Loading...
HomeMy WebLinkAboutbocc.con.001.2006 CLERK'S CHECK LIST FOR CONTRACTS SUBMITTED TO CLERK AND RECORDER FOR SCANNING/ARCHIVING CONTRACT #: 001-06 Originating Department/Division: Resource Recovery Contact Person: Chris IIoofnagle Phone #: 429-2882 Project Name Engineering Services o BOCC AGENDA ITEM (BOCC signature required) lX]STAFF AUTHORIZED SIGNATURE (per Revised Procurement Code 7/2005) Check procurement type: DNone DInformal DFormal [ZJSole Source DEmergency DState Bid 0 Check Contract Tvpe: Dollar Amount: $77,000 Budget Line Item/Ledger Number 416.68.92664.86849; and 416.68.92664.86850 DEmployment (for county employees) DIntergovernmental Agreement (Requires BOCC Action) DNon-Profit DQuasi-Public DGrant Agreements (Requires BOCC Action) DChange Order/Contract Amendment C81Services/Maintenance DLicense/U se DLease DConstruction DGoods, Equipment, Supplies DOther (e.g. revenue) ContractorlBusiness (Complete Name): Golder Associates, Inc. Contract Execution Date: January I, 2006 Contract End Date: December 31, 2009 Automatic Renewal (YDNLXJ) Term of Contract: 4 years All Contracts should be proofed for the following: C81No Pages Missing C81If a Page is Left Intentionally Blank -Note on Page C81Page numbered consecutively C81All Signatures Affixed C81All Dates Filled In C81All Other Blanks Filled In C81All Exhibits Attached DAll Legal Descriptions Attached (if appropriate) DNotice of Award/Proceed Attached (if appropriate) DSpecial Instructions for Finance Department: C81Sent to Clerk and Recorder for Scanningl Archiving C81Authorized Staff Person's Name: Chris Hoofnag1e BY CHECKING ABOVE AND ENTERING NAME, THE AUTHORIZED STAFF PERSON INDICATES THAT DOCUMENT HAS BEEN PROOFED AND READY FOR SCANNING. Note: Clerk's Office will keep original documents in compliance with Colorado State Archives retainage schedule. Amended 5-12-06 I Rev. 10/24/05 dq CONTRACT FOR PROVISION OF SERVICES Contract # 001-06 Ledger # THIS CONTRACT is made and entered by and between the Pitkin County Board of County Commissioners ("County") and Golder Associates, Inc. 44 Union Blvd, Suite 300, Lakewood, CO 80228 (hereinafter "Contractor"). 1. Term. The term of this contract is from January 1. 2006 to December 31. 2009. At the expiration of the initial term, the contract may be extended for an additional term of up to five (5) years by the express written consent of both parties. 2. Contractor's Obligations. At the end of each calendar year in the contract term, the contractor shall provide a scope of services and cost estimate to be approved and accepted by the Solid Waste Manager. The scope will include those items that the Solid Waste Manager has requested for upcoming year. Work will progress each year according to the scope developed by Golder at the Solid Waste Managers request. At no time shall costs for services exceed the estimate in a given project task or calendar year without consent ofthe Solid Waste Manager. The agreed upon scope and estimate for calendar year 2006 is attached as exhibit A ofthese contract documents. 3. Compensation and Expenses, Invoicing, Payment and Offset. The County shall compensate Contractor for its services in accordance with the Project Budget and Schedule set out in Paragraph 2. It is expressly understood and agreed that in no event will the total compensation and reimbursement to be paid hereunder exceed the accepted estimate provided by Golder for project tasks or a calendar year for all services rendered. By contract or amendment, the County and Contractor may reallocate the budget among project tasks if the total budget amount remains unchanged. Contractor shall invoice for the project monthly based on hours worked, with payment expected within thirty (30) days of invoice, but any payment by the County may be offset by any amount the Contractor owes the County for any reason. 4. County'S Exclusive Ownership of Work Product. Drawings, specifications, guidelines and other documents prepared by Contractor in connection with this contract shall be the property of the County. However, Contractor shall have the right to utilize such documents in the course of its marketing, professional presentations, and for other ~ business purposes. Contractor assigns to County the copyrights to all work prepared, developed, or created pursuant to this contract, including the right to: 1) reproduce the work; 2) prepare derivative works; 3) distribute copies to the public; 4) perform the works publicly; and 5) to display the work publicly. Contractor shall have right to use materials produced in the course ofthis contract for marketing purposes and professional presentations, articles, speeches and other business purposes. 5. Pitkin County'S Obligations. Pitkin County shall administer this contract through a County Representative. Chris Hoofnagle will manage the project as the County's Representative. In the event that Chris Hoofnagle is not available, Brian Pettet shall assume the County Representative's duties. The services provided and products delivered by the Contractor under this contract will be subject to review by the County's Representatives, or a designee, for compliance with Contractor's obligations prior to final payment. 