Loading...
HomeMy WebLinkAboutbocc.con.093.2007/15.2005 CLERK'S CHECK LIST FOR CONTRACTS SUBMITTED TO CLERK AND RECORDER FOR SCANNING/ARCHIVING CONTRACT #: Oq3J~O()7j;5.,;zn;s- Originating Department/Division: Public Works Tansportation (/trt1f:4V'bs c!..f71\1T1l.ALr 15. ~(Jt6) Contact Person: Bert Pearce Phone #: 920-5397 Project Name: 2005 Red Mountain Reconstruction Engineering Services D BOCC AGENDA ITEM (BOCC signature required) ~STAFF AUTHORIZED SIGNATURE (per Revised Procurement Code 7/2005) Check procurement type: DNone DInformal ~Formal DSole Source DEmergency DState Bid D Check Contract TVDe: Dollar Amount: $256,743.00 ~ServiceslMaintenance DLicenselUse DLease DConstruction DGoods, Equipment, Supplies DOther (e.g. revenue) Budget Line ItemlLedger Number 110.54.96200.87260 DEmployment (for county employees) DIntergovemmental Agreement (Requires BOCC Action) DNon-Profit DQuasi-Public DGrant Agreements (Requires BOCC Action) ~Change Order/Contract Amendment SGM Complete Name: Schmueser Gordon Meyer Inc. April 26, 2005 Contract End Date: December 30, Contractor/Business *Contract Execution 2007 Automatic Renewal N Term of Contract: 2.5 years All Contracts should be proofed for the following: ~No Pages Missing ~If a Page is Left Intentionally Blank -Note on Page DPage numbered consecutively ~All Signatures Affixed ~All Dates Filled In ~All Other Blanks Filled In DAll Exhibits Attached DAll Legal Descriptions Attached (if appropriate) DNotice of Award/Proceed Attached (if appropriate) DSpeciaI Instructions for Finance Department: ~Sent to Clerk and Recorder for Scanning/Archiving ~Authorized Staff Person's Name: Bert Pearce BY CHECKING ABOVE AND ENTERING NAME, THE AUTHORIZED STAFF PERSON INDICATES THAT DOCUMENT HAS BEEN PROOFED AND READY FOR SCANNING. ~ E)f~Cv-reD (by dJL'NT') f)N .5'-/7 -() 7 Note: Clerk's Office will keep original documents in compliance with Colorado State Archives retainage schedule. Amended 10_16_06 \ ~ ., PITKIN COUNTY CONTRACT AMENDMENT Project/Purchase Contract # 15-2005 Line Item Account # 110.54.96200.87260 The 2005 Red Mountain Reconstruction Engineering Services Contract for Provision of Services (the "Agreement") dated April 26, 2005 between Pitkin County (the "County") and Schmueser Gordon Meyer Inc. 118 W. 6' Suite 200 G1enwood Springs, CO 81601 (the "Engineer"; references to "Contractor" in original Agreement also refer to the Engineer), is hereby amended as follows: . 2. Engineer's Obligations. Engineer shall provide professional services in accordance with the commitment and requirements set forth in Exhibit 'A' and Exhibit 'B' and in Exhibit 'C'. These exhibits are incorporated herein by this reference. 3. Compensation and Exoenses. Invoicing. Pavment and Offset. The County shall compensate Engineer for its services in accordance with the Project Budget and Schedule set out in Paragraph 2. It is expressly understood and agreed that in no event will the total compensation and reimbursement to be paid hereunder exceed the sum of Two Hundred Fiftv Six Thousand. Seven Hundred Fortv Three Dollars and Zero Cents ($ 256.743.(0) (includes reimbursables and snowmelt feasibility study) for all services rendered. By contract or amendment, the County and Engineer may reallocate the budget among project tasks if the total budget amount remains unchanged. Engineer shall invoice for the project monthly based on hours worked, with payment expected within thirty (30) days of invoice, but any payment by the County may be offset by any amount the Engineer owes the County for any reason. Payment of five percent (5%) of each invoice will be withheld by the County until the Engineer's obligations are completed or each task is complete. In the event the Engineer incurs time and expenses in excess of the total compensation stated above, no compensation for said additional time and expenses shall be required to be paid by the County without written amendment to this contract executed by the County. Compensation for services provided pursuant to the Scope of Construction Observation Services set forth in Exhibit 'C' shall not exceed One Hundred Two Thousand, Nine Hundred Eighteen Dollars and Zero Cents ($102,918.00). 