Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
bocc.con.075.1974
THE AMERICAN INSTITUTE OF ARCHITECTS AIA Document A?07 Standard Form of Agreement Between Owner and Contractor Short [orm Agreement for Small Construction Contracts Where the Basis of Payment is a STIPULATED SUM THIS DOCUMENT HAS IMPORTANT LEGAL CONSEQUENCES; CONSULTATION WITH AN ATTORNEY IS ENCOURAGED WITH RESPECT TO ITS COMPLETION OR MODIFICATION For other contracts the AIA issues Standard Forms of Owner-Contractor Agreements and Standard General Conditions of the Contract for Construction for use in connection therewith. This document has been approved and endorsed by The Associated General Contractors of America. AGREEMENT made this Ninth (9th) Hundred and Seventy Four day of September in the year Nineteen BETWEEN the Owner: and the Contractor: Pitkin County Commission P. O. Box 4096 Aspen, Colorado 81611 Lada Vrany Construction Co., Inc. P.O. Box 658 Aspen, Colorado 81611 the Project: Remodeling of the west end of the Pitkin County Courthouse basement and the first floor Ladies and Mens toilet rooms. the Architect: Theodore L. Mularz, AIA, Architects The Owner and Contractor agree as set forth below. AIA DOCUMENT A107 ° SMALL CONSTRUCTION CONTRACT · JANUARY 1974 EDITION ° AIA® · ©1974 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., N.W., WASHINGTON, D.C. 20006 ARTICLE 1 THE WORK The Contractor shall perform all the Work required by the Contract Documents for Pitkin County Courthouse Remodel Aspen, Colorado 7405-9 ARTICLE 2 TIME OF COMMENCEMENT AND COMPLETION The Work to be performed under this Contract shall be commenced immediate I y and completed on or before 15 November 1974. ARTICLE 3 CONTRACT SUM The Owner shill pay the Contractor for the performance of the Wor ' · · Order as provided in the Genera Co,,,~;*;~-- .- . . k, subject to addRrons and deductions by Change (State here the lump sum anloun unit orices -- ~,~,,,v~,~. In current tunos, the Contract Sum of Thirty-Eight Thousand Eight Hundred Eighty-eight and 00/100 Dollars. (~38,SSS.O0). Includes: Cost of Basement Cost of Baths 101 Total Does not include: Cost of Baths 201 Remodeling: $34,898.00 and 102: - 38;s88.06 and 202: $4,784.00 AIA DOCU&4ENT A107 · SMALL CONSTRUCTION CONTRACT · JANUARY 1974 EDITION · AIA® · ©1974 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., N.W., WASHINGTON, D. C. 20006 ARTICLE 4 PROGRESS PAYMENTS gased upon Applications for Payment submitted to the Architect by the Contractor and Certificates for Payment issued by the Architect, the Owner shall make progress payments on account of the Contract Sum to the Contractor as follows: On or about the tenth (10th) day of each month, ninety (90~) percent of the proportion of the Contract Sum properly allocable to labor, materials and equipment incorporated in the work and ninety (90~) percent of the portion of the Contract Sum properly allocable to materials and equipment suitably stored at the site up to the first (1st) day of that month, less the aggregate of previous payments in each case; and upon substantial completion of the entire work, a sum sufficient to increase the total payments to one hundred (100~ percent of the Contract Sum, less such retafnages as the Architect shall determine for all incomplete work and unsettled claims. ARTICLE 5 FINAL PAYMENT The Owner shall make final payment th i rty-two (32) days after completion of the Work, provided the Contract be then fully performed, subject to the provisions of Article 16 of the General Conditions. ARTICLE 6 ENUMERATION OF CONTRACT DOCUMENTS The Contract Documents are as noted in Paragraph 7.1 of the General Conditions and are enumerated as follows: (List below the Agreement, Conditions ot the Contract (General, Supplementary, and other Condilions), Drawings, Specifications, Addenda and accepted NO. DATE TITLE A1 7/29/74 Plan, Schedules, Notes A2 7/29/74 Int. Elevs. Details A3 7/29/74 Electrical, Int. Elevs., Notes A4 7/29/74 Bathroom Plans, Elevs., Notes 8/21/74 Cost Breakdown AIA DOCUMENT A107 · SMALL CONSTRUCTION CONTRACTo JANUARY 1974 EDITION · AIA® · ©1974 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., N.W., WASHINGTON, D.C. 20006 GENERAL CONDITIONS ARTICLE 7 CONTRACT DOCUMENTS 7.1 The Contract Documents consist of this Agreement (which includes the General Conditions), Supplementary and other Conditions, the Drawings, the Specifications, all Addenda issued prior to the execution of this Agree- merit, all modifications, Change Orders, and written interpretations of the Contract Documents issued by the Architect. These form the Contract and what is required by any one shall be as binding as if required by all. The intention of the Contract Documents is to include all labor, materials, equipment and other items as provided in Paragraph 10.2 necessary for the proper execution and completion of the Work and the terms and conditions of payment therefor, and also to include all Work which may be reasonably inferable from the Contract Documents as being necessary to produce the intended results. 