6. Termination Prior to Expiration of Contract Term. The County has the right to terminate this contract, with or without cause, by giving written notice to the Contractor of such termination and specifying the effective date thereof. Such notice shall be given at least ten (10) days before the effective date of such termination. In such event all finished or unfinished documents, data, studies and reports prepared by the Contractor pursuant to this contract shall become the County's property. Contractor shall be entitled to receive compensation in accordance with the contract for any satisfactory work completed pursuant to the terms ofthis contract prior to the date oftermination. Not withstanding the above, Contractor shall not be relieved ofliability to the County for damages sustained by the County by virtue of any breach of the contract by the Contractor. 7. Independent Contractor Status. A. The parties to this contract intend that the relationship between them contemplated by the contract is that of independent Contractor. Contractor, and any agent, employee, or servant of Contractor shall not be deemed to be an employee, agent, or servant of Pitkin County. B. Contractor is not required to offer his services exclusively to Pitkin County under this contract. Contractor may choose to work for other individuals or entities during the term ofthis contract, provided that the basic services and deliverable products required under this contract are submitted in the manner and on the schedule defined under this contract. C. Contractor will conduct all work in a manner that all work produced will conform to all applicable industry standard of care, skill and diligence in the performance of Contractor's obligations under this contract. D. Contractor shall not attempt to oversee or supervise the work or actions of any Pitkin County employee, servant or agent in the course of completing work under this contract. 3 E. Contractor is not entitled to any Workers' Compensation benefits through Pitkin County and is responsible for payment of any federal, state, FICA and other income taxes. 8 Assil!Ilability. This contract is not assignable by either party. Any use of subcontractors by the Contractor for performance of this contract must be accepted in writing by the County. 9. Binding Arbitration. Any disputes arising out ofthis contract shall be subject to binding arbitration. The parties agree that any disputes concerning the terms and conditions of this contract shall be submitted and finally settled by arbitration. Arbitration shall be conducted pursuant to the rules of the American Arbitration Association and shall be presided over by the Pitkin County Hearing Officer appointed to arbitrate Pitkin County contract disputes. Costs of the arbitration shall be awarded to the substantially prevailing party. 10. Severability. In the event that any provision ofthis contract shall be held to be invalid or unenforceable, the remaining provisions of this contract shall remain valid and binding upon the parties hereto 11. Integration and Modification. A. This contract represents the entire and integrated contract between the County and the Contractor and supersedes all prior negotiations, representations, or contract, either written or oral. This contract may be amended only by written contract signed by both the County and the Contractor. B. The County may, from time to time, request changes in the scope of services of the Contractor to be performed hereunder. Such changes, including the increase or decrease in the amount ofthe Contractor's compensation, which are mutually agreed upon between the County and the Contractor, shall be in writing and upon execution shall become part of this contract. 12. Indemnity. The Contractor (including, by definition here and hereinafter, its officials, employees, agents and representatives, subcontractors and suppliers), shall and hereby does release, discharge, indemnify and hold harmless the County of Pitkin and its officials, employees, agents and representatives from and against liability for any claim, demand, loss, damages, penalty, judgment, expenses, costs (including costs of investigation and defense), fees (including reasonable attorney and expert witness fees) or compensation in any form or kind whatsoever for any bodily injury, death, personal injury or property damage arising out of or in connection with any negligent act, intentional act, error or omission by the Contractor, and for any consequential liability alleged to accrue against the County on account of the Contractor's acts, errors or omissions; provided, however, that such indemnity shall not be construed as an indemnity for bodily injury or property damage arising from the negligence of the County or its employees. 