Contract Information
Contract Number
Project Name
Contractor
Budget Line Item Multiple
Procurement Method:
Type:
Contract Start Date
Contract End Date
Contract Type
Retainage
If this is a new contractor, please enter the New Vendor information into Munis for workflow approval.
Contact Information:
Department
County Representative Diane Jackson County Representative
Phone (970) 429-1880
Provide a brief description of the Contract or Change Order:
Contract Value Summary:
$ 1,557,751.00
$ 2,197,179.00
$ 1,662,759.00
$ 5,417,689.00
003.22 A-1-F
Pitkin County
Procurement Cover Sheet
Please complete the Contract Cover Sheet when the contract/task order is complete and fully executed.
Return all Contract Cover Sheets and Contracts/Change Orders/Amendments/Task Orders to Procurement
No
ASE Layout Plan Consultancy Services
Jacobsen Daniels, LLC
NTE $1,662,759.00
Additional Budget Line
Item(s)
(Please fully allocate New Contract Total)
$ -
$ -
$ -
NTE $1,662,759.00
Formal
Services/Maintenance
8/17/2022
12/31/2025
Change Order/Contract Amendment
Airport
Amendment to extend the Task Order End Date to 12/31/2025, add services to Task 14 of Task Order Scope of
Work, and to allocate additional funding in an amount not to exceed $1,662,759.
Original Contract Amount
Previous Change Order/Amendment Amount
This Change order/Amendment amount
Contract Total
Contract #: 003.22 Rev. 2022.08.04 CDD
*Increases over $25,000 and/or 10% (single increase or accumulative) of original contract must
have County Manager signature. 1
CHANGE ORDER / CONTRACT AMENDMENT
Change Order Number: 003.22 A-1-F
OWNER:
Pitkin County, Colorado
530 E. Main St., Suite #302
Aspen, CO 81611
CONTRACTOR:
Jacobsen Daniels, LLC
121 Pearl Street
Ypsilanti, MI 48197
The Provision of ASE Airport Layout Plan Consultancy Services pursuant to Task Order 003.22
A-1, as amended, (the “Task Order”) dated August 18, 2022 between the Board of County
Commissioners of Pitkin County, Colorado (the “County”) and Jacobsen Daniels, LLC (the
“Contractor”), is hereby amended as follows:
Description of Change:
1. Amendment to Task Order Scope of Work for Task # 14, as described in the attached
Contractor Amendment 5 (“Attachment A”);
2. Extension of the Task Order End Date to 12/31/2025; and
3. Pursuant to Contractor’s Task 14 Annual Budget (“Attachment B”) and Contractor’s
Program Management Expenses (“Attachment C”), allocation of additional funding not
to exceed $1,662,759.00 to cover the cost of added services for the remainder of 2025.
Reason for Change: Additional Scope of Work requested by the County for Task 14, additional
time required to perform services, and allocation of additional funds.
Original Contract Amount $ 1,557,751.00
Previous Change Order/Amendment Amount $ 2,197,179.00
This Change Order/Amendment Amount $ 1,662,759.00 New Contract Total $ 5,417,689.00
Contract #: 003.22 Rev. 2022.08.04 CDD
*Increases over $25,000 and/or 10% (single increase or accumulative) of original contract must
have County Manager signature. 2
In all other respects, the Contract is in full force and effect and remains unchanged by this
Amendment.
JACOBSEN DANIELS, LLC
________________________________________________ !#VENDOR SIGNATURE#! Date
PITKIN COUNTY, COLORADO
RECOMMENDED FOR APPROVAL:
_________________________________________________ !#DEPARTMENT REPRESENTATIVE#! Date
COUNTY MANAGER APPROVAL:
________________________________________________
!#COUNTY MANAGER#! Date
Airport Director
Diane Jackson
Nov-21-2025
Executive Vice President
Brad Jacobsen
Dec-02-2025
Jon Peacock
Dec-02-2025
County Manager
121 Pearl Street, Ypsilanti, MI 48197 | Tel. 734 961 3200 | JacobsenDaniels.com 1
AIRPORT LAYOUT PLAN UPDATE CONSULTANCY SERVICES
SCOPE OF WORK – AMENDMENT 5
Attachment A
ASPEN/PITKIN COUNTY AIRPORT
AIRPORT LAYOUT PLAN UPDATE
SCOPE OF WORK
121 Pearl Street, Ypsilanti, MI 48197 | Tel. 734 961 3200 | JacobsenDaniels.com 2
November 3, 2025
TASK 14: PROGRAM MANAGEMENT
The Airport Modernization Program (AMP) that resulted from the Airport Layout Plan Update will
update critical airport infrastructure, eliminate or replace non-standard/substandard facilities and
enhance operational efficiency. The major components of the AMP include a new replacement terminal
building and associated landside infrastructure and facilities as well as a new replacement runway (80’
west of the existing runway) along with an expanded deice pad and associated airfield taxiway/taxilane
and utility improvements. This task will support Pitkin County with the definition/refinement of the capital
program components and development and execution of an implementation strategy to design and
construct the new facilities while minimizing operational impacts to the airport users and the surrounding
community.