7.2 The Contract Documents shah be signed in not less than triplicate by the Owner and the Contractor. If either the Owner or the Contractor do not sign the Drawings, Specifications, or any of the other Contract Documents, the Architect shah identify them. By executing the Con- tract, the Contractor represents that he has visited the site and familiarized himself with the local conditions under which the Work is to be performed. 7.3 The term Work as used in the Contract Documents includes all labor necessary to produce the construction required by the Contract Documents, and all materials and equipment incorporated or to be incorporated in such construction. ARTICLE 8 ARCHITECT 8.1 The Architect will provide general administration of the Contract and will be the Owner's representative during construction and until issuance of the final Certi- ficate for Payment. 8.2 The Architect shall at all times have access to the Work wherever it is in preparation and progress. 8.3 The Architect will make periodic visits to the site to familiarize himself generally with the progress and quality of the Work and to determine in general if the Work is proceeding in accordance with the Contract Documents. On the basis of his on-site observations as an architect, he will keep the Owner informed of the progress of the Work, and will endeavor to guard the Owner against defects and deficiencies in the Work of the Contractor. The Architect will not be required to make exhaustive or continuous on-site inspections to check the quality or quantity of the Work. The Archi- tect will not be responsible for construction means, methods, techniques, sequences or procedures, or for safety precautions and programs in connection with the Work, and he will not be responsible for the Contractor's failure to carry out the Work in accordance with the Contract Documents. 0.4 Based on such observations and the Contractor's Applications for Payment, the Architect will determine the amounts owing to the Contractor and will issue Cer- tificates for Payment in accordance with Article 17. 8.5 The Architect will be, in the first instance, the in- terpreter of the requirements of the Contract Documents. He will make decisions on all claims and disputes be- tween the Owner and the Contractor. All his decisions are subject to arbitration. 8.6 The Architect will have authority to reject Work which does not conform to the Contract Documents. ARTICLE 9 OWNER 9.1 The Owner shall furnish all surveys. 9.2 The Owner shall secure and pay for easements for permanent structures or permanent changes in existing facilities. 9.3 The Owner shall issue all instructions to the Con- tractor through the Architect. ARTICLE 10 CONTRACTOR 10.1 The Contractor shall supervise and direct the work, using his best skill and attention. The Con- tractor shall be solely responsible for all construction means, methods, techniques, sequences and procedures and for coordinating all portions of the Work under the Contract. 10.2 Unless otherwise specifically noted, the Contractor shall provide and pay for all labor, materials, equipment, tools, construction equipment and machinery, water, heat, utilities, transportation, and other facilities and services necessary for the proper execution and comple- tion of the Work. 10.3 The Contractor shall at all times enforce strict discipline and good order among his employees, and shall not employ on the Work any unfit person or any- one not skilled in the task assigned to him. 10.4 The Contractor warrants to the Owner and the Architect that all materials and equipment incorporated in the Work will be new unless otherwise specified, and that all Work will be of good quality, free from faults and defects and in conformance with the Contract Docu- ments. All Work not so conforming to these standards may be considered defective. 