4 The Contractor further shall investigate process, respond to, adjust, provide defense for and defend, payor settle all claims, demands, or lawsuits related to any negligent act, error or omissions by the contractor at its sole expense and shall bear all other costs and expenses related thereto, even if the claim, demand or lawsuit is groundless, false or fraudulent. County agrees to limit the liability of the Contractor, its employees, officers, directors, agents, consultants, and subcontractors to Contractor, its employees, officers, directors, agents, consultants, and subcontractors, whether in contract or tort, which arises directly or indirectly from the Contractor's acts, errors, or omissions, such that the total aggregate liability of Contractor to all those named shall not exceed the limits and conditions of the applicable insurance as specified in the agreement, $1,000,000.00 per claim and $3,000,000.00 aggregated for professional errors and omissions. Should the required insurance company deny coverage for any claim, Contractor will remain liable for claims to the extent limited by this contract. 13. Insurance. A. In whole or in part, the Contractor shall secure and maintain for the term of its contractual relationship with the County such insurance policies, from companies licensed in the State of Colorado, as will protect itself, the County and others as specified from claims for bodily injuries, death, personal injury or property damage, which may arise out of or result from the Contractor's acts, errors or omissions. The following insur- ance coverage, at or above the limits indicated and including such endorsements as are indicated by an "X", are required: 1. Statutory Workers' Compensation: Colorado statutory minimums 2. Commercial General Liability- ISO 1998 Form or equivalent (With County named additional insured) Each Occurrence Limit $1,000,000.00 General Aggregate Limit $2,000,000.00 Products/Comp1eted Operations Aggregate Limit $2,000,000.00 Comprehensive Form (All risks) to include ----X- PremiseslOperations Underground, Explosion & Collapse Hazard ----X- Products/Completed Operations ----X- Contractual Liability ----X- Independent Contractors and Subcontractors ----X- Broad Form Property Damage ----X- Personal Injury 3. Business Auto Coverage: Combined Single Limit Liability (each accident) $1.000.000.00 4. Special Coverages (check as appropriate and insert amount): (1) Performance Bond Labor and Material Payment Bond s l (2) Professional Errors and Omissions $1.000.000.00 l Per project aggregate $3.000.000.00 (3) Aircraft Liability (4) Owner's Protective (5) Builder's Risk (6) Boiler and Machinery (7) Loss of Use Insurance (8) Pollution Liability (9) Crime, including Employee Dishonesty Coverage, or Fidelity Bond B. Proof of Insurance: 1. To provide evidence ofthe required insurance coverage, copies of Certificates of Insurance in a form acceptable to the County shall be filed with the County through the representative identified in Paragraph 5, no later than ten (10) calendar days prior to commencement of operations affecting the County. Failure to file or maintain acceptable Certificates of Insurance with the County is agreed to be a material breach of any contract. These Certificates of Insurance shall contain a provision that coverage afforded under the policies will not be canceled or materially altered unless at least thirty (30) calendar days prior written notice by certified mail, return receipt requested (effective upon proper mailing), has been sent to the County (through the County's Risk Department). (For purposes of this provision, "materially altered" shall mean a change affecting the coverage's required herein, including a change to policy limits as set out in the then-current policy declarations page). Simultaneously with the Certificates of Insurance, the Contractor shall file with the County's Risk Department (and promptly update, as necessary) a certified statement as to claims pending against the required coverage, reserves established on account of such claims, defense costs expended and amounts remaining on policy limits. 2. In addition, these Certificates of Insurance shall contain the following clauses: a. The clause "other insurance provisions," in a policy in which the County of Pitkin holds a Certificate, shall not apply to the County of Pitkin. b. The insurance companies issuing the policy or policies hereunder shall have no recourse against the County of Pitkin for payment of any premiums or for assessments under any form of policy. c. Any and all deductibles in the above-described insurance policies shall be assumed by and be for the amount of, and at the sole expense of the Contractor. d. Location of operations shall be: "all operations and locations at which work for the referenced Project is being done." ~ 3. Certificates of Insurance for all renewal policies shall be delivered to the County's Representative at least fifteen (15) days prior to a policy's expiration date except for any policy expiring on the expiration date of this contract or there- after. 