5. Piktin County's Obligations. Pitkin County shall administer this contract through a County Representative. Gerald Fielding, County Engineer will manage the project as the County's Representative. In the event that Gerald Fielding, County Engineer is not available, Bert Pearce, Public P- - - N ~.;, Representative. Gerald Fielding, County Engineer will manage the project as the County's Representative. In the event that Gerald Fielding, County Engineer is not available, Bert Pearce, Public Works Technician shall assume the County's Representative duties. The services provided and products delivered by the Engineer under this contract will be subject to review by the County's Representatives, or a designee, for compliance with Engineer's obligations prior to final payment. In all other respects the Agreement is in full force and effect and remains unchanged by this Amendment. EXECUTED this _ day of PITKIN COUNTY: ENGINEER, ' Tj ~1- - ) , By: J /' APPROVED AS TO FORM, this _ day of '''~ ( '. --...J By: /4d7 County Attorney's Office ~ ~t:~r County Engineer et, Public Works Director Date /I;/. 5;n .0 Hilary County 1 tcher, nager Date '? Scope of Construction Observation Services Red Mountain Road Reconstruction Project Provide directed construction management services support to the Pitkin County to act as field observation, for the construction of the Red Mountain Road Reconstruction Project. Services are to include project coordination, traffic control review, field inspection, project documentation, materials testing, and check surveying, Construction work on this project includes the following: removals, excavation and embankment, coordination of the relocation of utilities, placement of drainage and irrigation facilities, widening of existing roadway template, and topsoil, gravel and HBP surface treatments, All of this construction will be in accordance with the Plans and Specification created by SGM dated April 2007 including any revisions that may take place from time to time. The anticipated period of service for this project starts April 6th, 2007 and runs through October 31 5t, 2007, The scope of services provided are based on a maximum duration of hours in the attached Construction Engineering Estimate Forms, Schmueser Gordon Meyer shall provide a part time Field Inspector to assist the County Engineer in the administration of the contracts, The Construction Administration services shall be in accordance with Pitkin County and CDOT practices and policies and the industry standards. The administration work includes tasks commencing with the advertisement for bids and the completing with project finals. Tasks include, pre-constnJction meeting, directed coordination with utilities and other interested parties, conferences and weekly meetings, submittal coordination, work inspection and documentation, coordination with material testing fIrm, project reviews, coordination of changes to plans and specifications, and project finalizing. Work will be documented using standard County and CDOT practices and forms, Primary duties of the ProjectInspector will include, but not be limited to, inspection of base course, HBP, reinforced concrete, traffic control, embankment and other incidental construction items