HomeMy WebLinkAboutbocc.con.amended.147.25 B-1-E2026.04.29 CDD Contract Number Project Name Contractor Budget Line Item A2506-Design-Terminal !#BUDGET# $ 1,449,000.00 $ - $ - $ - $ 1,449,000.00 Procurement Method: Form: Contract Effective Date: Contract End Date Contract Type Retainage If this is a new contractor, please enter the New Vendor information into Munis for workflow approval. Contact Information: Department: Project Lead:Diane Jackson Phone:(970) 429-1881 Provide a brief description of the Contract or Change Order: Contract Value Summary: $ 4,813,200.00 $ 940,000.00 $ 1,449,000.00 $ 7,202,200.00 Airport Fifth amendment to Task Order #147.25 B-1 provides for a supplemental Schematic Design Alignment phase to address concerns with the current Schematic Design (SD) package and will include two primary deliverables: a long-term vision for the terminal, GTC, and parking garage, including overall massing and future phasing strategy; and a complete SD package for the Day One terminal and landside elements based on the $191 million budget that allows the project to enter the Design Development phase. Total NTE value of services is $1,449,000.00, which includes a NTE travel and expenses allowance of $69,000.00 (5%) for Contractor services. Original Contract Amount Previous Change Order/Amendment Amount This Change order/Amendment amount Contract Total No ASE Terminal Schematic Design ZGF Architects, LLP Additional Budget Line Item(s) (Please fully allocate Contract Total if multiple lines apply) Formal Services/Maintenance 1/5/2026 12/31/2026 Change Order/Contract Amendment 147.25 B-1-E Pitkin County Procurement Cover Sheet Cover Sheets are to be included with the contract record to provide an accurate summary of the Contract type, amounts, budget(s), and dates. Contract Information Contract #: 147.25 Rev. 2022.08.04 CDD *Increases over $25,000 and/or 10% (single increase or accumulative) of original contract must have County Manager signature. 1 CHANGE ORDER / CONTRACT AMENDMENT Change Order Number: 147.25 B-1-E OWNER: Pitkin County, Colorado 530 E. Main St., Suite #302 Aspen, CO 81611 CONTRACTOR: Zimmer Gunsul Frasca Architects LLP 1223 SW Washington Street, Suite 200 Portland, OR 97205 The Provision of ASE Terminal Schematic Design ( "Task Order 147.25 B-1"), as previously amended, entered into pursuant to the Architectural Design Services for Aspen/Pitkin County Airport Landside & Commercial Apron Redevelopment MSA (the “Contract”) dated August 1, 2025 between the Board of County Commissioners of Pitkin County, Colorado (the “County”) and Zimmer Gunsul Frasca Architects LLP (the “Contractor”), is hereby amended as follows: Description of Change: 1. This Fifth Amendment to Task Order #147.25 B-1 incorporates the Scope, Tasks, Fees, and Deliverables defined in Attachment A, Change Order Summary, along with supporting documentation, incorporated hereto. 2. This amendment also allocates additional funding in the amount not-to-exceed $1,449,000.00 for the services, deliverables, and any other milestones and/or tasks described in Attachment A, which includes an amount not-to-exceed $69,000.00 (5%) for associated travel and production expenses. Reason for Change: This amendment is needed to incorporate scope, budget, and deliverables to provide a supplemental Schematic Design Alignment phase to address a number of concerns with the current Schematic Design package prior to entering the Design Development phase of the project. Original Contract Amount $ 4,813,200.00 Previous Change Order/Amendment Amount $ 940,000.00 This Change Order/Amendment Amount $ 1,449,000.00 New Contract Total $ 7,202,200.00 Contract #: 147.25 Rev. 2022.08.04 CDD *Increases over $25,000 and/or 10% (single increase or accumulative) of original contract must have County Manager signature. 2 In all other respects, the Contract is in full force and effect and remains unchanged by this Amendment. ZIMMER GUNSUL FRASCA ARCHITECTS LLP ________________________________________________ !#VENDOR SIGNATURE#! Date PITKIN COUNTY, COLORADO RECOMMENDED FOR APPROVAL: _________________________________________________ !#DEPARTMENT REPRESENTATIVE#! Date MANAGER APPROVAL: ________________________________________________ !#COUNTY MANAGER#! Date Airport Director Aug-03-2026 Diane Jackson Aug-03-2026 Sharron van der Meulen Partner Ryan Mahoney Deputy County Manager Aug-03-2026 CO ASE - Aspen / Pitkin County Airport Version 1.0 MSA #Project Manager:Carter Strothman, PE Budget # Contract#Change Date: 147.25 B-1-E Change Orders to Date: Current Contract Amount: THIS CHANGE ORDER: (Time and Materials) New Contract Amount Change Order Summary ITEM 1 – Schematic Design Alignment – Detailed Scope Project String A2506, Design, Pro-Rated ITEM 2 ( Expenses: Schematic Design Alignment) Project String A2506, Design, Pro-Rate Total Change Order Amount Required Approvals Accepted: By: Architectural Services Project Manager /Principal-In-Charge By: Airport Facilities & Construction Director / Deputy Director / Manager Diane Jackson / David Schneider / Greg Boyd Date: ASE TERMINAL DESIGN ARCHITECTURE SERVICE MSA 147.25 A2506-Design-Terminal 147.25 7/2/2026 Contact Information ZGF-CCA TO / Change Order #: Company:ZGF Architects, LLP (dba: ZGF-CCA)Original Contract Number:147.25 B-1 Contract PM:Robert Snyder, AIA Original Contract Amount:4,813,200.00$ Address:223 SW Washington St, Suite 200 940,000.00$ City, State, Zip:Portland, OR 97205 5,753,200.00$ Phone:503-720-6237 1,449,000.00$ Email:Tony.martinez@zgf.com 7,202,200.00$ Contract Signatory:Sharron vander Meulen 69,000.00$ Email:sharron.vandermeulen@zgf.com Diversity % of this CO NA This change order is for the following items; 1,380,000.00$ The submitted Schematic Design package illustrates a concept that incorporates the full extents of the Common Ground Recommendations (CGR) and accommodates program flexibility and growth necessary to meet full operational requirements within the 140,000 SF program limit. Although the ASE Terminal Improvement Project received authorization to proceed into the Design Development (DD) Phase, pursuant to the BOCC Informal Resolution issues during the June 24, 2026, BOCC Session, the presented Schematic