4. The County reserves the right to request and receive a copy of any policy and any policy endorsement at any time during the term of this contract. 14. Exemptions and Preferences. All purchases of construction or building or any other materials for this contract shall not include Federal Excise Taxes or Colorado State or local sales or use taxes. Pitkin County is exempt from such taxes under registration numbers 98-02624 and 84-78000-5K. 15. Records. The Contractor shall maintain comprehensive, complete and accurate books, records, and documents concerning its performance relating to this contract for a period ofthree (3) years after final payment under the contract and the County shall have the right within the three (3) year period to inspect and audit these books, records and documents, upon demand, in a reasonable manner and at reasonable times, for the purpose of determining, by accepted accounting and auditing standards, compliance with all provisions of the contract and applicable law. 16. Contract Made in Colorado. The parties agree that this contract was made in accordance with the laws of the State of Colorado and shall be so construed. Venue is agreed to be exclusively in the courts of Pitkin County, Colorado. 17. Attorney's Fees. In the event that legal action is necessary to enforce any of the provisions of this contract beyond the arbitration described in Paragraph 9, the substantially prevailing party shall be entitled to its costs and reasonable attorney's fees. 18. Governmental Immunity. Contractor agrees and understands that Pitkin County is relying on and does not waive, by any provision ofthis contract, the monetary limitations or terms (presently $150,000.00 per person and $600,000 per occurrence) or any other rights, immunities, and protections provided by the Colorado Governmental Immunity Act, 24-10-101, et. Seq., C.R.S., as from time to time amended, or otherwise available to Pitkin County or any of its officers, agents or employees. Further, nothing in this contract shall be construed or interpreted to require or provide for indemnification of the Contractor by the County for any injury to any person or any property damage whatsoever which is caused by the negligence or other misconduct ofthe County or its agent or employees. 19. Current Vear Obligations. The parties acknowledge and agree that any payments provided for hereunder or requirements for future appropriations shall constitute only currently budgeted expenditures of Pitkin County. Pitkin County's obligations under this contract are subject to Pitkin County's annual right to budget and appropriate the sums necessary to provide the services set forth herein. No provisions of the contract shall constitute a mandatory charge or requirement in any ensuing fiscal year beyond the then current fiscal year of Pitkin County. No provision of the contract shall be construed or 1 interpreted as creating a multiple-fiscal year direct or indirect debt or other financial obligation of Pitkin County within the meaning of any constitutional or statutory debt limitation. This contract shall not directly or indirectly obligate Pitkin County to make any payments beyond those appropriated for Pitkin County's then current fiscal year. No provisions of this contract shall be construed to pledge or create a lien on any class or source of Pitkin County's moneys, nor shall any provision ofthis contract restrict the future issuance of Pitkin County's bonds or any obligations payable from any class or source of Pitkin County's money. 20. Standard of Care Services performed by Contractor will be conducted in a manner consistent with that level of care and skill ordinarily exercised by other members of the engineering and science professions currently practicing under similar conditions subject to the time limits and financial, physical or any other constraints applicable to the Services. No warranty, express or implied is made. 21. Notice. Any written notice required by this contract shall be deemed delivered through any of the following: (1) hand delivery to the person at the address below; (2) delivery by facsimile with confirmation of receipt to the fax number below; or (3) within three (3) days of being sent certified first class mail, postage prepaid, return receipt requested addressed as follows: A. To Pitkin County Chris Hoofnagle 76 Service Center Road Aspen, CO 81611 Fax: (970) 923-2043 with copies to: Pitkin County Attorney's Office 530 E. Main Street, #302 Aspen, Colorado 81611 Fax: (970) 920-5198 B. To Contractor: Mr. Ed Pottorff, Project Manager Golder Associates 44 Union Blvd. Lakewood, Colorado 80228 Fax (303) 985-2080 IN WITNESS WHEREOF, the parties have executed this contract as of the date first set out herein above. CONTRACTOR: By: fl... ",..., ~ ? Title V,Po ,IDs-/tJ' . Date C6 BOARD of COUNTY COMMISIONERS OF PITKIN COUNTY, COLORADO: By: t!.-.