number: _____________________________________ Email Address: david.schneider@aspenairport.com________________ Secondary Representative Name: _Greg Boyb Address: _ 233 E Airport Rd-Ste G Aspen, CO 81611_________________ Primary Phone Number: _970.429.1881____________________________ Secondary Phone Number: ______________________________________ Email Address: _ _greg.boyd@aspenairport.com_____________________________ ARTICLE 2 CONSTRUCTION MANAGER’S RESPONSIBILITIES § 2.1.1 Consultation The Construction Manager shall schedule and conduct meetings with the Owner and the architect to discuss such matters as procedures, progress, coordination, and scheduling of the Work. The Construction Manager shall advise the Owner and the Architect on proposed site use and improvements, selection of materials, and building systems and equipment. The Construction Manager shall also provide recommendations consistent with the Project requirements to the Owner and architect on constructability; availability of materials and labor; time requirements for procurement, installation, and construction; and factors related to construction cost including, but not limited to, costs of alternative designs or materials, preliminary budgets, life-cycle data, and possible cost reductions. § 2.1.2 Phased Construction The Construction Manager shall provide recommendations regarding accelerated or fast-track scheduling, procurement, or phased construction. The Construction Manager shall take into consideration cost reductions, cost information, constructability, provisions for temporary facilities and procurement and construction scheduling issues. § 2.1.3 Cost Estimates §2.1.3.1 Based on the preliminary design and other design criteria prepared by the architect, the Construction Manager shall prepare preliminary estimates of the cost of the Work or the cost of program requirements using area, volume or similar conceptual estimating techniques for the architect’s review and Owner’s approval. If the Architect or Construction Manager suggests alternative materials and systems, the Construction Manager shall provide cost evaluations of those alternative materials and systems. § 2.1.3.2 The Construction Manager shall prepare for the Owner (and for the Architect’s review if requested), a procurement schedule for items that must be ordered well in advance of construction. The Construction Manager shall expedite and coordinate the ordering and delivery of materials that must be ordered well in advance of construction. § 2.1.4 Extent of Responsibility The Construction Manager shall exercise reasonable care and shall comply with all applicable professional standards in preparing schedules and estimates. The Construction Manager is not required to ascertain that any drawings and specifications are in accordance with applicable laws, statutes, ordinances, codes, rules and regulations, or lawful orders of public authorities, but the Construction Manager shall promptly report to the Owner, and Architect if necessary, any nonconformity discovered by or made known to the Construction Manager during the course of his work and performance Page 3 of 8 of contractual duties. § 2.1.5 Notices and Compliance with Laws The Construction Manager shall comply with applicable laws, statutes, ordinances, codes, rules and regulations, applicable professional standards, and lawful orders of public authorities applicable to its performance under this Contract, and with equal employment opportunity programs, and other programs as may be required by governmental and/or quasi-governmental authorities. § 2.2 Construction § 2.2.1 General The contract for construction shall commence upon the Owner’s acceptance of the Construction Manager’s proposal to begin the Work. § 2.2.2 Those portions of the Work that the Construction Manager does not customarily perform with the Construction Manager’s own personnel shall be performed under subcontracts or by other appropriate agreements with the Construction Manager. Such subcontracts will be negotiated and executed by the Construction Manager, subject to the cost of Work being within the cost estimates under §2.2.1 of this Agreement. If any subcontract results in the cost estimates being exceeded the Construction Manager shall promptly communicate such details to the Owner and not enter such contractual arrangement(s) without and until the Owner’s consent. The Construction Manager shall not be required to contract with anyone to whom the Construction Manager has reasonable objection. § 2.2.3 The Construction Manager shall be always reasonably available to meet and/or discuss with the Owner such matters as procedures, progress, coordination, scheduling, and status of the Work. § 2.2.4 Architect The Construction Manager shall retain a qualified and licensed Architect to provide services, duties and responsibilities expected of a professional within the architecture industry. The Construction Manager shall provide the Owner with a copy of the executed agreement between the Construction Manager and the Architect, and any further modifications to the agreement. ARTICLE 