PermitNa (~~e/~ ZG2'"2`]
PITKIN COUNTY FARTHMOVING PERMIT APPLICATION ~
Jot,Aaat~ ~7nm/J~I ~-SO i B~l<1yG- /~S, drz>en-iry~Z
'"~F7" ~t Block Subdivision
pwna lef /cirr. r-~~ ~... - - ' - .Phone
Nase Mailing Address
CmtraCoc GZC /~.C /~/o rs/~G~' "race? ~~~'~?
. ~~
Nase Mailing Address
Type of Wozk: Scope of Wozk:
^ Berms ^ Trenches Total Cubic Yards (cut & fill): T ~ ZS"~
^ Ponds ^ Utilities Total Cut 2
,~ Max.~~; d>'1 tLt!• Max. Depth:
T. ails ^ Other_.______- Max. Width: / • ~' MaxIieght /~__
TypeoEmate'ialstobeexravated: G" E`Z. ®SOlt-
bfaterialbmughtfrom v j ~
Material relocated to: 2• • ~• G /L ooa/t-
_t
Cmia+ads ... .
Date J'0 °~ ~ ~
Applicant's Sigtahue ' ~'' c"" ~" '
»»r»»r»»»r»»»»»»»rrrr»»»rryr»»»»»r»r»»»*»r»r»»r»»»»»»»»rr»»s»r»r»rrrr»»»»»»r»*»»r»:»»»»»»»»»rr»»»r+»
FOR STAFF USE 01~'LY
Permit- Permit De artment Autnonzea Lace
Receiv d Issued Zorun
Initials y En •ne
Date L #-- Land ~
Env. I- ~ .
Water ~_~C
Parks
`~ ~~' -
~.
PITKIN COUNTY EARTHMOVING PERNIIT ._
APPLICATION CHECKLIST
(Berms, Ponds, Trenching, Trails, Utilities)
Note: .All required land use approvals must be obtained prior to submittal. of an earthmoving
permit application. Applications with outstanding land use reviews will be rejected in"the Zoning
Office and returned to the Building Department. If you are unsure as to whether a review is
needed, please contact the Zoning Office at 920-5090.
OWNER NAME: G/~~r/SD/~-l.~- ~`i~l' PERMIT NUMBER:
OWNER'S REPRESENTATIVE: 7'c~76~e'~` ~11YErt PHONE NL'1ViBER: 9to SZ /i
LEGAL DESCRIPTION: '~° C~~A~~" ~*~'''*~®~ ~'9/
JOB ADDRESS: ~/~'~- ~ ~+~~~- .~~~
--------
T'nese aze general lists of required information. More information may 6e required as each
project is individually evaluated.
I. PLEASE BE AWARE OF THE FOLLOWING
[ ] You aze responsible for the information contained in the attached Earthmovin~ Permit
Requirements handout.
[ ] State law (Senate Bill 93-15~) requires that you contact the Utility Notification Center of
Colorado, at (800) 922-1987, before commencing any earthmoving.
[ ] Work in a wetlands area is generally prohibited: however, some activities are permitted.
You are required to obtain a permit from the Army Corp of Engineers. Please call (303)
243-1199.
{ ] You will be required to post a Bond with the Building Department for revegetation if
your project:
a) Has a potential to impact watershed areas (riparian or streams; etc.).
b) Has a potential for visual impacts from public viewing corridors (Roads, County
Parks, Trails).
c) Has steep (15 0 or greater) slopes or unstable soils.
d) Disturbs large azeas (To be determined by the Land Management Department.)
[ ] If bonding is required, a revegetation plan including the following items, MUST be
~bmitted.
a) Plant Material List (BE SPECIFIC -scientific names aze required).
b) Planting schedule. This is a commitment by the applicant that the work will be
- performed by a certain date. The bond will be released after the vegetation has
been successfully established.
[ ] Most projects require a Fugitive Dust Control Plan. If you aze unsure whether you need
to submit a dust plan, please call the Environmental Health Department. at 920-5070.
[ ] Proposed ponds will require an impoundment permit by the State Water Engineer.
[ ] Permit applications not approved within six months of submittal will be voided.