~ Chris 'Hoofn Solid Waste Manager 1.1l-0~ Date y Manager 1,/S ,0,4 ~ Exhibit A December 22, 2005 OurRef.: P052200142 Pitkin County Solid Waste Center 76 Service Center Road Aspen, Colorado 81611 Attention: Mr. Chris Hoofnagle RE: SCOPE OF WORK FOR CONTINUING HYDROGEOLOGIC AND ENGINEERING SERVICES DURING 2006 FOR THE PITKIN COUNTY SOLID WASTE CENTER Dear Chris: At your request, Golder is providing a scope and cost estimate for hydrogeologic and engineering consulting services for 2006. Please note that Golder's existing general services agreement with Pitkin County (the County) is only valid through December 31, 2005. Consequently, Golder understands that the County will modify the agreement term and issue a revised agreement for Golder to review and sign. Golder will continue to use the current Project Number, 013-2298, for the 2006 work. 1.0 HYDROGEOLOGIC SERVICES SCOPE OF WORK The following tasks are envisioned for hydrogeologic services. Costs associated with each task are presented in Table 1A and are based on 2006 rates. Task 1.1 - Landfill Gas Monitoring and Compliance Support Anticipated services for this task include continued assistance with landfill gas (LFG) monitoring activities. The specific task activities are as follows. . Golder will address comments from the Colorado Department of Public Health and Environment (CDPHE) regarding any landfill gas (LFG) measurements, submit 2006 gas monitoring data to CDPHE, and continue to assist the County with equipment needs/problems which may occur in 2006. . If required by CDPHE, Golder will assist the County with any LFG sampling and analysis, data evaluation, and reporting. Because these activities may not be necessary and are not anticipated, they are costed separately in Table IA and include costs for laboratory analysis similar to that performed in 2004. The level of effort for addressing CDPHE comments and assisting the County with equipment needs/problems is difficult to estimate accurately at this time. Costs for installing additional gas probes, should this be required by CDPHE, are not included. It is assumed that any reporting associated with this task will be included in the annual evaluation of the effectiveness of corrective measures report described in Task 1.4, below. The estimates for ,0 this task will be adjusted, if necessary, with the concurrence of the County should additional work be required as the year progresses. Task 1.2 - Database Maintenance and Environmental Statistics This is an ongoing task and will include the following activities in 2006: . validation of the laboratory reports; . entry of the analytical results in the water quality database; . management of the water quality database; · furnishing copies of the laboratory reports and database to CDPHE and the County; . performing comparative statistical analysis; and · preparing semi-annual reports summarizing the results of the statistical analysis. A draft copy of each report will be submitted to the County for review. Once the comments are received, Golder will finalize the report and issue one copy directly to CDPHE and two copies to the County. Because the fourth quarter laboratory reports are generally not received by Golder until late in the year, work on the second semi-annual report will likely carry over into 2007. Task 1.3 - Groundwater Monitoring Support Anticipated services for this task include continued assistance with groundwater sampling activities. These consist of: . sampling schedules and bottle orders; . resolving laboratory and analytical issues; . assisting the County with equipment needs/problems; . performing a monitoring audit (optional); and . assisting the County with environmental sampling training and the preparation of a training manual (optional). The level of effort for 2006 is difficult to estimate accurately at this time but is generally based on time actually spent for this task in 2005. The monitoring audit and environmental sampling training and training manual are regarded as optional items; these activities are casted separately in Table IA. Cost estimates for Task 1.3 will be adjusted, if necessary, with the concurrence of the County should additional work be required as the year progresses. , \ Task 1.4 - Miscellaneous Consulting The activities presently anticipated for this task in 2006 include: . preparation of the annual evaluation of the effectiveness of corrective measures report (to be completed in early 2007); . meetings with County personnel to discuss 2006 activities; and . other hydrogeological support work that may be requested by the County in 2006 but has not yet been defined (optional). The 2005 annual evaluation of the effectiveness of corrective measures report will be completed in early 2006; the budget for this report was presented in the 2005 cost estimate. Costs for the 2006 annual evaluation of the effectiveness of correction measures report, to be completed in early 2007, are presented in Table lA. Presently, the County is