HomeMy WebLinkAboutbocc.con.amended.012.25 C-18/30/2021 CDD
Contract Information
Contract Number
Project Name
Contractor
Budget Line Item 11836362.573000.10098
Procurement Method:
Type:
Contract Start Date
Contract End Date
Contract Type
Retainage
If this is a new contractor, please enter the New Vendor information into Munis for workflow approval.
Contact Information:
Department
County Representative Ted O’Brien County Representative
Phone (970) 429-6130
Provide a brief description of the Contract or Change Order:
Contract Value Summary:
$ 101,000.00
$ -
$ -
$ 101,000.00
Open Space & Trails
Task order to provide engineering services for the Crystal Valley property.
Original Contract Amount
Previous Change Order/Amendment Amount
This Change order/Amendment amount
Contract Total
No
Crystal Valley Property
SGM Inc.
$ 101,000.00
Additional Budget Line
Item(s)
(Please fully allocate New Contract Total)
$ -
$ -
$ -
$ 101,000.00
Formal
Services/Maintenance
3/24/2025
12/31/2025
Task Order
012.25 C-1
Pitkin County
Procurement Cover Sheet
Please complete the Contract Cover Sheet when the contract/task order is complete and fully executed.
Return all Contract Cover Sheets and Contracts/Change Orders/Amendments/Task Orders to Procurement
Master Service Agreement #: 012.25 Rev: 2018-10-10 btf
1
TASK ORDER
Task Order/Project Name: Crystal Valley Property Task Order Number: C-1 Task Order Budget Line Item: 11836362.573000.10098
OWNER: CONTRACTOR:
Pitkin County SGM Inc. Ted O'Brien – Open Space and Trails Mike Fowler 530 E Main Street, Suite 202 118 West 6th St., Suite 200 Aspen, CO 81611 Glenwood Springs, CO 81601
Phone: (970) 920-5215 Phone: (970) 384-9075
ted.obrien@pitkincounty.com mikef@sgm-inc.com PROJECT NAME: CRYSTAL VALLEY PROPERTY
START DATE: March 24, 2025
END DATE: December 31, 2025 The On-Call Engineering Services (the “Agreement”) dated Agreement Start Date between the Board of County Commissioners of Pitkin County (the “County”) and SGM Inc. 118 West 6th St., Suite 200
Glenwood Springs, CO 81601 (the “Contractor”), shall include the following services.
1. Contractor’s Obligations. See attached Scope of Work. 2. Compensation and Expenses, Invoicing, Payment and Offset. The County shall compensate
Contractor for its services in accordance with the Project Budget and Schedule set out in
Paragraph 1 of this Task Order. It is expressly understood and agreed that in no event will the total compensation and reimbursement to be paid hereunder exceed the sum of One Hundred Thousand One dollars and Zero cents ($101,000.00) for all services rendered. By Task Order or Task Order Amendment, the County and Contractor may reallocate the budget among
project tasks if the total budget amount remains unchanged. Contractor shall invoice for the
project monthly based on hours worked, with payment expected within thirty (30) days of invoice, but any payment by the County may be offset by any amount the Contractor owes the County for any reason.
Any invoices not sent in the following manner may have payment delayed. All invoices for this
Task Order shall reference Task Order C-1 and Crystal Valley Property. Invoices shall be sent electronically in PDF format to ted.obrien@pitkincounty.com with a copy to kim.arensdorf@pitkincounty.com.