Design (SD) package was not approved. Therefore, the County is authorizing a supplemental “SD Alignment” phase intended to address a number of concerns with the current SD package as presented by the design team and will include two primary deliverables. First, it will provide a long-term vision for the terminal, GTC, and parking garage, including overall massing and future phasing strategy. It will not include a complete architectural design. The full terminal buildout will be achieved through phasing and will start with the Day One Schematic Design concept. Second, it will include a complete SD package for the Day One terminal and landside elements based on the $191 million budget that allows the project to enter the Design Development phase. The Master Plan (full site buildout) will align with: • Meeting the CGRs to the greatest extent possible • The ALP square footage cap • The Planning & Zoning approval cap Day One Schematic Design Complete the SD package for the Day One terminal based on the $191 million budget and prepare the project to enter Design Development. There are clarifications or clear decision points that will be needed quickly in order to ensure moving along quickly and determining what is the day one priority versus future phases, including, but not limited to: • Jet bridge phasing • In-line baggage phasing • Space phasing (hold rooms/ 4th line TSA) • 8 Gates/Positions + 1 RON and hold room size • Baggage enclosure • Admin building (included or external building) • Parking phasing • VSR and tail distance • Temporary ConRAC To facilitate internal communication and decision making, the design team, Program Manager, and County Staff will hold a weekly 30-minute coordination meeting to resolve outstanding decision points, identify issues that need to be elevated to AAB/BOCC, address community feedback and ensure we remain aligned internally and externally.z This Task Order provides scope and fees to cover the SD Alignment Phase and to cover the associated activities required to resolve the items presented in the BOCC Resolutions, as attached. This phase encompasses activities which are required to reconcile the Opening Day (Phase 1) SD package dated June 16, 2026 (approximately 96,500 SF) and to stay within the budget parameters of a hard direct construction cost of $191M, and to support presentations to the Task Forces, AAB, and BOCC during July and August 2026. Most of the work efforts will take place within a 6–8 Week period. The County requests that the ZGF/CCA Design Team collaborate with the selected CMAR to develop and present an affordable Opening Day (Phase 1) design to the County, AAB, and BOCC, and to confirm the design that will advance into the DD Phase. The collective ASE Terminal Improvement Team (PMT, ZGF/CCA, CMAR) will build the construction cost budget from the bottom-up to establish a new base-line cost, and will use the Value Engineering (VE) and the Cost-Driven Design (CDD) approaches to help the County reach an affordable design that addressed the Common Ground Recommendations and falls with the programming size range of up to 140,000 SF, as set in the Concept and Programming Book. These and other required services shall be performed on a Time-and-Materials basis and billed against the authorized Not-to-Exceed budget. Key Scope Items Needed to Advance Approval of the Opening Day (Phase 1) Design and Get ASE Leadership Approval (See attachment/below for detailed scope items): - Master Plan the site for ultimate terminal and landside development (<140,000 sf per FAA EA FONSI approval) - Provide a logical path from a Day One SD concept that will be taken forward into DD with a construction cost of $191M or less to the ultimate terminal and landside development - Ensure the Day One SD is functionally and aesthetically better than the existing terminal and landside and/or identify areas that do not meet that criteria - Ensure the Commercial Apron can accommodate eight (8) aircraft positions for passenger loading/unloading + one (1) position for Remain-Over-Night (RON). Travel and production expenses for OAC, VE/CRO, and AAB & BOCC Meetings. Executive Program Director / PM $1,449,000.00 In accepting this change order for extras or deductions, it is agreed by all parties that the time for completing the work under the contract shall not be extended unless expressly stated herein, and that this order shall not in any way alter the terms and conditions of the original contract. Accepted:Accepted: ZGF Architects, LLP (dba: ZGF-CCA)Jacobsen Daniels Associates, LLC By: Implementation Division Aspen / Pitkin County Airport Representative PM / PIC Joe Christie / Carter Strothman Date: Date: Approved By ASE Leadership at: Monday 7/20/2026 call with ZGF & The 7/24/2026 ASE Managers Meeting John C Strothman Digitally signed by John C StrothmanDN: C=US, E=carter.strothman@jacobsendaniels.com, O="Jacobsen Daniels Associates, LLC", OU=VP Implimentation Services, CN=John C StrothmanDate: 2026.07.24 08:45:10-06'00' Accepted Per Monday 7/20/2026 call with ASE Leadership. Attachment A ZIMMER GUNSUL FRASCA ARCHITECTS LLP ASE ZGF Project No. 24612.ASE 20260723 TASK ORDER AMENDMENT B-1-E MEMO TO: Joe Christie, Carter Strothman Jacobsen Daniels. FROM: Bob Snyder, ZGF SUBJECT: Day One plan project alignment Amendment B-1-E DISTRIBUTION: Above, Jason Henderson, Oanh Le. REQUESTED BY: Jacobsen Daniels. SCOPE OF WORK: Master Plan for Full Build Out This establishes the long-term vision for the terminal, GTC, and parking garage, including overall massing and future phasing. It is not a complete architectural design. The Master Plan will provide a vision the community can get behind and also ensure future phases are intentionally planned to integrate seamlessly with Day One construction, and can be implemented efficiently over time as funding and demand allows. Day One Schematic Design Complete the SD package for the Day One terminal based on the $191 million budget that will prepare the project to enter the Design Development phase. Work collaboratively with the selected Construction Manager at Risk (CMAR) during their preconstruction phase to evaluate cost savings proposals and to develop the project delivery