3 OWNER’S RESPONSIBILITIES § 3.1 Information and Services Required of the Owner § 3.1.1 The Owner shall provide information with reasonable promptness, regarding requirements for and limitations on the Project, including a written program which shall set forth the Owner’s objectives, constraints, and criteria. The individuals and parties comprising the Owner shall be jointly and severally responsible for the payment of all fees due to the Construction Manager and any other obligations required under this agreement. § 3.1.2 Prior to the execution of the Contract, the Construction Manager may request in writing that the Owner provide reasonable evidence that the Owner has made financial arrangements to fulfill the Owner’s obligations under the Contract. Thereafter, the Construction Manager may only request such evidence if (1) the Owner fails to make payments to the Construction Manager pursuant to Article 6 herein, (2) a change in the Work materially changes the total contract sum, as defined herein under Article 6, or (3) the Construction Manager identifies in writing a reasonable concern regarding the Owner’s ability to make payment when due. The Owner shall furnish such evidence as a condition precedent to commencement or continuation of the Work, or the portion of the Work affected by a material change. § 3.1.3 Structural and Environmental Tests, Surveys and Reports. Owner shall furnish any other information or services under the Owner’s control and relevant to the Construction Manager’s performance of the Work with reasonable promptness after receiving the Construction Manager’s written request for such information or services. The Construction Manager shall be entitled to rely on the accuracy of information and services furnished by the Owner but shall exercise proper precautions relating to the safe performance of the Work. § 3.1.3.1 The Owner shall furnish tests, inspections and reports required by law and as otherwise agreed to by the parties, such as structural, mechanical, and chemical tests, tests for air and water pollution, and tests for hazardous materials. § 3.1.3.2 The Owner shall furnish surveys describing physical characteristics, legal limitations, and utility locations for the site of the Project, and a legal description of the site. The surveys and legal information shall include, as applicable, grades and lines of streets, alleys, pavements and adjoining property and structures; designated wetlands; adjacent drainage; rights-of-way, restrictions, easements, encroachments, zoning, deed restrictions, boundaries and contours of the site; locations, dimensions and necessary data with respect to existing buildings, other improvements and trees; and information concerning available utility services and lines, both public and private, above and below grade, including Page 4 of 8 inverts and depths. All the information on the survey shall be referenced to a Project benchmark. § 3.1.3.3 The Owner, when such services are requested, shall furnish services of geotechnical engineers, which may include but are not limited to test borings, test pits, determinations of soil bearing values, percolation tests, evaluations of hazardous materials, seismic evaluation, ground corrosion tests and resistivity tests, including necessary operations for anticipating subsoil conditions, with written reports and appropriate recommendations. § 3.1.3.4 The Owner shall furnish information or services required of the Owner by this Agreement with reasonable promptness. The Owner shall also furnish any other information or services under the Owner’s control and relevant to the Construction Manager’s performance of the Work with reasonable promptness after receiving the Construction Manager’s written request for such information or services. ARTICLE 4 COMPENSATION AND PAYMENTS FOR CONSTRUCTION SERVICES § 4.1 Compensation § 4.1 For the Construction Manager’s performance of the Work as described in Article 2, the Owner shall pay the Construction Manager a sum (the “Contract Sum”) for the Construction Manager’s performance of the Contract. The Contract Sum is the cost of the Work as defined in Section 6.1.1 plus the Construction Manager’s percentage fee (the “Construction Manager’s Fee”). §4.2 The Construction Manager’s Fee: The Construction Manager’s Fee shall be __20%, plus__ the cost of Work. § 4.3 Changes in the Work § 4.3.1 The Owner may, without invalidating the Contract, order changes in the Work within the general scope of the Contract consisting of additions, deletions, or other revisions. The Owner shall issue such changes in writing. The Construction Manager shall be entitled to an equitable adjustment in an estimated time for completion of the Contract because of changes in the Work. ARTICLE 5 COST OF THE WORK FOR CONSTRUCTION § 5.1 Costs to Be Reimbursed § 5.1.1 The total cost of the Work shall mean costs necessarily incurred by the Construction Manager in the proper performance of the Work (the “Cost of the Work”). Such costs shall be at rates not higher than the standard paid at the place of the Project except with prior