ASPEN/PITKIN COUNTY AIRPORT
AIRPORT LAYOUT PLAN UPDATE
SCOPE OF WORK
121 Pearl Street, Ypsilanti, MI 48197 | Tel. 734 961 3200 | JacobsenDaniels.com 3
1. INTRODUCTION
This Statement of Work (SOW) outlines the services, objec@ves, deliverables, and responsibili@es for
providing Program Management Services for the APM at Aspen Pitkin County Airport (ASE). The program
management services will coordinate the planning, programming, design, construc@on and
commissioning/ORAT of mul@ple complex, inter-related projects (Runway, Terminal/Landside, and FBO)
that will modernize and improve the airport’s infrastructure and facili@es.
2. OBJECTIVE
The objec@ve of these program management services is to provide comprehensive oversight,
coordina@on, and strategic management of the large-scale, high-priority APM. The services will support
the airport’s long-term moderniza@on goals and help ensure that the projects are delivered on @me,
within budget, and in compliance with all applicable regula@ons, safety standards, and quality
benchmarks.
3. SCOPE OF WORK
The scope of work associated with this task includes the following services:
Project Administration and Management
1. Develop overall program delivery strategy, program manual and project plans for Pitkin County’s
approval.
2. Prepare Program Management Plan (PMP): typical elements will include:
· Developing program charter: defining the program's purpose, scope, goals, and key
stakeholders
· Crea@ng a work breakdown structure (WBS): breaking down the Program into
manageable project components and tasks; Terminal/Landside and Airfield
· Establishing governance structure: defining decision-making processes and
roles/responsibili@es for stakeholders within the program
· Plan for managing project dependencies: iden@fying and coordina@ng interdependencies
between different projects within the program
· Facilita@ng cross-func@onal collabora@on: fostering teamwork and communica@on
between different stakeholders within the County and across consul@ng and contractor
teams involved in the Program
· Conduc@ng rou@ne program reviews: Regularly assessing scope, schedule and budget as
well as program performance and making adjustments as needed
3. Strategic Alignment: aligning program objec@ves with broader organiza@onal strategies and
objec@ves, such as the Common Ground Recommenda@ons and Core Community Goals.
4. Regularly report progress and issues to Pitkin County’s designated project team
ASPEN/PITKIN COUNTY AIRPORT
AIRPORT LAYOUT PLAN UPDATE
SCOPE OF WORK
121 Pearl Street, Ypsilanti, MI 48197 | Tel. 734 961 3200 | JacobsenDaniels.com 4
5. Assist the County with implemen@ng Pitkin County’s project management systems and tools (e.g.
ProCore, etc.)
6. Hold regular program update mee@ngs with key stakeholders; iden@fying, engaging and
suppor@ng the Program stakeholders with informa@on needed to develop strategy and provide
direc@on; ensuring all projects are coordinated to minimize opera@onal impacts and/or op@mize
resources
7. Proac@vely iden@fying, assessing, and mi@ga@ng poten@al risks that could impact scope, schedule
or budget
8. Develop staffing plans to support all phases of the project
9. Allocate and manage program resources (people, @me, and money) efficiently and effec@vely.
10. Establish lines of communica@on and decision-making process amongst all stakeholders
11. Establish and facilitate contracts, change orders, invoices/pay applica@ons review, approval, and
tracking process
12. Iden@fy key stakeholders and define roles and responsibili@es throughout the project lifecycle
13. Coordinate with FAA; refining the AMP, and/or project sequencing, to achieve strategic goals,
maximize federal funding, and minimize opera@onal impacts; suppor@ng the environmental
review and approval process
14. Prepare and maintain overall APM schedule outlining key ac@vi@es, dura@ons, deliverables,
milestones, task responsibili@es, etc.