Master Service Agreement #: 012.25 Rev: 2018-10-10 btf
2
3. Pitkin County’s Obligations. Pitkin County shall administer this contract through a County Representative. Ted O'Brien , Deputy Director will manage the project as the County’s Representative. The services provided and products delivered by the Contractor under this
contract will be subject to review by the County’s Representatives, or a designee, for compliance with Contractor’s obligations prior to final payment. 4. Formation of Task Order. This Task Order is issued in accordance with the provisions of the Agreement. Contractor agrees to provide services subject to the terms of this Task Order and
for the avoidance of doubt this Task Order consists of the terms set out in the Agreement. In all other respects the Agreement is in full force and effect and remains unchanged by this Task Order. SGM INC. ________________________________________________
!#VENDOR SIGNATURE#! Date PITKIN COUNTY, COLORADO RECOMMENDED FOR APPROVAL:
_________________________________________________ !#DEPARTMENT REPRESENTATIVE#!Date
MANAGER APPROVAL:
________________________________________________ !#COUNTY MANAGER#! Date
Open Space and Trails Deputy Director
Ted O'Brien
Mar-26-2025
Mike Fowler
Mar-26-2025
Principal
Deputy County Manager
Mar-28-2025
Kara
Pitkin County On-Call Engineering Services Master Service Agreement #: 012.25
1
TASK ORDER SCOPE OF WORK AND COST ESTIMATE
Requesting Department: Open Space and Trails
Department Contact: Ted O’Brien
Task Order Name: Crystal Valley Property
Task Order Number: 012.25 C-1
Task Order Start Date: 3/24/2025
Task Order End Date: 12/31/2025
SGM Project Manager: Mike Fowler
(970) 945-1004
mikef@sgm-inc.com
1. Contractor’s Obligations.
A. Project Description
This project consists of providing surveying, civil engineering and site structural engineering
services to support the County’s redevelopment of the two buildings on the parcel for
employee housing. Other services that may be provided, if requested, include MEP
engineering, geothermal design and well testing. An initial Scoping phase was used to allow
the project team to visit the site, evaluate existing conditions and develop the scope of work
for the design phase. The attached proposal reflects the final design phases that came out
of the scoping phase.
B. Work Plan
See attached proposal for further information describing the design phase tasks 1-5.
TASK
ESTIMATED
FEE
0. Scoping $10,000
1. PM and Meetings $8,000
2. Survey $22,000
3. Civil Engineering $50,000
4. Site Structural Engineering $8,000
5. Bid Phase Services $3,000
Task Order Total $101,000
C. Deliverables
See attached design proposal.
Pitkin County On-Call Engineering Services Master Service Agreement #: 012.25
2
D. Schedule
See attached design proposal.
E. Exclusions and Limitations
See attached design proposal.
2. Compensation and Expenses.
Total compensation and reimbursement to be paid hereunder exceed the sum of:
One-hundred-one-thousand dollars and zero cents ($101,000.00) for all services
rendered.
p | 1
Pitkin County Crystal Valley Property
Survey/Civil/Structural Scope of Work
Project Information and Assumptions
We understand the following about this project:
· The two existing residential units on the property are being renovated for County employee
housing and other uses. The footprints of the residential units will not be changed.
· The Project Architect is Suzannah Reid and building structural engineering is being performed by
Evolve Structural.
· Artaic Group is providing Owner’s Rep services and will be SGM’s primary point of contact.
· Surveying, Civil, and Site Structural Engineering disciplines from SGM.
· MEP Engineering may be provided as an additional service at a future time.
· The Authority Having Jurisdiction is Pitkin County
· The building will be designed to the currently adopted 2021 international codes, 2023 NEC,
and local code amendments as adopted by the municipality.
· Project delivery:
o Design-Bid-Build project delivery method is currently anticipated.
o Permit/plan submission will be via Construction Documents
o Deliverables: Plans (in PDF format) issued at each milestone and corresponding
with AIA level of completion. Construction Documents will be sealed and signed by
a Colorado- licensed professional engineer.
o Client review and comment periods are anticipated to coincide with the milestone
plan sets, with comments incorporated into the next milestone if applicable.
· The existing site consists of the following residential buildings (from County Assessor information):
o Building 1 – 2,800 square feet, 3 bedroom, 2 bathroom, gas heating
o Building 2 – 2,136 square feet, 1 bedroom, 2 bathroom, electric
· Total budget amount for Design and Construction cost is $2,585,000.
· File formats utilized and coordination:
o Civil base maps will be provided in AutoCAD 2024 format.
o Architectural background files will be provided *.dwg CAD format
o Background updates, review comments, and basic spatial coordination efforts
will be processed in conjunction with milestone plan sets.
Project Scope of Work
Task 1 – Project Management
1. Mike Fowler will be the SGM Project Manager and dedicated point of contact, responsible
for SGM and coordinating SGM work and schedules, and disseminating incoming and
outgoing information as needed for the project.
2. Design leads to attend virtual design team meetings with the Ownership team and
Architect, as needed. We anticipate there may be up to three virtual meetings.