:~ ~
II. BERMS /TRENCHING /TRAILS /UTILITIES
Required Items:
[ ] Copy of land use approval (if required -Zoning)
[ ] Survey indicating existing and proposed conditions
[ J Topography indicating existing and finished grades (two foot intervals)
[ ] Elevations. of proposed work
[ ] Revegetation plan (Land Management)
[ ] Plans for mechanical support (if required)
[ ] Fugitive Dust Control Plan (Environmental Health)
[ ] Drainage and Erosion Control plan (Engineering)
[ ] Permit from the Army Corp of Engineers (if required)
III. PONDS
Required Items:
[ ] What is the proposed water' source?
[ ] Documentation of water rights
[ ] Survey indicating existing and proposed conditions
[ ] Elevations
[ ] Topography indicating existing and finished grades (two foot intervals)
[ ] Drainage and Erosion Control plan (Engineering)
[ ] Fugitive Dust Control. Plan (Environmental Health)
(] Permit from Atmy Corp of Engineers (if required)
[ ] Impoundment Permit from the State Water Engineer
IV. REVIEWING AGENCIES
Zoning Depa**.tnent Joanna Schaffner 920-5105
Environmental Health Nancy MacKenzie 920.5076
Land Resource M~ Steve Anthony 923-6116
County Engineering Bud Eylaz 920-5206
Aspen Water Department 920-5111
Community Development Vicki i~fonge 920-5090
V. COMMENTS
I have read, understand and agree to comply with the above.
Signature:
Date Received by Building Department:
Revised July 1996
PermitNo.
PITIQN COUNTY EAIZTHMOVING PERMIT APPLICATION
Jd, Address LowE/2.>9/U~'- ~i7
~~ Rio ~-^~~--~r
~~ ~'H6~Y Ell Ta uo~t-/c' .~/u~~..~0,/lr,~aoaY~/'~x ie~.
P~.~o~/.9 ,e~+~e.ea~ /ci~ra.~ sTS<-y / Y a
gt~ Subdrvsaon
o~ ~os32sao- ~~ /~is
Name ~~ yo~ivG-.9~~syb/e /d7~' u /°iT.~lrv trs/
Mailing Address Phone
contrary 9SP~~ ~"~?`',//y!a &/,~sic,~° t~C /~~c /09o c ~o.</L.~" co 970 A63 c~3 a°T
Name Mailing Address ~/(13 Phone
Type of Work: Scope of Work:
^ Berms ^ Trenches
^ Ponds ^ Utilities
~, Trails ^ ~~' Total CubicYards icut & fill): /S~ _ .,
Total Cut ?S~ Total Fill: 75~
Max Len iYf ~GEs Max. Depth: /
Max Width: /5/'a' Max Height / " .
Type of materials to be excavated: ~R/ST//`~G` ~ e d .1~/~ Ga~/L+rLS~/G,.GIGL
bia~rial brought from: I~f}/Lf 0 U 5
Materialrelocatedto: ~+41LRG$D ~ O W -
7@~ /~'®L, ~/~0 .~GG'~°` ~~/D/'/Ttf ~ f~ 3 .~.911~ic~~"'*-
/L/D Lsy'Z,q~I/
,
Comsads
Applicant's Signatrue ~~~/~ ,vO s. Dam ~.2Q 04
»:»»+s»+++»»+»»+»»»s»»+s»»»»»+»s»»+ s»s»»»+»»»s++»»s»»ss»»»ss»»»s»»»s+s»++»»s»»»»»»»ss»s»»»s»»»»s»»»s
FOR STAFF USE OriZY
~or~
R
Fees
Permit
Received Permit
Issued
Initials {-
Date Zy' ~
Amount Due Paid Date Paid Receipt
Permit
Zoning
Land M .t
Use Tax
Rev Bond
De artment Authorized Date
Zonin
En 'neerin
Land M t.
Env. Health
Water
Parks
~~''°
..
PTTKIN COUNTI' EARTHII%fOVIl~G`P;RMIT
APPLICATION CHECKLIST"
(Berms, Ponds, Trenching, Trails, Utilities)
Note: .All required land use approvals must be obtained prior to submittal of an eatthmoving
permit application. Applications with outstanding landuse reviews will be rejected in the Zoning
Office and returned to the Building Department. If you aze unsure as to whether a review is
needed, please contact the Zoning Office at 920-5090.