10.5 The Contractor shall pay all sales, consumer, use and other similar taxes required by law and shall secure all permits, fees and licenses necessary for the execution of the Work. 10.6 The Contractor shall give all notices and comply with all laws, ordinances, rules, regulations, and orders of any public authority bearing on the performance of AIA DOCUMENT A107 · SMALL CONSTRUCTION CONTRACT· JANUARY 1974 EDITION · AIA®· ©1974 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVl:., N.W., WASHINGTON, D.C. 20006 4 the Work, and shall notify the Architect if the Drawings and Specifications are at variance therewith. 10.7 The Contractor shah be responsible for the acts and omissions of all his employees and all Subcon- tractors, their agents and employees and all other persons performing any of the Work under a contract with the Contractor. 10.8 The Contractor shall review, stamp with his ap- proval and submit all samples and shop drawings as directed for approval of the Architect for conformance with the design concept and with the information given in the Contract Documents. The Work shall be in ac- cordance with approved samples and shop drawings. 10.9 The Contractor at all times shall keep the premises free from accumulation of waste materials or rubbish caused by his operations. At the completion of the Work he shall remove all his waste materials and rubbish from and about the Project as well as his tools, construction equipment, machinery and surplus materials, and shah clean all glass surfaces and shall leave the Work "broom clean" or its equivalent, except as otherwise specified. 10.10 The Contractor shall indemnify and hold harmless the Owner and the Architect and their agents and em- ployees from and against all claims, damages, losses and expenses including attorneys' fees arising out of or result- lng from the performance of the Work, provided that any such claim, damage, loss or expense (1) is attribut- able to bodily injury, sickness, disease or death, or to injury to or destruction of tangible property (other than the Work itself) including the loss of use resulting there- from, and (2) is caused in whole or in part by any negligent act or omission of the Contractor, any Sub- contractor, anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, regardless of whether or not it is caused in part by a party indemnified hereunder. In any and all claims against the Owner or the Architect or any of their agents or employees by any employee of the Contractor, any Subcontractor, anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, the indemnification obligation under this Para- graph 10.10 shall not be limited in any way by any limi- tation on the amount or type of damages, compensation or benefits payable by or for the Contractor or any Sub- contractor under workmen's compensation acts, dis- ability benefit acts or other employee benefit acts. The obligations of the Contractor under this Paragraph 10.10 shall not extend to the liability of the Architect, his agents or employees arising out of (1) the preparation or approval of maps, drawings, opinions, reports, sur- veys, Change Orders, designs or specifications, or (2) the giving of or the failure to give directions or instructions by the Architect, his agents or employees provided such giving or failure to give is the primary cause of the injury or damage. ARTICLE 11 SUBCONTRACTS 11.1 A Subcontractor is a person who has a direct contract with the Contractor to perform any of the Work at the site. 11.2 Unless otherwise specified in the Contract Docu- ments or in the Instructions to Bidders, the Contractor, as soon as practicable after the award of the Contract, si~a[I furnish to the Architect in writing a list of the names of Subcontractors proposed for the principal por- tions of the Work. The Contractor shall not employ any Subcontractor to whom the Architect or the Owner may have a reasonable obiection. The Contractor shall not be required to employ any Subcontractor to whom he has a reasonable objection. Contracts between the Con- tractor and the Subcontractor shall be in accordance with the terms of this Agreement and shall include the General Conditions of this Agreement insofar as applicable. ARTICLE 12 SEPARATE CONTRACTS 12.1 The Owner reserves the right to award other con- tracts in connection with other portions of the Project or other work on the site under these or similar Condi- tions of the Contract. 