Loading...
HomeMy WebLinkAboutpitkin.planning.273511400852 DOCUMENT LAYOUT THIS FILE MAY OR MAY NOT CONTAIN ALL OF THE INFORMATION LISTED BELOW IN THE FOLLOWING ORDER Summary Sheet Resolution for the BOCC and/or P&Z Ordinance for the BOCC and/or P&Z Determination for the Hearing Officer Administrative Determination Staff Memo Application Public Notice, Acceptance Letter, Referral(s) Letter Site Plan Miscellaneous Plat copies (11x17) x ~~ ADMINISTRATIVE DECISION OF THE COMMUNITY DEVELOPMENT DIRECTOR OF PITKIN COUNTY, COLORADO, APPROVING A TEMPORARY USE/SPECIAL EVENT PERMIT FOR RIDE THE ROCKIES FOR TUNE 21sT - 22ND, 2007 Administrative Decision No-2007 RECITALS A. Pursuant to Subsection 4-30-50(i) of the 2006 Pitkin County Land Use Code, the Community Development Director of Pitkin County, Colorado (``Director") may approve a Temporary Commercial Use/Special Event Permit for non-commercial activities or special events. B. Paul Balaguer of Ride the Rockies (hereafter the "Applicant") has proposed a major bicycling event on June 21 S` that will enter Pitkin County along the bike trail in Emma at approximately 7:00 AM and continue up valley. The route will then branch off to Lower River Road and continue up to McLain Flats Road where cyclists will ride into the City of Aspen and camp at Aspen High School. The Pitkin County portion of the event will end at approximately 1:00 PM. On June 22na the event will continue at approximately 7:00 AM along Hwy 82 and over Independence pass with the last cyclist exiting Pitkin County at appro aimately 1:00 PM. The event has proposed aone-lane road closure for Independence Pass on June 22 that has been approved by CDOT and will be monitored for safety by the Colorado State Patrol. Approximately 2,000 cyclists will be in attendance, 150 staff, and an undetermined number ofnon-registered riders who will ride along with the event. C. A Special Event Committee Meeting was held on Apri14, 2007 to discuss the proposal. The Committee collectively felt that the Rio Grand Bike Path route was a safer route than Hwy 82. The Committee's position on the proposed route was in conflict with Open Space and Trails recommendation to the BOCC which supported use of Hwy 82. On April 17, 2007 the issue was brought forth at a BOCC work session where the BOCC supported use of the bike path with specific conditions. On April 12~' the RFTA Board voted in favor of the event to use the RFTA portion of the bike path. D. In addition to the Special Events Committee meeting, the application was referred to Public Works, Aspen Ambulance, RFTA, Open Space and Trails, the United States Forest Service, Colorado State Patrol, and the City of Basalt. Entities that responded to the application outlined specific recommendations for approval which are documented in emails and retained in the file. These recommendations are outlined as conditions below. E. The Applicant has submitted adequate liability insurance acceptable to the Risk Manager. F. The Director finds that, to the extent applicable, the application complies with the standards in Subsection 4-30-50(i) of the Land Use Code. NOW THEREFORE BE IT RESOLVED that the Community Development Director of Pitkin County does hereby grant approval for the Ride the Rockies Temporary Use/Special Event Permit subject to the following conditions: The Applicant shall adhere to all material representations made in, or in connection with, the application, including but not limited to its Safety and Operations Plan. 2. The Applicant hereby expressly binds himself or itself to indemnify and hold harmless Pitkin County and each of its officers, agents, employees and insures against any and all liability, loss, damage, demands, for any claim, injury, or damage allegedly sustained received, and expressed of whatsoever nature (including court costs and attorney fees) which arise from or are caused by the acts of the (t ~ ! ~ t l rt ~ ~ ~ Page 1 of 3 Applicant, its officers, employees, agents, contractors or subcontractors, in connection with or in any way arising out of the activities of the Applicant. Spray painting or other permanent marking of the trail surface is strictly prohibited. Events requiring measured miles or the provision of other information to event participants must utilize non-permanent means of conveying the information. Failure to remove mile markers or other participant information from the trail within 24 hours may result in revocation of the permit or action by Pitkin County Government to withhold permits for future events. The Applicant is responsible for any remedial efforts necessitated by a violation of this condition. 4. The Applicant shall maintain the premises to standards of orderliness, neatness, sanitation, and safety acceptable to Pitkin County. 5. The Applicant shall pack out or otherwise remove from the area all refuse resulting from operations under this permit. 6. The Applicant, in exercising the privileges granted by this permit, shall comply with all Federal, State, and Pitkin County laws and regulations which are applicable to the area or operations covered by this permit. This includes Pitkin County Title XII regulations requiring bicyclists to travel at safe speeds and to yield to equestrians and pedestrians. 7. The Applicant shall exercise diligence in protecting from damage the land and property of Pitkin County Open Space and Trails used in connection with this permit, and shall pay Pitkin County for any damage resulting from negligence or from the violation of the terms of this permit or of any law or regulation applicable within the area used by the Applicant, or by any agents or employees of the holder acting within the scope of their agency or employment. 8. The Applicant shall notify Pitkin County of any substantial changes in the event type, route, venue or dates. Changes may be subject to approval by Pitkin County, In case of change of address, telephone, and/or contact person for the event, the Applicant shall immediately notify the permit agency agent. 9. Rising waters, high winds, falling limbs or trees, and other hazards are natural phenomenons that present risks, which the permitted assumes. The Applicant has the responsibility of inspecting his activity area and immediate adjoining area for hazardous conditions and, after securing permission from Pitkin County, removing such hazards. 10. No signs or advertising devices shall be erected on the area covered by this permit, or highways leading thereto, without prior approval of Pitkin County Government as to location, design, size, color, and message. Erected signs shall be maintained or renewed as necessary to neat and presentable standards. Signage approved for the event shall be removed promptly after the event 11. The event will not cause undue disturbance or inhibit safe travel on Pitkin County owned or managed properties oi• right-of--ways. 12. Marshals will warn other trail users of event in progress. The Applicant shall also post signs along the trail one week in advance of the event at the locations where marshals will be located with the following language, "Bicycle Event on Trail Heavy Up Valley Traffic towards Aspen Thursday June 21-from 7:30am to 2pm" Signs must be removed promptly following the conclusion of the event. 13. The Applicant shall post volunteer marshals at the following locations along the Rio Grande Trail as approved by Open Space and Trails in an email dated May 10, 2007 (Attachment A): a. Emma Road Crossing ,~~y ~ ~ Page 2 of 3 ~UtJ~~IJ~ b. Basalt High School c. Intersection Basalt Trail & Rio Grande Trail d. Path crossing Lower River Road (approx. 2.35 miles west of Arciero Trailhead) e. Where the route departs path (approx. 3.65 miles west of Arciero Trailhead) 14. The Applicant shall post signs and law enforcement officers, as designated below, at the following locations as approved by Public Works in the email dated April 18, 2007 (Attachment B): a. Lower River Road Mile Marker 2.2 -Rec. Path crosses road: Sign for east and west bound traffic on Lower River Road. Law Enforcement Officer present; b. Lower River Road Mile Marker 3.6 (proposed route departs from Rec. Path onto road.): Sign for westbound traffic on Lower River Road; c. Junction Upper River Road/Lower River Road &Gerbaz Way: Sign for westbound Upper River Road and northbound Gerbaz Way; d. Junction Upper River Road & Woody Creek Road: Sign for southbound Woody Creek Road. e. Junction Upper River Road/McLain Flats Road & Smith Way: Signs for westbound McLain Flats Road and northbound Smith Way. Law Enforcement Officer present; f. Junction McLain Flats Road & Raceway Road (Dump Truck Entrance): Sign for southbound Raceway Road. The Applicant shall also provide a list of these locations to the Pitkin County Sherriff s Office (Tom Grady) 1 week prior to the event. All signs and staging equipment shall be removed promptly at the conclusion of the event. 16. The Applicant shall place quarter page advertisements in the local newspapers and public service announcements on the local radio stations for one week prior to the event letting the public know the event date, time and route of the event. Letters shall be mailed to all adjacent property owners along the Pitkin County portion of the bike path to alert neighbors of the event. 17. The Applicant shall comply with the ambulance plan outlined in the email correspondence with Rich Walker dated 4-06-07 (Attachment C). Rich Walker shall be contacted if there is any modification to this plan. 18. The Applicant shall conform to the Colorado State Patrol safety plan for baggage trucks crossing Independence Pass and additional troopers for safety as outlined in the email correspondence with Captain Rich Duran dated 4-09-07 (Attachment D). State Patrol shall be contacted immediately if the Applicant proposes any change to this plan. 19. Failure to comply with the conditions of approval may result in revocation of this permit. APPROVED this ,~~ day of June, 2007 ~;~~~ C Cindy Houben Community Development Director PID#: 2735-114-00-852 P039-07 {~ Il £? ~ Page 3 of 3 Michael Kraemer Page 1 of 3 __,__--- From: Gary Tennenbaum Sent: Thursday, May 10, 2007 9:33 AM To: Michael Kraemer Cc: 'Balaguer, Paul'; Dale Will Subject: RE: Ride The Rockies Marshal Locations on Rio Grande Path in Pitkin County Pauf, I originally thought the RTR route was leaving the Rio Grande Trail at the Arciero Trailhead, so that's why I wanted a marshal at Arciero. If it is staying on the path till the second crossing of Lower River Road then I am ok with your change. Gary Tennenbaum Pitkin County Open Space and Trails Land Steward 76 Service Center Road Aspen, CO 81611 970-920-5355 www.aspenpitkin.com/openspace _...._ ... ___ m..~ ..~__ From: Michael Kraemer Sent: Thursday, May 10, 2007 9:09 AM 1"0: Gary Tennenbaum Cc: 'Balaguer, Paul' Subject: FW: Ride 'The Rockies Marshal Locations on Rio Grande Path in Pitkin County _~ _._~._. ~.__ ~,~~ ~~_......_ ~._.._.._.....~ ~ ......M~ From: Balaguer, Paul [mailto:PBalaguer@denverpost.com] Sent: Thursday, May 10, 2007 8:57 AM To: Michael Kraemer Subject: RE: Ride The Rockies Marshal Locations on Rio Grande Path in Pitkin County Mike, Fiad you heard anything from Gary about this?? If you've not sent it to him, I can do that. I just need his e-mail address. Also, can you please advise me on the status of our permit. Thanks, Paul Balaguer Tour Director Ride The Rockies Q~~nr~, 6/5/2007 Page 2 of 3 (303) 820-1602 Fr®rn: Balaguer, Paul Sent: Saturday, May 05, 2007 2:22 PM T®: 'Michael Kraemer' Sufbject: Ride The Rockies Marshal Locations on Rio Grande Path in Pitkin County Mike, Can you please either forward this to Gary Tennenbaum or provide me with his e-mail address. In all of the e- mails back and forth about path conditions, t never got his address. Thanks, Paul Gary, I rode the RTR route from Glenwood Springs to Aspen on Thursday, May 3. I am planning to locate marshals at the locations you specified, but want to inquire about a minor change. (The locations you specified are: Emma Road Crossing, Basalt HS, Intersection Basalt Trail & Rio Grande Trail and Arciero Trailhead.) I believe we need to have marshals located at both the following locations: 1. Where the path crosses Lower River Road (approx. 2.35 miles west of Arciero Trailhead) 2. Where the RTR route will depart the path (approx. 3.65 miles west of Arciero Trailhead) My question for you is can the above marshals serve in lieu of a marshal located at Arciero Trailhead? In my experience, the vast majority of the downvalley use of the Rio Grande Path from Arciero Trailhead has come down valley on the path, and therefore would have encountered the 2 marshals listed above. (In addition, we'll have a marshal located 1 mile downvalley at the intersection with the Basalt Trail.) I appreciate your consideration of the matter, as our personnel are stretched pretty thin in the valley, and I really do think that this would be the best use of our resources. If you approve, marshal locations on the path in Pitkin County will be: 1.Emma Road Crossing 2. Basalt HS 3.Intersection Basalt Trail & Rio Grande Trail 4. Path crosses Lower River Road (approx. 2.35 miles west of Arciero Trailhead) 5. RTR route departs path (approx. 3.65 miles west of Arciero Trailhead) Again, I appreciate your consideration and I look forward to hearing from you Sincerely, Paul Balaguer Tour Director Ride The Rockies (303) 820-1602 6~5~20®~ r~ o n u o From: Gerald Fielding --,-, Sent: Wednesday, June 06, 2007 9:26 AM To: Michael Kraemer Subject: FW: Ride The Rockies Safety and Operations Plan Here you go G.R. From: Michael Kraemer Sent: Wednesday, April 18, 2007 9:10 AM To: Gerald Fielding Subject: RE: Ride The Rockies Safety and Operations Plan thx GR. From: Gerald Fielding Sent: Wednesday, April 18, 2007 9:10 AM To: Balaguer, Paul Cc: Michael Kraemer Subject: RE: Ride The Rockies Safety and Operations Plan I concur with the locations of the signs below. Page 1 of 2 _.. From: Balaguer, Paul [mailto:PBalaguer@denverpost.com] Sent: Monday, April 09, 2007 8:36 AM To: Gerald Fielding Cc: Michael Kraemer Subject: Ride The Rockies Safety and Operations Plan G.R., Thank you very much for your assistance with the planning and execution of the 2007 Ride The Rockies in Pitkin County. We appreciate your efforts and are looking forward to the visit. Below is a summary of our discussion on Friday, April 6, 2007. When you get a chance, will you please review this a-mail, then hit "Reply All" to confirm to Michael Kraemer and me that you agree to the plan below for locations of motorist advisory signs and law enforcement officers on Pitkin County Roads for our Safety and Operations Plan. At the following locations on Ride The Rockies' proposed route on Pitkin country roads, 42" x 42" 0 orange signage will be located to advise intersecting motorists of the event's presence. In addition, where noted, a law enforcement officer will be present to direct traffic. 