HomeMy WebLinkAbout11 Nov 2011 packetAll times are subject to variation without notice
Agenda is subject to change
HEALTHY RIVERS AND STREAMS
CITIZENS ADVISORY BOARD
JOINT MEETING WITH THE PITKIN COUNTY
BOARD OF COUNTY COMMISSIONERS
Courthouse Plaza Building
Plaza 1
Aspen, CO
November 17, 2011 - 4 p.m.
4:00 Public Comment
4:05 Board Comments
4:10 Approval of Minutes
October 20, 2011
4:15 Status of the Fund and Program Goals
4:45 Executive Session pursuant to
C.R.S. 24-6-402(4)(b):
1. Eagle Park Reservoir Company-Homestake Exchange
2. Busk/Ivanhoe
3. City of Aspen
4. West Divide Water Conservancy District
5. Pitkin County RICD
5:15 Roaring Fork Conservancy-Coal Creek Project Funding Request
Protocol and Guidelines for Grants Included
October 20, 2011 Meeting Minutes will be provided for approval when available
AGENDA ITEM SUMMARY
November 17, 2011
TO: BOCC and River Board
FROM: John Ely
SUBJECT: Status of the Fund and Program Goals
The following work items are listed for informational purposes and will be
discussed further at the Boards’ meeting and can serve as a continuing guide for fund
allocation and anticipated expenses.
I. Instream Flow Protection and Enhancements
Agricultural Efficiencies
The idea behind this approach to stream flow enhancement is recognition that
there is no longer free water on any of our streams outside of the early season runoff
period. Therefore, if we are going to improve our flows the water must come from
somewhere else. If we are not drying up land that is currently being irrigated, then
perhaps improving the methodologies in current irrigation practices will realize benefits
to area rivers and streams by being able to deliver the same amount of usable water to
an ultimate consumer while relaxing an irrigator or ditch company’s current or future
potential diversions. As straightforward as this idea sounds it has not been done in
Colorado to my knowledge. An engineering methodology needs to be developed,
perhaps with assisting legislation as well as meeting the varying concerns of irrigators
and ditch companies.
Trust Agreement Additions
This item reflects the continuation of our pursuit to dedicate existing County
water rights to the Pitkin County/CWCB Trust Agreement. Additional work will also try
to reduce the transactional cost for these dedications and thereby enhance the use of
this methodology elsewhere in the state.
Water Right Acquisitions
Opportunistic purchases of water rights may present themselves from time to
time to the County.
2
November 17 , 2011
Status of the Fund and
Program Goals
Recreational In-Channel Diversion
The County application for its RICD at the location of the proposed kayak park on
the Roaring Fork River just upstream of the confluence of the Frying Pan River was filed
in water court at the end of 2010. This application will be progressing through the water
court this year although it is not expected that a final decree will enter until 2012.
Fry-Ark Project Diversion/PSOP
With the results of the 2010 general election and changes to the Colorado federal
delegation, it is logical to assume that renewed efforts to enact this federal legislation
will occur and possibly conclude. Our efforts continue to be to position the County to be
part of any deliberative process for prospective legislation and to participate in the
drafting of this potential legislation to effect the inclusion of beneficial language for the
County and the river systems on the west slope.
Potential Wild and Scenic Designation for the Crystal River
A Phase I analysis of the potential Wild and Scenic Designation of the Crystal was
concluded by the United States some years ago. An earlier effort for designation was
abandoned in the early 1990s. It is unclear how this designation would benefit the
Crystal River and how that benefit could be quantified but without pursuing this option,
we would be limiting ourselves in the future to a consideration of less than all possible
alternatives to maintain instream flows in the Crystal River.
Analysis of the North Star Preserve
Over the years since the County acquired ownership of this property, natural
flooding of the area has decreased, a deepening of the river channel, not of river depth,
has occurred and a general degradation of the fishery now exists. The reasons for these
occurrences are unclear but as the County still controls the land there is an opportunity
to correct the situation. Additionally, in the past, North Star represented a natural
wetland above the City of Aspen that served to decrease the danger of flood and
replenish flows to the Roaring Fork River later in the year. If this function could be
restored, it could benefit the upper Fork late-season flows without the prospect of the
creation of a storage reservoir.
Draft Environmental Assessment and Finding of No Significant Impact
(FONSI) to Provide 10825 Acre Feet to the 15-Mile Reach
The Bureau of Reclamation (BOR) has produced a FONSI regarding the recovery
program for endangered fish in the Colorado River. Pitkin County has provided
comments to the BOR highlighting the deficiencies within the Draft EA and FONSI. The
next step is to continue in our efforts to protect the Frying Pan River and Ruedi
3
November 17 , 2011
Status of the Fund and
Program Goals
Reservoir water and recreational resources with appropriate action depending upon the
final report issued by the BOR.
II. Opposition to Potentially Damaging Developments
West Divide Conservancy District and Colorado River District Conditional
Rights in the Crystal River Drainage
Conditional water rights for storage and diversion exist in the name of these two
entities along the mainstem of the Crystal and several tributaries. These rights were set
to lapse and be abandoned without a diligence application being filed by May of 2011.
The entities have abandoned the more unrealistic storage rights on the Crystal itself but
have retained two storage facilities and significant diversion rights in the Crystal River.
The County needs to continue to oppose this diligence application.