12.2 The Contractor shall afford other contractors rea- sonable opportunity for the introduction and storage of their materials and equipment and the execution of their work, and shall properly connect and coordinate his Work with theirs. 12.3 Any costs caused by defective or ill-timed work shall be borne by the party responsible therefor. ARTICLE 13 ROYALTIES AND PATENTS The Contractor shall pay all royalties and license fees. The Contractor shall defend all suits or claims for in- fringement of any patent rights and shall save the Owner harmless from loss on account thereof. ARTICLE 15 TIME 15.1 All time limits stated in the Contract Documents are of the essence of the Contract. 15.2 If the Contractor is delayed at any time in the progress of the Work by changes ordered in the Work, by labor disputes, fire, unusual delay in transportation, unavoidable casualties, causes beyond the Contractor's control, or by any cause which the Architect may de- termine justifies the delay, then the Contract Time shall be extended by Change Order for such reasonable time as the Architect may determine. AIA DOCUMENT A107 · SMALL CONSTRUCTION CONTRACT- JANUARY 1974 EDITION · AIA® · ©1974 5 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., N.W., WASHINGTON, D.C. 20006 ARTICLE 16 PAYMENTS 16.1 Payments shall be made as provided in Article 4 of this Agreement. 16.2 Payments may be withheld on account of (1) de- fective Work not remedied, (2) claims filed, (3) failure of the Contractor to make payments properly to Sub- contractors or for labor, materials, or equipment, (4) damage to another contractor, or (5) unsatisfactory prose- cution of the Work by the Contractor. 16.3 Final payment shall not be due until the Con- tractor has delivered to the Owner a complete release of all liens arising out of this Contract or receipts in full covering all labor, materials and equipment for which a lien could be filed, or a bond satisfactory to the Owner indemnifying him against any lien. 16.4 The making of final payment shall constitute a waiver of all claims by the Owner except those arising from (1) unsettled liens, (2) faulty or defective Work ap- pearing after Substantial Completion, (3) failure of the Work to comply with the requirements of the Contract Documents, or (4) terms of any special guarantees re- quired by the Contract Documents. The acceptance of final payment shall constitute a waiver of all claims by the Contractor except those previously made in writ- lng and still unsettled. ARTICLE 17 PROTECTION OF PERSONS AND PROPERTY The Contractor shall be responsible for initiating, main- taining, and supervising all safety precautions and pro- grams in connection with the Work. He shall take all reasonable precautions for the safety of, and shall provide all reasonable protection to prevent damage, injury or loss to (1) all employees on the Work and other persons who may be affected thereby, (2) all the Work and all materials and equipment to be incorporated therein, and (3) other property at the site or adjacent thereto. He shall comply with all applicable laws, ordinances, rules, regulations and orders of any public authority having jurisdiction for the safety of persons or property or to protect them from damage, injury or loss. All damage or loss to any property caused in whole or in part by the Contractor, any Subcontractor, any Sub- subcontractor or anyone directly or indirectly employed by any of them, or by anyone for whose acts any of them may be liable, shall be remedied by the Contractor, except damage or Joss attributable to faulty Drawings or Specifications or to the acts or omissions of the Owner or Architect or anyone employed by either of them or for whose acts either of them may be liable but which are not attributable to the fault or negligence of the Contractor. ARTICLE 18 CONTRACTOR'S LIABILITY INSURANCE The Contractor and each separate Contractor shall pur- chase and maintain such insurance as will protect him from claims under workmen's compensation acts and other employee benefit acts, from claims for damages because of bodily injury, including death, and from claims for damages to property which may arise out of or result from the Contractor's operations under this Contract, whether such operations be by