1. Lower River Road Mile Marker 2.2 -Rec. Path crosses road: Sign for east and west bound traffic on Lower River Road. Law Enforcement Officer present. 2. Lower River Road Mile Marker 3.6 (proposed route departs from Rec. Path onto road.): Sign for westbound traffic on Lower River Road. 3. Junction Upper River Road/Lower River Road &Gerbaz Way: Sign for westbound Upper River Road and northbound Gerbaz Way. 4. Junction Upper River Road & Woody Creek Road: Sign for southbound Woody Creek Road. oo~~~» file://C:1Planning MemoslSpecial EventslRide the RockieslPublicWorks_RTR.htm 6/6/2007 Page 2 of 2 5. Junction Upper River Road/McLain Flats Road & Smith Way: Signs for westbound McLain Flats Road and northbound Smith Way. Law Enforcement Officer present. 6. Junction McLain Flats Road & Raceway Road (Dump Truck Entrance): Sign for southbound Raceway Road. If you have any questions or concerns, please feel free to contact me at any time via e-mail or telephone. Again, our thanks for your assistance. Sincerely, Paul Balaguer Tour Director Ride The Rockies (303) 820-1602 ®oouo`~ file://C:\Planning Memos\Special Events\Ride the RockieslPublicWorks_RTR.htm 6/6/2007 ~~~C ~ 1 ~~~~.- ~ Page 1 of 2 From: Richard RTalker [rwalker137@gmail.com) Sent: Friday, Apri106, 2007 4:01 PM To: Balaguer, Paul Ce: Michael Kraemer Subject: Re: Ride The Rockies ambulance coverage Michael and Paul, As per my discussion with Paul this morning, this plan looks fine to me. This of course just pertains to our District's portion of Pitkin County only. Call me if you have any questions. Thanks, Rich 970-544-1580. On 4/6/07, Balaguer, Paul <PBala~uernden_v_..erpost.com> wrote: Rich, Good to talk to you today. Again, our thanks for your assistance with coordinating Ride The Rockies in Pitkin County. Below is a summary of our discussion of plans for ambulance coverage in Pitkin County. When you get a chance, will you please hit "Reply All" on this a-mail and confirm to Mike and I that you concur with this plan. Ride The Rockies (RTR} will be in Pitkin County on June 21 & 22, 2007. RTR will be accompanied by 2 ambulances from Stadium Medical. At this point it is not yet known if Stadium Medical will be licensed to transport patients in Pitkin County The agreed upon plan for Aspen Ambulances is: 1. If Stadium Medical obtains licensing for transporting in Pitkin County, Aspen Ambulance will have normal staffing on both days that RTR is in the county. In the event that RTR is in need of ambulance transport other than by Stadium Medical, we will activate local EMS via dispatch or 911. 2. If Stadium Medical does not obtain licensing for transporting in Pitkin County, Aspen Ambulance will have normal staffing on both days that RTR is in the county plus an additional standby ambulance stationed on the tour route each day. Hours of standby staffing will be 7:30 a.m. - 3:00 p.m. on June 21; 6:00 a.m. - 11 a.m. on June 22. In the event that RTR is in need of ambulance transport, we will activate the standby ambulance via dispatch or 911. Aspen Ambulance will invoice RTR after the event for the standby ambulance at a rate of $75 per hour. Invoice may be sent to me at this e-mail address. I will keep you posted about the status of Stadium Medical getting licensed to transport in Pitkin County. ~oavu® file://C:1Planning Memos\Special EventslRide the RockieslAmbulance_comments.htm 6/4/2007 Page 2 of 2 Please feel free to contact me with questions or concerns at any time via telephone ore-mail. Again, our thanks for your assistance. Sincerely, Paul Balaguer Tour Director Ride The Rockies (303) 820-1602 ®~~~0~ file://C:\Planning Memos\Special Events\Ride the Rockies\Ambulance_comments.htm 6/4/2007 ~~- ~r~~~,J ~ ~ '3 ~~G ~ s ~-~-,~-~ ti f~a~7-- ~ b,~ etc From: Balaguer, Paul [PBalaguer@denverpost.com] Sent: Monday, April 09, 2007 10:27 AM To: Tom Grady Cc: Michael Kraemer Subject: FW: Ride The Rockies in Pitkin County Tom (and Mike), Capt. Duran has indicated that he can provide the manpower for the officers in fixed locations on Pitkin County Roads. (Please see e-mails below.) When the route is finalized, I will confer with him to make sure we have the staffing at the locations we've discussed. Thanks, Paul Balaguer Tour Director Ride The Rockies (303) 820-1602 -----Original Message----- Frcm: Richard.Duran@cdps.state.co.us [mailto:Richard.Duran@cdps.state.co.us] Sent: Monday, April 09, 2007 10:17 AM To: Balaguer, Paul Subject: RE: :Ride The Rockies in Pitkin County Good Morning ! vie will be able to accommodate two more troopers to ensure everything is done safely. I am still in the process of putting together the amount of troopers needed. I will add these two additional troopers in my cost estimate. Captain Rich Duran Troop 4C - Glenwood Springs Office: (970) 945-6198 Fax: (970) 945-6598 Mobile: (970) 948-7959 "Balaguer, Paul" <PBalaguer@denver <Richard.Duran@cdps.state.co.us> post.com> To: cc: Subject: RE: Ride The ®~1~~~~ Rockies in Fitkin County 04/06/2007 11:09 An'I Hey Rich, One more question: Deper_ding upon the enact rcute in Pitkin County (it`s currently being debated by the Board of County Commissioners) we are likely going to need some additional Law Enforcement assistance in Pitkin County on June 21. If the board does not approve the route going on the new bike path, we're going to need officers to assist with the crossing of Colorado 82 (at the intersection with Lower River Road). Even if the route on the path is approved, there are 1 -2 intersections on Lower and Upper River Road where I am requesting law enforcement assistance. Tom Grady with the Pitkin Co. 5.0. has indicated that they are understaffed and would appreciate it if I can, if possible, contract with CSP to provide officers at those lccations. My question for you is do ycu think you have sufficient manpower to provide those 1 - 2 officers on 6/22? Thanks very much, Paul Balaguer Tour Director Ride The Rockies (303) 820-1602 -----Original Message----- From: Richard.Duran@cdps.state.co.us [mailto:Richard.Duran@cdps.state.co.us] Sent: Friday, April C6, 2007 7:43 AM To: Balaguer, Paul Cc: michaelk@co.pitkin.co.us; richard.duran@cdps.state.co.us Subject: Re: Ride The Rockies in Pitkin County I have discussed this plan with Paul on a few occasions. I agree with the plan as outlined below. We will also have additional units monitoring these locations above and beyond the motor team that will be traveling ®Q~~~~~ with the event. Captain Rich Duran Troop 4C - Glenwood Springs Office: (970) 945-6198 Fax: (970) 945-6598 Mobile: (970) 948-7959 "Balaguer, Paul" <PBalaguer@denver To: <richard.duran@cdps.state.co.us> post.com> cc: <michaelk@co.pitkin.co.us> Subject: Ride The Rockies in Pitkin County 04/C5/2007 09:48 PM Greetings Capt. Durar_, <?xml:namespace prefix = o ns _ "urn:schemas-microsoft-com:office:office" /> I Hope this finds you well. Mike Kraemer (in the CC field of this e-mail) is a planner in the Community Development Department in <?xml:riamespace prefix = stl ns _ "urn:schemas-microsoft-com:office:smarttags" />Pitkin County. He is processing our application for a special event permit in the county. As part of the permit process, Mike would like you to confirm that you have ®~~u~~ sanctioned our plan for traffic control for Independence Pass. Mike is fine with a simple e-mail from you stating that. When you get a moment, can you please hit "Reply All" to this e-mail and let Mike know that the su_nmary below is an accurate portrayal of the matter. (Note: I'm sure Mike doesn't expect you to recall the dates, only the gist of the conversations. ? I however noted the dates the conversations took place.) On 8/3G/06 Capt. Duran and Paul Balaguer discussed the matter by telephone. Paul Balaguer stated that the following measures would be implemented to make Ride The Rockies passage on Independence Pass as safe as possible. 1. Close RTR Baggage Trucks early to ensure early departure of cyclists. 2. In 2 locations, Colorado 82 will be reduced to one lane for alternating direction vehicle traffic. Cyclists will ride in approximately 5 ft. of the eastbound lane cf the road. Vehicles will drive in the rest of the roadway, alternating directions. Traffic Control will be provided by a certified traffic control company. Locations are: MM 48.75 ? 48.95 and MM 50.85 ? 50.95. Capt. Duran gave verbal approval to this plan. (Note: Earlier on the same day, Major Michael King also gave tentative approval to this plan, pending Capt. Duran's approval.) Capt. Duran and Paul Balaguer further discussed the matter on 3/8/07. Plans for Independence Pass ar_d other areas were again confirmed. Please let me know if you have any questions. As always, we are in your debt for your assistance. Q~IJI~. Sincerely, Paul Balaguer Tour Director Ride The Rockies 303-82G-1602 4J~~U~ ~~ ~~ :~ ~a ,~ , , 4 u ~/JVV TY' ~~~~~ '1 MEM®RAlVDUM, ®ate: March 15, 2007 Frorn: Paul Balaguer, Ride The Rockies Tour Director 1~iE DENVER POST RIDE THE ROC KI ES® P0.ESENiED BY 570 W. 53rd Place Denver, CO 80216 303-820-1338 www.ridetherockies;:oom Subject: Ride The Rockies Pitkin County Special Event Permit Application To: Mr. Mike Kraemer, Pitkin County Community Development Department Planner Thank you for your assistance in the planning and execution of the 2007 Ride The Rockies in Pitkin County on June 21 & 22. Enclosed please find: • Completed Pitkin County Special Event Permit Application. • Safety and Operations Plan with information to augment our permit application and address information requested in Attachment A. • Maps showing Ride The Rockies' proposed route in Pitkin County on 6/21/07 & 6!22/07. • A check for the $1386 permit application fee. Please note: We have requested a certificate of insurance naming Pitkin County as an additional insured party. Our insurance renews each year on May 1, so if we request the certificate now, it will expire on May 1, 2007. We will request a certificate immediately after May 1 and forward. it to you as soon as we receive it. Again, thank you for your assistance. If you need further information, or have any questions, I can be reached during business hours at (303} 820-1602. Thank you. ooouo COLORADO BICYCLE TOUR permpc.07.doc Proceeds from Ride The Rockies benefit Post-News Charities, a fund of the Mcformick Tribune Foundation. " O~c~~~'S yBZ~"`' ,,st,,,s. ,.gr 'i' '44' \~.:~ :~ .- ~- /' `.,r% ;:;`'i-;?';:',': Esther Y ~~~ s ,.~~°~~-~-~` .::~,:•.;;. .l`~ •~;{,r, `;;\;' ates •'~~' ~~~~ s. '~~". :~ of T ~\ / :'; a~ ~iY\~ fJ.'.~: •; v y ~ ~ -- - ~eY ~ :~~~ ~ ~.i~.~,. .~-.~~ f mac,..--^ .', ~: x.. v~N / F`Yrgrd ^~'"~z, `.. ~~'~:' z,, 3~,,. ~,/-.~ ~. .S`- ;',~_"`~ '~ ',RR~S c 1 .. A~5 :r. fir.,:.'- ~ 0 a ~ ~~'~_ ^ :. ': ~t,: k`: ~"i f `,fix ~~'. .~:' .. s w ~ . `,~. 'Reg aF _ _ ~ d.""^ ~ - I_ ,. i , ./.:'<'.~;`~.:..ti'-. R ..°OC:R" ,_:i'`.. T ' :.;- ;' , '~ :~~~ .. \ ,J~F^;73.1: y^c. f. ~N" ~ \~ `~\ •\,Y-f~t~ Y"~}f. 43: ".atw +k-/.(1l~'e'~`:~, l'1~~~`"~.:~~'t . ( ' , ~ :. F - ~ I .. , ^~.+ . ~' sX .Y ~ d ~ ~ - -- k 'off„j .YC~~.~~~~t~ .:~` ; P 't"w'~rt~rzvl, ~.~,~ = .:c;-' r', ' .. /. 6f Pa's `~... •w9~„'1..i ,~ t ~'c.....,._._ ,'F~~. ,,...ys~'~±r ., .....' ., ,, ~.'. e ) \ ~ ~ J^ ~ ` ,t\~ I i iii ^'~.,fr..+: ~ ~. '. ` ',.y.+w ., i:' ~_..t`J.~Lr^j~~~ ~'-n`~t••y, •,~ ;t.;: 4"" '~~ ~ ~-e . ''~ \~Y, 3_ 2~'i~.f.,~;~.^~~ ~tii1{"AAr '~ "k.': 'Y1."/b'":',:':s Y\ / ./~rJ'r k. j~?wNl. k; _rci^j'.. _~ir" `'• 4 ~w.~lg~:, . H, 9pR ~:~''3 e\ r Lr.F~ ~ .S`i'"-;:..^.../~,;, Ir~..~r: GB e ,n.,~", .fir ' ^t r"*~'.."^",~5.,:Xe~=%~,~y`~e 'e~': ">'`%~ i ~ aft"\. ~ B ~` ~ , a'`^~,""~a•`",? ,, ;" •.4k .. , ,.' . .. ;::., ~: ~, . gyp... , ~,. ,~'~ ,,~~ o. i ; -a _ ` ... ; -.-~ ,. ~w-- y;' ! ,. - ,. ;. ,~~, LL,~ -~-~_ ~~_ 2~t.. ,, eesancon..• ~~:~ulch~. f i ;~='~' r~:' /y . Y=' - ~~ .fir :"" ~ } ' ; , %.~ ~;'~v, ~ya~ fi"'Yie~ _F "ssf,~ - ~~ sm.. ''~.' - ~Z_,- __ `i''a`~ /~ :5~, ^. '~p. 'f~a'v .~;~ R; k • /'fir ', '~/.~~,~,,i~ -.^.i/ari'e..~:: i Li '~,:. ti^;~'\( :;\.; .'M'~i ~~ ,t .~~~~ .. j~`t~y~('i:::-.....ZEE `jtF'. .~ ' . ~ r ~:.. <+ ~ . ... ;i-a.,. , . . r. ~'~.-'.r . c ., , > ~' r ",-. 6 ~~ 1 ~~~~//.. . ,.. i~, ~ ^ r ~', • ~,~ . ~ r~~" ~ k .per 2~ ~f ~ .,1,,.. ` J ~~ ~ '~" s Y; ., .y ` r ~1n t 5. p '' 0/~-~X~'g~, i ~ t ~ji:~Ell/'^ - ~'~'~' x . q: ,r_,, - ~ ~~ ~~ .. "' A,~''T;..~4 r -.. ..tea '` • ^'"f°-.'' d~~,~ x ',>".~, '~: .. sue..... ~ri~ ~ ~7~'.': c;.~.` '.: "y~ ... ~ .~,~' ~ ~' ~~i'.i'k•,, `i.;.. ~., .,: pis` -~ ,:. ,. ~',NT '>~~ ~ a. ~~-% .l wk.. . • ~-,~'(,` ; s,s~., , az . 7v `a.i :"' ~. 32" '.\.-~..a ; '~L...~ ..II ~r,~ r • ~~#~4},\•!J } la ..:'. ~,fi;l~e` Q '~, ".~ \ Tyr" i':u ,w~,.,_.- , $.,`, Ifr ;. ~, ~_ {~'i.. ~,' ..+,.t ./". '\'. :'vim- ~a0' 1,[~'y~.`l~^ .i4y,+ itw.t `;y., •S,rj~;'' ~, E"y%'~ '7. ,'f„yw"/^`,vj~~ _-,`''...?;~ ,; ~t•; i~~... ~~_`i $~~ ~~„ a96 _ '.,'iy.;a:i; b'. .`~~y..?...._.\ ~ .':Tf ~Sr:.y ~ ~ FRMT~r-` r4~C~R .~.~~ t' k'~~.: Vii. ` ~1 ^^~.,:'s`>~.',~~"V e''. 1 .rig;. 1e ~1.~'/r.°t`;?l, ~w".'.,. .., ` ' '%~~,"y.,r'°".a} nx~:s; ls:-- .,451 .. :r^'~;;-~'-.~..'~;,..,,v ;.-..-.; ~'w.\~ t;'F~:~~;,;5^-. ..;.;, ,_. "'` ~x,"!•,tl3w...9' ~ :nt~~tj~~~' k v ~ Aw. ~. ~ rc ~ rtF' ~,~'',~ -' !` ~r ` ~ ~ ,`i\'T- r:~f.~1'r'n~ r~r..-rw,!'~`+:ip ~~`s?_,F?'?,:,4 '".'-~ r.y. 'Q,by' y~:,:;j7?,~~. .,,`~ f~, ...'• .h/, _,~~'-t 'Ca''Jy"'r`.K;'Y ~;v',.:i~ ~ r.~K:~~ ..1~~~~'!.t"f"f•' ~~'.;iiy,~" '~i F±., !/ - \V r ~''~'~t ~': ,„_Y:"..~ '`yy,..., \ .=~`i. - xi:Cti~` 7,-( - .L,(!.~~~~~~:':;'~'.~'~~'iaNt.~''~Y+?~~ / :it`t! C'.ti 1..: ~1 a - 'ja'r --4t~•'~;;s=.x < <{~~..= i; '..' - ,r : '! ~ ~' .,t';<.' 0 O O V o ~°-'-- 'sG~r . ::.:/~ ,} '~9W f~^~%': ~._1,'!r. :`,~Y'. •*}, ~Qr'~~ ,s''r....,~'; .•~:~> -.~ ~ :' r. ,.~a.. ,.-' ({i .iii;, t {:;:o < ... Fstdre ~;.~~~~. w;:.~Ly~'h„~`. ;g.r .>' T. ""~_:;~;",-~, •:.:i `~ :,:~~<''~,:.,,.%`:); `.''~• " ~~v ~ .J ~ _. _- ~ - ~ s ~ ,yam ~ R ' ~' ~' ;.%;dL~~':`~c`~}~~•• ~ :.~ _- ~; ...... ''} ~ `~{ ~~ 'fix =` %',f+~'~ ~" •''~` `.`x ~;,,~,x\', -. $ .t' :~ ... vs; & ~ - 3 _ Y T ~ a V ' Q~ ; r ~ f n j" rte' .. bArrs' 'qd. ~ ~ - ~v. s ~U i y f..~ r %;f r '~.. ' °H ~ ~ = ter. f=1.~'2~_:; e~;;, ,/~ :~: ; ,E ~.y, < . ;,_ .~ • ,-, ,' ' ,,:,. _ _. :. /~ti •, ¢, -, ' - ~if.i.>!SP/f-'~l~k' j r y?~+b~Jf`,q.['eti:t: mil'-' 5.~~`~~l':•_ •, ~;• ,, r • ~ ~ .a % :4~': . < ....: ~, r._~ \`~ ~ 7 .. ~ 9~.'^ :~ Fi ~ Vii:` /. ~'``,k,Y?:a;-, }y3'., w_."{ .,:6~~;~` .,~~~f".'.';f".- ' :'esa ~ ~` ~i eel- ri' ;~,!7'Y.~~}~. ,'`._~~,~, ; ~ Sry ~`~a},y`' ,yr `='...~°,` ~ia ,;:~~:;;~,`•i~%; ,,... • .: M :. r~"• '~•'.n - r^.~i ~1F: ~~•iS~'. •s' ~ 7~ r : ,~(_ ~-:rv`°r~:.~.,;. ` :4S' ',,".~; _..J~ ,J , ~. '~.~ i L~ ~ ~{.,: r ~r5. `,51;':..,~:..~..'•'akiA f s 't . _. ,, .... _ / ^~b \.y„ i •~~ (, ~~~-,.e~y,~ ,~.w,i;.s~j- ~,,5. , _ ~'?X.. Wit,,:': .._..:iGi, v & • pp. " .- ~ 5"+` ~..} _ ., eyed a ~ .. ~{ ; ``s:r~.. ,;,~,.