schedule. This information will be used to provide an addendum to the schematic design deliverable that will identify the changes made to reconcile the SD package such that DD can commence with a known scope of work in alignment with the project budget. SCHEDULE: ZGF’s recommendation is to allow eight weeks to complete the work, beginning with the selection of the CMAR following interviews during the week of 6/15/26. We understand the successful CMAR to be engaged by the second week of July 2026. ZGF recommends beginning this work prior to CMAR contract award. This phase will follow the outline below Weeks One and Two; 7/6 through 7/18 Confirm acceptability of changes to project program necessitated by budget. Begin planning the phased permitting approach with the AHJ. Initial strategies in support of the common ground recommendations and the resolution issued from the June 24 meeting of the BOCC will be reviewed in draft form with Jacobsen Daniels. Week Three; 7/20-7/25 Prepare presentation materials and present to internal project stakeholders for consensus and direction to proceed. The presentation will include a “path to budget” identifying cost reduction strategies to meet the target direct construction budget of 191 million dollars for the terminal. Weeks Four through Six; 7/27 through 8/15 Design and document selected cost savings measures at SD level following approval of the changes and receiving directions to proceed. Provide supporting materials for the 8/4 BOCC executive sessions and attend the 8/5 VE/CRO meeting in person with the CMAR and the ASE-PMT to review Attachment A the short list of recommendations. Weeks Six through Eight 8/17 through 8/29 Work with CMAR to develop design document delivery schedule for enabling and early work packages. August 18 BOCC and August 20 AAB meeting attendance virtually or in person if requested. The design team will continue to coordinate with the AHJ and utility service providers in support of developing realistic documentation and permitting schedules. Continue SD documentation of approved changes. In addition to the specific tasks outlined above ZGF will continue to participate in the project OAC meetings, and the K-H commercial Apron coordination as well as the TSA, and individual airline meetings during this time. ASE-PMT has identified the OAC meetings and the Monday meetings with ASE-PMT, and ASE/County Staff to review the integration of future masterplan phases as we define the scope to be included in the Day One phase. Specific scope areas to be reviewed are •Jet bridge phasing and Ground Loading access. •Future In-line baggage phasing •Incorporation of eight gates and one RON •Hold room sizing criteria •Enclosure and conditioning of the baggage sortation area •Location of administration program and support spaces– in terminal or stand-alone building •Parking count and phasing •VSR and tail distance •MEP/IT room space allocation and location •Waste Management Process and flow •ASE Facilities & County support spaces. During this alignment phase, we understand that a limited scope enabling package(s) may be requested which may include the following: •Earthwork and site modeling •Sound and retaining walls •Landscape element relocation efforts •Utility relocations and new services •QTS Facilities coordination •Early coordination with the CMAR (see “Weeks Seven and Eight” above) We will provide a separate fee for the documentation of separate early phase enabling packages once the scope and schedule have been defined. FEES: ZGF and consultant time will be billed hourly against a Not-To-Exceed time and materials contract amendment. Anticipated fees are presented in the table below. Consultant Total NTE Fee. ZGF 550,000 CCA 220,000 KL&A 65,000 HDR 325,000 PAE 80,000 DW 60,000 VTC 70,000 C Carbon 10,000 Attachment A Total Design Fees 1,380,000 Expenses at 5% 69,000 DELIVERABLES: Design team: •Design presentation materials illustrating design intent and project scope refinements including limited 3D views to be presented to the at AAB/BOCC meetings. •SD addenda to document and align changes to the SD documents with the proposed budget, schedule, and delivery method. •Participation in (2) workshops (3-4 hours working time) and approx. (20) 1– hour meetings with the CMAR and JD. Meetings will be held as part of the weekly OAC to evaluate progress and plan weekly focused work sessions with the CMAR’s team. CMAR •Cost estimates of proposed revisions as part of preconstruction services •Updated cost proposals for identified scope reductions and cost saving measures. •Early work and enabling package scope and schedules •Design assists in identifying systems cost drivers. •Construction site phasing diagrams. JD/Owner: •Approved revisions to program requirements as outlined above and extents of phase two accommodation to include in the opening day project scope. •Timely parking quantity, land survey, commercial apron tie-in, and Geotechnical information. •Permitting and construction phasing approach validated with the AHJ to include o Content of phased permit and early work packages o Anticipated review and approval timelines incorporated into project schedule o Permit drawing submission schedule Submitted by: ZIMMER GUNSUL FRASCA ARCHITECTS LLP By: Robert Snyder, AIA Principal Attachment A RESOLUTION OF THE BOARD OF COUNTY COMMISSIONERS (“BOCC”) OF PITKIN COUNTY, COLORADO, APPROVING THE ASPEN/PITKIN COUNTY AIRPORT ASE – TERMINAL SCHEMATIC DESIGN CONCEPT RESOLUTION NO. 067-2026 RECITALS WHEREAS, pursuant to Section 2.8.4 (Actions) of the Pitkin County Home Rule Charter (“HRC”), all matters not required to be acted upon by ordinance or formal resolution may be acted upon by informal resolution, and; WHEREAS, Pitkin County (County) is the owner, sponsor and operator of Aspen/Pitkin County Airport (Sardy Field), (Airport) located in the vicinity of Aspen, Colorado and operates, maintains and develops the Airport, in part, with federal grants, state funds, Passenger Facility Charges (PFC), and user fees, and; WHEREAS, pursuant to Resolution No. 025-2024, Pitkin County received approval of the Airport Layout Plan (ALP) from the Federal Aviation Administration (FAA), which serves as