Paul Krausch;aved that the following be adopted:
BEFORE THE BOARD OF ADJUSTMENT
OF THE COUNTY OFPITKIN
STATE OF COLORADO
RESOLUTION NO. 84-28
Ronald Harris, Lot 8, Block 5, Knollwood Subdivision
WHEREAS, the subject property is within the unincorporated area of Pitkin
County, Colorado; and,
WHEREAS, the Board of Adjustment is vested with the power to grant or deny
such variances by virtue of Title II; Section 16-1.,3, Pitkin County Code
(Land Use Code) and Colorado Revised Statutes, 1973, 30-?.8-118(2) (C); and,
WHEREAS, based on the evidence presented, the Board of Adjustment makes the
following findings:
1. Proper notice procedures, including the notification of all adjoining
property owners, has been shown by the applicant.
2. The required hardship or practical difficulty has been established.
3. Granting such relief will not cause substantial detriment to the
public welfare and will not substantially impair the intent and
purpose of the Zoning Resolutions and the zoning maps.
NOW, THEREFORE, AE ZT RESOLVED that the applicant's request for a
variance to exceed his F.A.R. by 80 sq.ft. for an addition
Additional conditions or restrictions:
WARNING: Any violation of the terms of this resolution may result in rehearing
and possible revocation.
Peter Dobrovolnyseconded the adoption of the foregoing Resolution. The roll
having been called, the vote was as follows:
Dottie Fox - yes Peter Dobrovolny - yes
Paul Krausch - yes
Joe Zanin - yes
The Resolution was adopted by vote of the Board of Adjustment of the County
of Pitkin, State of Colorado.
DATED: July 17, 1984
Attest:
IlC~~ALU OG~~x
Sacr tart'
The Board of Adjustment of Pitkin
County, (COl~',or~a/do
«, l/ Chairman ~nnn!`1
~~I„~s'J
_' • ,BOARD OF ADJUSTMENT .
DATE 3 July 19 84 CASE# ~Y- a-~
APPLICANT Hagman Yaw Architects, Ltd ADDRESS
OWNER Ronald Harris ADDRESS E-1215 1st National Bank
332 Minnesota Street
St. Paul, Minnesota 55101
LOCATION OF PROPERTY LOt 8 Knollwood - Rlcsrk ~
Pitkih County, Colorado
Any pertinent, data must accompany this application, and will be made part of
this .Case No.
The Soarfl may return this application if it :does not contain all 'the facts
in question. Applicant's description of proposed variance showing
justification:,
Mr. Ron Harris 'has recently purchased an existing single family residence located
on Lot 8, Knollwood Subdivision. His purchase was, in part, based on the
square footage notation on the as-built working drawings which indicated a total
floor area below. the allowable F.A.R. (0.16 to ,1). Upon examination, it was
determined that the residence was, in fact, in excess of the aNowable F.A.R.
Mr. Harris wishes variance to construct an 80 sq. ft. bathroom space to the house.
In addition to other physical alterations. planned-for the interior, we will be
deleting t28 sq. ft. of existing space, thus the resulting floor area will be less
than exists. We appreciate your consideration for variance in .this case.
' Applicant Signature
Larry YaW for Ronald rri
Provisions of"the zoning resolution; requiring .the Building Inspector to,
forward this .application to the Board of Adjustment and reason for not
granting a buding;permit:
~>~
_ ,~i~,,.,cQ~!
luilding Inspector~a~ /
p~a~
Date Permit reTectede
Application filed
Board decision
Date
Mailed
Secretary Board of Ad ustment
I ..+
Adjacent Property Owners
Lot 8, Block 5 -Harris
K nol l wood
Lots 7 E 9, Block 5
R.G.B. Construction Co.
222 South Bemiston
Clayton, Missouri 63105
Lot 52, Mt. Valley 2nd Filing
Miller, Jack S. DeBlois, Amelie Z.
Box 4285 Box 11656
Aspen, Colorado 81612 Aspen, Colorado 81612
Basler, Erwin J. and Helen V. Thomasen, Harry G.
2901 Highland Drive Thomasen, J.F.
Northbrook, Illinois 60062 No. 7
Collins Island, Balboa Island, CA 82662
Lot 20, First Filing
Heyman, Juliane M.
653 Cieneguitas
Santa Barbara, California 93110
~i~nni~
~,r t y V 'ls J
,~
RECORD OF PROCEEDINGS 100 Leaves
u c. r, eoa[a ,. e. a c. co.
BOARD OF ADJUSTMENT
PITKIN COUNTY
JULY 17, 1984
Members Present: Dottie Fox, Acting Chairperson
Paul Krauach
Joe Zanin
Alternates: Peter Dobrovolny
Fox called the Special Meeting of the Pitkin County Board of Adjustment to
order. There were no minutes from the last meeting at this time.