~ ,~ ;. `,~ , , . C~ee ''ni ., X, ;7_. .,OIL - .. Y: , .. - J k'"%+: "' ~, '. ..: ~./ \:. .., ~ .ti • . ,, 4 ,art - ,,mYry. ~-~- '.., n+ _ ,%../ Besancon::, '_Gu1~M. f ~ "Y ~ ,,`'' •GS"~,.". 1„'iF?~° .#_.- :~/r~i" ./. .ir `}.;/' ~ '-jam' ~~;;=:~~yt~, .. ., :, w ., v. - - -~,; ak ~,~ ~ i .a''~,; ." _ ';i,' ...irk;- ~,.rfrti"\"L:` _ ~ ~ 'S a; . ,.G "fir' 4 F ~ t"~;f•,.' p'q 0.v T ~e-`~```'{''~'~~fi .~~„''' ~. ~Q`. .\ A\'~. .~~~-~~r::~t~; i, ~'Y• +!~v+~• I-'f • `~~~ ' ~' ~ ~~~- \', z:-' ok". ;>YdS' y `1 C~. :~5?,z -„J; lr: x;. •w ~. .w~~ .:; _ ~ r .. ~' Y.: ~ ' ,,.. ' . - 1' . :.. •r" /, ' ' ,< .~ ~' - .+~. ~ Rw ~w'` ~„ ~. ^''~` x . `eF', ~ R:~i', '4spaYY,p ''y a t~ ~~\' ..1~ y.,t fix' , FrA . i'r ,F% /, t ' ~„ a ~•,'x.#~~r'e` ~ ,'.~;r^'. 's;. ._~`<' ',-~,..r"..+~~ ~ t'~r,_ '0i C,t r~.~Afixs~i~~/`,n'.'i `~:.':: ~:,, ~~~ SY ..` . i .\ 4 <y,, k ~-w '+` 5 at* i ; J/ i~ ~f "l 4 ~. '4~, Y F ~. ,%',>, ~ ;;;r ry. '~ 1 - _ ri . - is ~ 'lv r ~ "y ~~r „~ ~, w "L '-` _ ~.a ::W~ '"a:.+.:"~v,. -~rr~, "'..'~:~«,,`.'.+4°'^s^'tirt'~',..:--;... ~', 's~;~1 `,':~_.: ~j~ •'__ ~bv°,'^, ~.. ;;^~.±~K -?"'",r3"°",'i^r•'"t<.=r`,, ~ ~yi't p`~: _ _ / ,. " ~ ~',r~,,, f:t e'*.4~:Y< t,t~ <+;- .^r:.:i," :~~: ^:'•P r/~f ;: ^~ s<n ~r: psx.~'-'^`~ ~,(; ~i° ~*yL'±2$.'. ~~"lrzJ*. ~'/...'j~'(r ~~ '~~~fvi,/'Si..i ~:~,... ~'' t•I' ~~. ~.... .^}L~~/'J. :~`- jun. x.~iu_. Tom'' .: ~',.. r~ti*Y ~•'`: ~~ .~ F _ ..i~.i:«..~'N'"~~:.A. ~ ~ ,..I. .~ , ......_\• • . ~1,T~~~1'r n/.v"', ~'Y~: .~.: "vf r~, jl~y'/-`~' ~ r ~fY ._ ,^,^`'Y'~~"'' ` ~~"= .3~ ~+'„ "~'~-.~~',:'.r_~~ ' ~,1.: ;: it s>r~x ,.ti "~..,FrFri.<"' _.4~:~C.;'r"*..,"W.~Rv~"~iL., .~- :~»:"w~':r"' :<'`.. .,,~~'~. ~i; ... .' _ \. ., - Ys'J'.Yi,:'%~ ~:i.`ti~;r~-+,'.'f'~kti-~..; :...+f.r.%:•l1~ \'t.%/.'/'r~.l,.r (:~;: ••t (\ [F~~[ /% ~~5r~~~~.,ws: k2n'. ,l r r.~ae' /' ~~~/! I.:: '~t~• •£'. '/,_ _,~` \~ qtr. `.~!1~•,!/ .....•' -,lF~ :'3 %n'4 .. `i ' ~T.*~S~ :1L.~,r 'i'~, .:' . ..~,~' , / ~ :/r i i~! ~ t_ ` j ` V' - / f• / _ ( ^'. -. rr','~r=4~-.-~::! ..f~'pt'.r'..~'~". ~,~1'' ~~,,~;~'` _ - '...'::.: Y, ~~/ g ~i,,\~.#'l Y' :':L'.,:. '~r ... .. ~~ ~ i.~iii e.. ,viii :e,.: ~ o i, L. I..... iO ii I. iilii :iii ~~~ :~ ~, ~~.. ~~, .. i i~:. I i iii v 0 i.i 1 1 0 0 V O ti ~~- -- ~ eOh \ Brea 'a .i.;i?7gq; .•(, - '~,~,- - qt; - el ? , P - - - .4 ,, ~ ~. „' _ ',~../ _ ~.'' ~ i:^~ d9 _ _ , ' - i' .. _ Y iYl ,_;. ~:.' S ,., , y ~. ... .~. i~~ `. _ .. ..~ p,% ___ 4 ~,, ,,.. .... ,a. ... ;,,~: ,.. ., i /. ;,, ;. _ _ - ;,` .' ~ ~ -:. , . ~ ~ , _ -:. - - ~' n ~. ~~ . .. ' - 'r9 \ y 4. ~. _ ... .; _ ~ ~~_ , .. .: ,: ~:. ' - .:., :,` ~. %~% •+ v ~: `\` "? ,. -: , ... :..:.., 4> `S ~ J ?. _ , :. ~. ,~s ~ ::::..,` ,... , ;, . .,.., . is , J i, g{`~ i; s~",l, _~~~ . ~t`~\~ . ~ 't~` ~ ~~ { `~` \ ~::zi, ~/ mac,.. ' Y - .G~ .ss+.'t:\ . a. ~:~. ~\`. -=~\ - :~ -/ ~,J jj-(:;;'r alp 'j~%~ ~},. .,.`"~.... .~\'' "tfn.:a 2~. ,f:''::lS% ~''r,t;'~!!.•'~ •d`s ;X> v;, <..r:".e ~t; C.:~%,`Y ~'°s:1 %~ `. ~~, xx,~. '~,:r, is '~ ':, 1,/, ;,., :Z'• !., _ l~,. F`. , r. -'~,fr' , fa a~'~ r,~`~ v~:~': .., ~'"~ ., '.%«` •-"Jib'` ~:. ,'N,, ~ ~?':'q. >ra .~~~.. `''" ,: ~\'~. TA'. ,#::~ E ff .~>. .' ~ ~,\-, C'~:aeZs ~ ` -' :'\~f~"• •:G`':. ^ y'A:~I. >if: ~.,.s._?F,.wX :t :,x,.;~ti `. .,\+ " =~:; M`~.,.;' ,, %y : : i ` -u,~~'¢~ii ~!u ~-..'. .~ , :.~;,. ~'' +:(``.., J.; j{.1 :, d ~ {i ~n.~:r ~..b:.. ~.. ``~, • w ~'~.`.':,I ~\" ~ Y''i~i; ~, 's>`' . ,/ 'i.. (F, ~r. .k @yt. I. ;'rti; ~='„J"-;{~*,. y, ,rr?'~~x~• c:C~.. •+.'.f ,„`y' "'.,~:,.. ~J%'. .. \; .Y4.L%; ' l%i~ jj;;,~~,§~"~`}) .~ ll`{. § ,~4'~i ~7~~~~"ry' 1 n F< =':`~$,, J„ .4g ~ .~'\•~ ~ '.n+a-~- =1.''•`St -.Jij.Y.a:w: ,~ wf~.., ,".+9~.. z: fA. `.L'., " rYr3 `, c `'~-y+.,, '4' .~ '\ \ u. 4 /~ _ ji'j';;,lti ( :y: .%.'t~'p.'~i.'rr.. ~ ~ : /•., ~+~s. ,~. ~i. .,gy'p' .) ~~,..raf>a.n - •:~~~ r• "-r°k~ > i~c:'; °'~~` '^i-; fi rt._ 1' ;137,: i . .. ~";..,-.: r ~~ ...j'• :i'"~, 'd-`.' .~. ``~ Y~,~ ' ` .~.+ ~; ~ e... ,. ' 4° %~?."~. i k i ~'~'~M: 2d::: i'~ ~' v" ...f` -'>..};~.. , Yg'„`:.> •~~o ~~ .. i 'IY'i .,m~ :V..: r`„rl; ",,;>• 1° ~f!r:;:~l,, .~r~.~~-; •e',:.k`.• ~i'E ~"v.-:~. ~".~d~:t:.r 'R"~,t•,:~. 'a:,;t:">~'~ ;, ,< .\, ~~ ' arx. ` .} l~i. . y'~~."~r' y.Y r ` i'<`.~:~,-..:+ `''r,~'ex..~r~.,~. ..i '~.4 ' 'x::Y t~~~Cas..,:..-,.... ''r~'2.i ±,~,,,<K tee: t; ~ roi' ' ,~~1 :L,<,:z t ~;,i ~:i••,,i,n':.. ~i' i~x ;, t, ~ ~ J ' "; y.:,i3 .~~,~.'~. ~ ,~~.'. ~.`c ~ ~ ~ ~• 4 t l n~; .'k~t'.: 7{' ~;.. Cj , , w ~,_...- 1. ir.. ~:'`..' , r/ . /.. is ~ Z .~y S~ s.u.,.. . ~\• 5 "~ "k5 ;l;#il;ii'i z t '':~`` .,-S `r ~ ~ ~% '.$`~ ,..}:x: • tf `*k ~ ~.:'s I ' s, /%. "w:'^;~, .., 1,(x.:'. ri, '). ~I~;~.~.~,1~~s'*s`£E'~, ",~='':s ~~.Fi ,~ t~'3x a. ~ ~`~ `~:i;;i:f:,., .: ~7. ~`45 : '~ r,, e:l. f.'^w . .+ : "4~:r` t'.,,.{ ~ ,:il~..T> ;:F . ~'"~°' . ~'~1''„i .y:F°~~'^'~; }:,*~i ~:. l,ixr.\\r ..<„w'j,`/_,; :. ~w;;i;t. ,,,~~~ ~K ~~~r_. ': }, da.r '.i.~d~ ~. ~~C'"~5`:r ~~?.: , ~~~ ~'..~r. ,:i.~ ~.: w - :. A'.k:5s i,f%,, ti'%" _ .,r~-:,?".k3 ~;~~ce „s'"~':. ^z, q..,~. ~,rr .t n -nrty.•-. , ~i~i~'~(. :,k\ \\.SS.. '`~r'> ~`'1'+,x ,. ;'(':.., .:'ia~.~ x.t r ..k' ~ ' a',~ .'3 '.;.~'~:` °, '.t...;C ., " f i .i 1 `>.~:d .<~' ~~'ti `M1: ~~-? .. ),. ,e` .. - .:~ • ~•, sad . _ ~~ ~ ..~, '`~'„ .':f;,:.:1..:'-rL 't;r. [. ~ ... ' 7.,F ..,\!~;~.. j :.` C,ry'. L R r s .-:.J-.;~1;»:•.. ~iL~L~~."~~.rsi'.tis~,~... ~r".'? tiG~'~-`'',I's!~ ::t.~z . _ .. .e _ ,.3~' ~'." ~q kaa,,~ is ~' ~::~R ;/ •„ n~ ` #, max.,"~ `li'F '~ ~~`~~ ,~ ~~ •~~~ t aoooo3 ~: ~, \~ ~k ~txx~~;lr : r. ,l . I • t 1, ; l c r; :k ~,`~•~•, \~a 'f r. w:. ~., fir. ~'` ~t' ), :%r)%:' ( „ ,':~ ~, ,t'1,;;, ,~-...s~llF~%"% y...:, yt'~ ks ~:. ~~'' 71•; 44~',3{cie~ Aa i/~.I~ ./, CF. ~ .f, -•~• i3:~. .j7 '"'; 4' i w..y ~r "~w~"/,".,~~~1' }' i`, ~ % ~'.! /r`. ' ,/-, i; 1,~ - ~. - y~'' ~' - { ''~ '~' _ ~=:~~: ham ~"~~{/ gd~ ~, a ' n 0 V Q O n V ~ 0 0 ~ i PITKIN COUNTY COMMUNITY DEVELOPMENT DEPARTMENT TEMPORARY COMMERCIAL. USE/SPECIAL EVENT PERMIT APPLICATION Please answer the following questions in detail. If an item does not pertain to your activity/event, please mark it "N/A." 1. Name of event/activity: Ride The Rockies 2. Location of event/activity: Ride The Rockies is in Pitkin County on June 21 & 22. 2007. The entire event starts on Sunday, June 17 in Frisco and concludes Saturday, June 23 in Frisco. 3. Type of event/activity (parade, assembly, sporting event, filming, etc.): Sporting event - Non-competitive Bicycle Tour If the eventlactivity involves movement (e.g., parade, foot race), describe the route, including starting and dispersal locations, and attach a map. Ride The Rockies involves movement. Please see enclosed map for exact route. Proposed route: 6121: Rio Grande Path to Pitkin Countv Roads 16.17 & 19 to Aspen. 6122: Colorado 82 4. Name of applicant (sponsoring organization/event coordinator): The Denver Post Ride The Rockies Address: 570 W. 53~d PI.: Denver, CO 80216 Phone(s): (3031820-1338 E-mail: rtr(c~denverpost.com Name and title of person primarily responsible for oversight of event/activity: Paul Balaauer, Tour Director Address: same as above Phone(s): 1303) 820-1602 E-mail: pbalaauerCcr~.denverpost.com Cell phone during the event/activity: (3031883-5026 5. Date(s) of event/activity: June 21 & 22, 2007 in Pitkin Countv Starting time(s): 7:00 a.m., June 21 (Estimated time RTR cyclists enter Pitkin County) Ending time(s): 1:00 p.m., June 22 (Estimated time last RTR cyclists depart Pitkin Countv) 6. Number of people involved (including participants, staff (including volunteers), and spectators): Approximately 2,000 participants; 200 spectators: 150 staff If you will be using volunteers, what type of advance training will they be receiving and when? Ride The Rockies does utilize a volunteer staff during the event. The staff is very thoroughly trained in advance about their iob responsibilities. as well as in contingency plans. first aid, CPR, etc. The event volunteer staff is extremely well experienced. Of the 75 volunteers on the staff, only 2 are participating for the first time. Over 1/3 of the staff has over 10 years of experience working Ride The Rockies. 7 have over 20 years experience. a~0~~~ 7. Will you provide notification of the event/activity to the public and/or to adjacent/affected property owners? Yes If YES, describe who you will notify, when, and how: Varies bv, jurisdiction and reauirements, but Ride The Rockies' typical notification includes advisory signs on impacted roads and. paths as well as public notice. advertisements in local newspapers. 8. Are you planning to erect temporary structures or tents? If so, describe location, size, purpose, and if they will be heated/air conditioned: No. Applicant does not plan to erect temporary structures or tents on the tour route in Pitkin County. 9. Do you require electricity; if so, what is the source of your electric power? No. Applicant does not reauire electricity. 10. Will there be amplified sound, music, or fireworks? If YES, please describe: No, not by applicant. Town of Aspen is planning amplified music in Aspen. 11. Will any food be sold? No. Not by applicant. Again, Other entities are selling food. (I.e. Town of Aspen is coordinating food sales in Aspen.2 12. Will you be providing portable toilets and/or hand-washing stations? Yes. If so, where will they be located and how many will be provided? Ride The Rockies travels with 124 portable toilets. 10 mobile hand-washing stations and a portable shower truck. 82 toilets and 6 hand washing stations will be distributed at aid stations on the tour route. The shower truck. 42 toilets and 3hand-washing stations will be located at host community sites to augment the facilities there. Describe the types, number and location of trash/recycle containers to be provided: Temporary cardboard trash/recycle bins are provided at "aid station" on the tour route. Trash removal at RTR HQ and entertainment sites in Aspen is being coordinated by Town of Aspen. Name, title, address, a-mail and telephone number(s) of person responsible for clean up: Tour Route: Paul Balaguer, Tour Director. Contact info above. Sites in Aspen: coordinated by Town of Aspen. 13. Will beer, wine, or other alcoholic beverages be dispensed at your event? No. Not by applicant. 14. Are you requesting use of any County properties (e.g., parks, trails)? Yes If YES, please specify: Ride The Rockies proposed route includes both Countv Roads and Paths administered by the county. See attached map for detailed description. 15. Are you requesting road closures? NO. If YES, please include date(s) and times: Road From To .Date Road From To .Date If road closures are approved, the permittee will be required to publish notice of the closures in local daily newspapers at least 2 days prior to the closures. 16. If you do not require road closures, will your event/activity use any public or private roads? Yes. If YES, describe: Please see enclosed map for exact route. Proposed route includes state highways, Countv roads, municipal streets and multi-use paths in Pitkin Countv. Z ooooos 17. Where will you provide parking? Because Ride The Rockies is a cycling event, minimal parking is needed on the event route in Pitkin County. At event entertainment and HQ sites in Aspen, parking is being provided for event staff vehicles and accompanying vehicles. These sites are being coordinated by Town of Aspen. 18. Will shuttle service be provided? Yes. If YES, describe shuttle service (including hours of operation) and methods to be used to encourage use of public transit: Ride The Rockies travels with 6 full-sized tour busses to shuttle event participants in host communities. Encouragement isn't really an issue, because participants are on bicvcles. They will either use public transportation or bicvcles to ride to destinations. 19. Describe traffic control measures to be instituted: Please see attached safety and operations plan. Ride The Rockies will be contracting with Colorado State Patrol, Aspen Police Department and Pitkin County Sheriff department (County resources permitting) for traffic control assistance. In addition, the event employs traffic control contractors where necessary and deploys road safety marshals on the tour route. 20. How many personnel will be provided for security, and traffic and parking control? Including all of the above listed, approximately 40 in Pitkin County. Identify any subcontracted security and traffic/parking control service providers (name, address, contact person, telephone number(s), and e-mail): Colorado State Patrol. Aspen Police Department and Pitkin County Sheriff department (County resources permittinal for traffic control assistance. Traffic control contractor to be determined. Law enforcement services will be charged out at the current hourly rate established by fhe Sheriff's Department and ONLY if resources permit. The Sheriff reserves the right to place officers and staff at the event, at the permittee's expense, if deemed necessary in fhe interest of public safety. For further information, contact the Sheriff's Office. 21. How many and what size vehicles and equipment do you plan to use to stage the event/activity? Please provide the location for staging of all vehicles and equipment. Please see attached safety and operations plan for numbers and types of vehicles and how they are deployed on the tour route. Summary: 24 autos. 3 semi tractor-trailers and 4 Class C trucks. 22. Are you planning to use fixed wing or rotor wing aircraft for any aspect of the event/activity? If YES, please describe: No. 23. Describe any special requirements or aspects of your event/activity that have not been covered above: Please see attached safety and operations plan that outlines measures taken to ensure that Ride The Rockies is as safe as possible. 