scheduled to meet with Golder, at Golder's office, on January 5, 2006 to review current and future projects at the Solid Waste Center. Estimates costs for these meetings are presented as a separate item in Task 1.4 of Table 1A. Since it is uncertain at this time whether the County will require any work activities other than the 2006 annual report and January meetings, the level of effort for the optional hydrogeologic support activities is difficult to estimate accurately at this time. Thus, these activities are costed separately in Table 1A and this budget will only be used if needed. The costs associates with this task can be adjusted, if necessary, with the concurrence of the County should additional work outside the original scope be required as the year progresses. 2.0 Engineering Services Scope of Work The following tasks are envisioned for engineering services. Costs associated with each task are presented in Table 1B and are based on 2006 rates. Golder's 2006 Rate Schedule for Soils Laboratory Testing and Equipment are included in Attachment 1 for reference, should the County wish to submit potential final cover soil or other samples for testing in 2006. Thus, no soil testing costs are included in the 2006 proposal. Task 2.1 - Update Closure/Post-closure Cost Estimates This task will consist of: . Updating the landfill closure and post-closure cost estimates based on applicable inflation factors for annual submittal to CDPHE; and . Re-evaluating unit costs for major line items in the cost estimates to more accurately reflect actual rates from local contractors. Task 2.2 - North Perimeter Berm Raise 1 Construction Consultation Services The County envisions that the first "raise" (5-foot high lift) of the north perimeter berm will be constructed in 2006. This work will be conducted in accordance with the following documents: \1; . "Final Cover and Suiface Water Channel Modifications for Pitkin County Solid Waste Center. "Golder, March 3, 2003; . "Response to Comments on Proposed Final Cover and Suiface Water Channel Modifications for Pitkin County Solid Waste Center," Golder, August 22, 2003; · "Response to Comments on Proposed Final Cover and Suiface Water Channel Modifications for Pitkin County Solid Waste Center," Golder, October 10, 2003; . "Final Cover and Suiface Water Channel Modifications. Pitkin County Landfill, "approval letter from CDPHE (Roger Doak), October 17,2003; . "Northwest Perimeter Berm Construction Drawings," Golder, October 13, 2005; and . "SECTION 02210 GENERAL STRUCTURAL FILL AND COMPACTION, " Golder, November 4,2005. As allowed under the plans approved by CDPHE, it is currently assumed that the landfill contractor will construct the first lift ofthe berm and that the County will observe, inspect, test (non-acid generating demonstration), and document that the requirements of drawings and specifications have been met. Golder will assemble the results of the County oversight into a Construction Quality Assurance Report that will include a certification to be signed and stamped by the County. Services to be provided by Golder and our assumptions associated with this work are listed below: . The County and/or Contractor may have questions regarding the drawings and specifications during project implementation. Golder has included 10 hours in the project budget to respond to questions. · Following completion of the first lift of the north perimeter berm, Golder will prepare a fmal construction report. The report will include a brief summary of the construction activity, an overview of the field quality assurance provided by the County, a certification statement for signature by the Pitkin County Engineer, and an appendix with the Record Drawings prepared by the licensed surveyor retained by the County. A draft report will be prepared for review by the County. Following the review and incorporation of the County's comments, we will prepare the final report and transmit 5 copies to the County. The County Engineer will be the CertifYing Engineer and will sign and stamp the certification statement. The County will place a copy of the signed report in the landfill's operating record, and transmit a copy to CDPHE. Golder has assumed that CDPHE will not require any response to comments or revisions to the report. Task 2.3 - Redesign of Household Hazardous Waste (HHW) Storage Facility In 2004, the County relocated the impound lot to a location near the shooting range, installed a double-wide office trailer to replace the previous office trailer, regraded the \3 parking area, and constructed a portion of a drainage diversion to alleviate run-on problems in the entrance facility area. The remaining portion of the re-designed entrance facility was not constructed in 2004. In 2005, the County initiated additional preliminary work on the reconfiguration of the entrance facility. On May 20, 2005 Golder provided the County with a draft drawing entitled "Figure 1 Redesign of Facilities Area ". The scope of work