Loading...
HomeMy WebLinkAboutbocc.con.070.2005 CHECK LIST FOR CONTRACTS SUBMITTED TO CLERK AND RECORDER FOR SCANNING/ARCHIVING Originating Department/Division: ~)r~n:~aa" Contact Person: l:~om ~ )~.~,t. r~en~ Phone #: Project Name t~e~C'-~}se~.~ ¢~x~ ~x~2~ Contract fi: BOCC AGENDA ITEM (BOCC signature required) STAFF AUTHORIZED SIGNATURE (per Revised Procurement Code7/2005) Check Contract Type: _~Services Maintenance License/Use Lease Construction Grant Agreements (Requires BOCC Action) x/.. Change Order/Contract Amendment Other Signatures Required: Under 25K - Department Head Dollar Amount: $'I,4~ t~, Budget Line Item qOq Joq · qct'tl%.*i~cl:~ Purchase Employment Intergovernmental Agreement (Requires BOCC Action) Non Profit __Quasi-Public STAFF AUTHORIZED SIGN~ 25-50K - Department Head (if appropriate), Section Leader -- Over 50 K - Department Head (if appropriate), Section Leader, County Manager Contractor/Business (Complete. Name): Contract Execution Date: ~[X~.[OT~ Contract End Date: Automatic Renewal (Y/N): ~3 Term ~ year(s) All Contracts should be proofed for the following: · No Pages Missing · If a Page is Left Intentionally Blank - Note on Page (~ON~(~' # ~ 0 J ~ t~7~-~ · Page numbered consecutively -- · All Signatures Affixed · All Dates Filled In · All Other Blanks Filled In · All Exhibits Attached · All Legal Descriptions Attached (if appropriate) · Notice of Award/Proceed Attached (if appropriate) Sent to Clerk and Recorder for Scanning/Archiving ~'~ Date: Authorized Staff Person Signature of authorized staff person indicates that document has been proofed and ready for scanning. Note: Clerk's Office will keep original documents in compliance with Colorado State Archives retainage schedule. pcjmflwwlglscannninglcouniy contractslnarrativelchecklistsheet '1 C-B No. 071056.105 AIP PROJECT NO. 3-08-0003-32 · AMENDMENT NO. FOUR TO CONTRACT co c'r DATED FEBRUARY 19, 2003 BETWEEN CARTER & BURGESS, INC. AND PITKIN COUNTY COLORADO STAFF AUTHORIZED SIGNATURE The Sponsor and the Engineer (here after referred to as Engineer or Contractor interchangeably) agree to amend their contract for improvements to Pitkin County Airport, Colorado to include fees for engineering services. Item 3 is included in the Scope of Work of the original contract. The items covered by this amendment are detailed in the scope of work attached hereto as Exhibit A, which scope of work is incorporated herein by this reference, and are generally described as follows: Item No. 3 ARFF/SRE Facility Construction Services Item No. 3 refers to services generally defined under Construct ARFF/SRE Facility in the Scope of Work. The Sponsor agrees to pay the Engineer for the services listed under Article II of the original contract in the following manner: PART A - BASIC SERVICES Item No 3: Preliminary Design Phase ................................................. Lump sum of $18,641.00 BIDDING Item No. 3: Bidding Phase ................................................................. Lump sum of $22,820.00 Method of payment shall be as follows: Interim payments up to 90 percent based on work performed by the Engineer and detailed in a report submitted to the Sponsor with the request for payment. The remaining ten percent to be paid upon Notice to Proceed for construction, or, in the event the Sponsor does not elect to proceed with construction, the remaining ten percent to be paid upon receipt of request for payment from the Engineer. Page 1 of 8 ~ PART B - SPECIAL SERVICES (SOILS AND PAVEMENT INVESTIGATIONS/HYDROLOGIC STUDIES/CONSTRUCTION ADMINISTRATION AND FIELD ENGINEERING) The maximum estimated SPECIAL SERVICES engineering is as follows: CONSTRUCTION ADMINISTRATION Item No. 3: Construction Administration .............................................. Lump sum of $38,320.00 FIELD ENGINEERING Item No 3: Pre-Construction Coordination Phase ...................................Lump sum of $6,218.00 Construction Coordination Phase ...................................... Lump sum of $500,120.00 Post Construction ............................................................................. Lump sum of $35,077.00 DIRECT SUBCONSULTANTS Item No. 3: Architectural Services ....................................................... Lump sum of $85,000.00 MEP Services ................................................................. Lump sum of $20,000.00 Structural Services ............................................................................. Lump sum of $15,000.00 Planning Consultant .............................................................. Lump sum of $4,000.00 The Engineer's costs shall not be exceeded without the Sponsor's written prior approval. The above estimated maximum is based on a construction project taking 365 calendar days. If work is abandoned, or terminated, after obtaining approval by the Sponsor and the FAA of the final construction plans and specifications, the Sponsor shall reimburse up to 100 pement of the total lump sum as listed under PART A, and 100 percent of the invoiced costs for soils and pavement investigations, topographic surveys, and hydrological studies, or other studies as listed under PART B. Method of payment shall be as follows: Page 2 of 8 '~ For services rendered under PART B - SPECIAL SERVICES, the Sponsor agrees to make monthly payments based upon the work performed by the Engineer less 10 percent. The final 10 percent of the fee shall be due and payable when the project final inspection and the construction report have been completed, and when reproducible "Record Drawings" have been submitted to the Sponsor and when the revised Airport Layout Plan has been approved by the FAA or when the construction work has terminated. The "Record Drawings" and Construction Report shall be submitted within a period of 90 days from end of construction period. This Amendment shall be considered concurrent with completion of audit. PART C - ASSURANCES Civil Rights Act of 1964, Title VI - Contractor Contractual Requirements, 49 CFR Part 21, AC 150/5100-15. During the performance of this contract, the Engineer, for itself, its assignees and successors in interest agrees as follows: 1. Compliance with Regulations. The contractor shall comply with the Regulations relative to nondiscrimination in Federally assisted programs of the Department of Transportation (hereinafter, "DOT") Title 49, Code of Federal Regulations, Part 21, as they may be amended for time to time (hereinafter referred to as the Regulations), which are herein incorporated by reference and made a part of this contract. 2. Nondiscrimination. The contractor, with regard to the work performed by it during the contract, shall not discriminate on the grounds of race, color, or national origin in the selection and retention of Subcontractors, including procurement of materials and leases of equipment. The contractor shall not participate either directly or indirectly in the discrimination prohibited by section 21.5 of the Regulations, including employment practices when the contract covers a program set forth in Appendix B of the Regulations. 