3 aoooo7 *** ALL APPLICANTS: Please complete the attached Safety and Operations Plan or provide a separate document containing all of the required information (see Attachment A). A Safety and Operations Plan is required for planned events/activities because the emergency service infrastructure is funded by the Pitkin County taxpayers to offset unplanned events that pose a threat to life and property. As a result, any demand for services generated by a planned event/activity should be alleviated ahead of time by the event sponsor or organizer. The posting of financial security, in an acceptable form, may be deemed necessary by the Pitkin County Sheriff's Office upon review of the Safety and Operations Plan. I certify that I am an authorized representative of the applicant, Ride The Rockies and have the power to execute this application on behalf of the above-named organization. All of the above statements are true to the best of my knowledge, information and belief. I acknowledge that any Temporary Commercial UselSpecial Event Permit that I receive shall be subject to the following terms and conditions, in addition to those specified in the Administrative Determination/BOCC Resolution granting the permit: A. The County may revoke a Temporary Commercial Use/Special Event Permit prior to or during the event if the permittee violates any of the conditions of the permit. B. The County may require the permittee to participate in a post-event debriefing with referral agencies, affected citizens and other interested/involved parties to address issues that arose during the event. C. The County may require the permittee to post financial security to ensure compliance with any of the conditions of the permit. D. If a major incident or emergency occurs in the County during the event, the Sheriff reserves the right to remove any and all emergency medical, fire and law resources from the event. E. The permittee shall adhere to all representations made in the application and in public meetings. ~~~ Ride The Rockies Tour Director Signature of Authorized Representative Title of Applicant Paul Balaauer Print Name The Denver Post Ride The Rockies 570 W. 53`d PI. Denver. CO 80216 Address 0~~008 4 ATTACHMENT A SAFETY AND OPERATIONS PLAN REQUIREMENTS The purpose of this part of your application process is to promote public safety in the conduct of special events in Pitkin County. Please provide the following information as it applies to your event. Note that some questions will not be applicable, or appropriate, given the nature and/or scale of your event. Contact the Public Safety Council for additional information or direction regarding these requirements. • Is this acorporate-sponsored event for profit? X or anon-profit event? X Ride The Rockies is sponsored by The Denver Post, but all proceeds from the event are Routed to Post-New Charities, so the event is non-profit. The following statements assess the level of risk to the participant/citizens of the County by the event and its potential to affect normal public safety resources. (Check appropriate boxes.) X YES ^ NO A) Does the event pose risks to the individual participants and public safety? Onlv likely risk is to cyclists on the ride, not to public safety. ^ YES X NO B) Does the event occur in wilderness, swift water/open water or mountainous terrain and have the potential to affect normal public safety resources? If either A or B were answered YES, then the applicant may be required to post financial security with the Sheriff's Office. All participants of an event are encouraged to purchase and carry during the event a hiking, fishing, hunting, snowmobile, boat registration or back county certificate, which may cover costs of an emergency through the Colorado Departmenf of Local Affairs-DOLA Grant. A Safety and Operations Plan must be completed by all applicants. It can be written in outline format. It should: 1. Outline, in detail, all of the activities, risks, or other safety issues associated with staging or participating in your event. 2. Outline, in detail, the safety measures you will have in place for the event: A. Name the single point of contact public safety officials will be in communication with at all times during the event. List all means of communication and numbers/frequencies (e.g., cell phone, radio). Where will this individual be located during the event? B. Who has overall responsibility for the safety of the event? C. Describe (bullet topics) your safety briefing for event staff. D. Outline, in detail, your safety preplans. 1) Is your written safety/security plan developed and distributed? Please provide a copy. It should address the following items: 10/19/06 000009 a) Dispatch procedures for your internal emergency response resources. Drawings (flow chart) may be helpful. b) Requests for assistance procedures. c) Event communications plan. Drawings may be helpful 2) Please ensure that your map attached to the application clearly identifies emergency facilities, emergency access routes and hazards. 3) Outline, in detail, how you will detect and respond to event emergencies. 4) Describe event-provided emergency medical personnel, facilities and provisions for staff and participants. Will your event's safety facilities (aid stations, heli-spots, etc.) be prominently and clearly marked? If so, how? (The event may be required to supply its own Emergency Medical Services (including ambulance service), depending on the scale and risk assessment of the activities. You may contact local fire and ambulance departments, or private providers for quotes and availability.) E. Are there any low risk hazards likely to be encountered by the staff or participants and how will they be addressed (e.g., road crossings, stream crossings, etc.)? F. What are your inclement weather contingency plans? 10/19/06 oooolo ~: 2007 Ride The Rockies Pitkin County Special Event Permit Application -Safety & Operation Plan Ride The Rockies goes to great lengths to assure that the event is as safe as possible. A Tour Director, Community Coordinator, Tour Assistant and Intern are employed by The Denver Newspaper Agency to work. exclusively on Ride The Rockies. Below is a list of some, though not all,. of the measures taken by the Ride The Rockies staff to ensure that the event is as safe as possible: On-Tour Staff: Ride The Rockies is overseen by a large traveling staff. 75 well-trained individuals augment the four-person management staff. These individuals are all trained in first aid and CPR, as well as their tour assignments. Assignments include Road Safety Marshals, a team of people to staff aid stations that are placed at regular intervals on the route, a team to place directional, informational, and hazard warning signs, a person to chalk potholes "day glo" orange and sweep gravel and debris from the road surface, a team of "Sag" vehicle drivers to patrol the route for cyclists who need assistance or are too tired to complete the ride, a team of EMT's who patrol the route, etc. The entire staff meets several times before the event. In addition, the staff meets every evening during the tour for a review of the day's events and a detailed briefing of the next day's tour and assignments. Police Support and Review of Course: Each year's Ride The Rockies route is reviewed and approved by numerous Colorado State Patrol officers including the Lieutenant Colonel who serves as the liaison to Ride The Rockies, the Major in charge of each district that the tour visits, and the Captain in charge of each troop visited. The entire Ride The Rockies tour is accompanied by eight Colorado State Patrol motorcycle officers. In addition, officers from local State Patrol jurisdictions are dispatched to assist at areas where this is deemed necessary by Ride The Rockies or the State Patrol. The course is also reviewed and approved by the Sheriffs Department in each county the tour travels through and the Police Department in each overnight host community on the tour route. Additional on-road support as provided by municipal police departments in host towns and by sheriffs deputies when needed. permpc.07.doc 00001 Medical Support: Ride The Rockies is accompanied by two ambulances, each day. Dr. Alex Neel is the Medical Director of Ride The Rockies. He and 40 "Riding Medics" patrol the course on bicycle, carrying fanny packs outfitted as first aid kits. This staff is comprised of physicians, nurses and EMT's, and meets before the tour, as well as each evening during the tour for a briefing. As mentioned earlier, the on-tour staff includes 1 paramedic and 3 EMT's whose sole assignment is to patrol the route for cyclists who are in need of assistance. Their vehicles are equipped with medical supplies. In addition, the eight-person sag team, the water transportation team and the tour director all patrol the route and are first aid-trained and equipped with first aid kits. Each day's tour also includes up to eight aid stations on the route, each of which is equipped with a first aid kit and manned by staff trained in first aid. 15 Ride The Rockies support vehicles carry automatic external defibrillators. Two-way Radio Communications: In the event of an emergency, the Ride The Rockies staff is able to request immediate assistance through the use of an extensive two-way radio network. There are 82 two-way radios (35 vehicle mounted "mobile" radios and 48 hand-held portable radios) deployed on the route. Radios are used by tour management staff, the radio/EMT crew, the sag vehicle team, the Colorado State Patrol officers accompanying the tour, the water transportation crew, aid station attendants, road safety marshals, the sign crew, the aid station transportation crew, the bicycle repair crew,. and assorted other tour staff members including the baggage crew, banner crew, etc. All radio users are trained in radio use, including how to use radios to call for emergency assistance. In addition to the radios used on the tour frequency, there are numerous radios on the route using other frequencies. All State Patrol officers on the route can communicate among themselves and communications centers using either NLEEC or "State 3" frequency. Radios with these, frequencies, as well as FERN and HEAR are also carried by the Tour Director, the Technical Assistant, both tour ambulances, one of the tour paramedics, and one of the tour EMT's. The State Patrol Officers and tour .EMT/Paramedic staff also carry radios with additional frequencies used for emergency response. permpc.07.doc OOOU1~ Route Research and. Preparation: The event route is scouted by vehicle and bicycle by a technical expert. The routes are driven no fewer than four times to gather information for necessary safety precautions. Routes are ridden on a bicycle at least once (sections that warrant concern are ridden multiple times) to determine locations of directional, informational, and hazard warning signs, aid stations, areas requiring safety marshals or police officers, etc. Coordination with Construction and Maintenance Agencies: Every agency that has construction and/or maintenance jurisdiction over the tour route is contacted each year. Agencies include the Colorado Department of Transportation for state and federal roads, county road and bridge departments for each county's roads, and municipal public works departments for municipal streets. Tour management works with all agencies to avoid any conflict with construction and maintenance projects. Vehicular Traffic: Ride The Rockies is conducted on open roads. No road or traffic restrictions are requested. Vehicle traffic present on the tour route and at all major intersections on the route is advised of the cyclists' presence through signage. The sign crew is equipped with 28 42" x 42" advisory signs to warn motorists of the presence of cyclists and the number of miles to expect to travel among cyclists. Each of these signs is placed on the route each day of the tour. Ride The Rockies does make efforts to limit private support vehicle traffic on the tour route. When cyclists are accepted on the tour, they are mailed a packet of information confirming their registration. Included in this packet is a request that all cyclists who will be accompanied by a vehicle have that vehicle use a route other than the cyclists' where available. A list of alternate routes is provided in the packet and during the event. Before the event, a traffic advisory is printed in The Denver Post, informing motorists of the tour route and alternate route information when available. During the tour, cyclists' vehicles that are neglecting to use alternate routes frequently stop at tour aid stations to meet their companions. Aid station attendants are provided with flyers to be placed on the vehicles' windshields requesting that alternate routes be used. Bicycle Maintenance and Bicycle Repair Support: In the confirmation packet sent to each rider, participants are instructed to be certain that their bicycle and its repair are sufficient for the terrain they will be riding. Cyclists are instructed to have a bicycle shop examine their bicycle if they are unable. to determine this on their own. Riders are strongly encouraged to have their bicycle "tuned-up" prior to participating in Ride The Rockies. The confirmation packet, which is sent to cyclists approximately three months before the tour, includes a discount coupon for atune-up at participating bicycle shops. During the tour, the route is patrolled by six vans staffed with bicycle mechanics, and equipped with a complete set of tools. Vans are also stocked with spare parts to allow them to complete any repair. Bicycle Safety: While Ride The Rockies goes to great lengths to provide as safe a tour as possible, it is also understood that safety is a two-way street. Each cyclist can only be as safe as he/she rides. For this reason Ride The Rockies repeatedly emphasizes the need for all riders to ride as safely as possible. Tour cyclists are provided with a written list of safety tips and riding rules on four separate occasions. The first is in the afore-mentioned confirmation packet, which is sent to each cyclist to inform them of their selection in the tour registration. The second occasion is in a letter sent to each cyclist approximately 10 days before the start of the tour. When each rider registers the day before the tour, they have a list if safety rules attached to their wrist. Lastly, at registration, each cyclist receives a tour map book, which they keep for the duration of the ride. The map book contains a list safety tips and riding rules on the first page. These safety tips and riding rules are re-emphasized verbally at the opening ceremony of the tour by a Colorado State Patrol officer. The first item listed in the safety tips and riding rules is always the requirement that all cyclists wear an approved helmet at all times when riding. This requirement is stated in cyclists' materials no less than 5 times, frequently in bold and/or capital type. Signage: The Ride The Rockies route and all facilities (aid stations, etc.) will be clearly marked with directional signage at all intersections for event participants. In addition, motorists will be advised of the presence of the event on the route and at major intersections on the route using 28 42" x 42" bicycle traffic advisory signs. Each of these signs is placed on the route each day of the tour. permpc.Ol.doc oaoui4 Sanitation: Ride The Rockies travels with 124 portable toilets, 10 mobile hand-washing stations and a portable shower truck. 