a road map for implementing community-driven goals identified in the ASE Vision Common Ground Recommendations (“CGR”), and; WHEREAS, after a Request for Qualifications process for the solicitation of Terminal Architectural Design Services, ZGF-CCA (“the Design Team”) was contracted with Pitkin County to work on the first phase of the terminal design effort being the development and submittal of the ASE Concepts & Programming Phase Summary Book, and; WHEREAS, on January 28, 2026, the Board of County Commissioners (“BOCC”) approved Resolution No. 010-2026 Approving the Aspen/Pitkin County Airport Terminal Modernization ASE Concept and Programming Phase Summary Book, and; WHEREAS, the ASE Concepts & Programming Phase Summary Book was meant to serve as the basis and a starting point for the next strategic phases consisting of the Schematic Design Phase, Design Development Phase and Construction Documentation Phase, which will continue to fall under the project development and decision-making processes, and the document will be further refined to meet County requirements and budget constraints, and; WHEREAS, the recommendation for the transition from schematic to design development is based on significant community input to date, including comments from the Terminal Design and Airport Multimodal Connectivity Task Forces, multiple community meetings, and hundreds of community survey responses. This input was fundamental and foundational in defining the schematic design program in context of the CGR’s recommendations, and; WHEREAS, at a work session held on June 16, 2026, the BOCC directed staff, upon the recommendation of the Airport Advisory Board, to bring a resolution forward at their regular meeting Attachment A Resolution No. 067-2026 2 on June 24, 2026, acknowledging the transition from schematic to design development based on significant community input to date, and, WHEREAS, the BOCC supports the strategy to transition from full schematic design to the design development phase. The intent of forwarding the phase I design (as well as future phase designs) through design development based on full schematic design, while also anticipating future phases, is to proceed with each phase and move to the next without the need to restart the design process from the beginning of the concepts and programming phase, and, WHEREAS, on June 18, 2026, the Airport Advisory Board made a recommendation to the BOCC for consideration and approval of the ASE Terminal Schematic Design Concept, including Phase I, by motion and approval by the majority of the Board, and; WHEREAS, the BOCC considered this recommendation at their regular meeting on June 24, 2026 and determined that the ASE Terminal Schematic Design Document will serve as the basis to further the design to be within acceptable budget, reflect the Common Ground’s recommendations, and prove the flexibility to serve airport user, staff and community interest on opening day as well as the ability to anticipate and adapt for future needs, and; WHEREAS, the BOCC incorporates by this reference and adopts as part of this Resolution the June 18, 2026 recommendations from the AAB to address and find solutions, if possible, before the end of Design Development, to the following components of the ASE design: 1. define a specific proposed solution or explanation for the current employee, guest and locals’ adequate Opening Day parking; 2. evaluate the feasibility of an eighth gate, which the AAB believes is critical to maintain current levels of airline service and provides enough square footage in the hold area to accommodate an eight gate’s worth of passengers; 3. address the perception that the holding areas are too tight; 4. consider non-climate controlled baggage areas; 5. address the lack of exceptional views and a possible third story penthouse, gathering area, restaurant, and similar amenities; 6. design to future proofing Phase 1 to enable future construction of those remaining portions of the approved schematic design not included as part of Phase 1; 7. design for a beautiful, stunning and unique looking and functioning terminal. WHEREAS, the BOCC finds that it is in the best interests of the citizens of and the visitors to Pitkin County to approve this Resolution. NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of Pitkin County, Colorado that it hereby adopts a Resolution Approving the Aspen/Pitkin County Airport ASE – Terminal Schematic Design Concept, including Phase I, and authorizes the Chair to sign the Resolution and upon the satisfaction of the County Attorney as to form, execute any other associated documents necessary to complete this matter. Attachment A Resolution No. 067-2026 3 INTRODUCED, READ AND ADOPTED ON THE 24TH DAY OF JUNE 2026. ATTEST: BOARD OF COUNTY COMMISSIONERS By _________________________ By: _____________________________ Sam Engen Jeffrey H. Woodruff, Chair Deputy County Clerk Date: ______________ APPROVED AS TO FORM: MANAGER APPROVAL By:___________________________ By:____________________________ Richard Neiley, III Kara Silbernagel County Attorney County Manager Jun-26-2026 Attachment A RESOLUTION OF THE BOARD OF COUNTY COMMISSIONERS OF PITKIN COUNTY, COLORADO, OVERRULING THE RESOLUTION OF THE PITKIN COUNTY PLANNING AND ZONING COMMISSION OF PITKIN COUNTY, COLORADO, FINDING THE ASPEN/PITKIN COUNTY AIRPORT MODERNIZATION PROGRAM (ASE AMP) NOT IN CONFORMANCE WITH THE 2012 ASPEN AREA COMMUNITY PLAN (AACP) AND THE 2013 WEST OF MAROON CREEK MASTER PLAN (WOMP) AND THE APPLICABLE PROVISIONS OF THE WOODY CREEK MASTER PLAN AND THE BRUSH CREEK MASTER PLAN AND AUTHORIZING IMPLEMENTATION OF THE ASPEN/PITKIN COUNTY SARDY FIELD AIRPORT MODERNIZATION PLAN RESOLUTION NO. 058-2026 RECITALS WHEREAS, pursuant to Section 2.8.3 (Actions) of the Pitkin County Home Rule Charter (“HRC”) official action by formal resolution shall be required for all actions of the Board not requiring ordinance power on matters of significant importance affecting citizens. WHEREAS, Pitkin County is the owner and operator of the Pitkin County Airport/Sardy Field (“ASE” or the “Airport”). WHEREAS, ASE is a critical community asset that serves as an economic engine and aerial gateway to Aspen and