Loading...
HomeMy WebLinkAbout07 July 2022 packetAgenda items are subject to change – Times are approximate and are also subject to change Agenda | July 21, 2022 River Park Center Second Floor Conference Room 123 Emma Road, Basalt CO 81621 Time Item 4:00 PM • Board Comment • Public Comment • Additions/Deletions to Agenda • Outreach/Education/Grants Glassier Open Space Irrigation Efficiency Improvements and PCOST Colorado River District Funding Request– Paul Holsinger, Agricultural and Conservation Easement Manager, Pitkin County Open Space and Trails (PCOST) Carbondale Riverfront Park and In-stream Improvements – Quinn Donnelly, P.E., River Engineer, River Restoration Crystal River Wild and Scenic Updates on Aerial Advocacy and Video/Images Gallery– Lea Linse, Conservation Programs Manager, Ecoflight Crystal River Wild and Scenic Designation Audio/Visual/Print Support Project- Ryan Wolfe, Owner, Wild Wolfe Media, LLC 6:30 PM • Open Discussion 6:45 PM • Adjourn Upcoming Meeting Dates 1 Agenda items are subject to change – Times are approximate and also subject to change Time Administrative Items 4:00 PM Board Comment Public Comment Additions /Deletions to Agenda Outreach/Education/Grants 4:15 PM 4:45 PM 5:15 PM 6:00 PM Glassier Open Space Irrigation Efficiency Improvements and PCOST Colorado River District Funding Request– Paul Holsinger, Agricultural and Conservation Easement Manager, Pitkin County Open Space and Trails (PCOST) Carbondale Riverfront Park and In-stream Improvements – Quinn Donnelly, P.E., River Engineer, River Restoration Crystal River Wild and Scenic Updates on Aerial Advocacy and Video/Images Gallery– Lea Linse, Conservation Programs Manager, Ecoflight Crystal River Wild and Scenic Designation Audio/Visual/Print Support Project- Ryan Wolfe, Owner, Wild Wolfe Media, LLC 6:30PM Open Discussion 6:45 PM Adjourn Upcoming 2022 Regular Meetings Aug 18, Sep 15, Oct 20, Nov 24, Dec 15 2 Glassier Open Space Management Plan | Management Actions 55 Hexagon, CompassData, Pitkin County Glassier Open Space Rio Grande Trail !?Culvert !?Diversion Box !?Utility Irrigation Ditches Primary Secondary Catch Lateral Transfer 0 0.04 0.08 Miles This map/drawing is a graphical representation of the features depicted and is not a legal representation.Accuracy is not guaranteed. [ i Map 11. Redefined Lease Areas, Irrigation Ditches and Infrastructure Rio Grande Trail Lease B 81.2 acres 4.0 cfs water use Flood irrigation Lease A 44.5 acres 2.35 cfs water use Flood irrigation Lease E 0.6 acres 0.1 cfs water use Water tank & pump for sprinkler irrigation Lease F 3 acres 0.25 cfs water use Cistern & pump for sprinkler irrigation H o m e S u p pl y D itc h H o m e S u p pl y D itc h AGCI Soil Monitoring Station Saturated Zone Saturated Zone Interim pasture improvement / rehabilitation area Dry areas, not reached by current irrigation 3 Re v i s i o n # Dwg No. Job No. Drawn by: Date: File: PE:QC: Da t e By : Pr o j e c t M i l e s t o n e : Of : Graphic Scale In Feet: 1" = 150' 75 150 300 2021-120.005 SK 03-07-2022 SK GlassierIrrigation-NRCS-Exhibit RB 11 8 W e s t S i x t h S t r e e t , S u i t e 2 0 0 Gl e n w o o d S p r i n g s , C O 8 1 6 0 1 97 0 . 9 4 5 . 1 0 0 4 ww w . s g m - i n c . c o m 1 1 PR E L I M I N A R Y N O T F O R C O N S T R U C T I O N Title: Gl a s s i e r I r r i g a t i o n P h a s e 1 NRCS Contract Exhibit Pi t k i n C o u n t y O p e n S p a c e 4 Crystal River Restoration Project Crystal River Restoration Project Pitkin County Healthy Rivers and Streams Board July 21, 2022 15 Crystal River Restoration Project Project Team Project Stakeholders Consultant Team Project Partners 26 Crystal River Restoration Project Site Location 37 Crystal River Restoration Project Project Reach Crystal River •½ Mile Reach above Crystal River Bridge •Just downstream of CPW Hatchery •Weaver Ditch Diversion and Headgate Riverfront Park •Town of Carbondale Owned - 4.4 acres •Former Grazing/Ranch Area •Wildland Park •Intact Riparian Areas and Birding Habitat 48 Crystal River Restoration Project Crystal River Management Plan 2016 Crystal River Management Plan •Science and Stakeholder driven process •Provided Management Recommendations for the watershed and specific to the Town of Carbondale •Carbondale decided to focus first on the Riverfront Park reach of the Crystal River 59 Crystal River Restoration Project Project Goals •Restore ecological integrity of riparian zone •Develop solution for river channel & bank stability •Create a self sustaining Weaver Diversion •Enhance user experience Riverfront Park Keep “wild” feel to site. 1) Restore the ecological integrity of the riparian zone through streambank stabilization, reconnection of the floodplain, and replace invasive weed communities and plant monocultures with healthy and diverse riparian plant regimes, while preserving existing bird and wildlife habitat. 2) Develop a long term, self-sustaining solution to improve river channel stability, fish habitat and spawning areas by promoting conditions that support and enhance instream biotic structure and diversity. 3) Create a self-sustaining diversion and head gate structure for the Weaver Ditch to function as part of the river system while improving the water delivery for the Town of Carbondale and working cooperatively with future ditch improvements and efficiencies 4) Provide passive user experiences of Riverfront Park through interpretive signs, trails, gathering spaces, and educational programs. 