consent of the Owner. The Cost of the Work shall include only the items set forth under this Article 5 of the Agreement. § 5.1.2 Where any cost is subject to the Owner’s prior approval, the Construction Manager shall obtain this approval prior to incurring the cost. § 5.2 Labor Costs § 5.2.1 Wages of construction workers directly employed by the Construction Manager to perform the construction of the Work at the site or, with the Owner’s prior approval, at off-site workshops; and costs to be reimbursed will be the actual wages paid to the individuals performing the Work subject to wage maximums per the approval of the Owner. § 5.2.2 Wages or salaries of the Construction Manager’s project management, supervisory and administrative personnel, including travel and expenses, when traveling to, or stationed at the site of the Project. § 5.2.3 Wages and salaries of the Construction Manager’s supervisory or administrative personnel engaged at factories, workshops or on the road, in expediting the production or transportation of materials or equipment required for the Work, but only for that portion of their time required for the Work. § 5.2.4 Costs paid or incurred by the Construction Manager for taxes, insurance, contributions, assessments, and benefits required by law or collective bargaining agreements and, for personnel not covered by such agreements, customary benefits such as sick leave, medical and health benefits, holidays, vacations, and pensions, provided such costs are based on wages and salaries included in the Cost of the Work under Article 5 herein. § 5.2.5 Bonuses, profit sharing, incentive compensation and any other discretionary payments paid to anyone hired by the Construction Manager or paid to any Subcontractor or vendor, with the Owner’s prior approval. Page 5 of 8 § 5.3 Subcontractor Costs Payments made by the Construction Manager to subcontractors in accordance with the requirements of the subcontracts. Amounts properly billed by subcontractors for work which has been approved by the Construction Manager in accordance with the subcontract. § 5.4 Costs of Materials and Equipment Incorporated in the Completed Construction § 5.4.1 Costs, including transportation and storage, of materials and equipment incorporated or to be incorporated in the completed construction. § 5.4.2 Costs of materials described in the preceding Section 5.4.1 in excess of those actually installed to allow for reasonable waste and spoilage. Unused excess materials, if any, shall become the Owner’s property at the completion of the Work or, at the Owner’s option, shall be sold by the Construction Manager. Any amounts realized from such sales shall be credited to the Owner as a deduction from the Cost of the Work. § 5.4.3 Costs of materials purchased directly by the Construction Manager for use on the project may be allowed a markup of 15%. § 5.5 Costs of Other Materials and Equipment, Temporary Facilities and Related Items § 5.5.1 Costs of transportation, storage, installation, maintenance, dismantling and removal of materials, supplies, temporary facilities, machinery, equipment, and hand tools not customarily owned by construction workers that are provided by the Construction Manager at the site and fully consumed in the performance of the Work. Costs of materials, supplies, temporary facilities, machinery, equipment, and tools that are not fully consumed shall be based on the cost or value of the item at the time it is first used on the Project site less the value of the item when it is no longer used at the Project site. Costs for items not fully consumed by the Construction Manager shall mean fair market value. § 5.5.2 Rental charges for temporary facilities, machinery, equipment, and hand tools not customarily owned by construction workers that are provided by the Construction Manager at the site and costs of transportation, installation, minor repairs, dismantling and removal. The total rental cost billed to the project for any Construction Manager-owned item may not exceed the purchase price of any comparable item. Rates of Construction Manager owned equipment and quantities of equipment shall be subject to the Owner’s prior approval. § 5.5.3 Costs of removal of debris from the site of the Work and its proper and legal disposal. § 5.5.4 That portion of the reasonable expenses of the Construction Manager’s supervisory or administrative personnel incurred while traveling in discharge of duties connected with the Work. § 5.5.5 Costs of materials and equipment suitably stored off the site at a mutually acceptable location, subject to the Owner’s prior approval. § 5.6 Miscellaneous Costs § 5.6.1 Premiums for that portion of insurance and bonds required by this Agreement that can be directly attributed to this Agreement. Self-insurance for either full or partial amounts of the coverages required by this Agreement, with the Owner’s prior approval. § 5.6.2 Sales, use or similar taxes imposed by a governmental authority that are related to the Work and for which the Construction Manager is liable. § 5.6.3 Fees and assessments for the building permit