Snowmass while protecting our environment. The County has undertaken an extensive, multi-year planning process spanning from the 2012 Airport Masterplan through the current Airport Modernization Program to ensure the airport meets FAA safety standards, preserves commercial air service, and reflects community values. WHEREAS, on April 8, 2019, the BOCC adopted Resolution No. 006-2019 appointing Advisory Group members for the ASE Vision Public Outreach Process. WHEREAS, on December 18, 2020, the BOCC adopted Resolution No. 105-2020, which provided for the Pitkin County Board of Commissioners Amendments and Additions, to the ASE Vision Committee Common Ground Recommendations and Airport Map for the Aspen/Pitkin County Airport and the formation of an Airport Advisory Board (the “Common Ground Recommendations”). WHEREAS, the stated intent of the Common Ground Recommendation is to advise and assist the BOCC regarding airport matters recommended by the Vision Committee and to establish the Airport Advisory Board (the “AAB”) to make recommendations to the BOCC regarding ASE policy and modernization. Attachment A Resolution No. 058-2026 2 WHEREAS, on January 13, 2022, the BOCC adopted Resolution No. 005-2022, appointing the initial members to the AAB. WHEREAS, at a January 29, 2023, meeting, the FAA clarified that the County would be required to evaluate alternative ALP layout plans to ensure safety and accessibility requirements to comply with FAA grant assurances and raised safety and accessibility issues with the Vision Committee proposed ALP, as relevant here: Ɣ A taxiway shift to the East (potentiall\ reduceVGA apron capacity resulting in a grant assurance violation by restricting accessibility). Ɣ Runway Crossings (Potentially reduces airfield capacity). WHEREAS, on January 29, 2024, Pitkin County staff and the CEO and employees of Jacobsen/Daniels met with the Regional Staff of the Federal Aviation Administration (“FAA”) and Local Transportation Authority representatives to present the AAB’s recommended Common Ground Draft Airport Layout Plan (“ALP”). WHEREAS, on March 12, 2024, and in response to the FAA’s safety concerns, staff presented an amended conceptual ALP to the BOCC and AAB at a joint meeting. The purpose of the presentation was to address FAA safety and accessibility concerns. The BOCC and AAB directed staff to further refine an alternative ALP to address the safety issues raised by the FAA. WHEREAS, because of the safety issues raised by the FAA, on March 24, 2024, staff presented the amended ALP to the AAB. The AAB voted 6-1 in favor of recommending that the BOCC approve the Amended Airport Layout Plan depicting a runway shift of 80 feet to the West while maintaining all other components in the original ALP presented to the FAA in 2023. WHEREAS, on May 1, 2024, the BOCC adopted Resolution No. 025-2024 amending the ASE Vision Committee Common Ground Recommendations and Airport Map for the Airport (Resolution No. 105-2020 and Resolution No. 025-2024 will continue to be referred to collectively herein as the “Common Ground Recommendations”). The BOCC, further, directed staff to produce an Amended Airport Layout Plan for public consideration and BOCC adoption. WHEREAS, the Common Ground Recommendations, as adopted by the BOCC, state that any major deviations to Recommendation #15, Airport Map will be brought back by the Board of County Commissioners to the Pitkin County Airport Advisory Board for further discussion and refinement. WHEREAS, on November 20, 2024, the BOCC adopted Resolution No. 110-2024 authorizing the Chair to sign an Airport Layout Plan for ASE to forward to the Federal Aviation Administration for its signature. Subsequently, the County received formal approval of the ALP from the FAA, which serves as a critical roadmap for implementing Attachment A 3 Resolution No. 058-2026 community-driven goals identified in the ASE Vision process as memorialized in the Common Ground Recommendations. Critically, the FAA’s approval of an ALP that meets standards opens the door to Federal funding opportunities for critical airport projects including a new terminal and runway. WHEREAS, on November 19, 2025, the BOCC adopted Resolution No. 104-2025, approving the Proposed Capital Improvement Plan submitted by Atlantic Aviation for the Fixed Base Facility. WHEREAS, on March 13, 2026, the BOCC adopted Resolution No. 033-2026 affirming the Aspen/Pitkin County/Sardy Field Airport Modernization Plan as it was submitted for Location and Extent review. WHEREAS, pursuant to C.R.S. 30-28-110 and the Pitkin County Land Use Code, Section 2-30-30(h)(9) Pitkin County applied to the Pitkin County Planning and Zoning Commission for Location and Extent Review for the Aspen/Pitkin County Airport Modernization Program (the “ASE AMP”). The ASE AMP, substantially, includes three (3) redevelopment components designed to modernize the Airport, as follows: (1) Runway/Airfield; (2) the Commercial Terminal/Landside; and (3) the Fixed Base Operator/Eastside. The ASE AMP is intended and designed to meet the Common Ground Recommendations, which were adopted through the Board of County Commissioners’ Resolution No. 105-2020 and amended by Resolution No. 025-2024, which resulted from the ASE visioning process and recommendations from the AAB. WHEREAS, the Location and Extent review process is a review that operates as part of a legislative design intended to coordinate competing governmental authorities to determine whether a project is in conformance with the applicable Pitkin County Comprehensive Plan or Master Plan. WHEREAS, the Pitkin County Planning and Zoning Commission held a hearing, continued over the course of three (3) meetings, on the ASE AMP on April 7, April 14, and April 28, 2026, during which the Planning Commission heard staff presentation, public comment/ testimony, and considered the application. WHEREAS, at that conclusion of the hearing process, the Planning Commission voted to adopt Planning and Zoning Commissioner Resolution No. 007-2026 (attached hereto as Exhibit A), finding that certain aspects of the Aspen/Pitkin County Airport Modernization Program are not in Conformance with the 2012 Aspen Area Community Plan, the 2013 West of Maroon Creek Master Plan, and the 2016 Woody Creek Master Plan and the 2022 Brush Creek Master Plan. WHEREAS, the Planning Commission’s determination did find that development of the FBO Campus and associated Eastside development was in conformance with the applicable master plans and that aspect of the project could proceed to building permit application and review. Attachment A Resolution No. 058-2026 4 WHEREAS, Section 9(d), Location and Extent Review in the Pitkin County Code states that in the case of a disapproval by the Planning and Zoning Commission of a Location and Extent Review, the Commission shall communicate its reasons to the governing body or official having jurisdiction for the proposed project. In this case, the BOCC is the governing body having jurisdiction over the Airport because Pitkin County is the owner, sponsor, and project proponent of the ASE AMP. WHEREAS, C.R.S.