82 toilets and 6 hand washing stations will be distributed at aid stations on the tour route. The shower truck, 42 toilets and 3hand-washing stations will be located at host community sites to augment the facilities there. On the tour route, there will be an ample number of trash receptacles located at aid stations. Trash will be removed by the company providing the portable toilet service. Parking: Group parking is only expected at the headquarter sites. In addition, there will be a relatively small number of vehicles parked at the aid stations on the route. Insurance: Ride The Rockies carries liability insurance well in excess of the amounts required. Ride The Rockies will also provide to all governmental agencies with jurisdiction, which provide a written request, a Certificate of Insurance naming that agency as additional insured. Inclement Weather Contingency Plan Weather and road conditions can be such that it is unsafe for Ride The Rockies cyclists to begin or continue riding a day of the tour. The event has a complete Inclement Weather Contingency Plan. Below is a brief summary: In the event that in the middle of a ride, weather does not permit cyclists to continue, the first objective is to make sure that cyclists are not in jeopardy of hypothermia or other exposure-related risks. If shelter is available, it will be utilized. If cyclists are caught at high elevation without shelter available, the ranking RTR official onsite will make a decision about how best to get cyclists out of danger. (Are some capable of safely riding to lower elevations? Does everyone need to be transported?, etc.) Most likely, some portion of the cyclists will have ridden to the destination town. The main method to be used to transport the rest of the cyclists will be tour support vehicles, including, staff vehicles (35), tour shuttles buses (6 53-passenger buses), volunteer staff's vehicles and private support vehicles. If more capacity is required, additional buses can be chartered if contractors are located close enough to the site. A day with weather that precludes any riding, requires a different plan. In addition to the above methods of transportation, charter contractors will be contacted to provide buses. In the past, the company providing the event shuttles buses has performed this role and subcontracted with other providers for some of the equipment utilized. Trucks accompanying the event (3 semi tractor trailers and 4 class C trucks) will be utilized to transport bikes. If more capacity is required, Ride The Rockies can (and has) accessed additional equipment from the Denver Newspaper Agency. permpc.07,doc OUOU15 PITHIN COUNTY COMMUNITY DEVELOPMENT DEPARTMENT 130 South Galena Street Aspen, Colorado 81611 (970) 920-5526 FAX# (970) 920-5439 March 20, 2007 Paul Balaguer 570 West 53rd Place Denver, CO 80216 Re: Ride the Rockies Temporary Use/Special Event Permit (CASE P039-07; PID 2735-114-00-852) Dear Mr. Balaguer; The Planning Office has completed its preliminary review of the captioned application. We have determined that this application is complete. After a more detailed review of the submittal information, additional information specific to the application may be requested in order to adequately review and process the application. The planner in charge of the review will request the information from you directly. If you have any questions, please call Mike Kraemer, the planner assigned to your case, at 920-5482. Sincerely, Bonnie Waechtler Administrative Assistant PITKIN COUNTY COMMUNITY DEVELOPMENT DEPARTMENT 130 South Galena Street Aspen, Colorado. 81611 (970) 920-5526 FAX# (970) 920-5439 MEMORANDUM To: Ellen Andersen Environmental Health & Natural Resources Sheriff Ed Van FROM: Mike Kraemer, Community Development .Department Re: Ride the Rockies Temporary Use/Special Event Permit (PID 2735-114-00-852; Case P039-07) DATE: March 20, 2007 Attached for your review and comments are materials for an application submitted by The Denver Post. The Pitkin County Community Development Director will review the application. Please return your comments to me by Friday, March 28, 2007. PLEASE RETURN APPLICATION MATERIALS TO COMMUNITY DEVELOPMENT IF YOU HAVE NO FURTHER NEED OF THEM. Thank you. Page 1 of 2 IUlichael Kraemer From: Dan Blankenship [dblankenship@rfta.com] Sent: Monday, March 19, 2007 3:02 PM To: Michael Kraemer Cc: Kent Blackmer; John Rocker; Dave Iverson; Mike Hermes Subject: RE: contact for Ride the Rockies Mike: Depending upon the issue, the contacts for transit operations are Kent Blackmer, John Hocker, & Dave Iverson. The contact for the Rio Grande Trail is Mike Hermes. Their e-mail addresses are inserted above. Kent Blackmer: 384-4964 John Rocker: 384-4963 Dave Iverson: 384-4951 Mike Hermes: 384-4973 Hope this information is helpful in planning for Ride for the Rockies. Dan From: Michael Kraemer [mailto:michaelk@co.pitkin.co.us] Sent: Monday, March 19, 2007 2:46 PM To: Dan Blankenship Subject: contact for Ride the Rockies Dan, Can you provide me with your contact person for Ride the Rockies? Thanks, Mike Mike Kraemer Planner Community Development Department Pitkin County r ~ 130 S. Galena Street Aspen, CO 81611 ~~ 970.920.~526(phone) 970.920.~439(fax) / C~ 3/20/2007 ~ ~ ~ ~ ~ ~ 0~ ~~ Page 1 of 1 Michael Kraemer From: Michael Kraemer Sent: Tuesday, March 20, 2007 1:36 PM To: Ellen Anderson; Tom Grady; Ed Van Walraven; Carla Ostberg; Keith Berglund; 'Bob Nevins'; 'ballred@fs.fed.us'; 'richard.duran@cdps.state.co.us'; 'jamesl@basalt.net'; Gerald Fielding; 'Dan Blankenship' Cc: 'Balaguer, Paul'; Nancy Lesley; Kathryn Koch Subject: Ride the Rockies Special Event Committee meeting Everyone, Paul Balaguer has submitted a special events application for Ride the Rockies which has been proposed for June 21 & 22. Below is the link to view the application, safety and operations plan, and proposed route. http://www._aspenpitkin com/pdfs/depts/7/lan_duse.pdf Click on "Ride the Rockies" under the 3/16/07 submission date. We will be meeting as a Special Events Committee to go over the proposal w/Paul on Apnl 4th_from__1:30 _until 3 00._at_the P.laz_a.._1_ Meeting Room. If you cannot make the meeting please provide written comments via email by April 3rd so we can bring them to the attention of the Applicant. Thanks, Mike Mike Kraemer Planner Community Development Department Pitkin County 130 S. Galena Street Aspen, CO 81611 970.920.5526(phone) 970.920.5439(fax) michaelkCo~co.oitkin.co. us 3/20/2007 ~ ~ ~ ~ Q Page 1 of 3 From: Gary Tennenbaum Sent: Tuesday, Apri124, 2007 10:32 AM 'i'o: Michael Kraemer Ce: Dale Will; Barb D' Autrechy Subject: RE: Rio Grande Path notice Our comments are as follows: The flyer is fine. #2. Spray chalk is fine. #10. Signage template is approved. #14. I feel Paul doesn't understand that we are well aware of our trail use and putting the Marshalls in the locations we indicated will address issues we feel might arise during the event. These areas were chosen based on access points far users. The one location I am ok with omitting is the Marshall at the Wingo Bridge. However, we are trying to avoid any conflicts and allowing Ride the Rockies to decide where to put trails is unacceptable. #15. I'm ok with simplifying the signage with the following: Bicycle Event on Trail Heavy Up Valley Traffic towards Aspen (not every visitor knows up valley and downvalley) Thursday, June 21 7:30 to 1:30 Gary Tennenbaum Pitkin County Open Space and Trails Land Steward 76 Service Center Road Aspen, CO 81611 970-920-5355 www.aspenpitkin.com/openspace From: Michael Kraemer Sent: Tuesday, April 24, 2007 10:10 AM T®: Gary Tennenbaum Subject: FW: Rio Grande Path notice Gary, Paul B. w/ RTR had some concerns with the OST conditions. Could you look over his email below and let me know what you think? Thanks! Mike ___._.._ .µ...._... __m,_.~......__.~....... From: Balaguer, Paul [mailto:PBalaguer@denverpost.com] Sent: Monday, April 23, 2007 4:05 PM To: Michael Kraemer Subject: RE: Rio Grande Path notice Mike, I'll wait to hear from you about the flyer once you've had a chance to speak with Open Space and Trails as well as to receive the contact information for the residents. It would be very helpful if we could get both of those this ®~~~~ file://C:1Planning MemoslSpecial Events\Ride the RockieslOST additionalconditions.htm 6/4/2007 Page 2 of 3 week. I've looked over the list form Open Space and Trails. There are a couple of things that concern me: #2. Ride The Rockies typically marks hazards with a spray chalk product. It is not permanent. Is that product acceptable for use on the trail? #10 Signage. Ride The Rockies places directional signage for its cyclists. Diagram of the sign is attached in tempt. Can you please let me know if this is approved. #14 I appreciate the input of the Open Space and Trails staff, but my concern is that they lack the knowledge to best utilize the personnel we have available. I've been conducting this event for 22 years, and I think safety would be better served by allowing me to use my judgment about location of marshals. (For example, having a marshal at the Wingo Bridge, when there is no substantial path egress or access is wasting personnel that could be better utilized elsewhere.) If you're uncomfortable addressing this issue, I'd be happy to discuss the matter with OST or BOCC myself. #15 Signs. My experience is that putting that much copy on a sign read reduces the likelihood that anyone will read it. It would be my strong suggestion to simplify the signs greatly. Can we please just go with this: Bike Event on Path Heavy Up Valley Traffic Thursday, June 21 7:30 a.m. - 1:30 p.m. #16 Ad is attached in the "temp" file. Can you please advise if this is approved. I look forward to hearing from you. Thank you, Paul Balaguer Tour Director Ride The Rockies (303) 820-1602 ~rorn: Michael Kraemer [mailto:michaefk@co.pitkin.co.us] Sent: Monday, April 23, 2007 1:38 PM To: Balaguer, Paul Subject: RE: Rio Grande Path notice Hey Paul, This draft looks good to me. I will also forward to Open Space and Trails for their review. I will forward on landowner addresses when I receive them this week. ®U~U~~ file://C:\Planning IVlemos\Special Events\Ride the Rockies\OST_additionalconditions.htm 6/4/2007 Page 3 of 3 Here is a list of conditions from OST for the event. Please review and let me know if there is any concern on your end. Thanks, Mike From: Balaguer, Paul [mailto:PBalaguer@denverpost.com) Sent: Thursday, April 19, 2007 9:22 AM To: Michael Kraemer Subject: Rio Grande Path notice Hey Mike, Attached is a draft of a memo to send to landowners adjacent to the Rio Grande Path in Pitkin County. Please have a look and let me know if you're good with this. Thanks, Paul Balaguer Tour Director Ride The Rockies (303) 820-1602 ~(~C~~ file://C:1Planning MemoslSpecial EventslRide the RockieslOST additionalconditions.htm 6/4/2007 Page 1 of 2 Frown: Balaguer, Paul [PBalaguer@denverpost.com] Sent: Friday, Apri106, 2007 9:56 AM 'I'o: Michael Kraemer Subject: Ride The Rockies "Punch List" for Pitkin County Permit Mike, This should be the last a-mail that I initiate for a bit. Below is a summary of the items we discussed that need to be resolved for Ride The Rockies' (RTR) Special Event permit. 1. Certificate of Insurance: I will work with Kris Jewkes to get the exact language desired. Again, this will be issued during the first week in May. I'll e-mail it to both you and Kris. 2. Ambulance: Check if Stadium Medical is getting licensed to transport in Pitkin County and inform you and Rich Walker. Discuss staffing with Rich Walker to ensure that he is comfortable with the level of coverage. If Stadium Medical is not getting licensed for transport and Rich thinks it is necessary, RTR can pay to have additional standby staffing on the days RTR is in Pitkin County. 3. Route in Garfield & Eagle Counties: Once RFTA Board makes a decision (at the board meeting 4/12) advise you of RTR's route in Garfield & Eagle Counties 4. Confirmation from Captain Duran that CSP has endorsed the RTR's traffic control on Independence Pass. E- mail received and acknowledged by you today - 4/6/07 5. Confirmation from G.R. that he approves the locations of our traffic advisory signage on Pitkin County roads for the Safety and Operations plan. My plan is to call him today. Get a list of locations he specifies. Send an e-mail to him and you saying we conunit to signs in those locations. Ask him to reply to both of us to confirm he approves of that plan. That's everything I have from our discussions. Please advise if anything has been left out or needs to be adapted. ooou~~o file://C:1Planning MemoslSpecial EventslRide the RockieslRequirements_Punch List.htm 6/4/2007 Page 2 of 2 Sincerely, Paul Balaguer Tour Director Ride The Rockies (303) 820-1602 ®Q~~®~ file://C:\Planning MemoslSpecial Events\Ride the Rockies\Requirements_Punch List.htm 6/4/2007 PITKIN COUNTY OPEN SPACE AND TRAILS STANDARD CONDITIONS 1. The permittee hereby expressly binds himself or itself to indemnify and hold harmless Pitkin County and each of its offers, agents, employees and insures against any and all liability, loss, damage, demands, for any claim, injury, or damage allegedly sustained received, and expresses of whatsoever nature (including court costs and attorney fees) which arise from or are caused by the acts of the premittee, its officers, employee, agents, contractors or subcontractors, in connection with or in any way arising out of the activities of the permittee. 2. Spray painting or other permanent marking of the trail surface is strictly prohibited. Events requiring measured miles or the provision of other information to event participants must utilize non-permanent means of conveying the information. Failure to remove mile markers or other participant information from the trail within 24 hours may result in revocation of the permit or action by Pitkin County Government to withhold permits for future events. The permittee is responsible for any remedial efforts necessitated by a violation of this condition. 3. The permittee shall maintain the premises to standards of orderliness, neatness, sanitation, and safety acceptable to Pitkin County Open Space and Trails. 4. The permittee shall pack out or otherwise remove from the area all refuse resulting from operations under this permit. 5. The permittee, in exercising the privileges granted by this permit, shall comply with all Federal, State, and Pitkin County laws and regulations which are applicable to the area or operations covered by this permit. This includes Pitkin County Title XII regulations requiring bicyclists to travel at safe speeds and to yield to equestrians and pedestrians. 6. The permittee shall submit and comply with a safety and operation plan, approved by Pitkin County Open Space and Trails during the operational period of this perrnit. 7. The permittee shall exercise diligence in protecting from damage the land and property of Pitkin County Open Space and Trails used in connection with this permit, and shall pay Pitkin County for any damage resulting from negligence or from the violation of the terms of this permit or of any law or regulation applicable within the area used by the permittee, or by any agents or employees of the holder acting within the scope of their agency or employment. 