himself or by any Sub- contractor or anyone directly or indirectly employed by any of them. This insurance shall be written for not [ess than any limits of liability specified as part of this Con- tract, or required by law, whichever is the greater, and shall include contractual liability insurance as applicable to the Contractor's obligations under Paragraph 10.10. Certificates of such insurance shall be filed with the Owner and each separate Contractor. ARTICLE 19 OWNER'S LIABILITY INSURANCE The Owner shall be responsible for purchasing and maintaining his own liability insurance and, at his op- tion, may maintain such insurance as will protect him against claims which may arise from operations under the Contract. ARTICLE 20 PROPERTY INSURANCE 20.1 Unless otherwise provided, the Owner shall pur- chase and maintain property insurance upon the entire Work at the site to the full insurable value thereof. This insurance shall include the interests of the Owner, the Contractor, Subcontractors and Sub-subcontractors in the Work and shall insure against the perils of Fire, Extended Coverage, Vandalism and Malicious Mischief. 20.2 Any insured loss is to be adjusted with the Owner and made payable to the Owner as trustee for the insureds, as their interests may appear, subject to the requirements of any mortgagee clause. 20.3 The Owner shall file a copy of all policies with the Contractor prior to the commencement of the Work. 20.4 The Owner and Contractor waive all rights against each other for damages caused by fire or other perils to the extent covered by insurance provided under this paragraph. The Contractor shall require similar waivers by Subcontractors and Sub-subcontractors. ARTICLE 21 CHANGES IN THE WORK 21.1 The Owner without invalidating the Contract may order Changes in the Work consisting of additions, de- letions, or modifications, the Contract Sum and the Con- tract Time being adjusted accordingly. All such Changes in the Work shah be authorized by written Change Order signed by the Owner or the Architect as his duly author- ized agent. 21.2 The Contract Sum and the Contract Time may be changed only by Change Order. 21.3 The cost or credit to the Owner from a Change in the Work shall be determined by mutual agreement. AIA DOCUMENT A107 · SMALL CONSTRUCTION CONTRACT· JANUARY 1974 EDITION · AIA® · ©1974 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., N.W., WASHINGTON, D.C. 20006 6 ARTICLE 22 CORRECTION OF WORK The Contractor shall correct any Work that fails to con- form to the requirements of the Contract Documents where such failure to conform appears during the progress of the Work, and shall remedy any defects due to faulty materials, equipment or workmanship which appear within a period of one year from the Date of Substantial Completion of the Contract or within such longer period of time as may be prescribed by law or by the terms of any applicable special guarantee required by the Contract Documents. The provisions of this Article 22 apply to Work done by Subcontractors as well as to Work done by direct employees of the Contractor. ARTICLE 23 TERMINATION BY THE CONTRACTOR If the Architect fails to issue a Certificate of Payment for a period of thirty days through no fault of the Con- tractor, or if the Owner fails to make payment thereon for a period of thirty days, the Contractor may, upon seven days' written notice to the Owner and the Archi- tect, terminate the Contract and recover from the Owner payment for all Work executed and for any proven loss sustained upon any materials, equipment, too]s, and construction equipment and machinery, including rea- sonab[e profit and damages. ARTICLE 24 TERMINATION BY THE OWNER If the Contractor defaults or neglects to carry out the Work in accordance with the Contract Documents or fails to perform any provision of the Contract, the Owner may, after seven days' written notice to the Contractor and without prejudice to any other remedy he may have, make good such deficiencies and may deduct the cost thereof from the payment then or thereafter due the Contractor or, at his option, may terminate the Contract and take possession of the site and of all materials, equip- ment, tools, and construction equipment and machinery thereon owned by the Contractor and may finish the Work by whatever method he may deem expedient, and if the unpaid balance of the Contract Sum exceeds the expense