§ 38-28-110(b), provides that, in the case of the Planning Commission’s disapproval of the ASE AMP, the BOCC has the power to overrule such disapproval by a vote of not less than a majority of its members. The statute further provides that, upon such overruling, the project may proceed. The only mandatory procedural requirement provided by C.R.S.§ 38-28-110(b) is that the BOCC attain the requisite majority vote to move the project forward to permitting and construction. WHEREAS, in reaching its decision to overrule the Planning Commission or not, the BOCC is not limited by the record from the Planning Commission meetings on the ASE AMP application, resulting in the disapproval of the project. Instead, because the quasi- judicial process ended with the Planning Commission’s decision, the BOCC, in exercising its executive/administrative function to determine the proper path forward for the ASE AMP, may and should consider other relevant sources of information, including but not limited to: prior statements of policy and decisions with respect to the Airport, such as the Common Ground Recommendations and ASE visioning process; the financial implications of the project; the economic impacts from the project to the County and the surrounding area; obligations to third-parties; requirements and standards set from the State and Federal Governments and the practical and financial consequences for failing to meet such standards; community values; and impacts and benefits on and to the County, its residents, and the region. WHEREAS, the BOCC reviewed the Planning and Zoning Commission’s Resolution at a regularly scheduled meeting on May 13, 2026, where the BOCC considered documents and information relevant to the ASE AMP and public comment was taken and did the same at a further duly noticed public hearing on May 27, 2026. WHEREAS, the BOCC approved first reading of this Resolution at their regular meeting held on May 13, 2026, and made the following findings: To exclude property depicted in the WOMP (current location of the Battery Energy Storage System) for use as the temporary CONRAC, andinvestigate as an alternative, the use of lots A-1 and A-2 of the Brush CreekParking Lot. To explore DarkSky compliant lighting for the landside terminal and parking area. That the square footage for the TSA baggage screening operations and the Attachment A Resolution No. 058-2026 5 Sheriff’s Office security space accommodations shall meet the programmatic needs of the community and the requirements of the U.S. Government. 4. The ASE currently monitors environmental quality at the airport, including air quality and sound levels and the BOCC will continue to be committed to that environmental responsibility as follows: a. The BOCC will continue to track air quality and continue to build out an air quality monitoring program that recognizes nationally recognized air quality standards and emerging environmental health science. b. The BOCC will continue to track sound/noise levels to meet or exceed federal standards so that future fleet mix operates quieter. c. The ASE will continue to lower GHGs at the airport (emissions reductions). WHEREAS, the BOCC finds that it is in the best interests of the citizens of and the visitors to Pitkin County to approve this Resolution. NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of Pitkin County, Colorado that it hereby adopts a Resolution of the Board of County Commissioners Overruling Resolution No. 007-2026 of the Pitkin County Planning and Zoning Commission of Pitkin County, Colorado, that the Aspen/Pitkin County Airport Modernization Program (ASE AMP) is not in Conformance with the 2012 Aspen Area Community Plan (AACP) and the 2013 West of Maroon Creek Master Plan (WOMP) and the Applicable Provisions of the Woody Creek Master Plan and the Brush Creek Master Plan and Authorizing Implementation of the Aspen/Pitkin County Sardy Field Airport Modernization Plan. In so overruling, the BOCC authorizes the ASE AMP to proceed as proposed to the Planning and Zoning Commission, as such plans may be modified by this Resolution. Attachment A Resolution No. 058-2026 6 INTRODUCED AND FIRST READ ON THE 13TH DAY OF MAY, 2026 AND SET FOR SECOND READING AND PUBLIC HEARING ON THE 27TH DAY OF MAY 2026. NOTICE OF PUBLIC HEARING AND TITLE AND SHORT SUMMARY OF THE RESOLUTION PUBLISHED IN THE ASPEN DAILY NEWS ON THE 14TH DAY OF MAY, 2026. NOTICE OF PUBLIC HEARING AND THE FULL TEXT OF THE RESOLUTION POSTED ON THE OFFICIAL PITKIN COUNTY WEBSITE (www.pitkincounty.com ) ON THE 14TH DAY OF MAY 2026. ADOPTED AFTER FINAL READING ON THE 27TH DAY OF MAY 2026. POSTED BY TITLE AND SHORT SUMMARY AFTER ADOPTION, ON THE OFFICIAL PITKIN COUNTY WEBSITE (www.pitkincounty.com ) AFTER ADOPTION, ON THE 4TH DAY OF JUNE 2026. PUBLISHED BY TITLE AND SHORT SUMMARY AFTER ADOPTION, IN THE ASPEN DAILY NEWS ON THE 4TH DAY OF JUNE, 2026. ATTEST: BOARD OF COUNTY COMMISSIONERS By _________________________ By: _____________________________ Sam Engen Jeffrey H. Woodruff, Chair Deputy County Clerk Date: ______________ APPROVED AS TO FORM: MANAGER APPROVAL By: ___________________________ By:_______________________________ Richard Neiley, III Kara Silbernagel, County Attorney County Manager Form Revised 04/01/2026  Attachment A Certificate Of Completion