RESOLUTION OF THE BOARD OF COUNTY COMMISSIONERS OF PITKIN
COUNTY, COLORADO, GRANTING ANNUAL REVIEW APPROVAL TO THE
ELAM GRAVEL PIT SPECIAL REVIEW PERMIT
Resolution No.105 -2000
RECITALS
1. By Resolution No. 88-47, the Board of County Commissioners of Pitkin County,
Colorado (BOCC), granted a special review use permit to Elam Construction,
Incorporated (Applicant) for the Elam Sand and Gravel Pit and Asphalt /Hot
Mix/Concrete plant pursuant to Section 3-210.10 (formerly Section 3-6) of the Pitkin
County Land Use Code.
2. By Resolution No. 99-69 The BOCC extended the special review approval for 10
years, until April 14, 2009.
3. Resolution No. 99-69 requires an annual review of the Elam operations at a public
hearing for compliance with all terms and conditions of the resolution and subsequent
resolutions.
4. On May 10, 2000, the BOCC held the annual review of the Elam Sand and Gravel Pit
special review permit for the operation year of 1999, and continued the public hearing to
June 14, 2000. At both meetings members of the public had opportunity to voice their
comments.
5. The BOCC determined that the Applicant has been operating in compliance with the
terms of Resolution No. 99-69.
NOW, THEREFORE, BE IT RESOLVED, that the Board of County
Commissioners of Pitkin County, Colorado, hereby finds Elam Construction,
Incorporated to be in compliance with their current special review permit, subject to the
following conditions:
1. All material representations made by the applicant in the application, in subsequent
correspondence, and at the public hearing shall be adhered to and considered conditions
of approval.
2. The applicant shall continue to be bound by all conditions of Resolution No. 99-66,
unless modified by terms of this resolution.
3. Drain lines, nozzles, and shut off valves in the fuel storage area shall be repaired.
Fuel storage in the pit shall be located in a containment basin capable of retaining
contents of the primary storage vessels These improvements shall be made to the
Resolution No 905-2000 11111111111111111111111 III 1111111111111 III 1111111111111
Page 2 2 of 6 R 0.00 D 0.00 N 0.00 PITKINDAVIS COUNTYILVI CO
satisfaction of the Environmental Health Department within 30 days of approval of this
resolution.
4. The Lafarge concrete operation shall construct an approved, contained truck wash bay
by July 1, 2000. This facility shall be approved by the Environmental Health Department.
5. The asphalt plant and rock crusher must be permitted by the Colorado Department of
Public Health and Environment and must stay in compliance with conditions of the
permit.
6. Fugitive dust from the pit operations must be contained to maintain compliance with
applicable state standards.
7. Crusher operations shall be limited to the dates of April 1 through November 25 of
each year. Any required extensions beyond these dates must be approved in writing by
the Woody Creek Caucus. Also, the Applicant will investigate the possibility of
"baffling" crusher noise.
8. Any non Elam-owned trucks on site shall be of two principal contractors only (Ute
City and Reliable) and shall be stored out of public view. The storage area shall include
plug-in engine block heaters.
9. Any acceptance of off-site soil brought to the pit shall be subject to the protocol
detailed in Attachment 1.
10. Standing water in the pit shall be subject to testing according to a protocol to
be developed by Elam and approved by the Environmental Health Department and the
Woody Creek Caucus within 60 days of the approval of this resolution.
Resolution No./05 -2000
Page 3
I I'IIII "III 'IIII' I'III III 'II"III II"I III I'III IIII II'I
446135 07/25/2000 09:57A RESOLUTI DAVIS SILVI
3 of 6 R 0.00 D 0.00 N 0.00 PITKIN COUNTY CO
APPROVED AND ADOPTED ON THE 14th DAY OF JUNE,2000
ATTEST: BOARD OF COUNTY COMMISSIONERS
OF PITKIN COUNTY, COLORADO
y dee R. Dean By \o-r,n.v
Deputy Clerk and Recorder Shellie Roy Harper, dhairmaill
Date q - l 9- d-L
APPROVED AS TO FORM: APPROVED AS TO CONTENT:
John Cindy Houben 6/w/moo
ounty Attorney Community Development Director
LC:c:\home\1ancec\e1amres0.doc
264316112010
P44-00
5-24-DO; lc'31aM;=1all cans:. , Inc. -
Attachment 9
SOIL ACCEPTANCE CRITERIA
SAMPLING PROTOCOL
_(A FOR MAY ul�
—0 VAGNEUR GRAVEL PIT
�~x Pitkin County, Colorado EWIRoNMENTALHEALTH
J" May 22, 2000
�0d
ea Elam Construction, Inc. has been accepting Inert soil from construction related
=M
= activities in the area of their operation at Woody Creek during the last 36 months.