3. Solicitations for Subcontracts, Including Procurement of Materials and Equipment. In all solicitations either by competitive bidding or negotiation made by the Engineer for work to be performed under a subcontract, including procurement of materials or leases of equipment, each potential Subcontractor or supplier shall be notified by the contractor of the contractor's obligations under this contract and the Regulations relative to nondiscrimination on the grounds of race, color, or national origin. 4. Information and Reports. The contractor shall provide all information and reports required by the Regulations or directives issued pursuant thereto and shall permit access to its books, records, accounts, other sources of information, and its facilities as may be determined by the Sponsor or the Federal Aviation Administration (FAA) to be pertinent to ascertain compliance with such Regulations, orders, and instructions. Where any information required of an contractor is in the exclusive possession of another who fails or refuses to furnish this information, the contractor shall so certify to the Sponsor or the FAA, as appropriate, and shall set forth what efforts it has made to obtain the information. 5. Sanctions for Noncompliance. In the event of the contractor's noncompliance with the nondiscrimination provisions of this contract, the Sponsor shall impose such contract sanctions Page 3 of 8 II. III. as it or the FAA may determine to be appropriate, including, but not limited to: a. Withholding of payments to the contractor under the contract until the contractor complies, and/or b. cancellation, termination, or suspension of the contract, in whole or in part. 6. Incorporation of Provisions. The contractor shall include the provisions of paragraphs 1 through 5 in every subcontract, including procurement of materials and leases of equipment, unless exempt by the Regulations of directives issued pursuant thereto. The contractor shall take such action with respect to any subcontract or procurement as the Sponsor or the FAA may direct as a means of enforcing such provisions including sanctions for noncompliance. Provided, however, that in the event the contractor becomes involved in, or is threatened with, litigation with a Subcontractor or supplier as a result of such direction, the contractor may request the Sponsor to enter into such litigation to protect the interests of the Sponsor and, in addition, the contractor may request the United States to enter into such litigation to protect the interests of the United States. Airport and Airway Improvement Act of 1982, Section 520 - General Civil Rights Provisions, Title 49 47123, AC 150/5100-15, Para. 10.c. The contractor assures that it will comply with pertinent statutes, Executive orders and such rules as are promulgated to assure that no person shall, on the grounds of race, creed, color, national origin, sex, age, or handicap be excluded from participating in any activity conducted with or benefiting from Federal assistance. This provision obligates the tenant/concessionaire/lessee or its transferee for the period during which Federal assistance is extended to the Airport for a program, except where Federal assistance is to provide, or is in the form of personal property or real property or interest therein or structures or improvements thereon. In these cases the provision obligates the party or any transferee for the longer of the following periods: (a) the period during which the property is used by the airport Sponsor or any transferee for a purpose for which Federal assistance is extended, or for another purpose involving the provision of similar services or benefits or (b) the period during which the airport Sponsor or any transferee retains ownership or possession of the property. In the case of contractors, this provision binds the contractors from the bid solicitation period through the completion of the contract. This provision is in addition to that required of Title VI of the Civil Rights Act of 1964. Disadvantaged Business Enterprises, 49 CFR Part 26. Contract Assurance (§26.13) - The contractor or subcontractor shall not discriminate on the basis of race, color, national origin, or sex in the performance of this contract. The contractor shall carry out applicable requirements of 49 CFR Pat126 in the award and administration of DOT assisted contracts. Failure by the contractor to carry out these requirements is a material breach of this contract, which may result in the termination of this contract or such other remedy, as the recipient deems appropriate. Prompt Payment (§26.29) - The prime contractor agrees to pay each subcontractor under this prime contract for satisfactory performance of its contract no later than Fifteen (15) days from the receipt of each payment the prime contractor receives from Board. The prime contractor agrees further to return retainage payments to each subcontractor within Fifteen (15) days al~er the subcontractor's work is satisfactorily completed. Any delay or postponement of payment from the above referenced time frame may occur only for good cause following written approval of the Board. This clause applies to both DBE Page 4 of 8 /' and non-DBE subcontractors. Lobbying and Influencing Federal Employees, 49 CFR Part 20, Appendix A. (1) No Federal appropriated funds shall be paid, by or on behalf of the contractor, to any person for influencing or attempting to influence an officer or employee of any agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with the making of any Federal grant and the amendment or modification of any Federal grant. (2) If any funds other than Federal appropriated funds have been paid or will be paid to any person for influencing or attempting to influence an officer or employee of any agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with any Federal grant, the contractor shall complete and submit Standard Form-LLL, "Disclosure of Lobby Activities," in accordance with its instructions. VI. VII. VIII. Access to Records and Reports, 49 CFR Part 18.36(0, FAA Order 5100.38. The contractor shall maintain an acceptable cost accounting system. The contractor agrees to provide the Sponsor, the Federal Aviation Administration, and the Comptroller General of the United States or any of their duly authorized representatives access to any books, documents, papers, and records of the contractor which are directly pertinent to the specific contract for the purposes of making an audit, examination, excerpts, and transcriptions. The contractor agrees to maintain all books, records and reports required under this contract for a period of not less than three years after the final payment is made and all pending matters are closed. Breach