Loading...
HomeMy WebLinkAbout05 May hrs minutes 2024 1 HEALTHY RIVERS AND STREAMS CITIZENS ADVISORY BOARD Regular Meeting May 16, 2024 4:00 PM River Park Center 123 Emma Road 2nd floor Basalt, CO 81621 River Board members present: Chris Wheatley, Andre Wille, Bill Jochems, Kirstin Neff, Maciej Mrotek, Chris Lemons – via Zoom River Board members absent: Wendy Huber Attendees in addition to presenters: Lisa MacDonald, Lisa Tasker via Zoom, Matt Annabel, Laura Makar Media Present: Heather Sackett _____________________________________________________________________________________________________________________________________ Board Comment: None Public Comment: None Additions/Deletions to the Agenda: change agenda items to accommodate Mr. Dahl’s schedule Approval of April 18, 2024 minutes Mr. Wille moved to approve the April 18, 2024 minutes. Mr. Jochems seconded the motion. The motion passed 6/0 Whitewater Park Site Design Update - Sam Baucum, Bluegreen Mr. Baucum presented the design updates to the Board. We are working with the Town of Basalt on the Road shift design and hope to bid it out this summer. Work on the Emergency Access will happen per a request from the original authorization of the park from Basalt. This will only be for Emergency Personnel. There is no public access allowed. Road shift work is occurring per recommendations from Basalt. Lincoln Creek/Grizzly Reservoir Water Sampling 2024 Proposal and update – Kurt Dahl Pitkin Co Environmental Health Manager and Chad Rudow, RFC The River program has $15,000 budgeted in 2024 to support lab testing costs for 3-4 sites, with 4 different sampling times (pre-draining, during reservoir draining, during a change in creek diversion, and post construction completion). The sampling times will be determined once we receive the construction outline from Twin Lakes Canal Company. Mr. Dahl and Mr. Rudow presented a proposal and update to the Board regarding the testing and plans. The dam construction will require Grizzly Reservoir to be drained and flows from Lincoln Creek will be diverted towards Twin Lakes until a senior water rights “call” from downstream requires water from the creek. Lincoln Creek will be released to the Roaring Fork River during these “calls”. It is not clear at this time if the creek will be diverted through the bottom of the drained reservoir or if will be routed around it. Given the combination of factors they believe it is important to take water samples at different phases of the construction to determine if there may be a possibility of impacts to the creek and river. This will help us to understand how future dam construction/maintenance might impact the creek and river and influence future planning for how to minimize possible impacts. Sponsorship request of $4880 for the Study of trace metals and rare earth elements in water, streambed sediment and biota in Lincoln Creek and associated water bodies – Roaring Fork 2 Conservancy and Diane McKnight Institute of Arctic and Alpine Research University of Colorado- Boulder Ms. McKnight asked for funding for a study of the Lincoln Creek system during summer 2024 by collecting water, stream sediment and benthic macroinvertebrate samples for analysis of REEs. The results of these analyses will complement the planned study by state and local agencies. Two master’s degree students in the Environmental Engineering Program at CU will participate in the sampling efforts, and will also analyze the samples and work with others involved in the study to interpret the results. These students will work with Profs. Diane McKnight and Tom Marchitto with the Institute of Arctic and Alpine Research (INSTAAR) at CU. These samples for REEs will be analyzed by the ICP-MS laboratory at INSTAAR, which has developed methods for these analyses of REEs in previous studies. The students will be trained in the sampling protocols by the staff of the Roaring Fork Conservancy. Mr. Mrotek moved to approve a sponsorship to CU in the amount of $4880. Mr. Wille seconded the motion. The motion passed 6/0. Modifications to the USFS Collection Agreement - Beaver Project and Monitoring – Lisa Tasker Ms. Tasker sought board approval of the Collection Agreement extending the terms to align with the original agreement to 2027. She also asked to modify the agreement to include $10,000 to contribute to the collection of water quantity and quality data in the vicinity of Lincoln Creek, a Roaring Fork River tributary, related to recent declines in water quality. These funds will purchase equipment needed for quantification of water quantity and quality parameters and could include processing for sediment, macroinvertebrates, or other related samples in coordination with the Healthy Rivers Program. Mr. Wille moved to approve the additional $10,000 and extend the terms of the Collection Agreement. Ms. Neff seconded the motion. The motion passed 6/0. Monthly Staff Report Staff provided an update on projects and work as contained in the report in the Board’s packet. The Crystal River Project is complete until the fall planting. Swift Water Training Course is happening in June. Open Discussion Mr. Jochems had a question regarding the data collection and where will it lead. Mr. Jochems moved to adjourn the meeting. Mr. Mrotek seconded the motion. The motion passed 6/0. The meeting adjourned at approx. 6:20 pm. Approved: Attest: ______________________________________________ _________________________________________________ Wendy Huber – Chair Lisa Tasker