as may be assigned by the Pitkin County staff. One Tester is required at a level comparable to the CDOT EngineeringlPhysical Science Technician lor II, Primary duties will include, but not be limited to, the testing of base course, HBP, reinforced concrete, embankment and other incidental construction items, as may be assigned by the Project Engineer, This person will be responsible for tt;sting and therefore will need to have certifications called for under CP- I 0 of the current CDOT materials manual. Task 1.0 Construction Management Support Provide County Engineer with the following inspection support, 1,1 Construction Coordination: Regularly scheduled weekly or as-needed meetings will be conducted with the Contractor and other involved parties to review, update, and coordinate construction activities, Weekly meetings will include a review of issues which are impacting progress, the cost to complete the work, and significant ~ .......__.-...,~~."'""...~.^.,,'..,------~--~ situations encountered related to the construction of the Project. 1.2 Review of Contractor's Traffic Control Plan: During construction, monitor the Contractor's approved traffic control plan for implementation of traffic signing, barriers, and other traffic control measures. Relocations and adjustments to detours will be coordinated with the Contractor, County, and other impacted agencies, 1.3 Review of Construction for Conformance with Plans and Soecifications: Monitor the Contractor's construction activities with respect to the contract documents and relevant schedule submittals governing the performance of the work, Resolve construction problems and/or recommend action for their resolution, as they relate to changed field conditions or conflicts in the contract documents, Coordinate with the County Engineer and designer during construction for implementation of revisions to the plans as may be required. 104 Processinl! of ShoolWorking Drawinl!s Submitted bv the Contractor: Submittals, design drawings, shop drawings, materials, and test procedures received from the Contractor will be forwarded to appropriate design personnel and/or the Consultant designer of record for review and approval. Approved drawings will be returned to the Contractor, as well as a copy retained for use during the remainder of the project. 1.5 Periodic Ouality Control Insoection: Perform periodic quality control observations of construction activities to document construction activities performed and assessment of conformance with the contract documents, Inspection items will include excavation, backfill, and compaction operations; concrete placement; pile driving; paving; drainage; utilities; guardrail placement; structures; signing and striping; landscaping; and traffic control installations, 1.6 Ouantitv Control: Assist the County in resolving disputes in quantities with the Contractor prior to the preparation of the pay estimate, 1,7 Proiect Documentation: Maintain daily diaries, prepare inspectors progress reports, and complete appropriate paperwork and forms with inspection and testing, 1.8 Materials Testing: Materials testing will be directed and scheduled to assess the contractor's compliance with the requirements of the contract documents, Testing reports to be submitted to CDOT as part of a Form 250 at the conclusion of the project. The Consultant Tester shall follow the guidelines stated on the current CDOT Field Materials Manual. The Consultant Tester shall be permanently assigned to the project and have obtained the requirements set forth in the current CDOT Field Materials Manual CP-lO. All certifications will be made available to the County Engineer, ~ The Consultant Tester shall provide and have available