of Contract Terms, 49 CFR Part 18.36. Any violation or breach of the terms of this contract on the part of the contractor or their subcontractors may result in the suspension or termination of this contract or such other action that may be necessary to enforce the rights of the parties of this agreement. The duties and obligations imposed bythe Contract Documents and the rights and remedies available thereunder shall be in addition to an not a limitation of duties, obligations, rights and remedies otherwise imposed or available by law. Rights to Inventions, 49 CFR Part 18.36(0(8), FAA Order 5100.38. All rights to inventions and materials generated under this contract are subject to regulations issued by the FAA and the Sponsor of the Federal grant under which this contract is executed. Trade Restriction Clause, 49 CFR Part 30.13, FAA Order 5100.38. The contractor or subcontractor, by submission of an offer and/or execution of a contract, certifies that it: a. is not owned or controlled by one or more citizens of a foreign country included in the list of countries that discriminate against U.S. finns published by the Office of the Un/ted States Trade Representative CLISTR); b. has not knowingly entered into any contract or subcontract for this project with a person that is a citizen or national of a foreign country on said list, or is owned or controlled directly or indirectly by one or more citizens or nationals of a foreign country on said list; has not procured any product nor subcontracted for the supply of any product for Page 5 of 8 · use on the project that is produced in a foreign county on said list. Unless the restrictions of this clause are waived by the Secretary of Transportation in accordance with 49 CFR 30.17, no contract shall be awarded to a contractor or subcontractor who is unable to certify to the above. If the contractor knowingly procures or subcontracts for the supply of any product or service of a foreign country on said list for use on the project, the Federal Aviation Administration may direct through the Sponsor cancellation of the contract at no cost to the Government. Further, the contractor agrees that, if awarded a contract resulting from this solicitation, it will incorporate this provision for certification without modification in each contract and in all lower tier subcontracts. The contractor may rely on the certification of a prospective Subcontractor unless it has knowledge that the certification is erroneous. The contractor shall provide immediate written notice to the Sponsor if the contractor leams that its certification or that of a Subcontractor was erroneous when submitted or has become erroneous by reason of changed circumstances. The subcontractor agrees to provide written notice if at any time it learns that its certification was erroneous by reason of changed cimumstances. This certification is a material representation of fact upon which reliance was placed when making the award. If it is later determined that the contractor or subcontractor knowingly rendered an erroneous certification, the Federal Aviation Administration may direct through the Sponsor cancellation of the contract or subcontract for default at no cost to the Government. Nothing contained in the foregoing shall be constructed to require establishment of a system of records in order to render, in good faith, the certification required by this provision. The knowledge and information of a contractor is not required to exceed that which is normally possessed by a prudent person in the ordinary course of business dealings. This certification concerns a matter within the jurisdiction of an agency of the United States of America and the making of a false, fictitious, or fraudulent certification may render the maker subject to prosecution under Title 18, United States Code, Section 1001. Termination of Contract, 49 CFR Part 18.36(i)(2), FAA Order 5100.38. 1. TheSponsor may, by written notice, terminate this contract in whole or in part at any time, either for the Sponsor's convenience or because of failure to fulfill contract obligations. Upon receipt of such notice services shall be immediately discontinued (unless the notice directs otherwise) and all materials as may have been accumulated in performing this contract, whether completed or in progress, delivered to the Sponsor. 2. If the termination is for the convenience of the Sponsor, an equitable adjustment in the contract price shall be made, but no amount shall be allowed for anticipated profit on unperformed services. If the termination is due to failure to fulfill the contractor's obligations, the Sponsor may Page 6 of 8 '1 take over the work and prosecute the same to completion by contract or otherwise. In such case, the contractor shall be liable to the Sponsor for any additional cost occasioned to the Sponsor thereby. 4. If, after notice of termination for failure to fulfill contract obligations, it is determined that the contractor had not so failed, the termination shall be deemed to have been effected for the convenience of the Sponsor. In such event, adjustment in the contract price shall be made as provided in paragraph 2 of this clause. 5. The rights and remedies of the Sponsor provided in this clause are in addition to any other rights and remedies provided by law or under this contract. Certification Regarding Debarment, Suspension, Ineligibility, and Voluntary Exclusion, 49 CFR Part 29, FAA Order 5100.38. The bidder/offeror certifies, by submission of this proposal or acceptance of this contract, that neither it nor its principals is presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation in this transaction by any Federal department or agency. It further agrees by submitting this proposal that it will include this clause without modification in all lower tier transactions, solicitations, proposals, contracts and subcontracts. Where the bidder/offeror/contractor or any lower tier participant is unable to certify to this statement, it shall attach an explanation to this solicitation/proposal. All other terms and conditions of the original contract shall remain in effect. Page 7 of 8 IN WITNESS WHEREOF, the parties hereto have affixed their signatUres this , ) t.