Envelope Id: 1E7C1B7F-8497-845C-826E-62366DC6CBBB Status: Completed Subject: ZGF Architects LLP | Pitkin County Contract 147.25 B-1-E for Review & Signature Source Envelope: Document Pages: 16 Signatures: 3 Envelope Originator: Certificate Pages: 6 Initials: 1 Pitkin County Procurement AutoNav: Enabled EnvelopeId Stamping: Disabled Time Zone: (UTC-07:00) Mountain Time (US & Canada) 530 East Main Street Suite 203 Aspen, CO 81611 Procurement@PitkinCounty.com IP Address: 2601:281:17f:45 Record Tracking Status: Original 7/29/2026 12:31:28 PM Holder: Pitkin County Procurement Procurement@PitkinCounty.com Location: DocuSign Signer Events Signature Timestamp Connie Baker connie.baker@pitkincounty.com Budget Director Pitkin County Security Level: Email, Account Authentication (None) Signature Adoption: Pre-selected Style Using IP Address: 74.244.9.45 Sent: 7/30/2026 11:48:48 AM Viewed: 7/30/2026 11:49:11 AM Signed: 7/30/2026 11:50:00 AM Electronic Record and Signature Disclosure: Not Offered via Docusign Diane Jackson diane.jackson@aspenairport.com Airport Director Security Level: Email, Account Authentication (None)Signature Adoption: Pre-selected Style Using IP Address: 2601:281:80:bcf0:6c63:5001:7dad:d36 Sent: 7/30/2026 11:50:02 AM Viewed: 8/3/2026 9:29:50 AM Signed: 8/3/2026 9:30:41 AM Electronic Record and Signature Disclosure: Accepted: 8/3/2026 9:29:50 AM ID: 523de0c0-20ca-4875-9b32-fa488dcce4f9 Company Name: Pitkin County, Colorado Sharron van der Meulen sharron.vandermeulen@zgf.com Partner Security Level: Email, Account Authentication (None)Signature Adoption: Pre-selected Style Using IP Address: 2600:387:16:119::6 Signed using mobile Sent: 8/3/2026 9:30:43 AM Viewed: 8/3/2026 10:46:24 AM Signed: 8/3/2026 10:47:38 AM Electronic Record and Signature Disclosure: Accepted: 8/3/2026 10:46:24 AM ID: 6a75df3e-7edc-4d22-b377-b725548f4733 Company Name: Pitkin County, Colorado Ryan Mahoney ryan.mahoney@pitkincounty.com Deputy County Manager Signing Group: County Manager Group Security Level: Email, Account Authentication (None) Signature Adoption: Pre-selected Style Using IP Address: 2601:281:3:8990:d403:38c9:1e16:e876 Sent: 8/3/2026 10:47:40 AM Viewed: 8/3/2026 4:01:08 PM Signed: 8/3/2026 4:02:10 PM Signer Events Signature Timestamp Electronic Record and Signature Disclosure: Not Offered via Docusign In Person Signer Events Signature Timestamp Editor Delivery Events Status Timestamp Agent Delivery Events Status Timestamp Intermediary Delivery Events Status Timestamp Certified Delivery Events Status Timestamp Carbon Copy Events Status Timestamp Pitkin County Procurement procurement@pitkincounty.com Ruslana Ivanova, Procurement Specialist Pitkin County Security Level: Email, Account Authentication (None) Sent: 8/3/2026 4:02:11 PM Resent: 8/3/2026 4:02:28 PM Viewed: 8/3/2026 4:53:07 PM Electronic Record and Signature Disclosure: Not Offered via Docusign Accounts Payable AP@pitkincounty.com Accounts Payable Pitkin County Security Level: Email, Account Authentication (None) Sent: 8/3/2026 4:02:12 PM Electronic Record and Signature Disclosure: Not Offered via Docusign Carter Strothman Carter.Strothman@jacobsendaniels.com Vice President Security Level: Email, Account Authentication (None) Sent: 8/3/2026 4:02:13 PM Electronic Record and Signature Disclosure: Not Offered via Docusign Joe Christie joe.christie@jacobsendaniels.com Security Level: Email, Account Authentication (None) Sent: 8/3/2026 4:02:13 PM Electronic Record and Signature Disclosure: Not Offered via Docusign G.R. Fielding g.r.fielding@jacobsendaniels.com Security Level: Email, Account Authentication (None) Sent: 8/3/2026 4:02:14 PM Electronic Record and Signature Disclosure: Not Offered via Docusign Witness Events Signature Timestamp Notary Events Signature Timestamp Envelope Summary Events Status Timestamps Envelope Summary Events Status Timestamps Envelope Sent Hashed/Encrypted 7/30/2026 11:48:48 AM Certified Delivered Security Checked 8/3/2026 4:01:08 PM Signing Complete Security Checked 8/3/2026 4:02:10 PM Completed Security Checked 8/3/2026 4:02:14 PM Payment Events Status Timestamps Electronic Record and Signature Disclosure ELECTRONIC RECORD AND SIGNATURE DISCLOSURE From time to time, Pitkin County (we, us or Pitkin County) may be required by law to provide you with certain written notices or disclosures. Described below are the terms and conditions for providing to you such notices and disclosures electronically when we send you documents for electronic signature. Acknowledging your Access, Intent, and Consent to Receive and Sign Materials Electronically To confirm that you can access this information electronically, which will be similar to other electronic notices and disclosures that we will provide to you, please verify that you were able to read this electronic disclosure and that you also were able to print on paper or electronically save this page for your future reference and access or that you were able to e-mail this disclosure and consent to an address where you will be able to print on paper or save it for your future reference and access. Further, if you consent to receive notices and disclosures exclusively in electronic format on the terms and conditions described above, please let us know by clicking the 'I agree' button below. By checking the 'I Agree' box, I confirm that:  I am establishing my intent to be bound to the transaction, and indicating that I am fully aware of the purpose for which the signature is being provided.  