Loading...
HomeMy WebLinkAboutEntrance to Aspen Reevaluation Letter 9.5.2025 CDOT Region 3 TransportaƟon Director Jason Smith 222 South 6th St., #317 Grand JuncƟon, CO 81501-2769 September 5, 2025 RE: Entrance to Aspen ReevaluaƟon Dear Mr. Smith: The City of Aspen intends to move forward with the remaining elements of the preferred alternaƟve to the Entrance to Aspen Project and formally requests approval and coordinaƟon from the Colorado Department of TransportaƟon (CDOT) to have Jacobs Engineering conduct a re-evaluaƟon of the August 1998 Final Environmental Impact Statement (FEIS) and Record of Decision (ROD). Those remaining elements of the preferred alternaƟve (the “Project”) were ranked as the highest transportaƟon priority in Pitkin County in the recent effort to update CDOT’s Long Range Plan and 10-year-plan with the Intermountain TransportaƟon Planning Region On May 28, 2025, the Pitkin County Board of County Commissioners adopted ResoluƟon #047- 2025 acknowledging that it is in the best interests of the ciƟzens of Pitkin County to endorse the exisƟng Record of Decision for the Entrance to Aspen and to iniƟate the reevaluaƟon of its supporƟng Environmental Impact Statement. On July 22, 2025, the Aspen City Council adopted ResoluƟon #104, Series 2025, direcƟng staff to pursue a re-evaluaƟon of the FEIS and ROD for the Project, and ResoluƟon #105, Series 2025, approving a change order for Jacobs Engineering to iniƟate the work to re-evaluate the 1998 FEIS and ROD. This process is esƟmated to take approximately 15 months to also include public engagement and explore Project refinements to opƟmize and bring design standards to today’s requirements. The 1998 ROD is 27 years old and includes the results of a community process developed more than 30 years ago. Nevertheless, the purpose and need for the Project and the Project elements analyzed through the NEPA process and approved in the 1998 ROD are the same. These are:  Realignment of Owl Creek Road and BuƩermilk Road to create a combined intersecƟon  Replacement of the Maroon Creek Bridge north of exisƟng bridge  Roundabout at Maroon Creek Road  A realignment of State Highway 82 between Maroon Creek Road Roundabout and Main Street in Aspen through the Marolt-Thomas open space to include a general-purpose lane  in each direcƟon and two exclusive bus lanes one in each direcƟon that would remain in place unƟl funding for a light rail (LRT) is available – LRT is a future component of the PA  A cut and cover tunnel allowing for trail and wildlife connecƟons of the realigned SH 82 in the Marolt-Thomas Open Space  ConstrucƟon of a new Castle Creek Bridge on the alignment through Marolt-Thomas open space  Conversion of the roadway and bridge between Cemetery Lane and North 7th Street to a local road only  An open space corridor connecƟng Marolt-Thomas Open Space to the Aspen Golf Course, created by converƟng the abandoned porƟon of highway 82 between Cemetery Lane and the roundabout into open space  Incremental TransportaƟon Management Program  Two future parking faciliƟes at the Aspen Airport and BuƩermilk Ski area Over the past 25 years, CDOT, Aspen and other regional partners have increased transit connecƟvity, implemented TransportaƟon Demand Management measures including paid parking, constructed the Maroon Creek Bridge and the roundabout, and realigned Owl Creek Road. The major remaining pieces of the ROD that have not yet been implemented are the realignment of State Highway 82 and construcƟon of a new Castle Creek Bridge for a new entrance to Aspen. As you know, Jacobs Engineering conducted a hands-on bridge evaluaƟon through the City of Aspen in fall 2023 and CDOT conducted an inspecƟon of the bridge in September of 2024, both of which confirmed that the Castle Creek Bridge remains within the ‘fair’ category and notes evidence of considerable deterioraƟon of its components. The inspecƟon showed needed deck repairs, substructure deterioraƟon, needed girder replacement, and other evidence of the bridge’s age. CDOT did clarify that despite the age and condiƟon, the bridge is sƟll safe for highway use. In a leƩer dated February 13, 2023, CDOT in collaboraƟon with the FHWA Colorado Division noted that “when the exisƟng Castle Creek Bridge needs to be replaced the 1998 ROD Preferred AlternaƟve will be constructed.” Jacobs is conducƟng the re-evaluaƟon with addiƟonal steps to solicit public feedback with the goal of construcƟng the most opƟmal design of these remaining elements of the Project. The purpose of this leƩer is to request CDOT’s approval and coordinaƟon for Jacobs to re-evaluate the Project as the iniƟal effort to acquire necessary agency approvals. It should be noted that the city is self-funding this reevaluaƟon, and no monetary request is being made of CDOT for this re-evaluaƟon scope of work. The City of Aspen is extremely appreciaƟve of the informaƟon that CDOT and FHWA have already provided in service to this effort. We look forward to our conƟnued work on this important regional project, and CDOT’s response to the City’s request for its approval and commitment to coordinate with Jacobs Engineering. Sincerely, Rachael E. Richards Kelly McNicholas Kury Alyssa Shenk Mayor Chair Mayor Aspen Pitkin County Snowmass Village Board of County Commissioners AƩachments: Pitkin County Board of County Commissioners ResoluƟon #47 Series of 2025, Endorsing the reevaluaƟon of the Entrance to Aspen Record of Decision and its SupporƟng Environmental Impact Statement hƩps://records.pitkincounty.com/WebLink/DocView.aspx?id=507779&dbid=0&repo=LFRecords City of Aspen ResoluƟon #104, Series 2025, direcƟng staff to pursue a re-evaluaƟon of the Environmental Impact Statement and the Record of Decision for the Entrance to Aspen: hƩps://records.aspen.gov/WebLink/DocView.aspx?id=2261471&dbid=0&repo=LFRecords City of Aspen ResoluƟon #105, Series 2025, approving a change order to the contract between the City of Aspen and Jacobs Engineering Group, Inc. authorizing the City Manager to execute said contract on behalf of the City of Aspen, Colorado: hƩps://records.aspen.gov/WebLink/DocView.aspx?id=2261472&dbid=0&repo=LFRecords Jacobs Engineering ReevaluaƟon Scope of Work C: CDOT ExecuƟve Director Shoshana Lew CDOT Region 3 Central Program Engineer Roland Wagner CDOT Region 3 Planning and Environmental Manager David Cesark FHWA Environmental ProtecƟon Specialist Lindsay Edgar FHWA Program Improvement Engineer Elizabeth Cramer FHWA Program Delivery Team Leader/Region 3 Area Engineer Julian Gonzalez City of Aspen Special Counsel Anne Sibree City of Aspen City AƩorney Kate Johnson City of Aspen Interim City Manager Pete Strecker