and for other permits, licenses, and inspections for which the Construction Manager is required by this Agreement, if any, to pay. § 5.6.4 Costs for electronic equipment and software, directly related to the Work with the Owner’s prior approval. § 5.6.5 Deposits lost for causes other than the Construction Manager’s negligence or failure to fulfill a specific responsibility in this Agreement. § 5.6.6 Legal, mediation and arbitration costs, including attorneys’ fees, other than those arising from disputes between the Page 6 of 8 Owner and Construction Manager, incurred by the Construction Manager after the execution of this Agreement in the performance of the Work and with the Owner’s prior approval, which shall not be unreasonably withheld. § 5.6.7 Subject to the Owner’s prior approval, expenses incurred in accordance with the Construction Manager’s standard written personnel policy for relocation and temporary living allowances of the Construction Manager’s personnel required for the Work. §5.6.8 Cost of necessary safety equipment, supplies, drug testing, and associated safety procedures as it pertains to the Work. §5.6.9 Off site storage warehousing and fabricating, if necessary, as it pertains to the Work. § 5.7 Other Costs and Emergencies § 5.7.1 Any cost not specifically excluded herein, which Construction Manager incurs in the performance of the Work or furtherance of the Project § 5.7.2 Costs incurred in taking action to prevent threatened damage, injury, or loss in case of an emergency affecting the safety of persons and property, through the Construction Manager’s course of the Work. § 5.7.3 Costs of repairing or correcting damaged or nonconforming Work executed by the Construction Manager, subcontractors, or suppliers, provided that such damaged or nonconforming Work was not caused by negligence or failure to fulfill a specific responsibility of the Construction Manager and only to the extent that the cost of repair or correction is not recovered by the Construction Manager from insurance, sureties, subcontractors, suppliers, or others. § 5.8 Accounting Records The Construction Manager shall keep full and detailed records and accounts related to the cost of the Work and exercise such controls as may be necessary for proper financial management under this Contract and to substantiate all costs incurred. The accounting and control systems shall be satisfactory to the Owner. The Owner and the Owner’s auditors shall, during regular business hours and upon reasonable notice, be afforded access to, and shall be permitted to audit and copy, the Construction Manager’s records and accounts, including complete documentation supporting accounting entries, books, correspondence, instructions, drawings, receipts, subcontracts, subcontractor’s proposals, purchase orders, vouchers, memoranda, and other data relating to this Contract. The Construction Manager shall preserve these records for a period of three years after final payment, or for a longer period as may be required by law. ARTICLE 6 PAYMENTS FOR CONSTRUCTION PHASE SERVICES § 6.1 Progress Payments § 6.1.1 Based upon invoices issued by the Construction Manager, the Owner shall make progress payments on account of the Contract to the Construction Manager as provided below and elsewhere in this Agreement. Provided that the Owner receives an invoice not later than the 25th day of a month, the Owner shall make payment of the certified amount to the Construction Manager not later than the end of that given month. If an invoice is received by the Owner after the date fixed above, the Owner shall make payment not later than thirty (30) days after the Owner receives the invoice. § 6.1.2 The Construction Manager shall submit payrolls, material invoices, subcontractor invoices, petty cash accounts, receipted invoices or invoices with check vouchers attached, and any other evidence required by the Owner to demonstrate that cash disbursements already made by the Construction Manager on account of the Cost of the Work equal or exceed (1) progress payments already received by the Construction Manager; (2) less that portion of those payments attributable to the Construction Manager’s Fee: plus (3) payrolls for the period covered by the present invoice. In furtherance of the foregoing, the Construction Manager shall submit a log tracking all contingency draws, and supporting documentation for such draws, on the timeline set forth in the following sentence. The Construction Manager shall provide all backup information with the submission of pay requests. When approved by the Owner, the Construction Manager will be allowed up to 5 additional business days to provide all the backup information. In addition, all invoices must include tax or taxes paid. § 6.1.3 Each invoice shall be based on the most recent schedule of values submitted by the Construction Manager in accordance with this Agreement. § 6.1.4 Subject to other provisions of the Agreement, the amount of each payment shall be computed as follows: 1) The invoiced amount as set forth above. Page 7 of 8 2) Add the Construction Manager’s