the following equipment in sufficient quantity and in good working order to ensure accurate performance of all work required in a timely manner: 1. Nuclear Asphalt Content Gauge and/or extraction equipment and solvents 2, Nuclear Moisture-Density Gauge 3, Concrete air meter, slump cone, and other concrete testing equipment 4, 12 inch sieves for aggregate and soil gradations 5, Electronic scales 6, Sample containers and small tools 7, Proctor equipment for soil curves and one point tests 8, Atterberg, Rice value, and Sand Equivalent equipment 9, ,Concrete cylinder molds meeting AASHTO requirements, except that paper molds shall not be used and plastic molds shall not be reused, 10, All eqnipment necessary for properly performing the required soils, asphalt and concrete tests 1.9 Check Surveving: Provide quality control surveying and quantity verifications as needed, (The Contractor is responsible for performing all surveying required to properly layout and construct the work covered under this contract.) 1.10 Miscellaneous: Duties as assigned by the Pitkin County staff due to project needs, Task 2.0 Post Construction Support 2.1 ComDletion InsDection and Punch List: Conduct a final inspection with the Contractor upon substantial completion, The result of this inspection is the development of a punch list of remaining and/or outstanding work to be performed by the Contractor prior to final project acceptance, 2,2 As-Construction Drawings: Review for completeness full sized as-constructed drawings submitted by Contractor. 2.3 ComDletion InsDection and Close-Out: Following the completion of all punch list items by the Contractor, conduct a final inspection with representatives from the Contractor, to confIrm the completion of all work. The result of this inspection will constitute [mal project acceptance and initiation of the Contractor's warranty period for the work. Task 3.0 Project Management 3,1 Change Orders: Prepare project change orders and minor contract revisions at the direction of the County Engineer, 3.3 Proiect Coordination: Track project costs and coordinate project personnel including surveyors and material testers, 10 -'~"'------~"-- Deliverables generated during the project will include the following and will be submitted throughout the duration of the project, or at specific dates commensurate with the deliverable: . Project correspondence generated and received during the project. . Test reports and certifications, . Monthly consultant progress pay estimates, . Check survey results. . Construction management records generated including minutes of meetings, project diary, inspection reports, contract modification orders, and other documentation as prepared during the course of construction in accordance with CDOT requirements, . Review comments on "as-constructed" plans, ~ ~ Pitkin County - Red Mt Road Reconstruction 2007 REVISED Printed: Aoril 6, 2007 Construction Engineering Estimate Summary Form Company I Estimated By Date Rev Sht I of Schmueser Gordon Meyer Nicholas A, Senn 4/6/06 0 1 3 Task Description Transportation Hours and Labor Charges Item Code Personnel CalACtoN Rate Hours Salary Labor 1 PD Principal in Charae - Jav Hammond $145.00 22 $3.190 2 PM Proiect Manaaer - Senn, Nicholas $100,00 96 $9.600 3 SSE Senior Structural Encineer - Bill Swinert $125,00 40 $5,000 4 SFE Senior Field Enaineer -Dave Sheooard $90,00 20 $1.800 5 FEN Field Encineer - Bruce Grav $80,00 460 $36,800 6 DRA $65.00 0 $0 7 SM Survey Manaaer - Steve Ehlers $135,00 16 $2,160 8 ST Survev Technician $85,00 8 $680 9 FS Field Survey Crew $190,00 20 $3,800 10 ADM Administrative - $60.00 40 $2.400 11 0 $0 12 0 $0 13 0 $0 14 0 $0 15 0 $0 Subtotals 722 $65,430 Labor Overhead 0,00% Fee 