~,~ -s_ 2005. day of SPONSOR: PITKIN COUNTY COLORADO By ' ~r'tla~n~s 1~. ~lwood, A.A.E. Director of Aviation County Attorney ENGINEER: Carter & Burgess, Inc By // Ra~ndolph C.' Pierce Principal Page 8 of 8 ARFF/SRE FACILITY CONSTRUCTION SERVICES SCOPE OF WORK FOR ASPEN-PITKIN COUNTY AIRPORT ASPEN, COLORADO SCOPE OF WORK: This project will consist of Bidding, Project Management, Construction Administration, and Construction Observation for a new 30,000 SF ARFF/SRE Facility for Aspen-Pitkin County Airport. Project Packaging, Bidding, Construction Administration and Construction Observation are included for the ARFF/SRE Facility. The ARFF/SRE facility construction will be constructed concurrently with ESID Bid Package 4, a $7.0 Million dollar, 7 month, 24 hour per day project. The two projects will start almost simultaneously while Bid Package 4 will be completed at approximately the 70% completion stage of the ARFF/SRE Facility. The estimate completed as part of the bidding process indicates the project will cost approximately $10.4 million. PROJECT DESCRIPTION: The following elements are included in this project and are described in the subsequent scopes of work: Design ARFF/SRE Facility Schedule I Construct ARFF/SRE Facility Schedule II Construct ARFF/SRE Site Improvements Schedules I & II Description These schedules are described as the design of a new Aspen-Pitkin County Airport ARFF / SRE Maintenance and Storage Building in Aspen, Colorado to include necessary site improvements integrally related to the facility. The facility will include approximately 30,000 square feet of space, including storage and maintenance area for the Airport Fire and Rescue and snow removal equipment vehicles. A partial list of the support spaces Scope of Work Aspen-Pitkin County Airport Rev. No. 5 1 Aspen, CO AlP Project No. 3-08-0003-32 June 15, 2005 will include personnel offices, associated common areas necessary to operate in the intended manner, storage rooms for maintenance and materials, and Restroom/Lockers/Showers. As required by local code requirements three employee housing units are planned for construction under this project. Currently the Federal Aviation Administration does not recognize this code requirement as being federally eligible. The airfield electrical vault, currently in the existing ARFF/SRE facility will be relocated to the new facility. The building will be a site built commercial facility with exterior finishes to meet local requirements, with interior partition walls of concrete block and drywall where appropriate. The project site indicates a significant amount of embankment will be generated during construction. The excess embankment may be used to blend the facility into the hillside if feasible and may take the form of berms, fill against the structure and possibly incorporation into part of the roof structure. The building will be insulated and incorporate exposed concrete floors except in the administrative spaces and restroom areas where appropriate commercial floor coverings will be applied. The building will have mechanical and electrical systems as required to meet building codes and operational needs within the building. It is expected that a significant north-facing apron will be necessary based on site requirements. An exterior snowmelt system is expected to keep this area functional in the high mountain environment. The Federal Aviation Administration does not believe that this system is necessary and is not funding the exterior snowmelt piping. In addition to the standard electrical and mechanical systems, the facility will also house the airfield electrical vault. The airfield electrical vault controls navigational lighting for the runway system. For constructability reasons, the relocation of the airfield electrical vault is split between two separate contracts: All airfield equipment and ductwork outside the disturbance area for the facility will be installed by an Airfield electrician contracted under AlP 3-08-0003-31 (ALP-31) while the room and ductwork within the building site disturbance area will be installed by the facility contractor under AlP 3-08-0003-32. (AlP- 32) Once the room and ductwork is constructed under ALP-32 the ALP-31 contractor will be given access to the facility to complete the relocation process. The project will include utility extensions (water, sewer, natural gas, electric, telephone, cable TV, fiber optic data) and emergency standby power for the facility. For future development reasons, utility easements for some dry utilities and sewer will be constructed along the edge of the Runway safety area, requiring supervised nighttime construction. The project will include coordination of easements, utility extension for water, sewer, natural gas, electric, telephone, data and emergency standby power, the majority of the site grading (approx. 45,000 cy), including grading approximately 500 lineal feet of perimeter road and associated parking lots, drainage systems, area lighting, fencing, sidewalks, retaining walls, and related items. The utility extensions will come from various locations (e.g., along Owl Creek road and crossing the runway), with the Scope of Work Rev. No. 5 AlP Project No. 3-08-0003-32 Aspen-Pitkin County Airport Aspen, CO June 16, 2005 average length of each extension being 4000 feet. This phase will also incorporate a portion of the duct and related infrastructure necessary to relocating the airfield lighting circuit when the building is constructed. Construction Budget The total estimated project cost for ARFF/SRE Facility Design - ARFF/SRE Facility is $9.0 Million including the facility and site work. Landscaping is not included in this cost summary. Construction Administration will include all design disciplines required to ensure that requests for information are properly addressed. All requests will be routed through a construction administrator prior to review by the appropriate discipline to ensure proper coordination. The design team will include the following firms that were included in the design of the facility and their respective responsibilities: Carter & Burgess: Project Management/Construction Administration, Civil Engineering, and Airfield Electrical Engineering and all associated drawings and specifications Mainteoance Design Group: Equipment layouts and maintenance facility specialty items such as compressed air, equipment etc. Reno-Smith ,4rchltects: Local Architect responsible for Building Code Review, Architectural Drawings and specifications Beaudin Ganze: Facility Mechanical, Electrical and Plumbing design. McGlamery Structural Group: Facility structural design TG Malloy: Planning and zoning consultant responsible for preparation of documents necessary to obtain local planning and zoning approval for the new facility. Part A. Basic Services 1.0 Preliminary Design Phase 1.1 Preliminary meetings with the Sponsor and FAA. Meeting with the sponsor to determine critical dates, the feasibility of the proposed work and establish the need for topographical surveying and pavement testing. Various meetings during the design phase Scope of Work Aspen-Pitkin County Airport Rev. No. 5 3 AlP Project No. 3~08-0003-32 Aspen, CO June 16, 2005 will also be conducted to review the progress of the design and discuss construction details, proposed time frame of the construction, and special requirements of the project. It is anticipated that there will be approximately 5 meetings for the ARFF/SRE Facility with the Sponsor and/or the FAA, with some meetings occurring in Aspen and some in Denver. 