15. Manage and supervise design and construc@on as requested and approved by Pitkin County
16. Establish and coordinate communica@on with all program stakeholders and help ensure all
stakeholders are informed and engaged regarding program status and direc@on; coordinate and
inform the public about the status of the program
17. Coordinate FBO improvements and align with AMP and other County goals and objectives as
necessary
18. Other services as requested by Pitkin County.
Strategic Communications (GBSM and Kimley-Horn)
19. Lead Airport Leadership Team mee@ngs biweekly, Communica@ons team mee@ngs (3 per month),
Project Management mee@ngs (3 per month), and provide issues management as required.
20. Overarching Airport Communica@ons. Provide Airport Advisory Board support, stakeholder
briefings and materials, Airport newsleKer, website media and social media strategies, and Board
of County Commissioners mee@ngs and materials.
21. Design Phase Facilita@on and Outreach. Facilitate Terminal Design Task Force (up to 8 mee@ngs),
Mul@modal Task Force (up to 8 mee@ngs), and Community Events and Public Mee@ngs (up to 6
events or mee@ngs).
22. Construc@on Phase Communica@ons.
23. Other services as requested by Pitkin County.
ASPEN/PITKIN COUNTY AIRPORT
AIRPORT LAYOUT PLAN UPDATE
SCOPE OF WORK
121 Pearl Street, Ypsilanti, MI 48197 | Tel. 734 961 3200 | JacobsenDaniels.com 5
Contracting
24. Develop and manage scopes of work for all Program consultant agreements, including for A/E,
construc@on, and environmental contracts
25. Develop strategy for the procurement and selec@on of Construc@on Manager at Risk (CMAR) and
contractors to best benefit this project.
26. Conduct outreach to solicit interest from consultants and contractors to par@cipate in RFPs
27. Implement and oversee FAA/Pitkin County’s supplier goals and requirements
28. Support and manage RFQ/P processes through Pitkin County’s Procurement Department
29. Evaluate proposals, interview bidders, and develop award recommenda@on packages for Pitkin
County review
30. Nego@ate contracts with successful bidders for Pitkin County approval
31. Other services as requested by Pitkin County.
Project Controls
32. Develop budgets based on es@mates, benchmarks, and proposals
33. Assist Pitkin County to develop funding requests
34. Develop and maintain cash drawdown schedule based on current budget and schedule
35. Support cash flow forecasts
36. Develop and maintain owner’s master schedule
37. Review cost and schedule trends and assist Pitkin County in the evalua@on and approval of
changes
38. Review and approve contractors and design team pay applica@ons and invoices for conformance
to contracts and reported progress
39. Perform analysis of contractor’s schedule as required and project poten@al impacts rela@ve to
iden@fied risks
40. Other services as requested by Pitkin County
Quality Assurance / Quality Control
41. Perform QA/QC reviews at key milestones in the design and construc@on phases of the project
42. Ensuring Program work products and deliverables meet quan@ty and quality standards and
comply with defined requirements
43. Other services as requested by Pitkin County
ASPEN/PITKIN COUNTY AIRPORT
AIRPORT LAYOUT PLAN UPDATE
SCOPE OF WORK
121 Pearl Street, Ypsilanti, MI 48197 | Tel. 734 961 3200 | JacobsenDaniels.com 6
Reporting
44. Establish repor@ng procedures for the Project Management Team to be accepted by Pitkin
County, including but not limited to: Project Progress, Cost Management, QA/QC, Risk Register