0,0% subtotal (Labor Cost) 565,430 Other Direct Cost (ODC) Travel and Living $5.500 Errata Communications and Shipping $75 Composite Rate Proiect Office / Supplies $0 $90.62 CAD Eauipment/Computers/Software $0 ODC Rate Reproduction $142 $8,71 Other ( see Form C ) $572 Doc Count subtotal/ODC Cost 56.288 subtotal Nendor Cost $31,200 Hours / Document TOTAL COST I 5102,918 Comments Construction anticipated to begin April 6th 20076 and complete October 15th 2007 Time allotted for part time observation of the project. Approximately 24 weeks of construction on the project, SGM Confidential File: Red Mt CM REV.xls ..,Form A '1) Pitkin County - Red Mt Road Reconstruction 2007 REVISED Estimate Detail Sheet Task Description Com,."" Estimated By Discipline R" Date 0 Schmueser Gordon Me er Nicholas A. Senn 0 0 4/6/2006 A B C D E F G H I J K L M N 0 P Q=Sum(B:P) R=Q"'A' Doc, w w z ~ " Row was Number Count Drawing or Item of Work. Titles !;> i' !!! il; il' ~ J- '" 9 ::: ~ :l ;! :!' Unit Total Total 1 N/A 1 ril 10 8 20 8 4 10 60 60 2 N/A 1 Ma 2 8 40 10 70 8 4 10 152 152 3 N/A 1 June 2 8 80 90 90 4 N/A 1 Julv 2 8 80 90 90 5 N/A 1 ~ust 2 8 10 70 90 90 6 N/A 1 !ember 2 8 80 90 90 7 N/A 1 October 2 8 40 20 70 70 8 N/A 0 0 9 N/A 0 0 10 N/A 0 0 11 N/A 0 0 12 N/A 0 0 13 N/A 0 0 14 N/A 0 0 15 N/A 0 0 16 N/A 0 0 17 N/A 0 0 18 N/A 0 0 19 N/A 0 0 20 N/A 0 0 21 N/A 0 0 22 NlA 0 0 23 NJA 0 0 24 NJA 0 0 25 N/A 0 0 26 N/A 0 0 27 N/A 0 0 28 NJA 0 0 29 N/A Meetings 40 20 20 80 80 7 .. Total number of Drawings I:l .. ~ l:l ~ 0 - .. .. ~ 0 0 0 0 0 .. .. 0 Tolal Hours -+ 722 , '" '" '" :": '" '" '" '" '" '" Total cost {jncludes markun and escalation\ '" 8 1:0 1:0 a; 8l 1:0 ... ... I~ 0 0 0 0 0 1- '" 0 0 0 0 0 0 0 0 0 0 0 0 0 0 .. SGM Confidential File: Red Mt eM REV.xls...Form B q Pitkin Countv - Red Mt Road Reconstruction 2007 REVISED Printed: 4/612007 15:03 Estimate ODCNendor Detail Sheet Company Estimated By Date Re, I Shl 01 Schmueser Gordon Mever Nicholas A. Senn 4/6/2006 0 3 3 Task Description Discipline 0 0 Ulher nns Description Unit cost QuaniiiV Additional Lump Sum Cost Subtotals Mileaca <Ill $0.550 1000rmile 10000 miles 5,500 Piano lickats <Ill I""rtrin lrins 0 Hotel Iff> ~;75.00 IMr nichl niahts 0 Meals $50.00 lcardav davs 0 Tolls and Parkina Lumo Sum 0 Perdiem Per Week Weeks 0 Temn Housina Per Month Months 0 Relocation Each 0 Rental Car Per Week Weeks 0 other 0 Subtotal Travel 5,500 Telachcna Per Month Months 0 ExDresS mail $15.00 Per Month 5 Months 75 PostaoalFraichl Per Month Months 0 othar 0 Subtotal Communlcatlons/Shlpplna 75 Soace Rental Per Month Months 0 Utilltias Per Month 0 SUDolies PerMH 0 Furniture Lumo Sum 0 Enuinment Rental Per Month Months 0 MobilizationIDemobilization Lump Sum 0 Maintenance Per Month Months 0 other 0 Subtotal Prolect OffIce 0 CADDlirno Per Hour Hours 0 PenromslComouters Each 0 CAD Software Each 0 Other Software Each 0 Printers Each 0 other Each 0 Subtotal CAD /Computer 0 Plottlnn , Mvlar\ $2,00 OArsnft sn ft submissions 0 Recroducllons, 8 112x11 Iff> $0,07 car conv 4UO cornes 4 sots x 100 coDles 28 Reonoductions, 11x17~ $0,09 car CODV 1~0 conies 4 sets x 50 conies 14 Ronroduclions Drawinas Iff> OAr conv conies sets 0 Other - Color Photos $'WO.OO 100 Subtotal Outside Reproduction 142 Miscellaneous Exnenses 572 10% to all directs 0 0 0 Sub Total Otho 572 '.,' " " ,", ';<iflubT* Dhd $6,288 , Vendors I ProfessIonal Services Name Oescriotion of work Amount Yeh and Asso Geotechnical Testinn and Reoorts $31,200 $0 $0 " T Total for Vendorsl $31,200 SGM Confidential File: Red Mt CM REV,xls ..,Form C \0 I~ Yeh and Associates. Inc. Consulting Engineers & Scientists April 5,2007 Mr, Nick Senn Schmueser Gordon Meyer, lnc, 118 W. 6th Street, Suite 200 Glenwood