HomeMy WebLinkAboutbocc.pc Smith, Matthew - Existing Building Thermal Envelope Policy MEMORANDUM OF POLICY Building Codes FROM: Jeffrey Erickson, Chief Building Official DATE: January 28, 2026 SUBJECT: Existing Building Thermal Envelope Policy _____________________________________________________________________ Application of IECC R503.1.1 Exception #3 – Alterations to Existing Dwellings Purpose and Authority Section R503.1.1, Exception #3 of the 2021 International Energy Conservation Code (IECC) states: Alterations exposing or demolishing more than 75 percent of the building’s thermal envelope area shall comply with the energy requirements of Section R407 (new dwelling requirements). The intent of this policy is to provide clarification and establish consistent documentation and review requirements for alterations to existing dwellings in order to determine when the 75 percent thermal envelope threshold is exceeded. Construction Document Requirements Pursuant to Section R103.2.1 of the 2021 IECC, construction documents shall include a depiction of the building thermal envelope. Given the critical role of the thermal envelope and the alignment of the air barrier and thermal barrier systems in overall building energy performance, the design professional shall clearly demonstrate the following on the construction documents: ● The total building thermal envelope area (in square feet), and ● The total area of the building thermal envelope proposed to be altered, exposed, or demolished (in square feet). This documentation shall include existing conditions and, where applicable, the combined existing and new construction. The construction documents shall be prepared in a manner that allows the Pitkin County Building Department to clearly verify the total percentage of the building thermal envelope that is being altered. When is a Thermal Envelope Depiction Plan Required? Building Thermal Envelope Depiction Plans are required for all alterations affecting an existing building’s thermal envelope, except for permits limited to exterior veneer, siding, window, or door replacement only. Where the Chief Building Official determines that the scope of work is minor and does not materially impact existing wall assemblies, detailed thermal envelope calculations may be waived pursuant to the exception to R103.1 of the 2021 IECC. Change Orders and Threshold Exceedance Any project that was previously approved under the 75 percent threshold and subsequently exceeds the threshold as a result of a change order shall be required to comply with the most recently adopted Pitkin County Energy Code, including new dwelling requirements. Definition of Building Thermal Envelope Per Chapter 2 of the 2021 IECC, the building thermal envelope is defined as: BUILDING THERMAL ENVELOPE. The basement walls, exterior walls, floors, ceilings, roofs, and any other building element assemblies that enclose conditioned space or provide a boundary between conditioned space and exempt or unconditioned space. Clarification of Thermal Envelope Disturbance Removal of interior wall finishes that expose wall and ceiling cavities even if existing framing remains shall be considered disturbance of the building thermal envelope and shall be included in the thermal envelope depiction and calculations Siding, Window, and Door Replacement Replacement of exterior siding, veneer, windows, and doors only does not, by itself, trigger new dwelling requirements or require exposure of interior wall cavities. However, Section R503.1.1.1 shall apply, which states: Where all the siding and windows are replaced on one or more sides of a structure, the building envelope shall comply with Table R402.1.3. To determine the required level of continuous insulation, the applicant shall demonstrate the R-value of the existing cavity insulation.