and Schedule Control
45. Other services as requested by Pitkin County.
Planning Services
46. Prepare mul@-modal planning study for airport
47. Support ConRAC planning and programming - temporary and permanent
48. Complete environmental reviews for any program scope elements not covered by the exis@ng EA
49. Prepare Airport Layout Plan updates as required by FAA
50. Complete Safety Risk Assessment (based on FAA direction) for the APM
51. Support FBO Development Planning relative to the ALP and APM
52. Other services as requested by Pitkin County.
Design Management
53. Organize and manage Basis of Design (concepts/programming) process with key stakeholders and
selected Terminal/Landside A/E
54. Manage Organize and manage Master Civil Design (15%) for APM
55. Oversee and manage the Schematic Design, Design Development, and Construction Document
phases of the design processes
56. Coordinate design process with other interfacing scopes (e.g. FBO)
57. Ensure implementa@on of design requirements and guidelines with design team
58. Organize and manage workshops to review design concepts for conformance to Pitkin County’s
adopted Common Ground Recommenda@ons and Core Community Goals and the program goals
and principles
59. Integrate selected CMAR’s project team into the design process for constructability, cost and
schedule es@ma@ng
60. Provide independent cost es@ma@ng throughout the design process, in consulta@on with design
team
61. Support pricing discussions based on development of the design
62. Support procurement and coordina@on of FFE
63. Other services as requested by Pitkin County
ASPEN/PITKIN COUNTY AIRPORT
AIRPORT LAYOUT PLAN UPDATE
SCOPE OF WORK
121 Pearl Street, Ypsilanti, MI 48197 | Tel. 734 961 3200 | JacobsenDaniels.com 7
Pre-Construction Management
64. Coordinate Ini@al Guaranteed Maximum Price (GMP) with CMARs
65. Coordinate with the selected CMARs to develop a high-level Project schedules, in coordina@on
with the Design Teams
66. Coordinate constructability reviews with CMARs and Design Teams and iden@fy and priori@ze
poten@al opportuni@es for cost and schedule savings
67. Coordinate with the CMARs and Design Teams to develop preliminary bid package strategy and
preliminary construc@on phasing plans
68. Coordinate value engineering (VE) reviews and organize/prioritize opportunities for Pitkin
County to consider
69. Other services as requested by Pitkin County
Other Program Support Services that may be provided if requested by Pitkin County:
Construction Administration
70. Organize and oversee Construc@on Administra@on (CA) ac@vi@es during construc@on (some CA
services will be provided by design teams
71. Coordinate and conduct pre-construc@on and weekly progress mee@ngs during construc@on with
contractors and stakeholders
72. Lead the development and delivery of Construc@on Observa@on Program
73. Perform site inspec@ons to observe progress and quality of the contractors work
74. Review shop drawings for conformance with construc@on contract documents
75. Review and respond to requests for informa@on (RFI’s) as submiKed by the contractor; coordinate
RFI and similar requests with the design teams
76. Review and compile cer@ficates of inspec@ons and tests required by the contract documents
77. Monitor compliance with wage and labor requirements and DBE par@cipa@on as required by the
FAA
78. Review and approve applica@ons for payment
79. Issue any necessary request for proposals, interpreta@ons and clarifica@ons of the contract
documents and prepare change orders
80. Advise and assist Pitkin County in seKling any disputes between the owner and contractor
81. Conduct substan@al comple@on and final comple@on inspec@ons to determine if the completed
work is acceptable and develop and manage a comple@on/close-out punchlist
82. Prepare and deliver a Final Construc@on Comple@on Report
83. Prepare record drawings defining the actual loca@on of improvements and equipment based on
marked up drawings and other data furnished by the contractor; coordinate inclusion into airports
GIS System
ASPEN/PITKIN COUNTY AIRPORT
AIRPORT LAYOUT PLAN UPDATE
SCOPE OF WORK
121 Pearl Street, Ypsilanti, MI 48197 | Tel. 734 961 3200 | JacobsenDaniels.com 8
Quality Assurance / Construction Materials Testing
84. Subcontract with a construc@on materials tes@ng firm for the construc@on projects; tes@ng
required for the project will include:
· Field density tes@ng
· Subgrade and subbase sampling and lab density determina@ons
· Field density and grada@on tes@ng of subgrade and subbase materials
· Portland Cement Concrete Pavement Quality Assurance Tes@ng, if appropriate
· Asphalt Inspec@on and Tes@ng
· Special Inspec@ons or Tests
4. KEY DELIVERABLES
The program management services will oversee and maintain:
· Airport Moderniza@on Program Plan (AMP/PMP); Comprehensive planning document based on
the FAA Approved ALP, including project scopes, budgets, implementa@on schedules.