8. The permittee shall notify Pitkin County of any substantial changes in the event type, route, venue or dates. Changes may be subject to approval by Pitkin County, In case of change of address, telephone, and/or contact person for the event, the permittee shall immediately notify the permit agency agent. ®~~~)n~ g. Rising waters, high winds, falling limbs or trees, and other hazards are natural phenomenons that prevent risks, which the permitted assumes. The permittee has the responsibility of inspecting his activity area and immediate adjoining area for hazardous conditions and, after securing permission from the Pitkin County, removing such hazards. 10. No signs or advertising devices shall be erected on the area covered by this permit, or highways lending thereto, without prior approval of Pitkin County Government as to location, design, size, color, and message. Erected signs shall be maintained or renewed as necessary to neat and presentable standards. 11. The event will not cause undue disturbance or inhibit safe travel on Pitkin County owned or managed properties or right-of--ways. 12. Permittee hereby certifies that he/she ahs acquired valid approvals for conducting the event as proposed hereunder from the owner or manager of each of the properties proposed to be accused, crossed or otherwise directly affected by this event. 13. This permit may be terminated upon breach of any of the conditions herein. ADDI'I'I®NAL C®10TDI'I'®I~TS 14. Event organizer will post volunteer marshals at the following locations along the Rio Grande Trail: 1. Emma Road crossing 2. Basalt High School 3. Wingo Pedestrian Bridge 4. Intersection of Basalt Old Snowmass Trail and Rio Grande Trail 5. Arciero Trailhead near Snowmass Conoco Marshals will warn other trail users of event in progress. Permittee will also post signs along the trail one week in advance of the event at the locations where marshals will be located indicating "Ride the Rockies Bicycle Event on June 21- Caution Large number of Cyclists will be riding downvalley towards Aspen form 7:30am to 2pm" to warn other pathway users. Signs must be removed promptly following the conclusion of the race. 16. Event organizer will place quarter page ads in the local newspapers and ads on the local radio stations for one week prior to the event letting the public know the event date, time and route of the event. All ads must be approved by Pitkin County Open Space and Trails. ®®~}~~~~ Page 1 of 1 From: Dale Will Sent: Monday, Apri123, 2007 10:15 AM To: Gary Tennenbaum; Barb D' Autrechy; Kathleen O'Brien Cc: Michael Kraemer Subject: RE: OST Conditions on Ride the Rockies These look fine; I thought we also were going to require them to send a notice to all the landowners adjacent our section of trail? From: Gary Tennenbaum Sent: Monday, April 23, 2007 7:28 AM To: Dale Will; Barb D' Autrechy; Kathleen O'Brien Cc: Michael Kraemer Subject: OST Conditions on Ride the Rockies Dale and Barb, Just checking to see if you got a chance to review the attached conditions. Please let Mike in C;om Dev know if these are acceptable. Thanks, Gary Tennenbaum Pitkin County Open Space and Trails Land Steward 76 Service Center Road Aspen, CO 81611 970-920-5355 www.aspenpitkin.com/openspace OOOQ~_0 file://C:1Planning Memos\Special Events\Ride the Rockies\DaleWill_commentsRide the Ro... 6/4/2007 Page 1 of 1 From: Dale Will Sent: Thursday, April 19, 2007 10:51 AM To: Michael Kraemer C'c: Gary Tennenbaum Subject: RE: Ride the Rockies Hi Michael; I have forwarded your message to Gary Tennenbaum, who is working on this. Our conditions will be similar to those of Summit County. At the outset, please note that the County Ordinance requires cyclists to yield the right of way to equestrians and pedestrians, and to ride at a safe speed for the conditions. Will that be a problem? Regards Dale _.. _.... ,...... From: Michael Kraemer Sent: Wednesday, April 18, 2007 4:42 PM To: Dale Will Subject: Ride the Rockies Could you please provide me with any and all OST conditions for trail use for the Ride the Rockies permit. Thanks, Mike ~~OU.1~. file://C:1Planning Memos\Special EventslRide the RockieslDaleWill_conditionsRTR.htm 6/4/2007 Page 1 of 1 ~a-om: Kris Jewkes Sent: Tuesday, May 08, 2007 9:40 AM To: Michael Kraemer Subject: FW: Certificate of Insurance for Ride The Rockies Permit Application Attachments: inscert.07.pc.pdf Mike, The attachment looks good. Kris Jewkes HR/Risk Mgmt 429-2795 From: Balaguer, Paul [mailto:PBalaguer@denverpost.com] Sent: Tuesday, May 08, 2007 9:25 AM To: Michael Kraemer Cc: Kris Jewkes Subject: Certificate of Insurance for Ride The Rockies Permit Application Mike (and Kris), Thank you again for your assistance in planning Ride The Rockies in Pitkin County. Attached is a Certificate of Insurance naming Pitkin County as additional insured. l believe this is the only outstanding item for our permit. If you need further information, or have any questions, please call me at any time at (303) 820-1602. Thank you, Paul Balaguer Tour Director Ride The Rockies (303) 820-1602 ®Uii~s- file://C:1Planning Memos\Special Events\Ride the RockieslJewkesInsurance_RTR.htm 6/4/2007 Page 1 of 4 Frown: Michael Kraemer Sent: Friday, Apri106, 2007 9:31 AM To: 'Balaguer, Paul' Subject: RE: contact info and other stuff Paul, I see a slew of emails from you. I will start with this one. Contact Kris for insurance info: Icrisj.@co,.pitkin.co.us 429-2795 Don't have an email for Rich Walker, just phone # :544-1580. Try googling "Aspen Ambulance" 1.) I am fine w/you working with G.R. to designate locations of signs prior to riding the route. I am sure he knows where the "sticky" sections are on the road. 2.} Yes, a summary would be helpful. I think I see an outline in an email you sent this morning. If not please get something to me by next week. 3.) Those announcements should be fine. If you are not traveling through the towns then no need. I am not sure of your route past Indy Pass but thought I would mention them. Ok, on to the next emails! Mike From: Balaguer, Paul [mailto:PBalaguer@denverpost.com] Sent: Thursday, April 05, 2007 4:46 PM To: Michael Kraemer Subject: RE: contact info and other stuff Thanks Mike. I appreciate it. Is Kris whom I should contact regarding language on the certificate of insurance for Pitkin County? If so, do you have an a-mail address for her as well as for Rich Walker? Also, 3 other things. 1. The "punch list" we discussed yesterday. I'm going to put this into an a-mail to send you, so we're both on the ®ODU1~ file://C:1Planning MemoslSpecial EventslRide the Rockieslrne_responsel.htm 6/4/2007 Page 2 of 4 same page. In relation to one of the items - OK from G.R. regarding sign locations for our S & O plan. I had a bit of an epiphany about this - Rather than wait until I ride the route & transcribe all of that info, I'm going to chat with hie to That wi I allowaus to movelforwarld bar sooner (than the other plan nllalssume you're fi e with that the docu right? 2. Regarding the work session about the route. Would it be ok if I put together a list of some of the issues that we think are most important to send to you so that you have it available for that meeting? I truly don't mean to be a pest, I just think it is an extremely important safety matter for our cyclists. 3. Regarding newspapers, we'll plan to run ads in the papers in the Valley about the path (if that's approved) as well as info about Independence Pass. Obviously path info is not relevant in Leadville & Salida, so we'll just go with a PSA about the Pass 1 lane closure. Sound good? Thanks again for the all of your assistance, as well as for coordinating the meeting yesterday. Look forward to hearing from you soon. Cheers, Paul Balaguer Tour Director Ride The Rockies (303) 820-1602 Fr®rn: Michael Kraemer [mailto:michaelk@co.pitkin.co.us] Sent: Thursday, April 05, 2007 9:25 AM T®: Balaguer, Paul Subject: contact info and other stuff Paul, I just sent an email concerning a work session with the Board of County Commissioners. You will not need to attend. 0 0 0 0 ~. ~ 6/4/2007 file://C:\Planning Memos\Special Events\Ride the Rockies\me_responsel.htm MEMORANDUM OF INTEREST T®: Board of County Commissioners FROM: Keith Berglund, Pitkin County Open Space and Trails Ride The Rockies event on the Rio Grande Trail DATE: ~ March 13, 2007 DESCRIPTION OF ISSUE: Open Space and Trails has a long standing practice of not approving special events that would require a trail to be closed to the general public. This practice will be put to the test in June. The Denver Post Ride The Rockies is an annual bicycle tour that takes 2,000 cyclists on a 6-7 day ride on paved roads through Colorado's Rocky Mountains each June. The 2007 route will have the riders pedaling from Glenwood Springs to Aspen on June 21. The event organizers would like to utilize the Rio Grande Trail from Carbondale to Lower River Road. Because of the number of cyclists, they do not normally use recreational paths unless there is a compelling reason to do so. In this case, they feel that 2000 riders on the Rio Grande Trail would be safer than riding along CO 82 and making the left turn at Lower River Road. The section of the Rio Grande Trail within Pitkin County that the event would like to utilize is from Emma to Lower River Road. The event organizers are currently working with Community Development on their Special Event permit application. Additionally, they are working with the Roaring Fork Transit Authority to obtain permission to use the portion of the Rio Grande Trail from Carbondale to Emma. RECOMMENDED SrCAFF ACTION: The Open Space staff will proceed unless directed otherwise and stick with our standard practice and not allow the exclusive use of the trail by the Ride. We have heard that along with the 2,000 registered cyclists, another 2,000 unregistered "ghost riders" can be expected to ride along with the tour. Staff feels that this number of cyclists on this particular portion of the Rio Grande Trail will make public access to and use of the trail difficult and/or impossible during this event which, for all intents and purposes, renders the trail closed. The Open Space Board has carefully considered this, and has directed that staff stick with its position. However, if the BOCC feel strongly that we should change our current practice, we would like an opportunity to discuss in advance of our receipt of the RTR permit. 000015 Page 3 of 4 Contact info for the people we discussed yesterday is as follows Kris Jewkes: Risk Management-429.2795 Rich Walker: Aspen Ambulance - 544.1580 Mike Herms: RFTA - 384-4973 GR: Pitkin County Public Works - 920.5206 Also I have written down in my notes public announces for the following Aspen Daily News Aspen Times Snowmass Sun Glenwood Post Independent Salida's Newspaper (Don't know the name) Leadville's Newspaper Notification to CDOT -perhaps post on the website Any questions feel free to call or email. Preferred is email-I get soooooo many calls a day! Mike Mike dCraemer Pranner Community Development uepartment OO(~[ll~ file://C:1Planning MemoslSpecial EventslRide the Rockieslme_responsel.htm 6/4/2007 Page 1 of 3 From: Michael Kraemer Sent: Friday, April 06, 2007 9:35 AM To: °Balaguer, Paul' Subject: RE: contact info and other stuff No, I do not agree. I think regardless of the route we need to post in the papers, Trail or Hwy 82. The word needs to be out there that this many cyclists are coming through. Mike From: Balaguer, Paul [mailto:PBalaguer@denverpost.com] Sent: Thursday, April 05, 2007 5:06 PM 'To: Michael Kraemer Subject: RE: contact info and other stuff Quick Question. I assume we're only going to do the advertising in these papers if we're moving forward with the route on the path, is that correct. If not, I think we should be ok with just PSA's about the lane closure on Independence Pass. Do you agree? Paul Balaguer Tour Director Ride The Rockies (303) 820-1602 From: Michael Kraemer [mailto:michaelk@co.pitkin.co.us] Sent: Thursday, Apri! 05, 2007 9:25 AM To: Balaguer, Paul Subject: contact info and other stuff Paul, ODDO~.~~ file://C:1Planning MemoslSpecial EventslRide the Rockies\me_response2.htm 6/4/2007 Page 2 of 3 I just sent an email concerning a work session with the Board of County Commissioners. You will not need to attend. Contact info for the people we discussed yesterday is as follows: Kris Jewkes: Risk Management-429.2795 Rich Walker: Aspen Ambulance - 544.1580 Mike Herms: RFTA - 384-4973 GR: Pitkin County Public Works - 920.5206 Also 1 have written down in my notes public announces for the following: Aspen Daily News Aspen Times Snowmass Sun Glenwood Post Independent Salida's Newspaper (Don't know the name) Leadville's Newspaper Notification to CDOT -perhaps post on the website Any questions feel free to call or email. Preferred is email-I get soooooo many calls a day! Mike Mike Kraemer oooo~~ file://C:\Planning Memos\Special Events\Ride the Rockies\me_response2.htm 6/4/2007 Page 3 of 3 Planner Community Development Department Piikin County 130 S, Galena Sfreet Asoen, CO 81691 970.920.5525{phone) 97C 92C 5439(fax) michaelk(a~co.pitkin.co.us f1~~U~3 file://C:1Planning Memos\Special EventslRide the Rockieslme_response2.htm 6/4/2007 Page 1 of 2 BVlichael Kraemer From: Balaguer, Paul [PBalaguer@denverpost.com] Sent: Friday, April 06, 2007 9:56 AM To: Michael Kraemer Subject: Ride The Rockies "Punch List" for Pitkin County Permit Mike, This should be the last a-mail that I initiate for a bit. Below is a summary of the items we discussed that need to be resolved for Ride The Rockies' (RTR) Special Event permit. 1. Certificate of Insurance: I will work with Kris Jewkes to get the exact language desired. Again, this will be issued during the first week in May. I'll e-mail it to both you and Kris. 2. Ambulance: Check if Stadium Medical is getting licensed to transport in Pitkin County and inform you and Rich Waller. Discuss staffing with Rich Walker to ensure that he is comfortable with the level of coverage. If Stadium Medical is not getting licensed for transport and Rich thinks it is necessary, RTR can pay to have additional standby staffmg on the days RTR is in Pitkin County. 3. Route in Garfield & Eagle Counties: Once RFTA Board makes a decision (at the board meeting 4/12) advise you of RTR's route in Garfield & Eagle Counties 4. Confirmation from Captain Duran that CSP has endorsed the RTR's traffic control on dndependence Pass. E- mail received and acknowledged by you today - 4/6/07 5. Confirmation from G.R. that he approves the locations of our traffic advisory signage on Pitkin County roads for the Safety and Operations plan. My plan is to call him today. Get a list of locations he specifies. Send an e-mail to him and you saying we commit to signs in those locations. Ask him to reply to both of us to confirm he approves of that plan. That's everything I have from our discussions. Please advise if anything has been left out or needs to be adapted. 