1.2 Prepare Project Scope of Work and Contract. This includes establishing the scope of work through meeting with the Sponsor and the FAA. This also includes drafting the contract for work to be done by the Engineer for the Sponsor. 1.3 Coordinate Topographical Surveying. N/A Completed under Bid Package 3, AlP 3- 08-0003-28 1.4 Coordinate Pavement and Soil Testing. N/A Completed under Bid Package 3, AlP 3- 08-0003-28 1.5 Prepare Disadvantaged Business Enterprise (DBE) Goal. Completed under AlP 3-08- 0003-31 1.6 Prepare Federal Grant Application. This task consists of preparing the federal grant application. The Application will be submitted during the initial portion of the project. Preparation of the Application will include the following: Prepare Federal 424 form Prepare Project Funding Summary Prepare Program Narrative, discussing the Purpose and Need of the work and the Method of Accomplishment Prepare Preliminary Estimate Prepare the Sponsors Certification (Attachments 1, 2, 3, 4, and $) Attach the current Grant Assurances (check with FAA for current copy) The Engineer will submit the Application to the Sponsor for approval and signatures. After obtaining the necessary signatures, the Engineer will forward at least three copies of the signed Application to the FAA for further processing. The consultant will assist the sponsor in the preparation of necessary exhibits, cost estimates and appropriate attachments. 1.7 Prepare Environmental Checklist. Completed under AlP 3-08-0003-28 1.8 Update and Modify Exhibit *A~ Property Map. Engineer will review, and update, the Airport property map to include land parcels, ownership description, recording information (County records of Book and Page Numbers) and FAA interest and acquisition dates as available. Exhibit "A" will be based upon the Exhibit "A" approved submitted Scope of Work Rev. No. 5 AlP Project No. 3-08-0003-32 Aspen-Pitkin County Airport Aspen, CO June 16, 2005 under the Master Plan. The appropriate AlP project number will be placed on the Sponsor provided Exhibit "A" and the as-built condition will be shown at project completion. It is assumed that the product provided from the Master Planning process will meet the requirements of the Federal Aviation Administration (FAA) Northwest Mountain Region "ALP Checklist" criteria for Exhibit "A"s (current edition) and any revisions necessary for this update will not change the character of this product. 1.9 28 Topographical Surveying. N/A Completed under Bid Package 3, AlP 3-08-0003- Scope of Work Aspen-Pitkin County Airport Rev. No. 5 5 Aspen, CO AlP Project No. 3-08-0003.32 June 16, 2005 J ~:~..,._g~_ _j~m, ~ _~_ ~ ~_r~;L ~.~ g.~i~..~.v. _~ccal ~_g~_ ~_~_~ ml~3~.~.L~ ~ ~ ~ L~ ~QE ~ ~ ~ ~9.v..~ ~EE.,~.~ ~ a ~ ~i~ ~ ~$~ ~I Scope of Work ,Rev, No. 5 AlP Project No. 3-08-0003-32 Aspen-Pitkin County Airport Aspen, CO June 16, 2005 Scope of Work Rev. No. 5 AlP Project No. 3-08-0003-32 Aspen-Pitkin County Airport Aspen, CO June 16, 2005 Scope of Work Aspen-Pitkin County Airport Rev. No. 5 8 Aspen, CO q AlP Project No. 3-08-0003-32 June 16, 2005 I I Scope of Work Rev. No. 5 AlP Project No. 3-08-0003-32 9 Aspen-Pitkin County Airport Aspen, CO June 16, 2005 Scope of Work ,Rev. No. 5 AlP Project No. 3-08-0003-32 10 Aspen-Pitkin County Airport Aspen, CO June 16, 2005 Scope of Work Aspen-Pitkin County Airport Rev. No. 5 11 Aspen, CO AlP Project No. 3-08-0003-32 June 16, 2005 Scope of Work Rev. No. 5 12 Aspen-Pitkin County Airport AlP Project No. 3-08-0003-32 Aspen, CO June 16, 2005 Scope of Work Aspen-Pitkin County Airpo~ Rev. No. 5 13 Aspen~ CO AlP Project No. $-08-0003-32 June 16, 2005 Scope of Work Rev. No. 5 AlP Project No. 3-08-0003-32 14 Aspen-Pitkin County Airport Aspen, CO June 16, 2005 Scope of Work Aspen-Pitkin County Airport Rev. No. 5 15 AlP Project No. 3-08-0003-32 Aspen, CO June 16, 2005 Scope of Work Aspen-Pitkin County Airport Rev. No. 5 16 Aspen, CO AlP Project No. 3-08~0003-32 June 16, 2005 PART B Special Services will consist of construction construction coordination, providing on-site construction/project close out. administration for office support, pre- construction coordination and post- The following structure will be utilized to manage the processes involved with this project. Construction Administration AlP 3-08-0003-32 4.0 Construction Administration 4.1 Prepare Construction Contract and Documents. This item accounts for the Engineer's in-house efforts during and immediately after the project bid opening. Engineer will prepare the Notice of Award, Notice to Proceed and Contract Agreements for the Sponsor's approval and signatures. Appropriate copies will be submitted to the successful contractor(s) for their signatures. Engineer will make five copies of the plans and specifications for the contractor's use during construction. 4.2 Office Assistance. Office engineering staff, CADD personnel, and clerical staff Scope of Work Rev. No. 5 AlP Project No. 3-08-0003~32 17 Aspen-Pitkin County Airport Aspen, CO June 16, 2005 will be required to assist the Resident Engineer as necessary during construction. Specific items to be accomplished include compiling and sending additional information requested from the office to the project site, providing secondary engineering opinions on issues arising during construction, maintaining project files as necessary (field files are mirrored in the office for continuity) and various other items necessary in day to day operations. 4.3 Periodic Cost Estimates and Request for Reimbursement. Engineer will prepare periodic cost estimates during construction and FAA requests for reimbursement of funds. One copy of each request for reimbursement with multiple copies of backup documentation will be submitted to the Sponsor's representative for review and approval prior to the Sponsor submitting to the appropriate agency. 4.4 Weekly/Monthly Reports. Senior Project Manager will review progress reports weekly and monthly. 4.5 Material Submittal Review. Material submittal data will be reviewed and approved by office personnel if the Resident Engineer is unable to make final determination of compliance. This shall include subconsultants for the various disciplines. 4.6 Change Orders/SupplementalAgreements. Clerical and drafting personnel will assist the Project Manager with change orders and supplemental agreements as necessary. 4.7 Record Drawings. All drafting for the Final Record Drawings will be completed by office drafting personnel. One set of half size black-line drawings, full size black-line, one version of microfiche, and one electronic copy (in acceptable format) will be provided to the FAA, and the Sponsor. 4.8 Final Construction Report. The project manager will review the Final Construction Report and clerical will complete the associated typing following construction completion. Clerical will prepare the Require Project Closeout statements. Two copies of the Construction Report will be submitted to the Sponsor, one copy submitted to the FAA, and one copy kept on file. It is expected that revisions will be necessary following submission to the FAA for formatting. 