HomeMy WebLinkAboutbocc.res.065.1974 RESOLUTION
BOARD OF COUNTY COMMISSIONERS
PITKIN COUNTY, COLORADO
NO. 74-~
OF
WHEREAS, Aspen Law Center Inc. has applied for pre-
liminary plat and subdivision approval, and outline development
plan PUD approval for its Phase II condominium and law center
development consisting of 24 residential units, 3 employee
units, 3 faculty housing units, and commissary cafeteria and
headquarters facilities, subject to certain conditions, and
WHEREAS, the densities are in conformity to existing
zoning, and
WHEREAS, the applicant has entered into a Subdivision
Improvement Agreement, a copy of which is attached hereto and
incorporated herein by reference, that includes all conditions
sought by the Planning and Zoning Commission, and by this
Board, including as to incorporating all of its property into
the application; providing pathways;.providing a land or cash
dedication as set forth in the subdivision regulations, and
the like,
NOW, THEREFORE, BE IT RESOLVED that preliminary plat
subdivision approval and outline development plan PUD approval
be and is hereby granted, all as according to the plat on
at the office of the Pitkin County Building Inspector.
Dated: i~[~ ~
Attest:
N±na Johnston, Deputy Clerk
file
BOARD OF COUNTY COMMISSIONERS
OF PITKIN COUNTY ~
SUBDIVISION IMPROVEMENT AGREEMENT
THIS AGREEMENT made and entered into effective July 8,
[974, by and between ASPEN LAW CENTER, INC., a Colorado corporation
(ALC) and PITKIN COUNTY, Colorado (County) acting by and through
its Board of County Commissioners,
WI TNE S S E TH
Recitals
1.1 ALC has filed an application for Subdivision
%pproval and Planned Unit Development relating to a portion of
Faraway Ranch, Aspen Law Center, more fully described in Exhibit A,
attached hereto. The property encompassed by the present PUD
~utline development plan and preliminary subdivision plat approval
is all of the property owned by ALC.
1.2 In April, 1974 the Pitkin County Planning and Zonin
Commission (p and Z) recommended and the Pitkin County Commissioner
approved the sketch plan of ALC for Phase 2 of ALC development
ject to ten enumerated conditions. A copy of the P and Z resolu-
I~tion is attached hereto as Exhibit B and is incorporated herein by
reference.
H 1.3 After the sketch plan approval, ALC was advls
"tha ' ' ed
t it must go through a Planned Unit Development approval to
include the proposed Commissary use and the limited parking which
would be required to meet the condition approved by the Commission-
ers to limit auto usage within the subdivision contrary to existinc
zoning requirements.
1.4 ALC responded to the requirement that it file for
Planned Unit Development by meeting the requirement of County in
this respect.
1.5 On July 5, 1974 the Planning and Zoning Commission
recommended to the Pitkin County Board of Commissioners subdivisior
preliminary plat approval and PUD outline development plan approval
requesting the following conditions:
Staff receipt of the State Geologists approval
of the site plan and the drainage plan before
preliminary plat approval.
1.6 The Board of County Commissioners acting upon the
recommendation of the County Planning and Zoning Commission and
as a condition of its approval of the ALC Subdivision and Planned
Unit Development requires that ALC do the things set forth in
Section II of this agreement.
A landscape plan for the site, including reloca-
tion of the existing log barn, to be approved of
by inspection, prior to final plat approval. Thi~
log barn does not have now, nor will it have afte~
relocation, sewer and water connections.
II.
Basic Agreement
2.1 ALC agrees to enter into a legally constituted
mprovement district for Brush Creek Road when and if such an
improvement district is formed.
2.2 ALC agrees to dedicate to the County at Final Plat
)royal such public pedestrian and equestrian pathway easements as
ire reasonably required by the Pitkin County Planning and Zoning
on. ALC hereby covenants that it, its successors and
[ssigns, and the condominium association of unit owners in ALC's
II, shall construct and maintain such pathways at their own
~xpense and such obligation shall run with the land.
2.3 ALC agrees to comply with the revegetation plan
)roved by the Soil Conservation Service and to provide for the
ary construction precautions to ensure soil stability and
)rotect against erosion and pollution. The estimated cost of the
~evegetation is $3,600.00.
2.4 ALC agrees to comply with the drainage plan for the
~ntire development and for the individual sites ensuring soil sta-
bility and run-off management as prescribed by Wright-McLaughlin
approved by the Office of the State Geologist. The estimated
of the compliance on the subject site is $2,000.00.