3. Design leads will attend in-person meetings with the client and design team, as requested.
We anticipate there may be one in-person meeting during design.
4. The Project Manager will regularly communicate with the design team via phone calls,
emails, and other correspondence.
5. Maintain electronic filing and project documentation.
6. Facilitate project closeout of SGM-assigned disciplines.
7. Perform monthly project budget status and invoice reviews.
p | 2
Pitkin County Crystal Valley Property
Survey/Civil/Structural Scope of Work
Task 2 – Survey
1. Review existing information (previous survey, record documents, etc.).
2. Develop initial site plan utilizing previous survey information, Pitkin County LiDAR and aerial
imagery.
3. Perform field survey of existing conditions to obtain topographic data and locations of
existing features. The field survey will be limited to the area around the buildings where
grading or other improvements are anticipated and will include items such as:
a. Location of existing bridge
b. Top of riverbank
c. Edge of water at time of survey
d. Approximate OHWL as indicated by edge of existing vegetation on riverbank
e. Building perimeters and finished floor elevations
f. Trees 6” caliper and larger
g. Septic tanks and cleanouts, seepage pit.
4. Integrate field survey information into site plan to produce final electronic site map for
design use.
Task 3 – Civil Engineering
Proposed Civil Engineering scope includes engineering design and permitting support associated
with the proposed site improvements. Planned development of the property includes:
· Remodel of two (2) residential buildings
· Water system improvements to provide domestic service from the existing well
· Fire suppression storage as needed to meet local fire code
· Combined septic system to serve both buildings
· Driveway Improvements for Fire Access
· Grading and drainage associated with site improvements
Site Improvements Design
SGM will prepare civil construction plans and design documents for the proposed site
improvements. We will include dimensional control, roadway improvements, grading, drainage,
erosion controls and utility design for construction based on the client approved site layout. Also
provided by SGM will be the necessary drainage calculations and engineering reports for
permitting. SGM will coordinate design with the client’s land planner, architect and landscape
architect for integrated plan preparation.
Site Plan
SGM will prepare a site plan with dimensional control and details of site elements, based on
the approved site layout, to meet current codes and criteria. A general site plan is warranted
to help encompass the scope, aid in design coordination, and provide an overall layout of all
site improvements.
Erosion Controls
SGM will prepare an Erosion and Sedimentation Control Plan that addresses temporary
erosion and sedimentation controls during construction to meet State and Federal
p | 3
Pitkin County Crystal Valley Property
Survey/Civil/Structural Scope of Work
requirements. The erosion control plan will also include typical notes for general slope
stabilization and revegetation of disturbed areas within the site. Revegetation notes will be
coordinated with the Landscape Architect. Any non-typical slope stabilization measures will
be coordinated with client’s geotechnical engineer.
Grading and Drainage
SGM will provide surface grading and drainage plans for the approved site layout. This
subtask will include coordination with client consultants regarding drainage around buildings
and integration of landscape features. The grading and drainage plans will be designed to
comply with local codes and criteria and will detail site grading and hardscape layout,
including detailed spot elevations and storm drainage infrastructure, as necessary. SGM will
provide adequate detail to amend the site to the proposed layout while matching existing
drainage patterns. A drainage report will also be provided for permit submittal.
Utilities
A Utility Plan will be provided for services to the proposed buildings onsite. SGM will
coordinate with the Architects MEP for the building connection points and service line sizes.
This proposal anticipates that fire and domestic water will be provided by an existing well
located onsite, sanitary service by a proposed onsite OWTS septic systems, gas service
provided by onsite propane tanks, and electric service from Holy Cross Energy.
OWTS Design
SGM will design an Onsite Wastewater Treatment System (OWTS) to serve the proposed
onsite housing. This task will include the following:
Tactile Soil Analysis
SGM will coordinate with the client’s excavator to establish test pit locations to be used to
obtain samples for a tactile soil analysis as required to determine subsurface characteristics
needed for the Soil Treatment Area (STA) design calculations. The analysis will include a
site log and analysis report to comply with local codes and criteria and will detail soil
properties and limiting layers to be used to determine the long-term acceptance rate (LTAR)
used for sizing the STA.