5.0 Acceptance Testing 5.1 Acceptance Testing. Testing shall be the responsibility of the contractor. 6.0 Pre-Construction Coordination Phase. 6.1 Prepare Construction Management Plan. The Resident Engineer will obtain the Scope of Work Rev. No. 5 AlP Project No. 3-08-0003-32 18 Aspen-Pitkin County Airport Aspen, CO June 16, 2005 Contractor's Quality Control Plan (QC). After reviewing the QC Plan, the Engineer will prepare the Construction Management Plan (CMP), which requires data to be extracted form the QC Plan and combined with Sponsor information and Engineer information for project responsibilities. A preliminary copy of the CMP will be submitted to the Sponsor, and FAA for approval. After the FAA's review, the CMP may be revised or issued to the Contractor for use. This CMP will not address facility issues in detail. 6.2 Prepare Project Files. The Engineer is required to assure the construction contracts are in order, the bonds have been completed, and the contractor has been provided with adequate copies of the construction plans. The Plans will be updated to include all addenda items issued during bidding. Clerical will prepare the quantity sheets, testing sheets, construction report format, and all other documents necessary for the successful implementation and completion of the Project. 6.3 Prepare Pre-Construction Meeting. The Engineer will assure the Pre- construction meeting has been scheduled and all necessary parties have been informed. The Project Manager and the Resident Engineer will establish a pre-construction meeting to review FAA and project specific requirements prior to commencing construction. 6.4 Conduct Pre-Construction Meeting. The meeting will be conducted at the Airport and will include the Sponsor, FAA-ADO (if possible), FAA-ATC, CDOT, Contractor, subcontractors, airport tenants effected by the construction, and utility companies. Scope of Work Aspen-Pitkin County Airport Rev. No. 5 19 Aspen, CO AlP Project No. 3-08-0003-32 June 16, 2005 7.0 On-Site Construction Coordination Phase. This phase will consist of providing necessary construction coordination supervision for the duration of the project. Civil inspection running concurrently with AlP 3-08-0003-31 will be jointly inspected by personnel identified under a separate scope. For the duration of the project it is expected that primarily a staff engineer, a project administrator, a resident architect, and applicable submittal review subconsultants will be necessary. See specific sections below for durations and requirements. At least one of the field engineers will be a licensed engineer in the state of Colorado, or have an equivalent of 10 years of construction management experience. The construction is estimated to take 365 Calendar days. Some of the considerations affecting the overall time and staffing necessary to construct this project include: limited access for construction within the safety area during negotiated nightly closures, restrictions on access to the project site in order to maintain airport operations, and coordination between two separate contracts working simultaneously. 7.1 Field Inspection/Coordination. The Project Manager will attend approximately once per month the weekly construction meetings via phone or in person and deal with construction issues as necessary for the duration of the project. The Staff Engineer and any additional field personnel will attend all weekly meetings as available and coordinate all related agendas, paperwork and notifications for airport personnel. 7.2 Resident Engineering. The Staff Engineer and Project Administrator will provide necessary design clarification and construction coordination for the project and perform a portion of the coordination to include all project meetings etc. The staff engineer will be required to provide owner's representative services and civil inspection, for the project. It is expected that the Staff Engineer can complete these requirements in 150 calendar days at 10 hours per day. It is expected that an economy of scale is included in this amount due to the concurrent work being performed under AIP3-08-O003-31. The project administrator will be onsite for the project duration (365 calendar days) nine hours per day. A locally based resident architect will also be onsite approximately 1 day per week for building construction supervision for the duration of the project in addition to submittal requirements. During the On-Site Construction Coordination Phase, Resident Engineering staff are required to visually inspect all work performed by the contractor to assure conformance with the plans and specifications, issue Non-Compliance Reports if necessary, and coordinate all work being performed with Airport Operations on a daily basis. It is assumed that each person will be able to complete all necessary documentation and attend applicable meetings in the course of the applicable shifts. Nighttime construction Scope of Work Rev. No. 5 AlP Project No. 3-08-0003-32 2O Aspen-Pitkin County Airport Aspen, CO June 16, 2005 coordination for utility installation is assumed to run concurrently with AlP 3-08-0003-31 and is not included in this scope of work. Unless specifically excluded, all other items identified in Section 7.0 will be completed during the durations identified in this section. 7.3 Review MaterialSubmittaI. The construction coordination will also consist of reviewing and approving the shop drawings and material submittal data from the contractor. The Staff Engineer will review copies of the contractor's survey data for pavement grades and structure locations. The engineering staff will review other construction items for general compliance with the construction documents. The project administrator will maintain and track submittals, requests for information and related items from the contractor and the associated disciplines responsible for detailed review of documents. The contract administrator will distribute and collect submittals for distribution to the various parties. Review will be completed by the various disciplines. 7.4 Review Contractor Payroll Forms. The Project Administrator will be required to make employee interviews and review Contractor's weekly payroll records as required by the FAA. 7.5 Calculate Construction Quantities. The Project Administrator will maintain daily record of the progress with review by the Staff Engineer and will submit weekly reports to the Sponsor regarding the progress. The Staff Engineer will review the quantity records with the Contractor on a periodic basis. 7.6 Periodic Cost Estimates. The Project Administrator with supervision by the Staff Engineer will prepare the Periodic Cost Estimates and review the quantities with the Contractor. The Staff Engineer, Airport and Contractor will resolve discrepancies, or disagreements with the Contractors records. 