for this task involves finalizing Figure 1. To facilitate finalizing the figure, Golder will meet with the County to obtain onsite input related to issues, concerns, and possible changes to the configuration of the entrance area. Following the site visit, a revised draft drawing will be submitted to the County for final review. Five prints of the final version of Figure 1 will be transmitted to the County upon completion. Task 2.4 - CQA Services for the Stormwater Pond Liner The County will construct the expanded storm water pond in the summer of 2006. Golder with provide construction quality assurance (CQA) services as described in the "Construction Quality Assurance Planfor Stormwater Pond Liner Construction at Pitkin County Landfill," Golder, November, 2005. The CQA services include an onsite CQA Monitor to provide observation and documentation ofliner installation and the preparation of a CQA Certification Report signed and stamped by a Colorado-registered Professional Engineer. Golder will submit one copy of the report to CDPHE and three copies to the County for placement into the operating record. In conjunction with this work, Golder had assumed: . The CQA Monitor will be onsite two days; . The liner installation contractor will provide Golder the documentation listed in Section 2.6 of the CQAP and an electronic copy of the record drawing set; · The Certifying Engineer will not be required to be onsite during liner installation; however he/she will coordinate with the CQA Monitor via telephone; and . CDPHE will accept the certification report without comment. Golder has also included scope in this task to revise Drawing 1 Site Map of the "Stormwater Management Plan Pitkin County Landfill, Pitkin County, Colorado, " Golder, December 27,2004. Drawing 1 will be revised to incorporate the recent revisions to storm water management at the site, e.g. channel reconfiguration and stormwater pond enlargement. Five prints of the drawing will be transmitted to the County and 1 copy to CDPHE for incorporation into their copy of the plan. Task 2.5 Conceptual Grading Plans for Relocation of the Aggregate Recovery Operations Pitkin County is considering relocation ofthe Aggregate Recovery Operations currently located in the north central portion of the landfill. To assist the County in selecting a new location Golder will perform the following. . Obtain data from the County regarding present operations and any future plans regarding expansion or contraction of aggregate recovery operations. l~ · Develop conceptual grading plans for two alternative locations for the operations on the landfill. The grading plans will be prepared using topographic mapping by Wertz Digital Mapping, July 6, 200S or more recent mapping if available. The plans will be drafted at a 1" = ISO' scale. · Utilize the conceptual grading plans to estimate fill quantities to achieve cover subgrade elevations. · Transmit S copies of each grading alternative to the County. 3.0 RATES We have adjusted the rates to reflect our proposed year 2006 rate schedule. The table below provides current and proposed labor-billing rates for individuals and for general professional categories likely to be involved in the project during the coming year. The rates may be revised after a period of one year to reflect normal adjustments. Dave O'Sadnick, Principal Engineer Matthew Wickham, Associate Hydrogeologist Rick Kinshella, Senior Project Manager Ed PottortT, Senior Project Hydrogeo10gist Tim Cazier, Senior Engineer Michael Keller, Senior Hydrogeologist Category Staff Professional Project Professional Senior Professional Drafting Secretarial $150 $13S $125 $105 $95 $95 2006 Rates $75 $85 $105 $70 $60 4.0 COSTS Costs for Hydrogeologic and Engineering Services are provided in Tables 1A and 18, respectively. Further, a communication/reproduction fee ofS percent of Golder labor charges will be assessed on each invoice. Subcontractor charges, if any, will also include a 5 percent handling mark-up. These charges are reflected on the attached tables. Although total annual costs are not to exceed an estimated $SO,OOO per year in accordance with the attached Agreement (see Attachment 2), current estimates for 2006 services surpass this limit. If all of the anticipated activities specified in the scope of work are initiated in 2006, Golder will request a written acknowledgment from the \5 County before exceeding the $50,000 limit. To authorize this scope of work, simply sign below and return one copy (FAX return is acceptable) for our records. We trust that the information provided here is sufficient. If you have any questions or need further clarification, please do not hesitate to call us at (303) 980-0540. Sincerely, GOLDER ASSOCIATES INC. Ed Pottorff, P.G. Rick Kinshella, P.E. Senior Project Hydrogeologist Senior Project Engineer Attachments: Table IA: Cost Estimate for Hydrogeological Activities In 2006 Table IB: Cost Estimate for Engineering Activities In 2006 Attachment 1: 2006 Rate Schedules for Soils Laboratory Testing and Equipment EP IRK/kag ACCEPTED BY PITKIN COUNTY: 0/~ Pitkin County Representative Date \~ Docelnbe J52200142 TABLI~ lA COST I:STIMA TE FOR HVDROGI.OLOGlCAL ACfIVTI1ES IN 2006 TIlE PITKIN COUNTY SOLID WASTE CI'.N'TER ASPEN. COLORADO , : TiJkl'.j Tilk;:.;2 1',,10:3 " , .tiir:d~.t4-' " Lr(lM:0Di.1}hIi..d'l;om'~lim~ P.i:fliill... Oiounlh;.tetJ'.f.ftlfjii6~ Stlppcirt .