· Program Status Reports: Summary reports on progress, including key performance metrics, risks,
and mi@ga@on strategies
· Risk Management Plan: A detailed risk register iden@fying poten@al risks and the proposed
mi@ga@on ac@ons
· Budget and Schedule Dashboards: Real-@me updates on project budgets and schedules
· Compliance and PermiPng Documenta@on: a collec@on of all necessary compliance records and
project permits
· Final Program Closeout Report: A detailed report summarizing the program’s success, challenges,
and lessons learned
5. STAFFING PLAN
· Execu@ve Program Manager
· Runway Project Manager
· Terminal/Landside Project Manager
· Deputy Project Manager(s)
· Project Controls Manager
· Public Rela@ons Support (GBSM and Kimley Horn)
· Cost Estimating (Connico)
· Other staff as requested/needed to support the Program and its successful implementa@on, with
approval from Pitkin County
ASPEN/PITKIN COUNTY AIRPORT
AIRPORT LAYOUT PLAN UPDATE
SCOPE OF WORK
121 Pearl Street, Ypsilanti, MI 48197 | Tel. 734 961 3200 | JacobsenDaniels.com 9
6. TIMELINE
The program management services will be performed over the course of 5 years (es@mated comple@on of
the Airport Moderniza@on Program) with key project milestones and deadlines iden@fied in the Program
Master Schedule.
7. TASK ORDERS
The program management services will be contracted using the exis@ng Master Services Agreement
between Pitkin County and Jacobsen Daniels, and new task orders for the scope of services as outlined
above. The first task order will include the program setup and administra@on for the design phase, CMAR
contrac@ng, and any early work packages to be delivered in 2025 through 2026. A detailed scope of work
and es@mated fee schedule will be provided upon request for this first phase and then addi@onal services
will be added in later stages and/or as requested. The PMT will be specific about services provided in
each task order, including any other services as requested by Pitkin County. This proposal covers the
entire duration of the program but annual task orders will be more specific for each year of the program
and additional services can be added by separate task orders as required. An owner’s contingency line
item will be included in each task order for up to 10-15% of the total that can be billed against upon the
County’s written approval of miscellaneous services and fees accordingly.
Aspen/Pitkin County Airport
Program Management - Terminal & Airside
Scope of Work
PIC EPM TPM APM FCM
DPM -
Planning On-Site DPM On-Site FC
Misc.
Support
B. Jacobsen J. Christie C. Strothman G. Fielding S. Reynolds A. Oommen TBD TBD TBD Total Hours Total Labor Cost JDA Expenses
% of Total
Labor Cost
Sub -
Communications
Sub - Cost
Estimating
Sub -
Environmental Total Cost
Task 14 Program Management 1080 7080 7440 7440 560 840 8880 6960 360 40640 11,884,483$ 1,720,381$ 14%1,500,000$ 300,000$ 65,000$ 16,009,261$
0 Project Administration & Management (Airfield & Terminal)
Year 1 2025 240 480 480 480 160 160 240 240 120 2600 858,080$ 169,679$ 20%500,000$ 100,000$ 35,000$ 1,662,759$
Year 2 2026 480 1920 1920 1920 120 400 1920 1920 120 10720 3,044,310$ 334,326$ 11%500,000$ 200,000$ 30,000$ 4,381,726$
Year 3 2027 160 1920 1920 1920 120 200 1920 1920 80 10160 2,915,700$ 379,326$ 13%200,000$ 3,689,686$
Year 4 2028 120 1920 1920 1920 80 80 1920 1920 40 9920 2,917,478$ 300,028$ 10%100,000$ 3,431,668$
Year 5 2029 80 840 960 960 80 0 1920 480 0 5320 1,611,372$ 288,608$ 18%100,000$ 1,996,288$
Year 6 2030 0 0 240 240 0 0 960 480 0 1920 537,543$ 248,414$ 46%100,000$ 847,134$
Task 14 COST 1080 7080 7440 7440 560 840 8880 6960 360 40640 11,884,483$ 1,720,381$ 14% 1,500,000$ 300,000$ 65,000$ 16,009,261$
Attachment B
Aspen/Pitkin County Airport
Program Management - Terminal/Landside and Airside
Expenses