OWTS Design Drawings
The OWTS will be designed to comply with Pitkin County design standards. OWTS design
plans and detail sheets will be prepared for the proposed onsite systems. SGM will
coordinate with the MEP for service line sizes and routing for sanitary service connection to
the buildings. OWTS design drawings will include site layout, flow line elevations and details
for all system components included within the OWTS to be used for construction and
permitting.
OWTS Permit and Construction Documents
SGM will prepare construction plans and documents for the OWTS permits through Pitkin
County. We will include site piping for the sanitary service, the septic tank design and the
soil treatment area components.
Permitting Support
SGM will compile the various civil related submittal documents to accompany the Improvements
Plans for submittal to the County. This task will include coordination with the client’s permitting
consultant to provide the various reports, plans, exhibits, narratives, property ownership and
p | 4
Pitkin County Crystal Valley Property
Survey/Civil/Structural Scope of Work
easements documents required for permit submittals. SGM will coordinate with County staff as
necessary to address review comments and attend meetings or conference calls as needed
throughout the review process. This task will include plan revisions to address comments
associated with code compliance and resubmittals for County staff approval. If significant
changes occur that are beyond this scope, we anticipate updating plans on an hourly basis.
Task 4 – Site Structural Engineering
The basic scope of structural engineering services for the project includes the design and detailing for
site retaining walls. SGM did a site walk-through on February 19th, 2025. We understand that the
slope above the two structures on site is bearing directly on the structures. The intent is to cut into the
slope and install retaining walls so that there is a clear space between the slopes and the structures
and room to provide drainage. The retaining wall design assumptions include:
1. Up to two retaining walls.
2. Maximum height of 6 feet measured from bottom of wall to top of wall (not retained height).
3. Maximum length of each retaining wall will be 200 feet.
4. Both walls will be the same type.
5. Walls will be either large block gravity wall system or engineered boulder wall system.
6. There will be no railings, copings, or other structural elements attached to the retaining walls.
7. No geotechnical investigation will be done. The design will use the presumptive soil property
from the International Building Code.
8. A separate retaining wall structural detail sheets may be included or details incorporated into
civil plans.
9. One review submittal is assumed. Comments will be addressed from that review submittal
and construction documents will be finalized.
No additional structural inspection or analysis is included for the bridge. SGM inspected and load rated
the bridge in 2019 and assisted the County in scour repairs and bridge deck replacement. The bridge
rating in 2019 indicated the operating rating for the girders was 33 tons. This is based on a standard
36 ton rating truck and did not include legal load ratings.
Task 5 – Bidding Support
Bidding support tasks (when requested) commonly include:
1. Assist team with contractor bidding efforts.
2. Reply to bidder questions.
3. Assist in reviewing proposals for scope, cost, and comparison.
Additional Services for Consideration
MEP Engineering
The required scope of work for MEP Engineering is not considered to be developed enough to include
it in the base project at this time. As the design is further developed we can refine the MEP scope and
add it to the project through a change order, or it could be determined to be unnecessary. If the full
MEP scope is required, as originally contemplated then the anticipated MEP scope may be based on
the following information.
We understand the following about this project:
p | 5
Pitkin County Crystal Valley Property
Survey/Civil/Structural Scope of Work
· Mechanical, Electrical, and Plumbing (MEP) systems:
o (2) Plan sets and permits will be required, one for each structure.
o The base mechanical system will be electric resistance baseboard. Cooling or boiler systems
will not be necessary.
o It is assumed that mechanical ventilation will be added, and based on “whole house
ventilation” strategy and associated ductwork and ERV.
o The site will be all electric, no natural gas or propane systems will be designed.
o Plumbing scope will not be necessary.
o Electrical service upgrades are anticipated. Electrical backup and standby systems are not
anticipated.
· File formats utilized and coordination:
o MEP models will be produced in Revit (‘25) 2D format.
he following tasks are necessary to develop the basis of design for each building structure:
1. Identify the Basis of Design (BoD) based on owner’s project requirements and input, via the
following activities, which will be used for the subsequent design tasks:
a. Teleconference with relevant stakeholders and consultants.
b. Identify locations of:
i. Electrical panels and meter stack
ii. Mechanical intake and exhaust envelope penetrations and associated
clearances
c. Confirm scope of any current or anticipated future solar arrays.