Ron A. Timroth 84-25
3687 E. Sopris Creek Road, requesting a height variance for construction
of a garage. Fox informed the Board that Timroth was in an RS-30 zone
which allows a 12' height half-way between the ridge and the eave of the.
building, not to exceed 17' at the top of the ridge. She questioned Timroth
as to what he was proposing to do. He explained that he built the garage
into a hill. The existing garage has a slope ramp that exceeds 3-1/2 feet
over a pad distance of approximately 10', so that in the wihter time he
either slides into the garage or he can't get out of the garage. The
new garage is located on the other side of the drive, up-hill, and it
was necessary that it was built into the side of the slope, The roof
line of his existing residence has a 9-12 pitch, ao he put the same pitch
on his garage which raises his height on the south aide. He measured and
found that the total height now Sa 19', which means that he is requesting
a 2' height variance. If he lowered the roofline, then the eave would hit
the ground.
Fox questioned if this was a proposed. structure. Timroth stated that that
was correct. Fox then questioned if the structure was not built at this time.
Timroth stated that it was built. He explained that due to a series of events
with communication with the Building Department, he started to work without
a building permit. He stated that a stop work order was placed on the structure.
He then made application but continued the construction of the garage without
following up on the permit ar picking the permit up. He stated that it was
not finished, but the walls and roof was up.
Zanin requested that the members look at the plans for the garage to see
how the design and height were drawn. Timroth gave them a brief discription
of the. submitted plans. Krauach stated that he was reviewing the situation
without letting the issue of it being built already. Fox pointed out that
on the application it was stated as being a proposed structure. Dobrovolny
didn't have a problem with the garage, feeling that it blended well with
the residence, but could not see the hardship that was involved.
Timroth stated that with a creek on one side and a road on the other aide,
he was cramped for apace. He stated that he could not widen the driveway
and build another garage without pushing it into the County Road. Krauach
questioned if a roof with less pitch wouldn't solve the problem. Timroth
stated that a different pitch would not correspond with his residence and
also he had had bad luck in the past with a 6/12 pitch. If he was not
allowed the variance he would not have the garage.
_,
RECO~tD OF PROCEEDINGS 100 Leaves
C. i. x0[C [Fl e. 9 t, CO.
July 17, 1984 Board of Adjustment Page 2
Fox questioned Bill Drueding, Building Department Zoning Officer, what the
next step would be if the variance was denied.. Drueding stated that Timroth
would be requested to rear off the present roof and bring in plans for
a roof that would conform to code.
Zanin questioned if there was a legitimate hardship involved in this
request. Dobrovolny and Fox agreed that there was not a hardship. Fox
explained to Timroth what hardships the Board could work with when granting
a variance.
Krausch moved to deny the request €or a height variance on the grounds that
there was not a hardship. Dobrovolny second the motion. A vote was taken
and all were in favor.
John R. & Pat R. Zollinger, Lot 33, Swiss Village 84-26
requesting a 7.5' sideyard setback variance and a 9' rearyatd setback
variance for construction of a garage. Fox explained to the Board that
the area is zoned R-15, with setback requirements of 30' front, 10' from
the sides and rear.
Mr. Parker was there to represent the Zollingers. Fox questioned if there
was any other location on the property where the garage could be placed..
Parker explained that the entry to the lot was the only reasonable entry
due to the slope of the lot. He pointed out various features of the lot.
The Board determined that the actual variances needed were from the side
and front. Parker pointed out a gully located on the property and explained
that the proposed location for the garage would be hidden from view for
the most part. There was a copy of a letter from the homepwners that feel
the proposed structure was ok. Zanin moved to grant a 7-1/2' sideyard setback
variance and a 29' frontyard setback variance due to topographical hardship
and the placement of the septic system. Krausch wondered if the structure
could be pushed back from the frontyard. Parker stated that that would
make the structure closer to the septic system. Krausch second the motion.
A vote was called for and all were in favor.
Stephen Chefan 84-27
Lot 102, Starwood 14, requesting a 20' frontyard setback variance for
construction of a new residence. Fox explained to the Board members that
the property is zoned AF-1, with a frontyard setback requirement of 100',
side and rearyard setbacks are 30'. Jon Seigle was there to represent
the owner. He explained that Starwood designated the building site when
it was first platted, but zoning changed after that. After deducting the
required setbacks there was no lot left. Starwood agreed to relocate
the building site. Seigle had a topo map of the property to present to
the Board members. He pointed out the new designated building site.
The access was then changed to Epply Drive. He also pointed out the
Red Mountain Ditch that ran along the property. He felt without a
variance the lot would be unbuildable. Dobrovolny felt that a house
could be designed to fit within the setbacks. Siegle explained that
they owner was trying to stay away from Stein's property. Fox stated
that David Dominique contacted Bill Mason and expressed Marge Stein's
concern that the house not come further down the property. Seigle felt
that the topography of the lot, the presence of the Red Mountain Ditch
and the fact that there is a lot of precedent from the Board for granting
variance in Starwood, it was an appropriate request.