Fee, less retainage of five percent (5.00 %). § 6.1.5 The Owner and Construction Manager shall agree upon (1) a mutually acceptable procedure for review and approval of payments to subcontractors and (2) the percentage of retainage held on subcontracts, and the Construction Manager shall execute subcontracts in accordance with those agreements. § 6.1.6 Except with the Owner’s prior approval, the Construction Manager shall not make advance payments to suppliers for materials or equipment which have not been delivered and stored at the site. § 6.2 Final Payment § 6.2.1 Final payment, constituting the entire unpaid balance of the Contract sum, shall be made by the Owner to the Construction Manager when: 1) the Construction Manager has fully performed the Contract except for the Construction Manager’s responsibility to correct Work under its established One Year Warranty as evidenced by separate written contract; and 2) the Construction Manager has submitted a final accounting for the Cost of the Work and any remaining retention, and a final invoice for such amount. The Owner’s final payment to the Construction Manager shall be made no later than thirty (15) days after the issuance of the Construction Manager’s final invoice. ARTICLE 7 INSURANCE AND BONDS For all phases of the Project, the Construction Manager and the Owner shall purchase and maintain suitable and appropriate insurance, including property insurance. ARTICLE 8 DISPUTE RESOLUTION § 8.1 Any claim between the Owner and Construction Manager shall be resolved in a court of competent jurisdiction in the state of Colorado. ARTICLE 9 TERMINATION OR SUSPENSION § 9.1 Termination In the event of termination of this Agreement pursuant to Section 10.1, the Construction Manager shall be equitably compensated for all construction work performed to date, including: .1 The Cost of the Work incurred by the Construction Manager to the date of termination; .2 Add the Construction Manager’s Fee computed upon the Cost of the Work to the date of termination. .3 Subtract the aggregate of previous payments made by the Owner for the Work at that point performed. The Owner shall also pay the Construction Manager fair compensation, either by purchase or rental at the election of the Owner, for any equipment owned by the Construction Manager which the Owner elects to retain and which is not otherwise included in the Cost of the Work. To the extent that the Owner elects to take legal assignment of subcontracts and purchase orders (including rental agreements), the Construction Manager shall, as a condition of receiving the payments referred to in this Article 9, execute and deliver all such papers and take all such steps, including the legal assignment of such subcontracts and other contractual rights of the Construction Manager, as the Owner may require for the purpose of fully vesting in the Owner the rights and benefits of the Construction Manager under such subcontracts or purchase orders. All subcontracts, purchase orders and rental agreements entered by the Construction Manager will contain provisions allowing for assignment to the Owner as described above. If the Owner accepts assignment of subcontracts, purchase orders or rental agreements as described above, the Owner will reimburse or indemnify the Construction Manager for all costs arising under the subcontract, purchase order or rental agreement, if those costs would have been reimbursable as Cost of the Work if the contract had not been terminated. If the Owner chooses not to accept assignment of any subcontract, purchase order or rental agreement that would have constituted a Cost of the Work had this agreement not been terminated, the Construction Manager will terminate the subcontract, purchase order or rental agreement and the Owner will pay the Construction Manager the costs necessarily incurred by the Construction Manager because of such termination. ARTICLE 10 MISCELLANEOUS PROVISIONS § 10.1 Governing Law Page 8 of 8 This Agreement shall be governed and interpreted according to the laws of the State of Colorado. § 10.2 Assignment The Owner and Construction Manager, respectively, bind themselves, their agents, successors, assigns and legal representatives to this Agreement. Neither the Owner nor the Construction Manager shall assign this Agreement without the written consent of the other, except that the Owner may assign this Agreement to a lender providing financing for the Project if the lender agrees to assume the Owner’s rights and obligations under this Agreement. Except as provided in this Section, neither party to the Contract shall assign the Contract as a whole without written consent of the other. If either party attempts to make such an assignment without such consent, that party shall nevertheless remain legally responsible for all obligations under the Contract. ARTICLE 11 SCOPE OF THE AGREEMENT § 11.1 This Agreement represents the entire and integrated agreement between the Owner and the Construction Manager and supersedes all prior negotiations, representations, or agreements, either written or oral. This Agreement