2. Architectural plan status: completion of this phases requires architectural floor plans to be
substantially complete with respect to layout as major changes will affect calculations in the next
phase.
3. Deliverable: Summary of systems via narrative and supporting graphical exhibit(s). Document
shall be considered the Basis of Design (BoD) for subsequent tasks.
4. Mechanical
a. Calculate building heat gain and loss. Calculations will be based on climatic data,
building envelope, lights, people, and equipment. Building envelope data will be based
on estimated performance of existing window, wall, and roof construction, or as
detailed by the architect if new construction. Space-by-space load calculations will be
completed using software meeting ASHRAE standard 183.
b. Design, calculate, and specify HVAC systems and materials as follows, and in
accordance with the basis of design and load calculation results:
i. Space heating for occupant comfort and freeze protection
ii. Code required ventilation rates based on residential code requirements.
iii. Code required exhaust rates and space use.
iv. Test and Balance (TAB) flows, specify TAB contractor qualification
requirements.
c. Layout routing of ventilation ductwork, equipment for the specified systems
i. Coordinate with the architect for adequate equipment space and clearances.
d. Specify control systems and sequences of operation for mechanical equipment.
5. Electrical:
a. Perform NEC-required calculations, including demand loads and fault study.
b. Coordinate interconnection for solar array (and battery system if applicable). Others
will do the design of the array and battery system.
c. Design and size the electrical service equipment and distribution system.
p | 6
Pitkin County Crystal Valley Property
Survey/Civil/Structural Scope of Work
d. Develop a one-line or riser diagram and associated details.
e. Design and layout receptacles, devices, and circuiting.
f. In addition to the above, power and raceway coordination will be provided for the
following items specified by other disciplines or trades, such as:
i. Mechanical and plumbing equipment
ii. Appliances
iii. Fire alarm
iv. Security
v. A/V
6. Solar: Coordinate electrical service equipment design to accommodate a solar photovoltaic
array. Provide performance-based specifications for the solar array, which will be completed
by others under a design/build approach.
Geothermal Design
1. Procure IGSHPA-Certified geothermal consultant to review project-specific heat rejection
and simulation results, design the bore loop, provide subsequent plan set. This
consultant may be procured under SGM or by the County, depending on contractual
preferences.
2. In addition to the base peak load calculations, SGM will calculate approximate annual energy
use profile, necessary for design of the geothermal bore loop. Calculations will be based on
Trane Trace 8760-hour simulation and general assumptions on appliance use and occupancy
schedules.
3. Design the necessary mechanical system to interface with the bore field loop. This will consist
of water to air heat pump(s) or water source heat pump(s) and their associated hydronic
systems (i.e. pumps, expansion tanks, piping, buffer tanks etc.).
Well Evaluation and Testing
We understand that the well was installed in 1965 and a previous ADU Special Review in 1981
indicated that the Division of Water Resources determined that the existing well is permitted as a
domestic well and may be used to serve a second house since adequate water appears to be
physically and legally available. SGM’s Water Resources team can perform additional review of the
existing well information for legal water supply adequacy and provide a summary and
recommendations memo. This task can be added if requested by the County.
Well pump testing and water quality testing can be provided by SGM’s Water Resources team. This
would include a 4-hour or 24-hour constant rate pump test, water sampling and testing and preparing a
memo summarizing findings, issues and recommendations. A pump contractor (e.g. Samuelson or
AquaTec) would be contracted separately.
Construction Phase Support
Construction phase work is not included in this scope. It is anticipated that a nominal amount of
construction support will be required from the design team, but it is difficult to estimate this level of
effort prior to completing the design. A separate future task order can be developed for design
support during construction.
p | 7
Pitkin County Crystal Valley Property
Survey/Civil/Structural Scope of Work
Exclusions
These services are either not requested or not required for this project, or the design is to be provided
by others.
· Construction cost estimates.
· Additional meetings not specifically identified in the scope.
· Structural design of building elements (this is being performed by separate structural firm through
the Project Architect).
· Lighting design.
· Third-party consultants not specifically called out, including pool design, low voltage,
security, acoustics, IT, A/V, solar panel array, kitchen equipment, etc.
· Generator or standby power design.