Springs, Colorado 81601 Proposa12006-P070 Revision # I Subject: Proposal for Materials Testing Services for Red Mountain Road 2007 Improvements Project, Pitkin County, Colorado Dear Mr. Senn: This letter presents Yeh and Associates, Inc, proposed scope of work, estimated project costs, fee schedule and general conditions for providing fiefd and laboratory materials testing for the subject project. Proiect Descrintion: We understand that the reconstruction project includes construction of new roadbed, paving, curb and gutter, and minor concrete work, Scone of Work: Based on our understanding of the project, we will provide soils, asphalt and concrete testing services as directed by the client, for the duration of the project. Estimated Costs: We are providing a cost estimate based on 24 weeks project duration. We assumed about 3 hours of field and lab work per day on average for 5 days per week for 24 weeks, The client will be invoiced on a time and materials basis in accordance with the attached Standard Fee Schedule and General Conditions, We estimate the following approximate costs for the project: Field and Lab Work (360 hrs @ $70/hr) Direct Costs and Mileage Estimated cost $25,200 $ 6.000 $31,200 Sincerely, Yeh and Associates, Inc, ~ Roger Pihl P,G, Principal Scientist Attachment: Fee Schedule (1/1/07 GWS), General Conditions ,. - 'i ,[ I ( \ ,q~' 1'" 'I',.. t. i H.: .:,; i .- ~", .' e . j C .1 "! Co ~ ,I 'I q; J > , t! i " ,I i " ' . I i ~, .. , c. I. ~ ~ 1 :. ! " , " \\ Effective January1,2007 YEH AND ASSOCIATES, INC. 2007 STANDARD FEE SCHEDULE - GLENWOOD SPRINGS AREA GLENWOOD SPRINGS IN-HOUSE LABORATORY TESTING (Additional testing services available upon request) Natural Density and Moisture Content Alterberg Limit (ASTM 043 18) Gradation Analysis (ASTM 0-422) a. All Standard Sieve to #4 Sieve b. Less than 1.5" Down to #200 Sieve c. Percent Less Than #200 Sieve d. Hydrometer Analysis, $15,00 $65,00 Swell-Consolidation a, Loaded to, 10,000 psf b, Per load in Addition to 10,000 psf Standard Proctor Compaction (ASTM 0-698) Modified Proctor Compaction (ASTM D-1557) Water Soluble Sulfate pH Concrete Cylinder Test, each $60,00 $5,00 $100,00 $110,00 $30.00 $20,00 $20,00 $65,00 $60,00 $30,00 add $65,00 ENGINEERING (Covers planning and general supervision, field trips, analysis, consultation, preparation of reports. and travel time,) Principal Engineer or Scientist Senior Project Engineer or Geologist Project Engineer or Geologist Staff Engineer or GeolQgist Senior Engineering Technician Staff Engineering Technician Administrative Assistant $140,00 per hour $110,00perbour $85,00 per hour $75,00 per hour $70,00 per hour $62,00 per hour $52,00 per hour OUTSIDE SERVICES AND MISCELLANEOUS Auto or Pickup Mileage Out-of- Town Living Expenses, Commercial Travel Costs, Vehicle Rental Contract Drill Rig and Related Equipmen~ Labor and Materials Contract Excavation Services and Related Equipment, Labor and Materials Other Outside Services Outside Consultant and Engineering Services Outside Laboratory Services Interest charged after 30 days from invoice date $0.50 per mile Cost + 10% Cost + 10% Cost + 10% Cost + 10% Cost Cost 1.5% per month \11 ",,~HHUESU; ("ORDOI'l M[tTR t f. :~, I " t L C;; L; I I.',' ': If ~; FEE SCHEDULE January 2007 HOURLY RATE PRINCIPAL ENGINEER .'" ,.."""""".,.""" ."...'" "" "'" """.. ..,.,."""""..""..,.." .....,., ..,..,.,.',.'""..""" $145.00 SENIOR ENGINEER"",.., "" ",.."",...,..",.,....,.'"""", ".., "".,.,...', """"""..".",.,....,.,..".,.,..""'...'"",,, $125,00 SENIOR ENERGY CONSULTANT .........,............,..'................,......,......,.................,..........,.............. $115,00 REGISTERED ENGINEER ."""".",..,..,.,."".,..'