of finishing the Work, such excess shall be paid to the Contractor, but if such expense exceeds such unpaid balance, the Contractor shah pay the difference to the Owner. ARTICLE 25 MISCELL,~NEOUS PROVISIONS AIA DOCUMENT A107 ' SMALL CONSTRUCTION CONTRACT ° JANUARY 1974 EDITION ° AIA® ' ©1974 7 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., N.W., WASHINGTON, D. C. 20006 9 September 1974 PITKIN GOUNTY - VRANY, OWNER-CONTRACTOR AGREEMENT~ Continued This Agreement executed the day and year first written above. PIT~:OUNTY COMIVI~$S]ON ~x/ LADA VRANY CO,~/~RUCTTON CO., JULI~ HANg, Clerk LADA VRANY, ~re~id~n,~ AIA DOCU~[NT A107 · SMALL CONSTRUCTION CONTRACT' JANUARY 1974 EDITION · AIA~' ~1974 THE AMERICAN INSTITUTE OF ARCHITECTS, 17~5 NEW YORK AVE., N.W., WASHINGTON~ D. C. 20006 INC. 8 .% ' keodore J. muJarz AIA architect SEP - 91974 THEODORE L. MI;LA ARCHI1 £CT :21 Augugt 107zl rI Lada Vrany Colorado 81611 Job No. 7405-') , 19 August So that a derision be, done. the C;ounLy for the following: A. Coot cf C. Cos ~ of D. Add i '; ~ c reu&rc;i,q,¢ Lb(, ;,Im,~lJnt Of work to you %0 suE¢~it tout breakdowns I, i''* (+) ' flxt;.,*~o and 4 Sv:f'Lches, and Feplace 3 .lxtu,~ cate, to oe sw tched s,~L.;,-': ,,. , , with 12 floor Ou, LJ~c8 aroun,.z, room,cur, 'ct ~.~ 4. Delete partit~,,,s a,,. oo~r Bur?c,,' ardware and east cub ~-:,-; n... ........ (' ~'r cS. Delete 4 p:~.:'crms ~r, Commissioner =-0~ Room ................... ,..i .... ,~ ..... ~'~')~--... I I iI II, theodore .,m u la rz A~A architect 21 August 1974, P]TKIN COUNTY COORTHIousE REMOD~,L Page 2 7. Add Tnt electric h:;neboard r~ 7~ ! red ........................................ ?o £nange "A" and "C" ripe doors f'r~m pcnel ~,.).,. to hOI Iow core rotary sawn mah~lga~y... (-)~ I I Theodore ' I,I 10. Delete 3" celotex' shea&i~ing on north Co~,mls~,ionor~ ~toom. Pain*. gypsum board if any dr the above Items are add,:d or deleted, provision wii,I be made Cot their addition or dei,,tidn i,a the Owner~ Flea3) si,~;; ,,,,u return two cop~e~; at yo~7 ~?arl co, c,onvenience so fha% L.~a ~ommiss~oners can .T~&ko a dec~s~o~n. CHANGE OWNer ARCHITECT ORDER CONTRACTOR FIELD ~,IA DOCUMENT G701 OTHER 9 September 1974 PROJECI: PI]KIN COUNTY COURTHOUSE (name addre,s) Aspen, Col orado CHANGE ORDER NUMBER: One TO ~Contra('tor; ~-Lada Vrsny Construction Co.,l[n~.CHITECTS PROJECT NO: 774.05-9 F~· O. BOX ~8 CONTRACT FOR: General Construction Aspen~ Colorado 81611 CONTRACT [)ATE: 9 September 1974 You are directed to make the following changes in this Contract: See attached sheet with 9 items. TOTAL AMOUNT OF THiS CHANGE ORDER ........ DEDUCT The original Contract Sum was ..................... $ 38! 888. O0 Net change by previous Change Orders ................. $ The Contract Sum prior to this Change Order was ............... $ :~8,8[~8. O0 The Contract Sum will be (]~llO~k~:J[ !decreased) (OtO/i~OIIJ~d) by this Change Order . · $ ] ,002.00 The new Contract Sum including this Change Order wilt be ......... $ 37~886.00 The Contract Time will be (!il~$1l~!~ll0l,~ (unchanged) by ( The Date of Complefion as of the date of this Change Order therefore is 15 November' 1974 Th~cmo r~e L. ARCHITEC1 _P.O. Box Address AIA. BOCUMENT G701 · CHANGE ORDER · APRIL 1970 EI~I ° ~ ° ~ 1!~70 · TH~ AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK A)/~, i~W, WA-~4'III~TON, D.G 200Q6 ONE PAGE theodore I. mula rz A~A architect 9 ~eptember 1974 Page 2 of 2 Pltkin County Courthouse Aspen, Colorado CHANGE ORDER NUN:BER ONE 7405-9 1. Remove 3~ "A" and 14, "G" electrical fixtures and 4 switches, and replace with 4 "B" fixtures each to be switched separately .................... (-)~ qO0.O0 2. Delete Projection Screen and switch ........... ( )~___~ 3. Delete 7 wall or step outlets and replace with 12 floor outlets around room perimeter. Final location will be verified with Architect .......... (+)~ Delete ~, east st~! 5. Delete 6. Add for 3'-(~'' × q'-O" "E" doors and hardware oarti' ' ( ):~~ 91atforms in Commissioner B~03 electric baseboard heaters as requlre~(+)~J.~ 7. Change "A" and "C" type doors from panel doors to hollow core rotary sawn mahogany ............... (-)~___L~ 8. Delete Aspen wood paneling over gypsum board. Trim gypsum board with "J" metal and paint ........ (-)~__~ 9. Delete ~" celotex sheathing on north wall of Commissioners Room. Paint gypsum board Instead....(-)$ 4~.00 TOTAL AMOUNT OF THIS CHANGE ORDER ....... (