· Life Safety design (fire alarms and fire sprinkler systems)
· 3D coordination, & modeling to a Level of Detail (LoD) specification, clash detection analysis.
· Demolition plans or demolition safety plans
· Documentation, coordination, and response to 3rd party reviews, peer reviews, specialty
consultants, historical preservation commissions, non-contractual contractors, or reviews by
other entities not specifically stated.
Project Fees
The proposed fees were developed by estimating the total labor required to complete the design. If
there are multiple iterations of the design, the project scope could change substantially, or, if
unforeseen circumstances arise, the fees shown would be negotiated accordingly. SGM will provide
detailed invoicing and monthly project status updates describing SGM's work.
TASK
ESTIMATED
FEE
PM and Meetings $8,000
Survey $22,000
Civil Engineering $50,000
Site Structural Engineering $8,000
Bid Phase Services $3,000
Project Total $91,000
ADD SERVICE
ESTIMATED
FEE
Notes
MEP Engineering $34,000 moved out of base project into ADD service
Geothermal Design $75,000 includes Borefield design subconsultant
Well Evaluation $5,000 review of existing well information
Well Testing $25,000 including pump contractor
Schedule
The surveying field work may commence prior to the site being free from snow to expedite the design and
additional field work would be required after snowmelt to gather remaining data. Civil engineering design
can begin after the initial survey and mapping is completed and after all pertinent site improvements
information is provided by the Project Architect. Site Structural engineering design efforts will be concurrent
with the Civil design. Project design is anticipated to begin in March and be completed by end of May 2025.
Certificate Of Completion
Envelope Id: 9074718D-5748-4603-81FE-4E5FF797F6AA Status: Completed
Subject: SGM, Inc. | Pitkin County Task Order 012.25 C-1 for Review and Signature
Source Envelope:
Document Pages: 12 Signatures: 3 Envelope Originator:
Certificate Pages: 5 Initials: 1 Pitkin County Procurement
AutoNav: Enabled
EnvelopeId Stamping: Disabled
Time Zone: (UTC-07:00) Mountain Time (US & Canada)
530 East Main Street
Suite 203
Aspen, CO 81611
Procurement@PitkinCounty.com
IP Address: 65.38.144.66
Record Tracking
Status: Original
3/26/2025 12:29:28 PM
Holder: Pitkin County Procurement
Procurement@PitkinCounty.com
Location: DocuSign
Signer Events Signature Timestamp
Connie Baker
connie.baker@pitkincounty.com
Budget Director
Pitkin County
Security Level: Email, Account Authentication
(None)
Signature Adoption: Pre-selected Style
Using IP Address: 216.147.125.136
Sent: 3/26/2025 1:06:12 PM
Viewed: 3/26/2025 1:07:35 PM
Signed: 3/26/2025 1:08:39 PM
Electronic Record and Signature Disclosure:
Not Offered via Docusign
Ted O'Brien
ted.obrien@pitkincounty.com
Open Space and Trails Deputy Director
Security Level: Email, Account Authentication
(None)Signature Adoption: Uploaded Signature Image
Using IP Address: 174.231.86.215
Sent: 3/26/2025 1:08:41 PM
Viewed: 3/26/2025 2:52:50 PM
Signed: 3/26/2025 2:53:09 PM
Electronic Record and Signature Disclosure:
Accepted: 3/26/2025 2:53:51 PM
ID: a3026af8-e935-4c2f-a918-f626824b6779
Company Name: Pitkin County, Colorado
Mike Fowler
mikef@sgm-inc.com
Principal
Schmueser Gordon Meyer, Inc
Security Level: Email, Account Authentication
(None)
Signature Adoption: Pre-selected Style
Using IP Address: 208.72.68.35
Sent: 3/26/2025 2:53:11 PM
Viewed: 3/26/2025 3:35:05 PM
Signed: 3/26/2025 3:45:30 PM
Electronic Record and Signature Disclosure:
Accepted: 4/2/2025 10:51:33 AM
ID: 0bf5d269-000b-4cfa-bc7d-1e88239fdb37
Company Name: Pitkin County, Colorado
Kara
kara.silbernagel@pitkincounty.com
Deputy County Manager
Pitkin County Colorado
Signing Group: County Manager Group
Security Level: Email, Account Authentication
(None)
Signature Adoption: Drawn on Device
Using IP Address: 73.203.8.247
Sent: 3/26/2025 3:45:32 PM
Viewed: 3/28/2025 12:06:14 PM
Signed: 3/28/2025 12:08:49 PM
Electronic Record and Signature Disclosure:
Not Offered via Docusign
In Person Signer Events Signature Timestamp
Editor Delivery Events Status Timestamp
Agent Delivery Events Status Timestamp
Intermediary Delivery Events Status Timestamp
