Loading...
HomeMy WebLinkAboutbocc.res.206.2000 RESOLUTION OF THE BOARD OF COUNTY COMMISSIONERS OF PITKIN COUNTY,COLORADO,GRANTING APPROVAL TO THE IVES SPECIAL REVIEW FOR A TELECOMMUNICATIONS SITE AND 1041 HAZARD REVIEW Resolution No,&-2000 RECITALS 1. Voice Stream Wireless ("Applicant")has applied to the BOCC for approval of a building envelope,which will contain a telecommunications base structure and tower. 2. The property is located at 2147 Lower River Road and is described as Tract 8 of Aspen River Valley Ranch. 3. The property is zoned AFR-10 and contains approximately 14.26 acres. The property is conforming in size and contains an existing residence. 4. The property was granted 1041 Hazard Review approval on April 19, 1988 pursuant to Resolution No. 88-13. 5. The Planning and Zoning Commission heard this application at a duly noticed public hearing on August 1, 2000, at which time evidence and testimony were presented with respect to this application. 6. The BOCC finds that the proposed telecommunications facility is appropriate and does not have any substantial visual impacts on the surrounding area. 7. The BOCC finds that the proposal is consistent with applicable master plans and the Special Review Criteria in Land Use Code Section 3-210. 8. The BOCC further finds that the proposed base structure and tower avoid wildlife habitat and wildfire hazard areas. NOW, THEREFORE,BE IT RESOLVED by the Board of County Commissioners that it hereby grants approval to the Ives Special Review for a Telecommunications Site and 1041 Hazard Review, subject to the following conditions,which shall run with the land and be binding on all successors in interest. 1. The Applicant shall adhere to all material representations made in the application and public meetings. 2. All previous conditions of approval on the property pursuant to Resolution No. 81-5 and 88-13 shall remain in effect unless modified by terms of this approval. 11111111111111111111111111111 IN 111111111111111111 IN 449203 11/28/2000 11:17A RESOLUTI DAVIS SILVI 1 of 4 R 0.00 D 0.00 N 0.00 PITKIN COUNTY CO Resolution No)44_-2000 Page 2 3. The approved tower and all antennas shall not exceed 25 feet in height and shall receive Board of Adjustment approval if required prior to building permit submission. 4. The tower shall be painted in an earth-tone color which blends with the surrounding background. The color shall be approved by planning staff prior to building permit application. 5. The building envelope shall be defined by the approved fence structure that surrounds the facility. The square footage of the building envelope shall not exceed 300 square feet. The building envelope shall avoid any approved easement on the property unless deemed an allowed use in the easement. 6. All structures associated with the telecommunication use shall be removed when the lease expires or when the use ceases. 7. The applicant shall provide a radio frequency radiation(RFR) study to the Pitkin County Communications Engineer for review and approval prior to building permit application. 8. The applicant shall conduct annual RFR site assessments with grid measurements available to Pitkin County and the Communications Engineer. 9. Access shall be provided to Pitkin County to conduct an independent RFR study to ensure that the applicant is operating within the FCC's Maximum Permissible Exposure(MPE) standards. 10. Within 60 days of the date of this approval, the Applicant shall record a 24 X 36 inch mylar 1041 Hazard Review Site Plan in accordance to Section 5-70-040 of the Land Use Code. The site plan shall also be submitted in digital format for integration in to the County Geographic Information System(GIS). 11. No development shall be permitted outside the building envelope except for access, reclamation, and landscaping as shown on the approved site plan. 12. The owner shall grant a leased access easement to the benefit of the Applicant which shall be recorded with the Pitkin County Clerk and Recorder's Office prior to building permit application. 13. There shall be no exterior lighting associated with the telecommunications facility. 14. Site development/construction shall not occur from December 1 through March 31. 15. No dogs are allowed on site by construction workers. Ililll IIIII III III IIIIII IIIII IIII IIIIII III"III IIII II!I 449204 110.00 000.00:N10.00SPITKIN COUNTY CO 2 of Resolution No�-2000 Page 3 16. A weed control program shall be established and implemented at the development site and along the access road leading to the site. The program shall be approved by the Land Management Office prior to building permit application. 17. Access to the site shall be limited from December 1 through March 31 to no more than one trip per month or for emergencies only. Access to the site should be restricted during this period from 10:00 a.m. to 3:00 p.m. 18. Small trees and shrubs (pinon juniper, serviceberry, oakbrush) shall be planted on the uphill side of the building envelope. A landscape plan shall be approved by the planning staff prior to building permit application. 19. Property owner shall be made aware of violations of active protective covenants if applicable. 20. Statutory vested rights for the approval contained herein are granted pursuant to the Pitkin County Land Use Code and Colorado Statutes, subject to the exceptions set forth in the Pitkin County Land Use Code § 4-140 and C.R.S., § 24-68-105. The statutory vested rights granted herein shall expire on September 27, 2003. 21. This approval shall expire after five years on October 25, 2005. The applicant is required to submit an application for extension of this permit no later than October 25, 2004 if an extension is desired. IIIIII IIIII 1111111111111111111 IN 111111111111111111 IN 449203 11/28/2000 11:17A RESOLUTI DAVIS SILVI 3 of 4 R 0.00 D 0.00 N 0.00 PITKIN COUNTY CO Resolution No,,V6-2000 Page 4 NOTICE OF THE PUBLIC HEARING PUBLISHED IN THE ASPEN TIMES WEEKLY ON THE 26th DAY OF AUGUST 2000. APPROVED ON THE 25TH DAY OF OCTOBER 2000. PUBLISHED AFTER ADOPTION FOR VESTED REAL PROPERTY RIGHTS IN THE ASPEN TIMES WEEKLY ON Nt)V, 24W ATTEST: BOARD OF COUNTY COMMISSIOERS, PITKIN COUNTY, COLORADO ��� R., 4 L dee p.. Dean Shefry Roy Harper, Clerk to the BOCC Chairperson Date: 11 • 2.1 ' APPROVED AS TO FORM: APPROVED AS TO CONTENT: John lyeCMdy Houben, �ziity Attorney Community Development Director Case#P77-00 246725300021 111111III111111111IIII 11 1A IIIIIIIIIIIIIIIII11; RESOLUTI DAYiS SILYI IIIIIII1111/28/2000 . g4of04 It 0.00 D 0.00 N 0.00 PITKIN COUNTY CO