.' '.'"",...,.,......, ..,..,....,..,...,...,..,.,..,.... ...,....,.....,,'.....,. $110.00 PROJECT MANAGER .."""", ""..,.,.,..,.,.".",..""""",..., ,. .....,...' .."""..",.."..,.,.....",.,.,. .,'....."",..""" $100.00 DESIGN ENGINEER...,..,.... ..,.'...,.'.,.."""""",.""...".'.,....'", """" "",.,...,..'""", """"""""""......,..,., $ 90,00 PLANNING ENGINEER """"...."""",.,..,.,.,.,.".'".." """"""".,.,....,.."""""..."" ,....,.,..,..,..,.....,...'"", $ 85.00 SENIOR FIELD ENGINEER ......,..........................,........,.......................,..,........,.........................,..... $ 90,00 FIELD ENGINEER ...'...,.."""""".....,..,......"".'"" """"""""',' '.','.',..""""""..,.,.......,.".....,.,..',..""", $ 80.00 SENIOR CADD DESIGNER ,.,.,.".,.,...""""""" ",.".. .,..', """""".."..,...,....,....".,.."""..""".. ,.."""..,.,$ 90,00 CADD DESIGNER ......,."""""".." "" .."..".. ..,..". """"""..""" ......,."", """"""" """...,.,.,...... ...""..'", $ 80,00 CADD DRAFTER """"""""".., ..,.,....,..,..,.'",.."""..".,.....,...' ..'""""..".,.... ..,...,. "..,. """"..,.."""" ,.".. $ 70.00 GIS TECHNICIAN ,..,..",..""..,."", ..,....,...""...."",..""". ..,...., .'"..""",..,....".,...".., ."...,..',.."..,.."",.. ,.. $ 85.00 PROJECT MARKETING """"""""",."".......,..",..."" .."",....",.,..,.'..,..""""""""".,.,...,.,........". ..'"", $ 80.00 CLERICAL STAFF ,...",..,.""",....",...'",'.',...."".."",.,..,.,..,..,....,....,.',..",..,.,.,.....,..,............,.,...,.."..',. $ 60,00 SURVEY MANAGER ......,...,.,...".,...'""",....",.. .,..,....,.",..,..", .."",...,..,.,..........."..,..,..,.."....".,.."..,.. $135,00 REGISTERED LAND SURVEYOR ........,.......,....................,....,..................................,..........,..,........ $110,00 SURVEY TECHNICIAN ...,.,....,."'.',.'"""""",.".,....,.,.".'"",,,"",.......".....,'..".,...."".",..,.., ",..,...,...,. $ 85,00 FIELD SURVEY (1-Man Crew) .""""",.."",.."",.,..,.",..."""".."....."..."'.,.",..""..,..,..""..""""...,..". $140,00 FIELD SURVEY (1-Man Crew OVERTIME) ..........................................,....,....................,.................$210.00 FIELD SURVEY (2-Man Crew) ..,................................,........................,.......................................,...., $190,00 FIELD SURVEY (2-Man Crew OVERTIME) ..,..............,..,......,..................,........,....,........,..,........,.... $285.00 EXPERT TESTIMONY ....,.,....,....,..,..','..'""",..""", ,.,....""'....""".....,......,.,...'"""..""".."",,",..,...,., $275,00 REIMBURSABLES EauiDment Rate Vehicle Mileage....."",...,.,.,....,.,....,.....,.,..."""""",.,..,.,.,..".."..,..",...""....,.....",..,..,.... ,$ O,60/mile ATV / SNOWMOBILE ,...,.,.......,."..."...'"..""""."....,...",..,...""...",......"".,.....,..,.,....", $ 125,OO/day ReDroduction (Plot Sheets are typical "D" size @ 2' x 3', Oversize higher) Black & White Plols..............,..,....,........,..........,..,..........,................,............,................ $ 5,OO/sheet Mylar Plots,....,.....""".".."",.."""""""."",.."....""""",..,.......,.....".....""..""..,.."",...... $17,50/sheet Color Plots"..""..,.."""..""",......,.".,.,..,.,.....,.",....,...""........",..""",..",..."""..,...,.... ,.. $26,50/sheet Photocopies...,......"".,.,....,.,.."""..""""""..,..,..,.,..,..,..""..,..".....,.........,........,....."...." $ O,20/page Miscellaneous Overtime will be charged out at 1 y,. times hourly rate (field survey overtime rates noted above), 10% will be added to all direct expenses, including Fed Ex, special delivery and courier charges, special consultants, subcontractors, laboratory tests. airfare. lodging, meals. car rental, telephone, outside printing expense, etc. Interest of 1.5% per month will be charged for invoices past 30 days, \~