610 Crystal River Restoration Project Current Site Conditions 711 Crystal River Restoration Project Current Site Conditions Crystal River •Over-widened, shallow channel with eroding banks. •Poor connectivity for aquatic species during low flow periods •Sediment inputs from banks and Weaver Diversion •Project proposes to: •Re-establish low flow channel •Install aquatic habitat features •Stabilize and revegetate banks •These improvements will: •Improve connectivity for aquatic species •Enhance in-channel habitat •Reduce bank erosion 812 Crystal River Restoration Project Current Site Conditions Weaver Diversion •Headgate Infrastructure is dated and degraded •Diversion structure requires annual maintenance with large impacts to the aquatic environment •Project proposes to: •Upgrade gate hardware (funded by Pitkin County Healthy Rivers) •Install permanent boulder grade control and engineered riffle. •Stabilize surround banks. •These improvements will: •Make it easier to regulate flow into Weaver Ditch •Provide capacity to retrofit headgate with automated upgrades •Create a stable and low maintenance diversion structure •Reduce channel disturbance and sediment input. 913 Crystal River Restoration Project Current Site Conditions Riverfront Park •Degraded riparian areas •Past uses (grazing) •Invasive Weeds •Project proposes to: •Replace invasive with native plants •Preserve upstream cottonwoods, understory, and bird habitat. •Create a rustic footpath and outdoor classroom. •Create an accessible path to riverbank and water. •Provide designated angler access. •These improvements will: •Provide accessible access to the Crystal River •Provide education space •Reduce invasive vegetation •Provide community amenity 1014 Crystal River Restoration Project Project Implementation Process •Data collection – Summer 2018 •Site Assessment – Summer 2018 •Conceptual Design – Spring 2019 •Preliminary Design & Permitting – Fall 2019 •Fundraising – 2019 - 2021 •Final Design – Spring 2021 •Construction Documents – Spring 2022 •Advertise for Bidding – May 2022 •Additional Fundraising – Summer/Fall 2022 •Re-bid – Winter 2022 •Construction – Summer/Fall 2023 Construction Window is heavily constrained •Bald Eagle Closure – December to April •Mountain Whitefish – no construction after September 30 th. •High water in Crystal River – May and June •Have to get waiver from CPW for construction prior to August 15th. 1115 Crystal River Restoration Project Current Funding Partners Funding Source Award Amount Colorado Parks & Wildlife $20,000 + $30,000 + $50,000 Aspen Valley Land Trust R3 Fund $10,000 Pitkin County Healthy Rivers $55,000 GOCO Resilient Communities $55,000 USBR WaterSMART $252,091 Town of Carbondale $400,000 CWCB Water Plan Grant $798,547 Total Funds Raised $1,780,638 •Town of Carbondale (Parks and Utilities •Colorado Parks and Wildlife Fishing is Fun •WaterSMART (USBR) •Colorado Water Conservation Board’s Water Plan Grant •Pitkin County Healthy Rivers •GOCO Resilient Communities Fund •Colorado River Water Conservation District •Aspen Valley Land Trust R3 Fund 1216 Crystal River Restoration Project May 2022 Bid and Funding Gap •Project Advertised April 2022 •Challenging Bid Climate •1 bid received, $1M+ funding gap •Team looked at phasing project, removing project elements •Decision made to keep project whole, raise additional funds, re-bid in winter 2022/2023 •Team looking to raise additional $750K - $1M 1317 Crystal River Restoration Project Pitkin County Healthy Rivers and Streams Board July 21, 2022 Questions? 1418 Crystal River Wild and Scenic Updates on Aerial Advocacy and Video/Images Gallery Lea Linse Conservation Programs Manager, EcoFlight Contact: lea@ecoflight.org 19 20 21 22 23 24 25 26 27 28 29 30 31 32 EcoFlight video trailer: https://drive.google.com/file/d/151FegsOMYQJ67Nk4ESTEJryT5GrahKle/view 33 Ryan Wolfe Wild Wolfe Media LLC Healthy Rivers and Streams Board Meeting, July 21, 2022: The Crystal River Media Project is a video series that will educate the public and dispel misconceptions about gaining Wild and Scenic congressional designation for the Crystal River. The focus and goals of this project underscore and advance key objectives and priorities of protecting the Crystal River, ensuring the ecological health, recreational opportunities, and wildlife and riparian habitat within the Crystal River Watershed by actively supporting Wild and Scenic designation for the Crystal River with a creative, educational, and entertaining media project. The Crystal River Media Project will consist of 10 short videos, three to five minutes each. Each video will address a different facet of the Crystal River and how we as a community can protect it forever. They will include interviews from experts related to each video’s topic, with graphics, music, and supporting footage, that will be edited to create an engaging video. Each video can be shared and used amongst all parties and organizations who are involved in seeing the Crystal River achieve Wild and Scenic designation, and widely amongst the general public. Further, this project will include material to promote a social media campaign to further grab the attention of the public and to build community education and excitement for gaining Wild and Scenic status for the Crystal River. This will include a 15-30 second teaser video to accompany each of the main videos, as well as a 15-30 second testimonial from each of the interviewees regarding the Crystal River and the impacts that Wild and Scenic designation would have. It will also include 30 still images that will be branded Pitkin County Healthy Rivers and used for Instagram and various other platforms to maintain a steady social media presence. Finally, it will include a slideshow that is intended for an upcoming event to promote Wild and Scenic designation for the Crystal River. 34 35 36 37