RECORD OF PROCEEDINGS 100 Leaves
Y N C. I. MO[CY.LL L. L. 1 L L0.
July 17, 1984 Board of Ad~uatment Page 3
Seigle pointed out the location of Epply Drive and stated that the rational
for the frontyard setback was to get the house away from the front road.
Fox felt that a redesigned structure could fit dnto the setbacks. Krausch
agreed. Dobrovolny agreed also. Seigle explained to the Board that the
Starwood Homeowners Association had been consulted several times to agree
on a design, and felt that the design was blending in conai'stent with the
neighborhood and had shown legitimate hardship. He pointed out that it
was a 3 acre lot.
Krausch stated that in past times the Board had requested that Che house
be redesigned to fit the building envelope. Seigle pointed out that in his
past experiences with Starwood requests, the variances had been granted.
He felt that there had always been a solution possible and .the Board was
there to help compromise. Fox questioned why the situation wasn't dealt'.
with at the architectural level instead of encroaching into the setbacks and
then coming before the Board. Seigle stated there was some confusion at
the time that the architects met with the Building Department. The exit/entrance
to the lot had been in question at the time. Krausch was solid in his feeling
that the house could have been designed to fit the lot. Ted Guy explained to
the Board that the. architects misunderstood the issue about frontyard being
the side that access is taken from. ' Seigle felt that the land use code as
sold had inadequate information in it. Drueding questioned where the
confusion stemmed from if the access was changed after the conversation with
the Building Department.
Ted Guy pointed out the various difficulties if the house had to be turned
to fit around all the topographical areas on the lot. Seigle stated that
much attention was given to positioning the house in the interest of the
neighbors. Drueding•,~stated that confusion was possible with the way the
land use code is worded regarding the frontyard of property.. Zanin could
see the problem. Fox agreed that there were many issues that an out-of-town
architect could be confused by. Dobrovolny pointed out that if the
historical access had been used there would be no problems and the resulting
damage to the hillside if that access had been used would be horrible.
Krausch moved to approve the variance based on the topographical hardships.
Zanin second the motion. A vote was called for and all were in favor.
Ronald Harris 84-28
Lot 8, Block 5, Knollwood, requesting a variance from his present F.A.R.
requirement. Fox explained to the Board members that the house was
existing in Knollwood Subdivision. The request was for an 80 aq.ft.
addition of a bath, with a deletion of 128 sq.ft. of existing space.
Larry Yaw was there to represent owner. The house was built within
the F.A.R. but prior to the inclusion in the F.A.R. code that subgrade
space counted. He pointed out that the basement was subgrade and did not
meet the ventilation requirements set forth by the code. Yaw stated that
at the time the residence was built the F.A.R. was below allowable F.A.R.
by 97 sq.ft. The owner will be moving to the area permanently and needs
the expansion of the bathroom. .Fox needed clarification regarding the
deletion of the 128 sq.ft. Yaw stated that the ceiling would be opened
up, somewhat like removing a floor. Yaw felt the hardship was due to the
fact that the basement was of no use in a'code sense.
_-
RECORD OF-PROCEEDINGS 100 Leaves
+ x c. r. xo¢xn r. a. s v. ca
July 17, 1984 Board of Adjustment Fage 4
Yaw gave a description of the house and the changes they were planning to
make. Yaw emphasized that the addition could be done without a problem.
under the prior zoning. Yaw stated that they still needed to get approval
from the Homeowners Association. Krausch questioned the hardship involved.
Yaw felt that while the basement is counted in the F.A.R., it is unusable
except for storage. Dobrovolny felt that if the definition of F.A.R. had
changed since the construction of the residence it would be classified as
downzoning. Bill Drueding, from the Building Department, questioned what
would deter the basement from being excavated out and being. renovated into
living space. Yaw stated that it would have to be brought. before the Board'
again. Drueding stated that it would not because it was already counted:
Krausch suggested that a condition might be placed on the motion. Fox agreed
with that suggestion. There was a discussion as to what type of condition
should be placed on the motion. Drueding. suggested that the condition be
recorded so that during a title search it would be discovered. Krausch wondered
if it was fair to take away an owner's right to build 2500 sq.ft. of house
in return for 80 sq.ft. Yaw stated that in order to make the space habitable
a series of several things would have to 'occur. Fox questioned if the Building
Department had control to the point not to let the house be expanded into a
duplex in the future. Drueding did not feel that they did. He also pointed
out that the renovations would be decreasing the non-conformity of the structure
which would be allowed in the City.
Krausch moved to grant the variance due to changes in the F,A.R. definition.
Dobrovolny second the motion. A vote was called for and all were in favor.
Respectfully submitted,
{{i /
/l_G r'~J~ r~. /77
~~u~ ~ `
~j Chairman
.Scanned 9/.19/07
File Finders Box
#11
LARGE PLAT(S)
AVAILABLE TO VIEW AT
COMMUNITY DEVELOPMENT
AVAILABLE TO BUY AT
CLERK & RECORDER