7.7 Prepare Requests for Reimbursement. Project Administrator will utilize the cost estimates and prepare a mark-up of the RFR that will be submitted to the Staff Engineer for finalization. After receiving the RFR markup from the Staff Engineer, the Project Administrator will be required to verify all entries and then submit copies to the Sponsor for processing. 7.8 Prepare Daily Reports. The Engineer and Project Administrator will maintain a daily log of the construction activities and maintain construction photos for record keeping purposes. 7.9 Prepare/Submit Weekly Reports. The Project Administrator will prepare a weekly status report using the FAA's standard form with review by the Staff Engineer. The report will be submitted to the Sponsor, FAA, and Carter and Burgess, Inc. The Sponsor requires weekly reports. Scope of Work Rev. No. 5 21 Aspen-Pitkin County Airport Aspen, CO AlP Project No. 3-08-0003-32 June 16, 2005 7.10 Review QC/QA Results provided by Contractor. The Engineer will review and coordinate revisions by the contractor to QC/QA submittals performed as part of the acceptance testing required by standard specifications. This will occur on a weekly basis and at project completion prior to submittal to the FAA and Sponsor. 8.0 Post Construction Coordination Phase. This phase will consist of project close out and site cleanup. 8.1 Final Inspection. The project manager and Staff Engineer, along with the Sponsor and FAA will conduct the final inspection. 8.2 Final Surveys. The Staff Engineer will coordinate with the contractor for the final survey after the construction is completed. 8.3 Site Cleanup. The Staff Engineer will assure the Contractor has removed all construction equipment and construction debris from the airport, that all access points have been re-secured (fences repaired, gates closed and locked, keys returned, etc.) and the site is clean. 8.4 Engineering Record Drawings. The Staff Engineer in coordination with the Architect will prepare the Record Drawings indicating modifications made during construction. The actual drafting involved on these items is covered under the Construction Administration Phase of the project. 8.5 Engineering Final Construction Report. The Staff Engineer will prepare the final construction report with the assistance of the project administrator. The actual clerical work involved on this item is covered under the Construction Administration Phase of the project. 8.6 Summarize Project Costs. The Staff Engineer will be required to obtain all administrative expenses, engineering fees and costs, surveying costs, testing cost and contraction costs associated with project and assemble a total project summary. The summary will be compared with the available funding. 8.7 Assist with Audit. When requested by the Sponsor or FAA, the engineer will assist with the project, or year-end audit. The Staff Engineer with the assistance of the Project Administrator will provide files requested that are pertinent to the project cost and completion. Special Considerations. The following special considerations are required for this Scope of Work Rev. No. 5 AlP Project No. 3-08-0003-32 22 Aspen-Pitkin County Airport Aspen, CO June 16, 2005 project but will be completed by sub-consultants to the Engineer. The cost for this work will be included in the Engineering contract agreement with the Sponsor. Resident Building Construction Oversight Building Architects This shall consist of resident architectural oversight as defined in item 7.2. Submittal/RFI Review Structural, Mechanical, Electrical and Equipment Subconsultants. This shall include submittals requests for information, and construction inspection for the various subconsultants. Each discipline shall include 3 one-day site visits in their scope of services which shall be considered all necessary visits required to complete the project. All subconsultants are not locally based but within four hours driving distance. Scope of Work Rev. No. 5 AlP Project No. 3-08-0003-32 23 Aspen-Pitkin County Airport Aspen, CO June 16, 2005 PART II Detailed Engineering Fee Breakout Am~'ORI': Aspen-Pitkin County Airport LOCATION: Aspen, Colorado AlP PROJECT NO. 3-08-0003-32 PROJECT DESCRIPTION: Construct ARFF/SRE Facility Bidding and Construction Administration PROJECT NUMBER: 071056.105.1.1C~0 DATE: 24-Feb-05 REV. NO: 3 Revised for format 6-16-05 Proposed Independent Negotiated PART A - BASIC SERVICES 1.0 Preliminary Design Phase 2.0 Design Phase 3.0 Biddin,q Phase )TAL PART A-DESIGN PHASES PART B - SPECIAL SERVICES 4.0 Consffuction Administration Phase 6.0 Pre-Consh'ucfion Coordination Phase 7.0 Construction Coordination 8.0 Post Construction Phase IOTAL PART B-CONSTRUCTION PHASES DIRECt, SUBCONSULTANI'S Architectural Services MEP Services including Equipment Structural Services Planning Services Fee Fee Analysis Fee $18,641.00 So.aa $22,820.00 $41,461.00 90.00 90.00 $6,218.00 $5OO, 120.OO $85,077.00 $579,735.00 $0.OO $20,000.00 $18,00(3.00 9124.000.OO $0.OO PART A - BASIC SERVICES Item Principal Engineer / AssocJale Electrical No. Engineer Staff Engineer Planner Engineer Engineer 1.0 Preliminary Design Phase $160.00 $130.00 9110.00 $95.00 9100.00 Draftsman Clerical Total Misc. Cost $65.00 $55.00 Hours Costs Summary 1,1 Preliminary Meetings w/the Sponsor and FAA 15 40 12 12 4 83 910,280.00 1.2 Prepare Project Scope of Work and Contract 3 18 0 0 5 26 $0,095.00 1.3 Coordinate Topographical Surveying 0 0 0 0 1.4 Coordinate Pavement and Soil Testing/ 0 0 0 0 0 0 0 1.5 Prepare DBE Goal 0 0 0 o o ~.oo 1.6 Prepare Federal Grant Application 0 3 12 4 4 6 29 $2,680.00 1.? Prepare Environmental Checklist 0 0 0 0 0 0 0 0 $0.OO hB Update and Modify Exhibit"A" Property Map 0 0 1 0 0 8 0 9 $530.00 1.9 Topographical Surveying 0 0 0 0 0 0 0 $O.OO 0 $O,OO Estimated Total Man-hours 18 61 28 16 0 12 15 147 1.9o Reimbursables Summon/Costs $2,880.00 $7,930.00 $2,750.00 $1,520.00 $780.00 1.91 Computer Cost 12.8 12 24.8 $25.00 9620.00 1.92 Miscellaneous 1.93 AU~ Renal 2 4 Days 970.00 92aa.aa Mileage 800 1600 Mi $0.36 $576.OO 1.95 Lodging and Per Diem 3 3 Days $160.aa $480.00 Page 1 6/17/2005 PART II Detailed Engineering Fee Breakout AmPom: Aspen-Pitkin County Airpod LOCATION: Aspen, Colorado AlP PROJECTNO. 3-C~0003-32 Total Preliminary Design Phase Checks DATE: 24-Feb-05 Page 2 e.,17/2oee PART II Detailed Engineering Fee Breakout AIRPOST: Aspen-Pitkin County Airport £OC~,.ON: Aspen, Colorado PROJECT NUMBER: 071056.105.1.1000 REV. NO: 3 Principal Engineer / Associate Electrical Engineer Staff Engineer Planner Engineer Engineer Draftsman Clerical Total Misc. Cost $160.00 $130.00 $110.00 $95.00 $100.00 $65.00 $55.00 Hours Costs Summary PART A - BASIC SERVICES (CONT.) 2.0 Design Phase NONE NONE NONE Page 3 es?