2.5 ALC agrees to the placement of a bus stop as rec-
~ommended by the Aspen School District at an approximate cost of
31,000.00.
2.6 ALC accepts as a condition for the granting of a
)uilding permit to build the subdivision or planned units the post-
_ng of a surety satisfactory to the County to ensure the perform-
Lnce of the obligations contained in paragraphs 2.3, 2.4 and 2.5
2.7 ALC agrees to build the buildings where shown in
khe fully engineered site plan submitted with the application for
~ubdivision preliminary plat and outline development plan PUD
~roval.
2.8 ALC agrees that the County shall have the option
)f requiring a 5% land dedication of, in addition to the pathways
~et forth in paragraph 2.2 above, land lying generally underneath
Benedict Ski Bridge and northerly of Brush Creek Road; or, on
other hand, cash equivalent to 20% of the assessed valuation
Df all the property as described in Exhibit A. Such option shall
)e exercised prior to final plat approval application to the Board
)f County Commissioners. In the event the County elects to take
2he cash option, ALC's obligation under paragraph 2.2 remains the
~ame. If the cash option is elected, the monies shall be used for
Lmprovements and the like in the general service area of the sub-
tivision.
f 2.9 It is understood that ALC proposes to seek to sub-
ivide and amend its PUD at some later time with regard to the
ortion of its property lying generally westerly of Phase II as
hown on the preliminary plat. It is specifically understood and
~ccepted by ALC that the County has promised no approval or any
)ther specific action with regard to such resubdivision and PUD
~mendment, if any, and that the County is free to act upon such
~uture applications under then-existing and applicable legal zoning
~nd subdivision standards. It is understood by the parties that the
nclusion of the westerly portion of the applicant's land in this PI
nd subdivision application is for the purpose of complying with the
~ubdivision and zoning regulations, and not for the purpose of desig
~ating that portion of the property as permanent open space.
- 2
2.10 The conditions expressed in~e letter from P and
to the Board dated July 5, 1974, a copy of which is attached
lereto as Exhibit C, are expressly incorporated herein by reference
substantial departure therefrom shall be permitted without the
~rior approval of P and Z.
2.11 ALC shall work with the county engineer and build-
ng department to provide a safe intersection at Brush Creek Road.
2.12 ALC waives any claim it may now or hereafter have
'ainst the County arising out of the published notice for outline
development plan approval.
III.
Miscellaneous
3.1 Binding Effects. This Agreement shall extend to ar
~e binding upon ALC's successors and assigns.
3.2 Section Headings. The section and paragraph head-
employed he~in are for convenience of reference only and sha
in no wise be construed as enlarging or proscribing the meaning of
any portion of this Agreement.
3.3 Notice. Any notice which either party or its agents
~r attorneys desires to give shall be in writing and deposited wi
the United States Postal Service, certified mail postage prepaid,
and addressed as follows: '
Aspen Law Center, Inc.
P.O. Box 5628, West Village
Aspen, Colorado 81615
Pitkin County Administrator
P.O. Box 4096
Aspen, Colorado 81611
The date of certification shall be the
)f the notice.
effective date
3.4 Amendment. This Agreement may be amended in writi~
Dnly and such amendment shall be executed by each of the parties
before becoming effective.
~ ~ Executed at Aspen,
/IAsS~stant Secr~t ary
II , , Dated:
~ c[~Nin~J6~s~on, Deputy Clerk
- 3 -
Colorado.
ASPEN LAW CENTER, INC.
esident~
PITKIN COUNTY, COLORADO BY ITS
BOARD OF COUNTY COS~4ISSIONERS
EXHIBIT "A"
Parcel I:
A parcel of land in T~act 42, Section i, Township 10 South, Range 86
'West of the 6th Principal Meridian, Pitkin County, Colorado, described
as follows: ·
Beginning at a point whence Corner 3 of said Tract 42 bears South
89°09'13'' West, 1261.03 feet;
thence North 00008,00'` East, 299.51 feet;
thence North 56°46'20,, East 274.59 feet;
thence South 65o58,12,, East 217.18 feet;
thence South 25o55,30,, East 359.53 feet;
thence along the Northerly right of way line of Brush Creek County
Road, South 74o59,17'' West, 121.94 feet;
thence along the Northerly right of way line of Brush Creek County
Road, 236.00 feet along a curve to the left having a radius of 1951~70
feet;
thence along the Northerly right of way line of Brush Creek County
Road, South 68003,36'' West, 23.30 feet;
thence North 70~59,00. West, 235.74 feet, to the Point of Beginning.