may be amended only by written instrument signed by both Owner and Construction Manager. This Agreement is entered into as of the day and year first written above. OWNER _________________________________________ _________________________________________ (Printed name and title) (Signature) _________________________________________ _________________________________________ (Printed name and title) (Signature) CONSTRUCTION MANAGER Levi Higgs, North Peak Inc. . _________________________________________ _________________________________________ (Printed name and title) (Signature) levi Higgs Digitally signed by levi HiggsDN: C=US, E=Levi@Northpeakconstruction.com, O="North Peak Construction ", OU=Project Manager, CN=levi HiggsReason: I am approving this documentDate: 2024.01.03 14:30:50-07'00' PROPOSAL 1 | P a g e Aspen Airport Exit Lane modification Project Information Contractor Information Name of Project: Aspen Airport Hallway modifications Contractor: North Peak Location: 233 E airport Rd Address: 305 Main St Project Owner: Aspen Airport Phone #: 970.629.8767 Project #: 01-23-075 Contact Name: Levi Higgs Contact: David Schneider Contact #: 970.331.5163 Contact Phone #: 970.429.1881 Contact Email: Levi@northpeakconstruction.com Contact Email: David.schneider@aspenairport.com Proposal Date: 1/3/24 SCOPE OF WORK: ◼ Remove existing Secure exit lane and place equipment on pallets for shipment by airport staff. ◼ Prep and frame area for new Exit Lane that has a clearance of 97.25” (unit height 92.5”) Two areas on both sides of entryway need modification of framing and removal of building systems as needed. ◼ Coordinate and Life safety and MEP’s contractors for appropriate Detach reset of equipment. ◼ Once completed North Peak will hang tape and paint disturbed drywall edge to edge of continuous surfaces. Other Items include floor and wall protection, temporary crowd control using plywood and basic framing to isolate the work area. It was observed at the time of the site visit that unknown equipment is concealed in the ceiling cavity above the Exit Lane and could potentially extend the cost and schedule of the project all items will be documented and addressed on a case-by-case bases. PROPOSAL 2 | P a g e Aspen Airport Exit Lane modification North Peak proposes the following schedule for the week of 1/15/24. Monday- Set all protection and containment, Disassemble existing Exit Lane system. Tuesday- Modify framing and make any adjustments to equipment in Ceiling as needed. Wednesday- Fire suppression system head relocation, MEP relocation as needed. Thursday- Hang and Tape drywall prep for Paint. Complete remaining finishes as needed. Friday- Paint, remove protection and containment. Final cleaning Due to the conditions of existing condition above the ceiling and lack of access to the work area North Peak will confirm any needed scope changes on Tuesday the 16th. EXCLUSIONS: Invoicing and Payment of Fire Sprinkler head relocation will be direct to the Airport. North Peak Construction proposes to furnish all labor, materials and management to complete the scope of work in a timely manner per the plans and specifications from the construction documents at the time of this proposal. Any deviation from the construction documents will result in possible additional charges that will be discussed and approved for in writing by the Owner or Representative. PROPOSED AMOUNT SUM OF: $24,745.88 Cost plus agreement Submitted by (Company Representative): Date: 1/3/24levi Higgs Digitally signed by levi HiggsDN: C=US, E=Levi@Northpeakconstruction.com, O="North Peak Construction ", OU=Project Manager, CN=levi HiggsReason: I am approving this documentDate: 2024.01.03 15:46:24-07'00' PROPOSAL 3 | P a g e Aspen Airport Exit Lane modification Acceptance of Proposal: Authorized Signature: Title: Date: Certificate Of Completion Envelope Id: 6C2DA45185F24A56BE3AF0649079DDAF Status: Completed Subject: North Peak, Inc. | Pitkin County Contract 058.24 for Review and Signature Source Envelope: Document Pages: 38 Signatures: 3 Envelope Originator: Certificate Pages: 5 Initials: 0 Pitkin County Procurement AutoNav: Enabled EnvelopeId Stamping: Disabled Time Zone: (UTC-07:00) Mountain Time (US & Canada) 530 East Main Street Suite 203 Aspen, CO 81611 Procurement@PitkinCounty.com IP Address: 65.38.144.66 Record Tracking Status: Original 1/5/2024 10:17:29 AM Holder: Pitkin County Procurement Procurement@PitkinCounty.com Location: DocuSign Signer Events Signature Timestamp David Schneider david.schneider@aspenairport.com Operations and Security Manager Security Level: Email, Account Authentication (None)Signature Adoption: Pre-selected Style Using IP Address: 65.38.144.66 Sent: 1/5/2024 10:19:36 AM Viewed: 1/5/2024 10:35:49 AM Signed: 1/5/2024 11:26:14 AM Electronic Record and Signature Disclosure: Accepted: 1/5/2024 10:35:49 AM ID: af56fdc4-53e5-426e-be2e-c5bb9ed98220 Company Name: Pitkin County, Colorado Dan Bartholomew dan.bartholomew@aspenairport.com Airport Director Aspen/Pitkin County Airport Security Level: Email, Account Authentication (None) Signature