4/6/2007 Page 2 of 2 Sincerely, Paul Balaguer Tour Director Ride The Rockies (303) 820-1602 4/6/200'70 ~ ~~ ~ ~ ~- Page 1 of 2 IVlichael Kraemer From: Richard Walker [rwalker137@gmail.com] Sent: Friday, April 06, 2007 4:01 PM To: Balaguer, Paul Cc: Michael Kraemer Subject: Re: Ride The Rockies ambulance coverage Michael and Paul, As per my discussion with Paul this morning, this plan looks fine to me. This of course just pertains to our District's portion of Pitkin County only. Call me if you have any questions. Thanks, Rich 970-544-1580. On 4/6/07, Balaguer, Paul <PBala~uer(cr~,denverpost,.com> wrote: Rich, Good to talk 'to you today. Again, our thanks for your assistance with coordinating Ride The Rockies in Pitkin County. Below is a summary of our discussion of plans for ambulance coverage in Pitkin County. When you get a chance, will you please hit "Reply All" on this a-mail and confirm to Mike and I that you concur with this plan. Ride The Rockies (RTR) will be in Pitkin County on June 21 & 22, 2007. RTR will be accompanied by 2 ambulances from Stadium Medical. At this point it is not yet known if Stadium Medical will be licensed to transport patients in Pitkin County The agreed upon plan for Aspen Ambulances is: 1. If Stadium Medical obtains licensing for transporting in Pitkin County, Aspen Ambulance will have normal staffing on both days that RTR is in the county. In the event that RTR is in need of ambulance transport other than by Stadium Medical, we will activate local EMS via dispatch or 911. 2. If Stadium Medical does not obtain licensing for transporting in Pitkin County, Aspen Ambulance will have normal staffmg on both days that RTR is in the county plus an additional standby ambulance stationed on the tour route each day. Hours of standby staffing will be 7:30 a.m. - 3:00 p.m. on June 21; 6:00 a.m. - 11 a.m. on June 22. In the event that RTR is in need of ambulance transport, we will activate the standby ambulance via dispatch or 911. Aspen Ambulance will invoice RTR after the event for the standby ambulance at a rate of $75 per hour. Invoice may be sent to me at this e-mail address. nnnrl 4/6/2007 ~ ~ ~~ Page 2 of 2 I will keep you posted about the status of Stadium Medical getting licensed to transport in Pitkin County. Please feel free to contact me with questions or concerns at any time via telephone ore-mail. Again, our thanks for your assistance. Sincerely, Paul Balaguer Tour Director Ride The Rockies (303) 820-1602 OUO~~ 4/6/2007 Michael FCraemer Frorn: Balaguer, Paul [PBalaguer@denverpost.com] Sent: Monday, April 09, 2007 10:27 AM To: Tom Grady Cc: Michael Kraemer Subject: FW: Ride The Rockies in Pitkin County Tom (and Mike), Capt. Duran has indicated that he can provide the manpower for the officers in fixed locations on Pitkin County Roads. (Please see e-mails below.) When the route is finalized, I will confer with him to make sure we have the staffing at the locations we've discussed. Thanks, Paul Balaguer Tour Director Ride The Rockies (303) 820-1602 -----Original Message----- From: Richard.Duran@cdps.state.co.us [mailto:Richard.Duran@cdps.state.co.us] Sent: Monday, April 09, 2007 10:17 AM To: Balaguer, Paul_ Subject: RE: Ride The Rockies in Pitkin County Good Morning ! We will be able to accommodate two more troopers to ensure everything is done safely. I am still in the process of putting together the amount of troopers needed. I will add these two additional troopers in my cost estimate. Captain Rich Duran Troop 4C - Glenwood Springs Office: (970) 945-6198 Fax: (970) 945-6598 Mobile: (970) 948-7959 "Balaguer, Paul" <PBalaguer@denver To: <Richard.Duran@cdps.state.co.us> post.com> cc: Rockies in Pitkin County Subject: RE: Ride The 04/06/2007 11:09 AM 4®®ll~~ 1 Hey Rich, One more question: Depending upon the exact route in Pitkin County (it's currently being debated by the Board of County Commissioners) we are likely going to need some additional Law Enforcement assistance in Pitkin County on June 21. If the board does not approve the route going on the new bike path, we're going to need officers to assist with the crossing of Colorado 82 (at the intersection with Lower River Road). Even if the route on the path is approved, there are 1 -2 intersections on Lower and Upper River Road where I am requesting law enforcement assistance. Tom Grady with the Pitkin Co. S.O. has indicated that they are understaffed and would appreciate it if I can, if possible, contract with CSP to provide officers at those locations. My question for you is do you think you have sufficient manpower to provide those 1 - 2 officers on 6/22? Thanks very much, Paul Balaguer Tour Director Ride The Rockies (303) 820-16C2 -----Original Message----- From: Richard.Duran@cdps.state.co.us [mailto:Richard.Duran@cdps.state.co.us] Sent: Friday, April 06, 2007 7:43 AM To: Balaguer, Paul Cc: michaelk@co.pitkin.co.us; richard.duran@cdps.state.co.us Subject: Re: Ride The Rockies in Pitkin County I have discussed this plan with Paul on a few occasions. I agree with the plan as outlined below. We will also have additional units monitoring these locations above and beyond the motor team that will be traveling with the event. Captain Rich Duran Troop 4C - Glenwood Springs Office: (970) 945-6198 Fax: (970) 945-6598 Mobile: (970) 948-7959 "Balaguer, Paul" <PBalaguer@denver To: 00002 2 <richard.duran@cdps.state.co.us> post.com> cc: <michaelk@co.pitkin.co.us> Rockies in Pitkin County Subject: Ride The 04/05/2007 09:48 PM Greetings Capt. Duran, <?xml•namespace prefix = o ns _ "urn:schemas-microsoft-com:office:office" /> I Hope this finds you well. Mike Kraemer (;n the CC field of this e-mail) is a planner in the Community Development Department in <?xml:namespace prefix = stl ns _ "urn:schemas-microsoft-com:office:smarttags" />Pitkin County. He is processing our application for a special event permit in the county. P_s part of the permit process, Mike would like you to confirm that you have sanctioned our plan for traffic control for Independence Pass. Mike is fine with a simple e-mail from you stating that. When you get a moment, can you please hit "Reply All" to this e-mail and let Mike know that the summary below is an accurate portrayal of the matter. (Note: I'm sure Mike doesn't expect you to recall the dates, only the gist of the conversations. ? I however noted t:he dates the conversations took place.) On 8/30/06 Capt. Duran and Paul Balaguer discussed the matter by telephone . Paul Balaguer stated that the following measures would be implemented to make Ride The Rockies passage on Independence Pass as safe as possible. 1. Close RTR Baggage Trucks early to ensure early departure of cyclists. 2. In 2 locations, Colorado 82 will be reduced to one lane for alternating d:irecticn vehicle traffic. Cyclists will ride in 3 OUOU~~ approximately 5 ft. of the eastbound lane of the road. Vehicles will drive in the rest of the roadway, alternating directions. Traffic Control will be provided by a certified traffic control company. Locations are: MM 48.75 ? 48.95 and MM 50.85 ? 50.95. Capt. Duran gave verbal approval to this plan. (Note: Earlier on the same royal to this lan, day, Major Michael King also gave tentative app_ p pending Capt. Duran°s approval.) Capt. Duran and Paul Balaguer further discussed the matter on 3/8/07. Plans for Independence Pass and other areas were again confirmed. Please let me know if you have any questions. As always, we are in your debt for your assistance. Sincerely, Paul Balaguer Tour Director Ride The Rockies 303-820-1602 ~~~~ 4 Page 1 of 4 N[ichael Kraemer .~_~ __. _ _w__,w.~. From: Michael Kraemer Sent: Friday, April 06, 2007 9:31 AM To: 'Balaguer, Paul' Subject: RE: contact info and other stuff Paul, I see a slew of emails from you. I will start with this one. Contact Kris for insurance info: krisj.@co.pitkn.co.us 429-2795 Don't have an email for Rich Walker, just phone # :544-1580. Try googling "Aspen Ambulance" 1.) I am fine w/you working with G.R. to designate locations of signs prior to riding the route. I am sure he knows where the "sticky" sections are on the road. 2.) Yes, a summary would be helpful. I think I see an outline in an email you sent this morning. If not please get something to me by next week. 3.) Those announcements should be fine. If you are not traveling through the towns then no need. I am not sure of your route past Iridy Pass but thought I would mention them. Ok, on to the next emails! Mike From: Balaguer, Paul [mailto:PBalaguer@denverpost.com] Sent: Thursday, April 05, 2007 4:46 PM To: Michael Kraemer Subject: RE: contact info and other stuff Thanks Mike. I appreciate it. Is Kris whom I should contact regarding language on the certificate of insurance for Pitkin County? If so, do you have an a-mail address for her as well as for Rich Walker? 4i6i2oo~ O~'!DO~ Page 2 ®f 4 Also, 3 other things. 1. The "punch list" we discussed yesterday. I'm going to put this into an e-mail to send you, so we're both on the same page. In relation to one of the items - OK from G.R. regarding sign locations for our S & O plan. I had a bit of an epiphany about this - Rather than wait until I ride the route & transcribe all of that info, I'm going to chat with him to get a list of locations he thinks will be appropriate for signage, then I'll just insert those signs into the document. That will allow us to move forward far sooner than the other plan. I assume you're fine with that, right? 2. Regarding the work session about the route. Would it be ok if I put together a list of some of the issues that we think are most important to send to you so that you have it available for that meeting? I truly don't mean to be a pest, I just think it is an extremely important safety matter for our cyclists. 3. Regarding newspapers, we'll plan to run ads in the papers in the Valley about the path (if that's approved) as well as info about Independence Pass. Obviously -path info is not relevant in Leadville & Salida, so we'll just go with a PSA about the Pass 1 lane closure. Sound good? Thanks again for the all of your assistance, as well as for coordinating the meeting yesterday. Look forward to hearing from you soon. Cheers, Paul Balaguer Tour Director Ride The Rockies (303) 820-1602 Fr®rvt: Michael Kraemer [mailto:michaelk@co.pitkin.co.us] Sent: Thursday, April 05, 2007 9:25 AM T®: Balaguer, Paul Subject: contact info and other stuff ®~~~ 4/6/2007 Page 3 of 4 Paul, I just sent an email concerning a work session with the Board of County Commissioners. You will not need to attend. Contact info for the people we discussed yesterday is as follows: Kris Jewkes: Risk Management-4292795 Rich Walker: Aspen Ambulance - 544.1580 Mike Herms: RFTA - 384-4973 GR: Pitkin County Public Works - 920.5206 Also I have written down in my notes public announces for the following: Aspen Daily News Aspen Times Snowmass Sun Glenwood Post Independent Salida's Newspaper (Don't know the name) Leadville's Newspaper Notification to CDOT -perhaps post on the website Any questions feel free to call or email. Preferred is email-I get soooooo many calls a day! Mike Mike Kraemer 4/6/2007 ~~UL7J® Page. l of 3 Michael Kraemer From: Michael Kraemer Sent: Friday, April 06, 2007 9:35 AM To: 'Balaguer, Paul' Subject: RE: contact info and other stuff No, I do not agree. I think regardless of the route we need to post in the papers, Trail or Hwy 82. The word needs to be out there that this many cyclists are coming through. Mike ..._._.. From: Balaguer, Paul [mailto:PBalaguer@denverpost.com] Sent: Thursday, April 05, 2007 5:06 PM To: Michael Kraemer Subject: RE: contact info and other stuff Quick Question I assume we're only going to do the advertising in these papers if we're moving forward with the route on the path, is that correct. If not, I think we should be ok with just PSA's about the lane closure on Independence Pass. Do you agree? Paul Balaguer Tour Director Ride The Rockies (303) 820-1602 From: Michael Kraemer [mailto:michaelk@co.pitkin.co.us) Sent: Thursday, April 05, 2007 9:25 AM To: Balaguer, Paul 4/6/2007 ~ ~ ®~ Page 2 of 3 Subject: contact info and other stuff Paul, I just sent an email concerning a work session with the Board of County Commissioners. You will not need to attend. Contact info for the people we discussed yesterday is as follows: Kris Jewkes: Risk Management-429.2795 Rich Walker: Aspen Ambulance - 544.1580 Mike I-terms: RFTA - 384-4973 GR: Pitkin County Public Works - 920.5206 Also I have written down in my notes public announces for the following: Aspen Daily News Aspen Times Snowmass Sun Glenwood Post Independent Salida's Newspaper (Don't know the name) Leadville's Newspaper Notification to CDOT -perhaps post on the website Any questions feel free to call or email. Preferred is email-I get soooooo many calls a day! Mike QU~lU32 4/6/2007 Page 1 of 2 Michael Kraemer Frorre: Balaguer, Paul [PBalaguer@denverpost.com) Sent: Thursday, April 05, 2007 7:59 AM To: Nancy Lesley; Michael Kraemer Cc: Ed Van Walraven Subject: RE: RTR/Aspen Thanks Nancy! Paul Balaguer Tour Director Ride The Rockies (303) 820-1602 Fr®m: Nancy Lesley [mailto:nancyl@ci.aspen.co.us] Sent: Wednesday, April 04, 2007 5:51 PM To: Michael Kraemer; Balaguer, Paul Cc: Ed Van Walraven Subject: RTR/Aspen Hi Mike, In my meeting with Eddy Van right after the Ride the Rockies permit meeting he brought up an excellent point regarding cyclists on the road vs. bike path. Since they are coming up on a Thursday, a workday, there will be many, many dumptrucks up and down Hwy. 82. As Ed explained, they are paid by the load and therefore are in an awfully big hurry to get wherever it is they need to go. This could lead to a conflicts between bikes and dump trucks. Anyway, I thought it was an excellent point and one that should be passed along. Thanks for inviting me today! 