Parcel II:
That part of Tracts 42 and 45 of Section One, Township 10 South, Range
86 West of the 6th P.M., aCcording to the Supplemental Plat for said
Township and Range approved on May 9, 1933, described as follows:
Beginning at the Northwest Corner of property described in Book 245
at Page 713 of the Pitkin County Records, from whence A.P. 1 (the
Northeast Corner) of said Tract 42 bears North 56o19,14,, East 1684.48
feet, more or less;
thence South 0o08,00-West 299.51 feet:
thence South 70o59,00,, East 235.74 feet, more or less, to the Northerly
right of way line of County Road as described'in Book 252 at Page 328:
thence along said right of way line as follows:
290.09 feet; South 68~03,36,, West
thence continuing along said right of way line along a curve to the
right having a radius of 689.26 feet (·the cord of which bears
South 75017,44'' West 173.62 feet) an arc distance of 174.29 feet
to an angle point in the Boundary of property described in Book 252
at Page 626;
thence ~long said Boundary North 47o51,00- Wes~ 180.5 feet, North
65028'00" West 13.78 feet; and North 89o35,00'' West 10 feet~
thence North 126.87 feet;
thence North 53o28,55`' East 462.14 feet, more or less, to the point
of beginning.
EXHIBIT "A"
Reception No. 166898 Peggy E. Miklich, Recorder'
PITKIN COUNTY PLAN~ING AND ZONING COMMISSION RESOLUTION
ASPEN LAW CENTER SUBDIVISION SKETCH PLAN
WHEREAS, Aspen Law Center has submitted a
subdivision sketch plan for an extension of their tourist
condominium, conference center development on Brush Creek
Road at Snowmass at, Aspen, and
WHEREAS, a sketch plan for Aspen Law Center,
consisting of 96 additional dwelling units and non residential
facilities in t~,o phases was originally submitted to the
Pitkin County Planning and Zoning Commission on December 3,
1973, and
WHEREAS, said sketch plan was tabled by the
Co~mmisslon pending further information pertaining to
geologic constraints of the site, and requesting a proposal
· zith less impact on overburdened public facilities than
t~at which would occur as a result of said development in
conjunction with other applications for large ~cale develop-
ments in the coumty, and
WHEREAS, a sketch plan was submitted by Aspen
Mw Center, consisting of 24 condominium units, 3 c~mployee
housing units, 3 faculty housing umits, a commissary,
cafeteria and headquarters facilities, and
WHEREAS, the Pitkin County Planning and Zoning
Commission has reviewed said sketch plan for its conformity
%;ith the submission requirements of the Pitkim County Sub-
di%~is ion Regulation,
· 'NOW THEREFORE. BE II RESOLVED, that the Pitkin
Cotmty Planning and Zoning Commission recommends approval
of said sketch plan of the entire ownership consisting of
ASPEN LAW CENTER IV[Sl9.~
24 condominium units,
3 employee housing units, 3 faculty
housing units+
subject to the
preliminary plat consideration:
An on site inspection by the Planning
and Zoning Commission.
2. A fully engineered site plan for in-
dividual buildings and for the site as
a whole, which has been approved by the
office of the State Geologist.
3. A plan to prevent erosion during consTruc-
tion and to protect Brush Creek from pollution
during the period of disturbance caused
byconstruction.
4. A revege=ation plan to ensure soil stability
a commissary cafeteria and headquarters facilities,
following conditions to be satisfied at the time of
erosion and pollhtion
Soil Conservation
the entire develop-
and protect against
and approved by the
Service.
A drainage plan for
merit and for individual sites ensuring
soil stability and run off management
satisfactory to Wright/McLaughlin and
approved by the office of the State Geologist.
Placement of a bus stop as recommended
by the Aspen School District.
Dedication of easements for public
pedestrian and equestrian paths along
trails and private roads.
A plan for the consideration of the Planning
and Zoning Co~ission, worked out in consul-
tation with the Planning Office, =o limit
the use of private automobiles on the site
and minimize the need for their use by
residents of the development on public roads
and highway.
PAGE
CENTER SUBDIVISION SKETCH
PLAN
oo 288
10.
Agreement to e~ter into a future improve-
ment district for Brush Creek-Road.
Submission of typical floor plan showing
the number of bedrooms in dwelling units
and layout of non residential uses,
acceptable to the Planning and Zoning
Com~ssion.
PITK[N COUNTY PLANNING COMMISSION