OWNER NAME: oP~ SPs~L'~ ~ 77/zz.9s~f' PERMTT NUMBER:
OWNER'S REPRESENTATIVE: T,~IyJ~L~' GL61t'I/E7E. PHONE NUMBER: 9lra S2io
LEGAL DESCRIPTION: ~/~-t'/A 'Odd/ ~ iPj~1 ~,wle,+~,,~,r~-.~,gi~,,, .
JOB ADDRESS:
These are general lists of required information More information may be required as each
project is individually evaluated.
I. PLEASE BE AWARE OF TIC FOLLO~VP;G
[ ] You are responsible for the information contained in the attached Earthmovin~ Permit
Requirements handout.
(] Sate law (Senate BiII 93-155) requires that you contact the Utility Notification Center of
Colorado, at (800) 9'_2-1987, before commencing any earthmoving.
[ ] Work in a wetlands area is generally prohibited: however, some activities are permitted.
Yeu are required to obtain a permit from the Army Corp of Engineers. Please call (303)
243-1199.
[ ] You will be required to post a Bond with the Building Department for revegetation if
your project:
a) Has a potential to impact watershed areas (riparian or streams, etc.).
b) Has a potential for visual impacts from public viewing corridors (Roads, County
Parks, Trails).
c) Has steep (15% or greater) slopes or unstable soils.
d) Disturbs lazge areas (To be determined by the Land Management Department.)
[ ] If bonding is required, a revegetation plan including the following`items, MUST be
submitted.
a) Plant Material List (BE SPECIFIC -scientific names aze required).
b) Planting schedule. This is a commitment by the applicant that the work will be
performed by a certain date. The bond will be released after the vegetation has
been successfully established.
[ ] Most projects require a Fugitive Dust Control Plan. If you are unsure whether you need
to submit a dust plan, please call the Environmental Health Depamnent, at 920-5070.
[ ] Proposed ponds will require an impoundment permit by the State Water Engineer.
[ ] Permit applications not approved within six months of submittal will be voided.
~.
r
II, BERMS /TRENCHING /TRAILS /UTILITIES
Required Items:
[ ] Copy of land use approval (if required -Zoning)
(] Survey indicating existing and proposed conditions
[ ] Topography indicating existmg and finished. grades (two foot intervals)
[ ] Elevations of proposed work
[ ] Revegetation plan. (Land Management)
[ ] Plans for mechanical. support (if required)
[ ] Fugitive Dust Control Plan (Environmental Health)
[ ] Drainage and Erosion Control plati (Engineering)
[ ] Permit from the Army Corp of Engineers (if required)
III. PONDS
Required Items:
[ ] What is the proposed water source?
[ ] Documentation of water rights
[ ] Survey indicating existing and proposed conditions
(] Elevations
(] Topography indicating existing and finished grades (two foot intervals)
[ ] Drainage and Erosion Control plan (Engineering)
[ ] Fugitive Dust Control Plan. (Environmental Health)
(] Permit from Anny Corp of Engineers (if required)
(] Impoundment Permit from the State Water Engineer
IV. REVIEWL~IG AGENCIES
Zoning Departanent
Environmental Health
Land Resource Mgt
County Engineering
Aspen Water Departrnenf
Community Development
V.
('f1MMF.~TTC
Joanna Schaffner 920-5105
Nancy MacKenzie 920-5076
Steve Anthony 923-b116
Bud Eylar 920-5206
920-5111
Vicki Monge 920-5090
I have read, understand and agree to comply with the above.
Date Received by Building Department:
Revised July 1996
.~
TO: Community Development
FROM: Rick Stevens, Aspen Earthmoving L.L.C.
RE: RIO GRANDE TRAIL PROJECT- PITKIN COUNTY OPEN SPACE & TRAILS
Please find attached an earthmoving permit application for the above referenced project. The project is
contained to the Pitkin County portion of the Rio Grande right of way. It starts at the end of the existing
trail at Old Snowmass and continues along the R.O.W. to the Woody Creek Tavern. A second section of
trail will be built from E. Sopris Rd. to the Basalt High School Along the R.O.W. Please contact me or
Project Manager Temple Glassier. Our start date is May 16;2000.
The contract addresses revegetation and dust control, as well as adjacent wetlands. Please advise if you
need more info as soon as possible.
Tha o
Rick Stevens AEM, LLC.
963-0377 or 379-2752
4-20-00