4/5/2007 Page 2 of 2 Nancy Nancy Lesley Director of Special Events and Marketing City of Aspen (p) 970.429.2092 (f) 970.544.9447 www. aspenrecreation.com 0(I003~ 4/5/2007 Page 1 of 1 Michael Kraemer rom: Michael Kraemer Sent: Thursday, Aprit 05, 2007 8:10 AM T®: Tom Grady; Ellen Anderson; Gary Tennenbaum Cc: 'Balaguer, Paul'; Barb D' Autrechy; Lance Clarke Subject: Ride the Rockies -Trail v. Hwy 82 route Everyone, The Special Events Committee convened yesterday to discuss Paul Balaguer's proposal for Ride the Rockies_ on June 21 and 22. During the meeting, the MOI from OST to the BOCC concerning the proposed route for the event was distributed and discussed. It is evident that OST does not want 2,000 riders plus an "x" number of "ghost" riders on the trail for safety and other reasons. The Special Events Committee acknowledges the position of OST however feels that many riders on Hwy 82 is also a safety concern. From alife/safety perspective the Special Events Committee supports use of the trail from Emma to Lower River Road. A work session with the BOCC has been scheduled for April 17th at 2:00 to discuss this item. I will prepare the Agenda Item Summary for the meeting and you will need to be there to discuss/answer questions from the Board. Thanks Everyone, Mike 4/5/2~~7~ ~ 3 Page 1 of 1 Michael Kraemer w w . _._~__. _. From: Michael Kraemer Sent: Thursday, April 05, 2007 8:25 AM To: 'Balaguer, Paul' Subject: contact info and other stuff Paul, I just sent an email concerning a work session with the Board of County Commissioners. You will not need to attend. Contact info for the people we discussed yesterday is as follows: Kris Jewkes: Risk Nlanagement-429.2795 Rich Walker: Aspen Ambulance - 544.1580 Mike Herms: RFTA - 384-4973 GR: Pitkin County Public Works - 920.5206 Also I have written down in my notes public announces for the following: Aspen Daily News Aspen Times Snowmass Sun Glenwood Post Independent Salida's Newspaper (Don't know the name) Leadville's Newspaper Notification to CDOT -perhaps post on the website Any questions feel free to call or email. Preferred is email-I get soooooo many calls a day! Mike Mike Kraemer Planner Community Development Department Pitkin County 130 S. Galena Street Aspen, CO 89619 970.920.5526(phone) 970.920.5439(fax) michaelkCa co.pitkin.co.us 00003~~~ 4/5/2007 Director Paul Balaguer Colorado Ride the Rockies Dear Paul: April 10, 2007 I am writing you in response to the decision by local trail directors to recommend to not allow the use of the public trails for your event. This response deeply troubles me since I strongly believe that even though there may be impact to the system, the alternative of using it for your event could very well save a life. As a medical responder and law enforcement officer, I find that placing your participants in a position of needlessly crossing Highway 82 to be completely unacceptable. As public officials, we have an alternative at our disposal that could keep participants safely away from Highway 82 from Emma to Lower River Road. I wholeheartedly believe that it is in everyone's best interest that this route should be utilized. I have complete confidence that your organization has the means and ability to mitigate issues related to the use of these trails for this event. I will be in attendance during the scheduled Commissioner Work Session concerning this issue and will fully support utilizing the public bike path for this event. Sincerely: Sent via E-mail Scott Thompson Basalt Fire Chief Chair, Pitkin County Public Safety Council. 0~~03~ MEMORANDUM OF INTEREST `I'®: Board of County Commissioners FROM: Keith Berglund, Pitkin County Open Space and Trails ~~ Ride The Rockies event on the Rio Grande Trail DATE:- March 13, 2007 DESCRIPTION OF ISSUE: Open Space and Trails has a long standing practice of not approving special events that would require a trail to be closed to the general public. This practice will be put to the test in June. The Denver Post Ride The Rockies is an annual bicycle tour that takes 2,000 cyclists on a 6-7 day ride on paved roads through Colorado's Rocky Mountains each June. The 2007 route will have the riders pedaling from Glenwood Springs to Aspen on June 21. The event organizers would like to utilize the Rio Grande Trail from Carbondale to Lower River Road. Because of the number of cyclists, they do not normally use recreational paths unless there is a compelling reason to do so. In this case, they feel that 2000 riders on the Rio Grande Trail would be safer than riding along CO 82 and making the left turn at Lower River Road. The section of the Rio Grande Trail within Pitkin County that the event would like to utilize is from Emma to Lower River Road. The event organizers are currently working with Community Development on their Special Event permit application. Additionally, they are working with the Roaring Fork Transit Authority to obtain permission to use the portion of the Rio Grande Trail from Carbondale to Emma. RECOMMENDED STAFF ACTION: The Open Space staff will proceed unless directed otherwise and stick with our standard practice and not allow the exclusive use of the trail by the Ride. We have heard that along with the 2,®00 registered cyclists, another 2,000 unregistered "ghost riders" can be expected to ride along with the tour. Staff feels that this number of cyclists on this particular portion of the Rio Grande Trail will make public access to and use of the trail difficult and/or impossible during this event which, for all intents and purposes, renders the trail closed. The Open Space Board has carefully considered this, and has directed that staff stick with its position. However, if the BOCC feel strongly that we should change our current practice, we would like an opportunity to discuss in advance of our receipt of the RTR permit. ®~®~~~ Page 1 of 1 From: Mike Hermes [mhermes@rfta.com] Sent: Tuesday, April 03, 2007 1:38 PM To: Michael Kraemer Cc: Dan Blankenship; Renee Black Mike, I am planning to attend tomorrow at least far later in the day. an hour or so. I have meeting down valley My questions 1. Is Pitkin county going to allow ride the Rockies to use the Rio Grande bike trail. 2. I have questions about them using the RFTA portion the trail ranging from safety to 0mpact on casual users, clean up, staging ect. I will be discussing this with my board on April 12th and we will be deciding if we want to allow rice the Rockies to use the RFTA portion of the Rio Grande trail. Regards, Michael Hermes Director of Properties and Trails Roaring Fork Transportation Authority (970) 384-4973 f~0~039 file://C:1Planning MemoslSpecial EventslRide the RockieslRFTA RTRcomments.htm 4/4/2007 AGENDA ITEM SUMMARY WORK SESSION DATE: AGENDA ITEM TITLE: STAFF RESPONSIBLE: DESCRIPTION OF ISSUE: April 17, 2007 Ride the Rockies, Special Event Mike Kraemer, Planner Background: The Ride the Rockies Special Event application has been submitted and is being reviewed by the Community Development Department. The portions of the Ride that have been proposed within Pitkin County are on June 21 where 2,000 bicyclists and "x" number of additional non-registered riders will ride from Glenwood to Aspen from approximately 7:30AM - 1:30PM. On June 22 the Ride will cross Independence Pass and continue on. Issue: The issue at hand stems from an Open Space and Trails (OST) recommendation and initial concurrence by the BOCC to not allow Ride the Rockies to utilize the Rio Grande Trail from Emma to Lower River Road. The MOI (Attachment A) from Keith Berglund of OST outlines reasons for non-use of the Trail and the email from Barb D'Autrechy (Attachment B) states BOCC support of the OST recommendation. As a result of the non- approved use of the Trail the event route will utilize Hwy 82 from Emma to Lower River Road, crossing the Hwy at the Old Snowmass Conoco intersection. The Applicant has also requested to utilize portions of the Rio Grande Trail that are under RFTA jurisdiction. The proposal is scheduled before the RFTA Board on Thursday April 12th, 2007. The Special Events Committee convened on April 4, 2007 to discuss the Ride the Rockies Special Event proposal with Paul Balaguer, the Event Coordinator. The MOI was brought to the attention of the Special Events Committee. The Special Events Committee acknowledges the position of OST and the BOCC, but feels that many riders on Hwy 82 is a safety concern, specifically the Hwy crossing at the Snowmass Conoco intersection. From alife/safety perspective, the Special Events Committee supports use of the trail from Emma to Lower River Road. Scott Thompson of the Basalt and Rural Fire District and chair of the Public Safety Council also submitted a letter acknowledging the hazard of crossing Hwy 82 on to Lower River Road. Thompson's letter can be viewed as Attachment C. RECOMMENDED BOCC ACTION: Staff recommends the BOCC consider the above mentioned concern of the Special Events Committee and, if deemed appropriate, amend their position regarding Rio Grande Trail use. ATTACHMENTS: A. MOI from OST B. Email from D'Autrechy C. Letter from Thompson. ®~®U~~ ,~~'.. ~~G~s--~~~.~ ~/ DDS ~~Sv~"~~~- ~1~~lC F1® ..i~1.SU2~~lc E ~A~~. G.~rGC. ex~rJ YgcC..~ Y t/~~~~ ~-- ~ ~ C, ~~Ir/®ecJnf~~S ~~cqG ~s~ ~D~ ~~~ ~~~. S~~G~~ L ~ ~~~ ; `~' lJ ON r c.c ~ r cz 7-cr ,~ L iv ~v~cl~ ,~j~ l~ ~. ~GJ ~ S L {~ +~ c~Cl - ovoo~~. Cc~~or~~~ S ~- s~va2~2! 7% G~ Lo~D~;-1o~~ MEMORANDUM OF INTEREST T®: Board of County Commissioners FROM: Keith Berglund, Pitkin County Open Space and Trails ~~ Ride The Rockies event on the Rio Grande Trail DATE: March 13, 2007 DESCRIPTION OF ISSUE: Open Space and Trails has a long standing practice of not approving special events that would require a trail to be closed to the general public. This practice will be put to the test in June. The Denver Post Ride The Rockies is an annual bicycle tour that takes 2,000 cyclists on a 6-7 day ride on paved roads through Colorado's Rocky Mountains each June. The 2007 route will have the riders pedaling from Glenwood Springs to Aspen on June 21. The event organizers would like to utilize the Rio Grande Trail from Carbondale to Lower River Road. Because of the number of cyclists, they do not normally use recreational paths unless there is a compelling reason to do so. In this case, they feel that 2000 riders on the Rio Grande Trail would be safer than riding along CO 82 and making the left turn at Lower River Road. The section of the Rio Grande Trail within Pitkin County that the event would like to utilize is from Emma to Lower River Road. The event organizers are currently working with Community Development on their Special Event permit application. Additionally, they are working with the Roaring Fork Transit Authority to obtain permission to use the portion of the Rio Grande Trail from Carbondale to Emma. RECOMMENDED STAFF ACTION: The Open Space staff will proceed unless directed otherwise and stick with our standard practice and not allow the exclusive use of the trail by the Ride. We have heard that along with the 2,000 registered cyclists, another 2,000 unregistered "ghost riders" can be expected to ride along with the tour. Staff feels that this number of cyclists on this particular portion of the Rio Grande Trail will make public access to and use of the trail difficult and/or impossible during this event which, for all intents and purposes, renders the trail closed. The Open Space Board has carefully considered this, and has directed that staff stick with its position. However, if the BOCC feel strongly that we should change our current practice, we would like an opportunity to discuss in advance of our receipt of the RTR permit. ®®~'~~ Director Paul Balaguer Colorado Ride the Rockies Dear Paul: April 10, 2007 I am writing you in response to the decision by local trail directors to recommend to not allow the use of the public trails for your event. This response deeply troubles me since I strongly believe that even though there may be impact to the system, the alternative of using it for your event could very well save a life. As a medical responder and law enforcement officer, I find that placing your participants in a position of needlessly crossing Highway 82 to be completely unacceptable. As public officials, we have an alternative at our disposal that could keep participants safely away from Highway 82 from Emma to Lower River Road. I wholeheartedly believe that it is in everyone's best interest that this route should be utilized. I have complete confidence that your organization has the means and ability to mitigate issues related to the use of these trails for this event. I will be in attendance during the scheduled Commissioner Work Session concerning this issue and will fully support utilizing the public bike path for this event. Sincerely: Sent via E-mail Scott Thompson Basalt Fire Chief Chair, Pitkin County Public Safety Council. OOf~f~~~ Page 1 of 1 From: Barb D' Autrechy Sent: Tuesday, Apri103, 2007 11:15 AM B'o: Michael Kraemer Ce: Gary Tenneribaum Subject: RE: Bikin' in Pit Co Attachments: MOI RidetheRockies2007.doc Mike: Unfortunately, no one from OST can make the meeting (sorry). Attached, please find a memo that OST sent to BOCC. The BOCC agreed with the recommendations put forth in this memo at their 3/13/07 with the Open Space Board. Please contact Gary if you have any questions. Thanks. Barb D'Autrechy ___...._._..__. __.__M____.....____ ___. _~..__.~..~___...._._. From: Michael Kraemer Sent: Tuesday, April 03, 2007 10:16 AM To: Ellen Anderson; Tom Grady; Ed Van Walraven; Carla Ostberg; Barb D' Autrechy; 'ballred@fs.fed.us'; 'richard.duran@cdps.state.co.us'; 'jamesl@basalt.net'; Gerald Fielding; 'Dan Blankenship'; Brian Pettet; Temple Glassier; 'csams@aspenkl2.net' Cc: 'Balaguer, Paul'; Kathryn Koch; Nancy Lesley Subject: Bikin' in Pit Co Hello All, Just a reminder that we are meeting with Paul Balaguer tomorrow, Apnl_4_th from.__1:30 .until 3:00_at the.._Plaza.._1 Meeting Room. for the Ride the Rockies Special Event Committee meeting to go over his proposal. Again here is the link to the application: http://www.as~enpitkin.com/ dfs/depts/7/landuse...pdf Sorry no refreshments or eats so bring your own. If you cannot make it and have concerns or issues that you would like to express please submit them to me via email at least 2 hours before the meeting so I can bring them to Paul's attention. Thanks Everyone, Mike Mike Kraemer Planner Community Development Department Pitkin County 130 S. Galena Street Aspen, CO 81611 970.920.5526(phone) 970.920.5439(fax) michaelkCa~co.oitkin.co. us file://C:\Planning MemoslSpecial EventslRide the RockieslOST email.htm - 4/17/2007 1 - .,~ ~ g COIVIMUNITY DEVELOPMENT DEPARTMENT 130 South Galena Street` ', Aspen, Colorado 8`1611 `I (970) 920=5526 j Pitkn County Land'Use: 172 Board of Adjustment 159 County Land Use Code 174 Flat Fee ~ '~ ~ 162 Zoning and Sign 169 Public Notice+ 160 Planning. Enforcement j 175 Hearing Officer 'i Referral. Fees: 1 210 Airport LUCO 1 County Clerk 211 County Engineer 194 Environmental Health l 1 208 Historic 198 Housing. 190 Land Management i 209 Redstone HPC 206 Wildlife Officer Building. Fees: ~ 170 Board of Appeals ' 105 Building Permit. 120 Electrical Permit 195 Energy Code Review 115 Mechanical Permit 150 Plan Check 110 Plumbing: Permit { 130 Reinspection - 152 AVFD Fire Marshal 158 BFD Fire Marshal Other Fees: 155 Use Tax 165 Copy PZ005 Master Plan Copy ~) 185 ~ Park Dedication ~'1< IS GIS Requirements v~('1 161 Housing Impact Fee ~~~ B 1202 Road Impact Fee ~v `+ B1203 School Impact Fee /~ t 'TOTAL. _ .: ;~ z NAME` r n ,., ~ ~.,. `i ADDRESS/.PROJECT: i ~~ ~ . . PHONE: CHECK# ° s= . i .~" , . ~ ~ ' ~ '~ ~I CASE/PERMIT#: ~ ~ ' f INITIAL: ~ DATE: . ~ F