14 Expenses Description Position Name Airfare/Trip Cost / Day # of Days/Trip Cost / Trip Estimated #
Trips/Year 2025 2026 2027 2028 2029 2030
1 Office Furniture, Equipment & Supplies 7,440$ 3,600$ 3,600$ 3,600$ 3,600$ 3,600$
2 Meals & Entertainment (Events with ASE/PitCo)2,700$ 6,000$ 6,000$ 6,000$ 6,000$ 6,000$
3 Travel*PIC Brad Jacobsen 800.00$ 513.70$ 2 1,827.40$ 10 18,274$ 12 21,929$ 12 21,929$ 4 7,310$ 4 7,310$ 4 7,310$
4 EPM Joe Christie 400.00$ 513.70$ 3 1,941.10$ 18 34,940$ 24 46,586$ 24 46,586$ 12 23,293$ 12 23,293$ 6 11,647$
5 PMT Carter Strothman 800.00$ 513.70$ 3 2,341.10$ 22 51,504$ 24 56,186$ 24 56,186$ 12 28,093$ 12 28,093$ 6 14,047$
6 DPM-P Abe Oommen 800.00$ 513.70$ 2 1,827.40$ 4 7,310$ 4 7,310$ 4 7,310$ 4 7,310$ 4 7,310$ 4 7,310$
7 DPM TBD 400.00$ 513.70$ 3 1,941.10$ 6 11,647$ 24 46,586$ 24 46,586$ 12 23,293$ 12 23,293$ 6 11,647$
8 FC TBD 400.00$ 513.70$ 2 1,427.40$ 6 8,564$ 12 17,129$ 12 17,129$ 12 17,129$ 4 5,710$ 2 2,855$
9 Subtotal Travel % of Total Labor 15%132,239$ 6%195,726$ 7%195,726$ 4%106,428$ 6%95,008$ 10%54,814$
10 Procore (Program Software)% of Total Labor 3% 30,000$ 4%135,000$ 6%180,000$ 7%190,000$ 12%190,000$ 35%190,000$
11 Subtotal Expenses 169,679$ 334,326$ 379,326$ 300,028$ 288,608$ 248,414$
% of Total Labor 20%11%13%10%18%46%
* Travel cost estimates include airfare, lodging, rental car, meals & incidentals, and taxes based on average per diem rates.
Actual costs will be billed at the time of expense without any markups.
Attachment C
Certificate Of Completion
Envelope Id: 3AB4B8EC-733A-4B2E-9621-FD68750431A1 Status: Completed
Subject: Jacobsen Daniels, LLC | Pitkin County Task Order 003.22 A-1-F for Review & Signature
Source Envelope:
Document Pages: 14 Signatures: 3 Envelope Originator:
Certificate Pages: 6 Initials: 1 Pitkin County Procurement
AutoNav: Enabled
EnvelopeId Stamping: Disabled
Time Zone: (UTC-07:00) Mountain Time (US & Canada)
530 East Main Street
Suite 203
Aspen, CO 81611
Procurement@PitkinCounty.com
IP Address: 65.38.144.66
Record Tracking
Status: Original
11/17/2025 11:52:22 AM
Holder: Pitkin County Procurement
Procurement@PitkinCounty.com
Location: DocuSign
Signer Events Signature Timestamp
Connie Baker
connie.baker@pitkincounty.com
Budget Director
Pitkin County
Security Level: Email, Account Authentication
(None)
Signature Adoption: Pre-selected Style
Using IP Address: 65.38.144.66
Sent: 11/17/2025 11:56:23 AM
Resent: 11/18/2025 9:55:47 AM
Viewed: 11/18/2025 9:56:51 AM
Signed: 11/18/2025 10:01:03 AM
Electronic Record and Signature Disclosure:
Not Offered via Docusign
Diane Jackson
diane.jackson@aspenairport.com
Airport Director
Security Level: Email, Account Authentication
(None)Signature Adoption: Pre-selected Style
Using IP Address:
2601:281:2:4e40:1981:3151:3320:8cac
Sent: 11/18/2025 10:01:05 AM
Resent: 11/20/2025 11:22:09 AM
Viewed: 11/21/2025 8:27:58 AM
Signed: 11/21/2025 8:28:46 AM
Electronic Record and Signature Disclosure:
Accepted: 12/1/2025 1:43:12 PM
ID: 842022b0-9f2d-4aea-9284-c029909e3530
Company Name: Pitkin County, Colorado
Brad Jacobsen
brad.jacobsen@jacobsendaniels.com
Executive Vice President
Security Level: Email, Account Authentication
(None)Signature Adoption: Pre-selected Style
Using IP Address: 68.40.132.168
Sent: 11/21/2025 8:28:48 AM
Viewed: 11/21/2025 10:50:36 AM
Signed: 12/2/2025 9:54:26 AM
Electronic Record and Signature Disclosure:
Accepted: 4/4/2022 1:30:27 PM
ID: 77d74145-4854-4803-b1ec-800580bc02bd
Company Name: Pitkin County, Colorado
Jon Peacock
jon.peacock@pitkincounty.com
County Manager
Pitkin County
Signing Group: County Manager Group
Security Level: Email, Account Authentication
(None)
Signature Adoption: Drawn on Device
Using IP Address: 65.38.144.66
Sent: 12/2/2025 9:54:28 AM
Viewed: 12/2/2025 10:53:07 AM
Signed: 12/2/2025 10:53:34 AM
Electronic Record and Signature Disclosure:
Signer Events Signature Timestamp
Not Offered via Docusign
In Person Signer Events Signature Timestamp
Editor Delivery Events Status Timestamp
Agent Delivery Events Status Timestamp
Intermediary Delivery Events Status Timestamp
Certified Delivery Events Status Timestamp
Carbon Copy Events Status Timestamp
Pitkin County Procurement
procurement@pitkincounty.com
Ruslana Ivanova, Procurement Specialist
Pitkin County
Security Level: Email, Account Authentication
(None)
Sent: 12/2/2025 10:53:35 AM
Electronic Record and Signature Disclosure:
Not Offered via Docusign
Accounts Payable
AP@pitkincounty.com
Accounts Payable
Pitkin County
Security Level: Email, Account Authentication
(None)
Sent: 12/2/2025 10:53:36 AM
Electronic Record and Signature Disclosure:
Not Offered via Docusign
Joe Christie
joe.christie@jacobsendaniels.com
Security Level: Email, Account Authentication
(None)
Sent: 12/2/2025 10:53:37 AM
Electronic Record and Signature Disclosure:
Not Offered via Docusign
Abe Oommen
abe.oommen@jacobsendaniels.com
Security Level: Email, Account Authentication
(None)
Sent: 12/2/2025 10:53:38 AM
Electronic Record and Signature Disclosure:
Not Offered via Docusign
Witness Events Signature Timestamp
Notary Events Signature Timestamp
Envelope Summary Events Status Timestamps
Envelope Sent Hashed/Encrypted 11/17/2025 11:56:23 AM
Envelope Updated Security Checked 11/18/2025 9:55:17 AM
Envelope Updated Security Checked 11/18/2025 9:55:17 AM
Envelope Updated Security Checked 11/18/2025 9:55:17 AM
Envelope Updated Security Checked 11/18/2025 9:55:18 AM
Envelope Updated Security Checked 11/18/2025 9:55:18 AM
Certified Delivered Security Checked 12/2/2025 10:53:07 AM
Signing Complete Security Checked 12/2/2025 10:53:34 AM
Envelope Summary Events Status Timestamps
Completed Security Checked 12/2/2025 10:53:38 AM
Payment Events Status Timestamps
Electronic Record and Signature Disclosure
ELECTRONIC RECORD AND SIGNATURE DISCLOSURE
From time to time, Pitkin County (we, us or Pitkin County) may be required by law to provide
you with certain written notices or disclosures. Described below are the terms and conditions for
providing to you such notices and disclosures electronically when we send you documents for
electronic signature.
Acknowledging your Access, Intent, and Consent to Receive and Sign Materials
Electronically
To confirm that you can access this information electronically, which will be similar to other
electronic notices and disclosures that we will provide to you, please verify that you were able to
read this electronic disclosure and that you also were able to print on paper or electronically save
this page for your future reference and access or that you were able to e-mail this disclosure and
consent to an address where you will be able to print on paper or save it for your future reference
and access. Further, if you consent to receive notices and disclosures exclusively in electronic
format on the terms and conditions described above, please let us know by clicking the 'I agree'
button below.
By checking the 'I Agree' box, I confirm that:
I am establishing my intent to be bound to the transaction, and indicating that I am fully
aware of the purpose for which the signature is being provided.
I can access and read this Electronic CONSENT TO ELECTRONIC RECEIPT OF
ELECTRONIC RECORD AND SIGNATURE DISCLOSURES document; and
I can print on paper the disclosure or save or send the disclosure to a place where I can
print it, for future reference and access; and
Until or unless I notify Pitkin County as described above, I consent to receive from
exclusively through electronic means all notices, disclosures, authorizations,
acknowledgments, and other documents that are required to be provided or made
available to me by Pitkin County during the course of my relationship with you.