�=--c;m
In order that the property remains free from any possible contamination this
�mm
�N existing company policy was developed which established acceptance criteria as
�nm
follows:
�m�
Fa; Elam Construction, Inc. will not accept, under any condition, material that
—v
knowingly contains:
• Hazardous (either listed or characteristic) waste.
.. Free liquids or sludge.
• Solid waste (i.e., tires, branches/logs, appliances, scrap wood/steel,
domestic rubbish, construction debris other than steel fee concrete and
asphalt rubble suitable for re-cycling, etc.)
• Biomedical waste.
• Petroleum hydrocarbon, or antifreeze, contamination.
• Heavy metals (i.g., cadmium, chromium, lead) contamination above
background levels.
• Radioactive materials or mill tailings.
• PCBs (polychlorinated biphenyls) or pesticides.
• Asbestos or asbestos in building materials (ACM).
To insure that all the material delivered to the facility from outside areas Is clean
and inert from the above listed items, the following procedure is implemented:
1. The Individual or company delivering material to the facility is required to sign
an affidavit certifying that the material is: clean and inert, the originating
2-2a-OC; 10 av1;_iam �ons- Inc. ;970 24= 771c
source of the material, and the estimated volume. At the discretion of the
facility operator, the certification may also include an environmental audit of
the source site prepared by a Colorado Registered Professional Engineer or a
Registered Environmental Manager.
2. During the stockpiling process, the facility manager, and those individuals
who operate the stockpiling equipment, will conduct constant visual and
olfactory analysis of the delivered material on a truck by truck basis. At a
minimum, the visual evaluation will identify that the soil does not have any
stained/discolored soils (an indicator of potential hydrocarbon contamination),
hazardous substances, or other solid waste.
3. In the event that contaminated material is identified, all work in the immediate
area will cease and a Colorado Registered Professional Engineer or a
Registered Environmental Manager will be contacted by the facility operator.
The listed qualified individual(s) will prepare, supervise and implement a
Remediation and Disposal Plan conducted in accordance with the
requirements of the governing regulatory agencies.
During the analysis process for the companies annual review of the activities
occurring at the facility during 1999/2000, it was determined that a certain
amount of testing be conducted not only on soil brought to the site, but on any
standing water which might be evident throughout the year. The following
changes are suggested to the current policy:
Anyone delivering soil to the Vagneur Gravel Pit will provide documentation that
it is clean and inert prior to disposal utilizing the following protocol which will be
provided to the customer prior to delivery:
1. One soil sample will be collected from the originating site as a 3 spot
composite using decontaminated sampling tools and following
111111111111111111111111111111111111111 III 111111111 I11I
445435 07/25/2000 09:57A RESOLUTI DAVIS SILVI
5 of 6 R 0.00 D 0.00 N 0.00 PITKIN COUNTY CO
5-24-cc: 10:31AM;EIam consr. , Inc. ;970 2=5 771.'. : ai a
+M
�NH
�M Z standard protocol for environmental sample collection and handling. At
Man Z least one composite sample will be taken for each load accepted and
=M for each 1000 cubic yards thereafter.
2. The soil sample will be submitted for laboratory analysis for the
following:
�mm
_.m m ANALYSIS METHOD
�No Total Petroleum Hydrocarbons PH EPA 8015M
�N
a BTEX EPA 8020
=�m RCRA Metals EPA 6010B & 7000 series
�mm
�in m
�rn 0 3. The laboratory analysis will include the name of the transporter, land
owner and the location of the origin of the soil. Elam Construction, Inc.
will maintain records and make them available for public inspection.
Supervision of the above presented protocol will be under the direction of Elam
Construction, Inc. staff personnel who is a "Certified Hazardous Materials
Manager".
The above listed analysis and methods will be used to test any standing water
which may exist from time to time within the facility. Grab samples will be taken
once a month.