Adoption: Pre-selected Style Using IP Address: 73.153.241.160 Sent: 1/5/2024 11:26:16 AM Viewed: 1/5/2024 12:07:59 PM Signed: 1/5/2024 12:08:26 PM Electronic Record and Signature Disclosure: Not Offered via DocuSign Kevin Young kevin.northpeakinc@gmail.com President North Peak, Inc Security Level: Email, Account Authentication (None) Signature Adoption: Drawn on Device Using IP Address: 72.175.60.108 Sent: 1/5/2024 11:26:16 AM Resent: 1/9/2024 11:28:33 AM Viewed: 1/10/2024 2:37:39 PM Signed: 1/10/2024 2:39:07 PM Electronic Record and Signature Disclosure: Accepted: 3/13/2023 8:46:47 AM ID: 34218e60-9c17-4c36-84ac-c463dfebe433 Company Name: Pitkin County, Colorado In Person Signer Events Signature Timestamp Editor Delivery Events Status Timestamp Agent Delivery Events Status Timestamp Intermediary Delivery Events Status Timestamp Certified Delivery Events Status Timestamp Carbon Copy Events Status Timestamp Pitkin County Procurement procurement@pitkincounty.com Procurement Specialist Pitkin County Security Level: Email, Account Authentication (None) Sent: 1/10/2024 2:39:08 PM Electronic Record and Signature Disclosure: Not Offered via DocuSign Accounts Payable AP@pitkincounty.com Accounts Payable Pitkin County Security Level: Email, Account Authentication (None) Sent: 1/10/2024 2:39:09 PM Electronic Record and Signature Disclosure: Not Offered via DocuSign Witness Events Signature Timestamp Notary Events Signature Timestamp Envelope Summary Events Status Timestamps Envelope Sent Hashed/Encrypted 1/5/2024 10:19:36 AM Envelope Updated Security Checked 1/9/2024 11:28:32 AM Envelope Updated Security Checked 1/9/2024 11:28:32 AM Envelope Updated Security Checked 1/9/2024 11:28:32 AM Certified Delivered Security Checked 1/10/2024 2:37:39 PM Signing Complete Security Checked 1/10/2024 2:39:07 PM Completed Security Checked 1/10/2024 2:39:09 PM Payment Events Status Timestamps Electronic Record and Signature Disclosure ELECTRONIC RECORD AND SIGNATURE DISCLOSURE From time to time, Pitkin County (we, us or Pitkin County) may be required by law to provide you with certain written notices or disclosures. Described below are the terms and conditions for providing to you such notices and disclosures electronically when we send you documents for electronic signature. Acknowledging your Access, Intent, and Consent to Receive and Sign Materials Electronically To confirm that you can access this information electronically, which will be similar to other electronic notices and disclosures that we will provide to you, please verify that you were able to read this electronic disclosure and that you also were able to print on paper or electronically save this page for your future reference and access or that you were able to e-mail this disclosure and consent to an address where you will be able to print on paper or save it for your future reference and access. Further, if you consent to receive notices and disclosures exclusively in electronic format on the terms and conditions described above, please let us know by clicking the 'I agree' button below. By checking the 'I Agree' box, I confirm that:  I am establishing my intent to be bound to the transaction, and indicating that I am fully aware of the purpose for which the signature is being provided.  I can access and read this Electronic CONSENT TO ELECTRONIC RECEIPT OF ELECTRONIC RECORD AND SIGNATURE DISCLOSURES document; and  I can print on paper the disclosure or save or send the disclosure to a place where I can print it, for future reference and access; and  Until or unless I notify Pitkin County as described above, I consent to receive from exclusively through electronic means all notices, disclosures, authorizations, acknowledgments, and other documents that are required to be provided or made available to me by Pitkin County during the course of my relationship with you. Signing Documents without a Pitkin County DocuSign Account: Pitkin County may not require all document signers to be authorized users of the Pitkin County DocuSign Account. Please read the information below carefully and thoroughly, and if you can access this information electronically to your satisfaction and agree to these terms and conditions, please confirm your agreement by clicking the 'I agree' button at the bottom of this document. When you don't have a DocuSign account, you will be provided the opportunity to agree to the Legal Disclosure each time you open an "envelope" for signing, at this time, you can download and retain this disclosure. Pitkin County will forward completed documents that you've reviewed, processed or signed via email. Should you require copies of these signed documents (e.g., if they get deleted from your email account) you should request those documents from Pitkin County under the Colorado Open Records Act by contacting the Pitkin County custodian who sent you the document for signature. Signing Documents with a Pitkin County DocuSign Account: Electronic Record and Signature Disclosure created on: 3/20/2020 3:28:13 PM Parties agreed to: David Schneider, Kevin Young Please read the information