City of Aspen Hydroelectric Power Plant
It is hoped that the City will conclude an IGA with Pitkin County consistent with
its previous representations. However, there is currently no agreement ready for
adoption. In this regard, the County is still an opposing party in the City’s diligence
application regarding the operation of the Castle Creek Hydroelectric Plant and that
case is set for trial in April of 2012.
III. General River Protection Strategies
Upper Roaring Fork River Analysis
Work initiated last year by MEC, Bill Miller, will conclude this summer with
hopefully far-ranging applications for its conclusions. However, I would foresee future
enhancements of this work to continue through time to increase our chances of a
successfully managed flow in the Roaring Fork above the confluence with Castle Creek.
Roaring Fork Drainage Gage System
The river fund will continue to support at least one gage in the valley, as well as
contemplate future support of additional existing gages. This effort however, will only
be complete upon a full analysis of the entire drainage and identification of appropriate
locations for gages and the establishment and maintenance of these gages. A project of
this type will probably continue over numerous years and involve partnerships with
other jurisdictions and conservation entities.
4
November 17 , 2011
Status of the Fund and
Program Goals
Ground Water Mapping and FEMA (Federal Emergency Management
Administration) Flood Mapping
These two efforts have already been directed and budgeted and hopefully will
conclude in 2011.
Invasive Species Control
In the past, we were requested by RWAPA (Ruedi Water and Power Authority) to
assist with the cost of zebra mussel control at Ruedi Reservoir. I would anticipate a
continued participation with RWAPA in this regard and perhaps an expansion of
previous minimal efforts.
Continued Support of Partners in River Protection
In the past year, the river fund has been used to support the Roaring Fork
Conservancy and the Ruedi Water and Power Authority. This year I would anticipate
requests for continued support from these entities as well as additional grant requests
from other entities including the Pitkin County General Fund.
Requested Board Action: Informational – Discussion and comments from the
Boards
PROTOCOL AND GUIDELINES FOR MONETARY GRANT AWARDS FROM
THE PITKIN COUNTY HEALTY RIVERS AND STREAMS FUND
1. Applicability. This protocol and these guidelines are applicable to projects and
requests that are not being actively managed or participated in by Pitkin County or the
Healthy Rivers and Streams Board.
2. Availability of Grant Funding. Every budget year at or near the October
meeting of the River Board, the River Board will make a recommendation to the BOCC
for appropriation of sums to be made available for the following budget year to be
awarded to individuals and organizations making appropriate requests for grants and
financial assistance. This recommendation shall be based upon the available resources
for the fund but may be changed at any time during the course of the coming year by the
BOCC upon recommendation of the River Board.
3. Review of Grant Requests. To the greatest extent possible, the River Board
shall review and make recommendations on grant requests once a year in the fourth
budgetary quarter. This review timing is to allow the River Board to compare requests
for funding in order to select the most deserving projects and requests. However, the
River Board may make recommendations for funding at any time of the year based upon
the particular needs of the requesting party or scheduling needs involved with a
particular project.
4. Conditions of Award. All individuals or entities shall be required to
complete a grant agreement contract upon award of a grant request. Such grant
agreements shall be individually structured based upon the particulars of the project
and award but will contain at a minimum, a commitment on the part of Pitkin County to
fund the grant request at a particular identified level; a requirement to report back to
the River Board on progress of the project and its ultimate completion; a dispersal
schedule for the grant award; a statement of ownership of any final work product or
studies and a description of any restrictions to the use of that work product or
availability to the County and public at large; a commitment by the grantee to adhere to
all of its representations made to the River Board; and a penalty provision that failure to
utilize the grant award in a manner stated in the agreement and as represented in the
application may result in forfeiture of the remainder of the grant and an obligation to
refund monies previously dispersed by the County.
5. Review and Award of Grant Requests. There is no obligation on the part
of the River Board or Pitkin County to award all of the grant funds appropriated. All
recommendations for funding are based not only upon the availability of funds but also
the merits of the request. The River Board is free to request additional information
from any party seeking an award in order to better understand and evaluate the project
and request. All requests shall be evaluated according to following enumerated criteria.
The use of the criteria and scoring associated with the criteria is not an absolute formula
to an award of grant requests but serves as a guide to allow the River Board to evaluate
projects and proposals in relation to each other and to evaluate the overall merits of a
project or proposal.
Grant Criteria and Weighting
Viability of Project
The likelihood of completion of the
project with the grant or award, or
recognition that other steps and further
funding would be needed to fully
complete the project
MAXIMUM 25 POINTS
Visibility of Project
The degree the project will be seen and
appreciated by the public or actively used
by the public
MAXIMUM 25 POINTS
Goals of River Board
Degree with which the proposed project
coincides with the stated goals of the
River Board or other ongoing projects of
the River Board
MAXIMUM 25 POINTS
Prospect of Repetition of Project
Degree to which the grant or project
represents a strategy or proposal that
could be repeated in other locations so
that the benefits of the award may not be
limited to one single event
MAXIMUM 10 POINTS
History of the Requesting Party
The degree to which the individual or
entity has been successful in other
projects or endeavors or is known in the
community
MAXIMUM 10 POINTS
Participation by Other Parties
Is the grant applicant conducting the
project or work on its own or does it have
partnerships been established with other
agencies or entities that reflect that the
goal of the project is shared by more than
one party
MAXIMUM 10 POINTS
Proposed Project Budget
Is the requested grant the sole source of
funding for the proposed project or are
there other funding sources available to
the applicant
MAXIMUM 10 POINTS