Certified Delivery Events Status Timestamp
Carbon Copy Events Status Timestamp
Pitkin County Procurement
procurement@pitkincounty.com
Procurement Specialist
Pitkin County
Security Level: Email, Account Authentication
(None)
Sent: 3/28/2025 12:08:51 PM
Resent: 3/28/2025 12:08:58 PM
Electronic Record and Signature Disclosure:
Not Offered via Docusign
Accounts Payable
AP@pitkincounty.com
Accounts Payable
Pitkin County
Security Level: Email, Account Authentication
(None)
Sent: 3/28/2025 12:08:51 PM
Viewed: 3/28/2025 12:13:47 PM
Electronic Record and Signature Disclosure:
Not Offered via Docusign
Kim Arensdorf
kim.arensdorf@pitkincounty.com
Security Level: Email, Account Authentication
(None)
Sent: 3/28/2025 12:08:52 PM
Viewed: 4/3/2025 12:26:37 PM
Electronic Record and Signature Disclosure:
Accepted: 1/2/2025 8:57:23 AM
ID: 6be81804-0934-46f7-9348-aafa7fbdfef2
Company Name: Pitkin County, Colorado
Witness Events Signature Timestamp
Notary Events Signature Timestamp
Envelope Summary Events Status Timestamps
Envelope Sent Hashed/Encrypted 3/26/2025 1:06:12 PM
Certified Delivered Security Checked 3/28/2025 12:06:14 PM
Signing Complete Security Checked 3/28/2025 12:08:49 PM
Completed Security Checked 3/28/2025 12:08:52 PM
Payment Events Status Timestamps
Electronic Record and Signature Disclosure
ELECTRONIC RECORD AND SIGNATURE DISCLOSURE
From time to time, Pitkin County (we, us or Pitkin County) may be required by law to provide
you with certain written notices or disclosures. Described below are the terms and conditions for
providing to you such notices and disclosures electronically when we send you documents for
electronic signature.
Acknowledging your Access, Intent, and Consent to Receive and Sign Materials
Electronically
To confirm that you can access this information electronically, which will be similar to other
electronic notices and disclosures that we will provide to you, please verify that you were able to
read this electronic disclosure and that you also were able to print on paper or electronically save
this page for your future reference and access or that you were able to e-mail this disclosure and
consent to an address where you will be able to print on paper or save it for your future reference
and access. Further, if you consent to receive notices and disclosures exclusively in electronic
format on the terms and conditions described above, please let us know by clicking the 'I agree'
button below.
By checking the 'I Agree' box, I confirm that:
I am establishing my intent to be bound to the transaction, and indicating that I am fully
aware of the purpose for which the signature is being provided.
I can access and read this Electronic CONSENT TO ELECTRONIC RECEIPT OF
ELECTRONIC RECORD AND SIGNATURE DISCLOSURES document; and
I can print on paper the disclosure or save or send the disclosure to a place where I can
print it, for future reference and access; and
Until or unless I notify Pitkin County as described above, I consent to receive from
exclusively through electronic means all notices, disclosures, authorizations,
acknowledgments, and other documents that are required to be provided or made
available to me by Pitkin County during the course of my relationship with you.
Signing Documents without a Pitkin County DocuSign Account:
Pitkin County may not require all document signers to be authorized users of the Pitkin County
DocuSign Account. Please read the information below carefully and thoroughly, and if you can
access this information electronically to your satisfaction and agree to these terms and
conditions, please confirm your agreement by clicking the 'I agree' button at the bottom of this
document. When you don't have a DocuSign account, you will be provided the opportunity to
agree to the Legal Disclosure each time you open an "envelope" for signing, at this time, you can
download and retain this disclosure. Pitkin County will forward completed documents that
you've reviewed, processed or signed via email. Should you require copies of these signed
documents (e.g., if they get deleted from your email account) you should request those
documents from Pitkin County under the Colorado Open Records Act by contacting the Pitkin
County custodian who sent you the document for signature.