below carefully and thoroughly, and if you can access this information electronically to your satisfaction and agree to these terms and conditions, please confirm your agreement by clicking the 'I agree' button at the bottom of this document. Getting paper or electronic copies At any time, you may request from us a paper or electronic copy of any record provided or made available electronically to you by us. For such copies, as long as you are an authorized user of the DocuSign system you will have the ability to download and print any documents we send to you through your DocuSign user account for a limited period of time (usually 30 days) after such documents are first sent to you. After such time, if you wish for us to send you paper or electronic copies of any such documents from our office to you, you may be charged a per-page fee. You may request delivery of such paper or electronic copies from us by following the procedure described below. Withdrawing your consent If you are an authorized DocuSign Account holder, you can decide to receive notices and disclosures from us electronically, you may at any time change your mind and tell us that thereafter you want to receive required notices and disclosures only in paper format. Described below is the process for informing us of your decision to receive future notices and disclosure in paper format and also how to withdraw your consent to receive notices and disclosures electronically. Consequences of changing your mind If you elect to receive required notices and disclosures only in paper format, it will slow the speed at which we can complete certain steps in transactions with you and delivering services to you because we will need first to send the required notices or disclosures to you in paper format, and then wait until we receive back from you your acknowledgment of your receipt of such paper notices or disclosures. To indicate to us that you are changing your mind, you must withdraw your consent using the DocuSign 'Withdraw Consent' form on the signing page of your DocuSign account. This will indicate to us that you have withdrawn your consent to receive required notices and disclosures electronically from us and you will no longer be able to use your DocuSign user account to receive required notices and consents electronically from us or to sign electronically documents from us. All notices and disclosures will be sent to you electronically Unless you tell us otherwise in accordance with the procedures described herein, we will provide electronically to you through your DocuSign user account all required notices, disclosures, authorizations, acknowledgments, and other documents that are required to be provided or made available to you during the course of our relationship with you. To reduce the chance of you inadvertently not receiving any notice or disclosure, we prefer to provide all of the required notices and disclosures to you by the same method and to the same address that you have given us. Thus, you can receive all the disclosures and notices electronically or in paper format through the paper mail delivery system. If you do not agree with this process, please let us know as described below. Please also see the paragraph immediately above that describes the consequences of your electing not to receive delivery of the notices and disclosures electronically from us. How to contact Pitkin County: You may contact us to let us know of your changes as to how we may contact you electronically, to request paper copies of certain information from us, and to withdraw your prior consent to receive notices and disclosures electronically as follows: To contact us by email send messages to Helpdesk@provelocity.com To advise Pitkin County of your new e-mail address To let us know of a change in your e-mail address where we should send notices and disclosures electronically to you, you must send an email message to us at Helpdesk@provelocity.com and in the body of such request you must state: your previous e-mail address, your new e-mail address . In addition, you must notify DocuSign, Inc to arrange for your new email address to be reflected in your DocuSign account by following the process for changing e-mail in DocuSign. To request paper or electronic copies from Pitkin County To request delivery from us of paper or electronic copies of the notices and disclosures previously provided by us to you electronically, you should request those documents from Pitkin County under the Colorado Open Records Act by contacting the Pitkin County custodian who sent you the document for signature. To withdraw your consent with Pitkin County To inform us that you no longer want to receive future notices and disclosures in electronic format you may: i. decline to sign a document from within your DocuSign account, and on the subsequent page, select the check-box indicating you wish to withdraw your consent, or you may; ii. send us an e-mail to Helpdesk@provelocity.com and in the body of such a request, you must state your e-mail, full name, Postal Address, telephone number, and account number.