~~.!JiII!!.':L...,._~ !iM"iblteuanu Mil- .- , - - .-' ., ~_, "'~7~~utPo~~~~i'~TC!!:, --.- :ii,.ballil S....~,.I.~I.( ~~irim..t:I'I:filt' AnlluilJ 'ACM 9.~~I~.!~I~P'P',!rl: a_m~:^~.ijj.J ;! .-,~<<~~~ri 9!FI~rStipP!tl ~udj~~. 1)~iJ1~. ~ '~_~i."'~p.!lL"" "M~~l' '.:Q~!~~r S~'Vi~t:l4i PER..WNNEL llOURL Y TOTAL TOTAL E,timated Istimafed Eslimatt.d I.Ifrmated Il:JtiEQated J:!fiJhared X.tim.ted I:5lim.led Esthn-.tw PROFESSIONAL PERSONNEL RATE HOURS COST !!m!!J !Ii!lr! !!m!!J !li!I!a l!!l!!l l!!lII! !!!!!!I lli!.m:! !!m!:J. Principal $ISO.OO 0 $0 Senior Projt!Ct Managet/Associata Review $125.00 22 $2,750 2 2 2 2 . . 2 Senior Professional SIOS.OO '56 $16,3BO 32 16 16 24 \4 16 26 . , Senior EngineulSclentist $95.00 0 $0 Project EngineerlSc:::ienrist $85.00 140 $11.900 16 '0 12 . . . . Staff HngineerlScienusf S15.00 66 14950 . . 32 8 2 . TOTAL ESTIMATED ENGINEERING COST ". $3S,CJ80 55,570 51.,530 511,130 53.540 $1,470 $3,210 U,560 51,600 $2,310 SuPPORT PERSONNEl. Drafting/CADD $70.00 10 $\,400 4 . . Clerica1lWord Processing $60.00 4. $2760 . . 8 2 2 8 8 . . TOTAL ESTIMATED SUPPORT COST 66 $0(,160 S36D $240 .760 $120 511.0 5\,040 51,040 5240 $140 TOTAL~MATED.ERSONNELCOST $.4.0,140 55,930 $1,770 5Jl,1I9O 53,660 $1,590 54,150 $5,600 Sl,840 $2,li10 TOTAL DiRECT Jon COSTS gjfi gjfi gjfi gjfi !mI mrr gjfi = !ElI = Vehicle ($8OJday or S350/wlc) $480 $160 '160 IlliO Per di~ ($lOO1day) $300 $\00 $100 $100 Fwd BquipiMllt $175 SllS $'0 Gas Probe Pumit Fees $760 $760 OlhefB'Xpel'13cs1 $2 007 $297 $139 SS95 $183 S&O 121] S280 $92 $131 TOTAL ESTIMATED D1RltCf COST $3,721 Sl,057 $514 $595 SlBl $3'" $473 $180 S01 $131 SUllCONTRACl'OR COST.S DdUins; $0 Analyticall...aOOfatoty $115, $1155 TOTAL rsrlMATED SUBCONTUCTOR COSTS 51,155 '0 Sl,155 SO $0 SO SO SO SO SO Note: L Other expenses include reproduction, pcrstaBe. and commllOicaboo cosl.s eslimatedas 5% labor 2. This analysis wiU only be pcrfo.rmed ifrequi~ by CDPHB. 3. n.. ",,,.,;lOrin. ..<Ii...d....... will be pe<funne<I 00" ift_Ied by Ih< Couuly; th",r.... ...... in.. are ",coni'" u rouol. '. Othcc "MisceUnneous Consulting ServiGes may oot be ~ed \bus this i. an oplional. task. 1'OTAL F$I'IMATED COST EX-CLUDlNG OPTIONAL AcnvrrlES 531126 I $"'.7 S11 &5 Sl-:i~3 SS.lIID SUJ2 'l'r '1J'il:' "rs E Itr mil II ~j";ibi~& " E:~~,f ";;'~~,,,:7:.';~; -'-'it,:,.!, JU) nt" ,~;U~U:;;;.f:~:::'r "~:" :',,- 'F'" ~'f'lii7T, -, :"$ttT<F" TOTAL ESTIMATED CO.n FOR ALL ACI1VmES S4SD17 I $6..917 I 14449 ft $11.485 I 11.14.3 I 51.930 547:0 I $5&10 I $1,,932 I $174.1 ~~I_D:IOOI-h:lllOllc...tTlWooI""'ID11~T"'''1'' Golder ASloclates ,1 Deceml J5 _ 052200142 TABLE IB COST ESTIMATE FOR ENGINEERING AcnvrrlES IN 2006 PITKIN COUNTY SOLID W AS1'E CENTER ASPEN, COLORADO T:idt.2~l T.,k'2i2 r.skii;l Ttik"lA Ti,ik"1~5 COb.trudhu'i,QuIllty :Concephi.ilJ'GrlldJng'l)llns "U~.~,..t~ ~Jos~,re_:tfi PO~tl_i North:Y,efim~:Berni Entr.anC:lllradl_g (:As'btanc:i' {6'i'Storntwater "-. foi'llelnclting Aggr'~~.tl! Ci~i~~;.;'..~tiv'.;tim.tel C6n.ti'lIdi~ri:,Cj)ii!l'i1ltjtlon ""DrJiiniireJm"i\rnvemelits . . porldl.i"'er." I Recoverv.onCrll.thinll PERSONNEL HOURLY TOTAL TOTAL Estldlated Eltimated E.tlmatcd Estimated .:stima(cd PROFESSIONAL PERSONNEL RATE HOURS COST Boun 1I0UTS Houri Uoun lIo11r~ Principal $\50.00 4 $600 I I 1 1 Senior Project Manager/Associate Review $125.00 66 $8.250 16 10 24 8 a Seliior DeBign Eligineec $105.00 \6 $1.680 8 8 Senior EngineerlScientist $95.00 0 $0 Project Engineer/Scientist $85.00 8 $680 8 Staff EngincerlScicntist $75.00 128 $9,600 8 16 16 48 40 TOTAL ESTIMATED ENGINEERING COST 2~~ $10,810 $2,600 $3,440 $5,870 $4,750 $4,150 SUPPORT PERSONNEl. DraftingfCADD $70.00 20 $1,400 4 8 4 4 . ClericallWord Processing $60.00 10 $600 2 2 2 2 2 TOTAL ESTIMATED SUPPORT COST 30 $1,000 120 S400 S680 $400 $400 TOTAL ESTIMATED PERSONNEL COST $12,810 $2,720 $3,840 $6,550 $5,150 S4,550 TOTAL DIRECT JOn COSTS COST Q1fi COST COST COST COST Vehicle (S801day or $J501wk) $141J $240 Pcrdiem (SIOO/day) $500 $100 $100 $300 Field Equipment (nuclear gauge) (S2501week) $0 Project Manager Vehicle (380 mi RT @ $O.445/mi) $338 $169 $169 Other Expenses' $1.141 $136 $192 $328 $158 $128 TOTAL ESTIMATED DlRECI' COST $2,219 $136 5461 $597 $798 $228 SOILS lABORATORY CDS"I Undisturbed Penneabi1ity tests for Compost Pad (ASTM DS084) - 4 t . $2,75 $0 TOTAL ESTIMATED LABORATORY COSTS SO SO $II $0 SO $0 Note: 1. Other expenses include reproduction, postage, and communication costs estimated as 5% labor TOTAL ESTIMATED PROJECI' COST $25 01.9 $2,856 S4,301 $7147 $5948 $4,77H 1:'I'R0Pl005\PUI200I~'Z11J01412OOll0l0lT"""IA""'11I21D1!C8bln.w.ln Golder Associates Jr