I can access and read this Electronic CONSENT TO ELECTRONIC RECEIPT OF ELECTRONIC RECORD AND SIGNATURE DISCLOSURES document; and  I can print on paper the disclosure or save or send the disclosure to a place where I can print it, for future reference and access; and  Until or unless I notify Pitkin County as described above, I consent to receive from exclusively through electronic means all notices, disclosures, authorizations, acknowledgments, and other documents that are required to be provided or made available to me by Pitkin County during the course of my relationship with you. Signing Documents without a Pitkin County DocuSign Account: Pitkin County may not require all document signers to be authorized users of the Pitkin County DocuSign Account. Please read the information below carefully and thoroughly, and if you can access this information electronically to your satisfaction and agree to these terms and conditions, please confirm your agreement by clicking the 'I agree' button at the bottom of this document. When you don't have a DocuSign account, you will be provided the opportunity to agree to the Legal Disclosure each time you open an "envelope" for signing, at this time, you can download and retain this disclosure. Pitkin County will forward completed documents that you've reviewed, processed or signed via email. Should you require copies of these signed documents (e.g., if they get deleted from your email account) you should request those documents from Pitkin County under the Colorado Open Records Act by contacting the Pitkin County custodian who sent you the document for signature. Signing Documents with a Pitkin County DocuSign Account: Electronic Record and Signature Disclosure created on: 3/20/2020 3:28:13 PM Parties agreed to: Diane Jackson, Sharron van der Meulen Please read the information below carefully and thoroughly, and if you can access this information electronically to your satisfaction and agree to these terms and conditions, please confirm your agreement by clicking the 'I agree' button at the bottom of this document. Getting paper or electronic copies At any time, you may request from us a paper or electronic copy of any record provided or made available electronically to you by us. For such copies, as long as you are an authorized user of the DocuSign system you will have the ability to download and print any documents we send to you through your DocuSign user account for a limited period of time (usually 30 days) after such documents are first sent to you. After such time, if you wish for us to send you paper or electronic copies of any such documents from our office to you, you may be charged a per-page fee. You may request delivery of such paper or electronic copies from us by following the procedure described below. Withdrawing your consent If you are an authorized DocuSign Account holder, you can decide to receive notices and disclosures from us electronically, you may at any time change your mind and tell us that thereafter you want to receive required notices and disclosures only in paper format. Described below is the process for informing us of your decision to receive future notices and disclosure in paper format and also how to withdraw your consent to receive notices and disclosures electronically. Consequences of changing your mind If you elect to receive required notices and disclosures only in paper format, it will slow the speed at which we can complete certain steps in transactions with you and delivering services to you because we will need first to send the required notices or disclosures to you in paper format, and then wait until we receive back from you your acknowledgment of your receipt of such paper notices or disclosures. To indicate to us that you are changing your mind, you must withdraw your consent using the DocuSign 'Withdraw Consent' form on the signing page of your DocuSign account. This will indicate to us that you have withdrawn your consent to receive required notices and disclosures electronically from us and you will no longer be able to use your DocuSign user account to receive required notices and consents electronically from us or to sign electronically documents from us. All notices and disclosures will be sent to you electronically Unless you tell us otherwise in accordance with the procedures described herein, we will provide electronically to you through your DocuSign user account all required notices, disclosures, authorizations, acknowledgments, and other documents that are required to be provided or made available to you during the course of our relationship with you. To reduce the chance of you inadvertently not receiving any notice or disclosure, we prefer to provide all of the required notices and disclosures to you by the same method and to the same address that you have given us. Thus, you can receive all the disclosures and notices electronically or in paper format through the paper mail delivery system. If you do not agree with this process, please let us know as described below. Please also see the paragraph immediately above that describes the consequences of your electing not to receive delivery of the notices and disclosures electronically from us. How to contact Pitkin County: You may contact us to let us know of your changes as to how we may contact you electronically, to request paper copies of certain information from us, and to withdraw your prior consent to receive notices and disclosures electronically as follows: To contact us by email send messages to Helpdesk@provelocity.com To advise Pitkin County of your new e-mail address To let us know of a change in your e-mail address where we should send notices and disclosures electronically to you, you must send an email message to us at Helpdesk@provelocity.com and in the body of such request you must state: your previous e-mail address, your new e-mail address . In addition, you must notify DocuSign, Inc to arrange for your new email address to be reflected in your DocuSign account by following the process for changing e-mail in DocuSign. To request paper or electronic copies from Pitkin County To request delivery from us of paper or electronic copies of the notices and disclosures previously provided by us to you electronically, you should request those documents from Pitkin County under the Colorado Open Records Act by contacting the Pitkin County custodian who sent you the document for signature. To withdraw your consent with Pitkin County To inform us that you no longer want to receive future notices and disclosures in electronic format you may: i. decline to sign a document from within your DocuSign account, and on the subsequent page, select the check-box indicating you wish to withdraw your consent, or you may; ii. send us an e-mail to Helpdesk@provelocity.com and in the body of such a request, you must state your e-mail, full name, Postal Address, telephone number, and account number.