Signing Documents with a Pitkin County DocuSign Account:
Electronic Record and Signature Disclosure created on: 3/20/2020 3:28:13 PM
Parties agreed to: Ted O'Brien, Mike Fowler, Kim Arensdorf
Please read the information below carefully and thoroughly, and if you can access this
information electronically to your satisfaction and agree to these terms and conditions, please
confirm your agreement by clicking the 'I agree' button at the bottom of this document.
Getting paper or electronic copies
At any time, you may request from us a paper or electronic copy of any record provided or made
available electronically to you by us. For such copies, as long as you are an authorized user of
the DocuSign system you will have the ability to download and print any documents we send to
you through your DocuSign user account for a limited period of time (usually 30 days) after such
documents are first sent to you. After such time, if you wish for us to send you paper or
electronic copies of any such documents from our office to you, you may be charged a per-page
fee. You may request delivery of such paper or electronic copies from us by following the
procedure described below.
Withdrawing your consent
If you are an authorized DocuSign Account holder, you can decide to receive notices and
disclosures from us electronically, you may at any time change your mind and tell us that
thereafter you want to receive required notices and disclosures only in paper format. Described
below is the process for informing us of your decision to receive future notices and disclosure in
paper format and also how to withdraw your consent to receive notices and disclosures
electronically.
Consequences of changing your mind
If you elect to receive required notices and disclosures only in paper format, it will slow the
speed at which we can complete certain steps in transactions with you and delivering services to
you because we will need first to send the required notices or disclosures to you in paper format,
and then wait until we receive back from you your acknowledgment of your receipt of such
paper notices or disclosures. To indicate to us that you are changing your mind, you must
withdraw your consent using the DocuSign 'Withdraw Consent' form on the signing page of your
DocuSign account. This will indicate to us that you have withdrawn your consent to receive
required notices and disclosures electronically from us and you will no longer be able to use your
DocuSign user account to receive required notices and consents electronically from us or to sign
electronically documents from us.
All notices and disclosures will be sent to you electronically
Unless you tell us otherwise in accordance with the procedures described herein, we will provide
electronically to you through your DocuSign user account all required notices, disclosures,
authorizations, acknowledgments, and other documents that are required to be provided or made
available to you during the course of our relationship with you. To reduce the chance of you
inadvertently not receiving any notice or disclosure, we prefer to provide all of the required
notices and disclosures to you by the same method and to the same address that you have given
us. Thus, you can receive all the disclosures and notices electronically or in paper format through
the paper mail delivery system. If you do not agree with this process, please let us know as
described below. Please also see the paragraph immediately above that describes the
consequences of your electing not to receive delivery of the notices and disclosures
electronically from us.
How to contact Pitkin County:
You may contact us to let us know of your changes as to how we may contact you electronically,
to request paper copies of certain information from us, and to withdraw your prior consent to
receive notices and disclosures electronically as follows:
To contact us by email send messages to Helpdesk@provelocity.com
To advise Pitkin County of your new e-mail address
To let us know of a change in your e-mail address where we should send notices and disclosures
electronically to you, you must send an email message to us at Helpdesk@provelocity.com and
in the body of such request you must state: your previous e-mail address, your new e-mail
address .
In addition, you must notify DocuSign, Inc to arrange for your new email address to be reflected
in your DocuSign account by following the process for changing e-mail in DocuSign.
To request paper or electronic copies from Pitkin County
To request delivery from us of paper or electronic copies of the notices and disclosures
previously provided by us to you electronically, you should request those documents from Pitkin
County under the Colorado Open Records Act by contacting the Pitkin County custodian who
sent you the document for signature.
To withdraw your consent with Pitkin County
To inform us that you no longer want to receive future notices and disclosures in electronic
format you may:
i. decline to sign a document from within your DocuSign account, and on the subsequent
page, select the check-box indicating you wish to withdraw your consent, or you may;
ii. send us an e-mail to Helpdesk@provelocity.com and in the body of such a request, you
must state your e-mail, full name, Postal Address, telephone number, and account
number.