Signing Documents without a Pitkin County DocuSign Account:
Pitkin County may not require all document signers to be authorized users of the Pitkin County
DocuSign Account. Please read the information below carefully and thoroughly, and if you can
access this information electronically to your satisfaction and agree to these terms and
conditions, please confirm your agreement by clicking the 'I agree' button at the bottom of this
document. When you don't have a DocuSign account, you will be provided the opportunity to
agree to the Legal Disclosure each time you open an "envelope" for signing, at this time, you can
download and retain this disclosure. Pitkin County will forward completed documents that
you've reviewed, processed or signed via email. Should you require copies of these signed
documents (e.g., if they get deleted from your email account) you should request those
documents from Pitkin County under the Colorado Open Records Act by contacting the Pitkin
County custodian who sent you the document for signature.
Signing Documents with a Pitkin County DocuSign Account:
Electronic Record and Signature Disclosure created on: 3/20/2020 3:28:13 PM
Parties agreed to: Diane Jackson, Brad Jacobsen
Please read the information below carefully and thoroughly, and if you can access this
information electronically to your satisfaction and agree to these terms and conditions, please
confirm your agreement by clicking the 'I agree' button at the bottom of this document.
Getting paper or electronic copies
At any time, you may request from us a paper or electronic copy of any record provided or made
available electronically to you by us. For such copies, as long as you are an authorized user of
the DocuSign system you will have the ability to download and print any documents we send to
you through your DocuSign user account for a limited period of time (usually 30 days) after such
documents are first sent to you. After such time, if you wish for us to send you paper or
electronic copies of any such documents from our office to you, you may be charged a per-page
fee. You may request delivery of such paper or electronic copies from us by following the
procedure described below.
Withdrawing your consent
If you are an authorized DocuSign Account holder, you can decide to receive notices and
disclosures from us electronically, you may at any time change your mind and tell us that
thereafter you want to receive required notices and disclosures only in paper format. Described
below is the process for informing us of your decision to receive future notices and disclosure in
paper format and also how to withdraw your consent to receive notices and disclosures
electronically.
Consequences of changing your mind
If you elect to receive required notices and disclosures only in paper format, it will slow the
speed at which we can complete certain steps in transactions with you and delivering services to
you because we will need first to send the required notices or disclosures to you in paper format,
and then wait until we receive back from you your acknowledgment of your receipt of such
paper notices or disclosures. To indicate to us that you are changing your mind, you must
withdraw your consent using the DocuSign 'Withdraw Consent' form on the signing page of your
DocuSign account. This will indicate to us that you have withdrawn your consent to receive
required notices and disclosures electronically from us and you will no longer be able to use your
DocuSign user account to receive required notices and consents electronically from us or to sign
electronically documents from us.
All notices and disclosures will be sent to you electronically
Unless you tell us otherwise in accordance with the procedures described herein, we will provide
electronically to you through your DocuSign user account all required notices, disclosures,
authorizations, acknowledgments, and other documents that are required to be provided or made
available to you during the course of our relationship with you. To reduce the chance of you
inadvertently not receiving any notice or disclosure, we prefer to provide all of the required
notices and disclosures to you by the same method and to the same address that you have given
us. Thus, you can receive all the disclosures and notices electronically or in paper format through
the paper mail delivery system. If you do not agree with this process, please let us know as
described below. Please also see the paragraph immediately above that describes the
consequences of your electing not to receive delivery of the notices and disclosures
electronically from us.
How to contact Pitkin County:
You may contact us to let us know of your changes as to how we may contact you electronically,
to request paper copies of certain information from us, and to withdraw your prior consent to
receive notices and disclosures electronically as follows:
To contact us by email send messages to Helpdesk@provelocity.com
To advise Pitkin County of your new e-mail address
To let us know of a change in your e-mail address where we should send notices and disclosures
electronically to you, you must send an email message to us at Helpdesk@provelocity.com and
in the body of such request you must state: your previous e-mail address, your new e-mail
address .
In addition, you must notify DocuSign, Inc to arrange for your new email address to be reflected
in your DocuSign account by following the process for changing e-mail in DocuSign.
To request paper or electronic copies from Pitkin County
To request delivery from us of paper or electronic copies of the notices and disclosures
previously provided by us to you electronically, you should request those documents from Pitkin
County under the Colorado Open Records Act by contacting the Pitkin County custodian who
sent you the document for signature.
To withdraw your consent with Pitkin County
To inform us that you no longer want to receive future notices and disclosures in electronic
format you may:
i. decline to sign a document from within your DocuSign account, and on the subsequent
page, select the check-box indicating you wish to withdraw your consent, or you may;
ii. send us an e-mail to Helpdesk@provelocity.com and in the body of such a request, you
must state your e-mail, full name, Postal Address, telephone number, and account
number.