~oos PART II Detailed Engineering Fee Breakout AIRPORT: Aspen-Pitkin County Airport LOCATION: Aspen, Colorado AlP PROJECT NO. 3-06-0003-32 PART A - BASIC SERVICES (CONT.) PROJECT NUMBER: 071056.105.1.~ 0CO DATE: 24-Feb-05 REV. NO: 3 Item Pdncipal Engineer/ Associate Electrical No. Engineer Staff Engineer Planner Engineer Engineer Draftsman Clerical Total Misc. Cost 3~) Bidding Phme $160.00 $130.00 $110.00 $95.00 $100.00 $65.00 $55.00 Hours Costs Summaw 3.1 Advedise for Bids 1 4 24 29 $2,000.00 3.2 Prepare/Conduct Pre-Bid Meeting 1 12 0 4 17 $h940.00 3,3 Prepare Addenda 8 12 24 24 68 $5,060.00 3.4 Consult with Prospective Bidders 2 25 12 39 $4,710.00 3.5 Conduct Bid Opening 0 12 12 $1,560.00 3.6 Review Bid Proposals 4 12 12 28 $2,860.00 3.7 Prepare Recommendation of Award 5 8 12 25 $2,500.C Estimated Total Man.hours 13 81 0 24 0 24 76 218 3.90 Reimbur*,,b!e~ Summary Costs ~2,080.00 $10,530.00 ~0.00 ~2,280.00 $0.00 $1,560.00 ~1,180.00 $0.00 3.91 Computer Cost 19.2 24 43.2 $25.00 $1,080.00 3.92 Miscellaneous $0.00 3.92 Auto Rental 1 2 3 Days $70.00 $210.00 3.94 Mileage 500 500 Mi $0.36 ,$180.00 3.95 Lod~Jin~ and Per Diem 2 0 2 Days $160.00 $320.00 3.96 Travel and Airline Costs 1 0 1 Trips $400.00 $400.00 Total Bidding Phase $22,820.00 Checks Page 4 PART II Detailed Engineering Fee Breakout AIRPORT: Aspen-Pitkin County Airporl LOCATION: Aspen, Colorado PROJECT NUMBER: 071056.105,1.10g0 DATE: 24-Feb-05 REV. NO: 3 PART B - SPECIAL SERVICES Item Principal Engineer/ Associate Electrical No. Engineer Staff Engineer Planner Engineer Engineer Draftsman Clerical Total Misc. Cost 4.0 Construction Administration Phase $160.00 $130.00 $110.00 $95.00 $100.00 $65.00 $55.00 Hours Costs Summary 4.~ Prepare Construction Contracts and Docs 18 8 12 38 $5,400.00 4.2 Office Assistance 2 8 30 40 $3,010.00 4.3 Periodic Cost Estimate and RFR 4 $2 16 $2,200.00 4.4 Weekly/Monthly Reports 4 12 16 $2,200.0 4.5 Material Submittal Review 10 35 0 10 55 $4,975.00 25 Change Orders/Supplemental Agreements 3 5 5 35 0 25 25 98 $8,005.00 4.7 Record Drawings 30 6 36 $2,280.00 4.8 Final Construction Report 5 10 40 5 3,5 95 $7,800.0C Estimated Total Man.hours 13 42 43 118 0 60 118 394 Summary Costs $2,080.00 5S,460.00 ~4,730.00 $11,210.00 50.00 53,900.00 $6,490.00 $0.00 4.9O Fixed Fee/Relmbu,~_~b!e~ 4.91 Fixed Fee 4.92 Computer Cost 118 60 178 $25.00 $4,450.00 4.93 Miscellaneous $0.00 4.94 Auto Rental 0 Days $70.00 $0.00 4.95 Mileage 0 Mi $0.36 $0.00 4.96 Lodging and Per Diem 0 Days $160.00 $0.00 4.97 Travel and Airline Costs 0 Trips $400.00 $0.00 Total Construction Administration ~38,320.00 Checks Item Principal Engineer/ Associate Electrical No. Engineer Staff Engineer Planner Engineer Engineer Draftsman Clerical Total Misc. Cost 5~) Acceptance Testing $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Hours Costs Summary 5.1 Acceptance Testing NONE Item Principal Engineer/ Associate Electrical No. Engineer Staff Engineer Planner Engineer Engineer Draftsman Clerical Tolal Misc. Cost 6.0 Pre.Conshuction Coordination Phase $160.00 $130.00 $l 10.00 $95.00 $100.00 $65.00 $55.00 Hours Costs Summary 6.1 Prepare Construction Management Plan 20 20 $2,200.00 6.2 Prepare Proiects Files 2 12 14 $920.00 6.3 Prepare for Pre-Construction Meeting 6.4 Conduct Pre-Construction Meeting 4 2 6 $630.00 10 2 12 $1,410.00 Estimated Total Man-houTE 0 16 20 0 0 0 16 52 Summary Costs ~0.00 ~2,080.00 S2,200.D0 ~0.00 ~0.00 50.00 ~880.00 ~0.00 6.9o Fixed Fee/ReJmbuTEables 6.91 F~xed Fee $774.00 Page 5 ~ ?rzms PART II Detailed Engineering Fee Breakout AIR~'ORT: Aspen-Pitkin County Airport PROJECT NUMBER: 071056.105.1.10~0 LOCATION: Aspen, Colorado DATE: 24-Feb,5 AIF FI~OJECT NO. 3K]8-0003-32 REV. NO: 3 6.92 Computer Cost 0 0 0 $25.00 $0.00 6,93 Miscellaneous $0.0( 6.94 Auto Rental 2 2 Days $70.00 $140.00 6.95 Mileage 400 400 Mi $0.36 $144.00 6,96 Lod~ling and Per Diem 0 0 Days $160.00 $0.00 6.97 Travel and Airline Costs 0 0 Trips $400.00 Total Pre. Construction Phase :~,|~,,~ed Total Man.hours 160 2644 2350 95 1 O0 65 967 0 Summary Costs $0.00 50.00 ~.00 $0.00 $0.00 50.00 ~0.00 50.00 $0.00 Page 6 ~'~ ?rzoes PART II Detailed Engineering Fee Breakout AIRPORT: Aspen-Pitkin County AJlport LOCATION: Aspen, Colorado AlP PROJEC'f NO. 3-08-0003-32 PART B - SPECIAL SERVICES (CONT.) Item Principal Engineer/ Associate Electrical No. Construction Coordination Engineer Staff Engineer Planner Engineer Engineer 7~ $160.00 $130.00 $110.00 $95.00 $100.00 7.1 Field Inspection/Coordination 40 0 0 0 0 PROJECT NUMBER: 071056.105.1.1000 DATE: 24-Feb-05 REV. NO: 3 Clerical Total Misc. Cost $35.00 Hours Costs Summary 0 0 40 $6,400.00 7.2 Resident Engineering 0 1500 0 0 0 2920 0 4420 $384,800.00 7~3 Review Material Submittal 0 0 0 0 0 0 0 0 $0.00 7.4 Review Contractor PayroJl Forms 0 0 0 0 0 0 0 0 $0.00 7.5 Calculate Conslru¢fion Quantities 0 0 0 0 0 0 0 0 ,$0.00 7.6 Periodic Cost Estimates 0 0 0 0 0 0 0 0 $0.00 7.7 Prepare Requests for Reimbursement 0 0 0 0 0 0 0 0 $C).00 7~ Prepare Daily Repods 0 0 0 0 0 0 0 0 $0.00 7.9 Prepare/Submit Weekly Reports 0 0 0 0 0 0 0 0 $0.00 7.10 Review QC/QA Results provided by Contractor 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0.00 Estimated Total Man.hours 40 1500 0 0 0 2920 0 4460 Summary Costs Sa,4oo.00 S195,000.00 S0.00 ~0.00 $0.00 $189,800.00 ~0.00 $0.00 7.9o Rxed Fee/Reimbursables 7.91 FJxecI Fee 7.92 Miscellaneous 0 Days $0.00 7.93 Auto Rental 5 150 0 0 365 520 Days $70.00 $36,400.00 J 7.94 Mileage 2000 150g0 0 0 20000 37000 Mi $0.36 $13,320.00 J 7.95 Lod~in~ and Per Diem 5 0 0 0 365 370 Days $160.00 $39,200.00 J 7.96 Travel and Airline costs 0 0 Trips $400.00 Total Construction Phase ,~500t120.00 J Checks Page PART II Detailed Engineering Fee Breakout AIR~'ORI: Aspen-Pitkin Counfy Airport LOCATION: Aspen, CoJo~ado AlP PROJECT NO. 3-0~0003-32 PART B - SPECIAL SERVICES (CONT.) PROJECT NUMBER: 071056,105.1,1C~0 DATE: 24-Feb-OS REV. NO: 3 ~tem Principal Engineer/ Associate Electrical No. Engineer Staff Engineer Planner Engineer Engineer Draftsman Cledcol Total Misc. Cost 8.0 Fad Construction Phase $160.00 $130.00 $110.00 $95.00 $100.00 $65.00 $55.00 Hours Costs Summary 8.~ Conduct Final Inspection 12 12 24 $2,880.00 8.2 Coordinate Final Surveys 16 16 32 $3,280.00 8.3 Prepare Clean-up Item List 40 40 $4,400.00 8.4 Engineering Record Drawings 50 50 $3,250.00 8.5 Engineering Final Construction Report 4 30 50 35 119 $10,495.00 8.6 Summarize Project Costs 15 20 8 43 $3,990.00 8.7 Assist with Project Audit 6 12 6 24 $2,130.00 Estimated Total Man-hours 0 16 119 98 0 50 49 332 Summary Costs ~0.00 $2,080.00 S13,090.00 $9,310.00 $0.00 ~3,250.00 $2,695.00 SO.00 s.~o fixed Fee/Reimbursables 8.91 Eixed Fee ,:~4,564.00 8.92 Computer Cost 0 0 0 $25.00 $0.00 8.93 Miscellaneous $0.00 $0.00 8.94 Auto Rental I 1 Days $70.00 $70.~O 8.95 Mileage 50 50 Mi $0.36 $18.~O 8.96 Lodging and Per Diem 0 Days $160.00 $0.00 8.97 Travel and Aidine Costs 0 Tdps $400.00 .~0.00 Total Post Construction Phase ,~35,077.00 Checks Page 8 e~ ?r~co5